IR 05000250-13-403 and 05000251-13-403; 02/4/2013 - 02/8/2013; Turkey Point Nuclear Plant, Units 3 and 4; Security (Cover Letter) - OUO Removed
ML13056A507
Person / Time
Site: Turkey Point  
Issue date: 02/25/2013
From: Binoy Desai
NRC/RGN-II/DRS/PSB2
To: Nazar M
Florida Power & Light Co
References
IR-13-403
Download: ML13056A507 (4)


Text

February 25, 2013

SUBJECT:

TURKEY POINT NUCLEAR PLANT - NRC PHYSICAL SECURITY INSPECTION REPORT 05000250/2013403 AND 05000251/2013403

Dear Mr. Nazar:

On February 8, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Turkey Point Nuclear Plant, Units 3 and 4. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed Inspection Report documents the inspection results, which were discussed on February 8, 2013, with Mr. E. McCartney and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings were identified during this inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Binoy Desai, Chief

Plant Support Branch 2

Division of Reactor Safety

Docket No.

50-250, 50-251 License No. DPR-31, DRP-41

Enclosure:

Inspection Report 05000250/2013403 and 05000251/2013403 w/Attachment: Supp. Info (OUO)

cc w/encl.: (See page 3)

ML13056A507 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRS/PSB2 RII: DRS/PSB2 RII: DRS/PSB2 RII: DRP RII: DRS/PSB2 SIGNATURE

/RA/

/RA/

/RA/

/RA/

/RA/

/RA/

NAME J. Shehee A. Richardson K. Davis B. Desai D. Rich B. Desai DATE 2/22/2013 2/22/2013 2/20/2013 2/21/2013 2/22/2013 2/25/2013 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO 3 cc:

Michael Kiley Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344th Street Florida City, FL 33035

Robert J. Tomonto Licensing Manager Turkey Point Nuclear Plant Florida Power & Light Company 9762 SW 344th Street Florida City, FL 33035