Letter Sequence Response to RAI |
---|
|
|
MONTHYEARML12275A0132012-09-27027 September 2012 River Bend Station Unit 1 & Waterford 3 Steam Electric Station, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments Project stage: Request CNRO-2012-00007, Grand Gulf Nuclear Station & Waterford 3 Steam Electric Station Status of Decommissioning Funding - Entergy Operations, Inc2012-10-15015 October 2012 Grand Gulf Nuclear Station & Waterford 3 Steam Electric Station Status of Decommissioning Funding - Entergy Operations, Inc Project stage: Request ML12311A1342012-11-0505 November 2012 Entergy Fleet and ISFSI-Acceptance Review Email, Direct License Transfer and Conforming Amendments for Arkansas Nuclear Units 1 & 2; Grand Gulf Unit 1, and Grand Gulf Early Site Permit; Indirect License Transfer for River Bend and Waterford Project stage: Acceptance Review ML12325A3342012-12-21021 December 2012 FRN, Notice of Consideration of Approval of Indirect and Direct Transfer for Facility Operating License and Opportunity for a Hearing Project stage: Other ML12325A2782012-12-21021 December 2012 Letter, Notice of Consideration of Approval of Indirect and Direct Transfer for Facility Operating License and Conforming Amendment, and Opportunity for a Hearing Project stage: Other ML12325A2802012-12-21021 December 2012 FRN, Notice of Consideration of Approval of Indirect and Direct Transfer for Facility Operating License and Conforming Amendment, and Opportunity for a Hearing Project stage: Other ML12325A4312012-12-21021 December 2012 FRN, Notice of Consideration of Approval of Indirect and Direct Transfer for Facility Operating Licenses and Conforming Amendments, and Opportunity for a Hearing Project stage: Other ML12325A4182012-12-21021 December 2012 Letter, Notice of Consideration of Approval of Indirect and Direct Transfer for Facility Operating Licenses and Conforming Amendments, and Opportunity for a Hearing Project stage: Other ML12325A3212012-12-21021 December 2012 Letter, Notice of Consideration of Approval of Indirect and Direct Transfer of Facility Operating License and Opportunity for a Hearing Project stage: Other ML12325A3942012-12-21021 December 2012 FRN, Notice of Consideration of Approval of Indirect and Direct Transfer for Facility Operating License and Opportunity for a Hearing Project stage: Other ML12325A3872012-12-21021 December 2012 Letter, Notice of Consideration of Approval of Indirect and Direct Transfer for Facility Operating License and Opportunity for a Hearing Project stage: Other ML13023A3282013-01-23023 January 2013 Entergy Fleet and ISFSI-Request for Additional Information Email, Indirect and Direct License Transfer Sand Conforming Amendments for Arkansas Nuclear One 1 and 2; Grand Gulf 1 and Early Site Permit; River Bend 1, and Waterford 3 (TAC ME970 Project stage: RAI ML13030A2632013-01-23023 January 2013 Entergy Fleet and ISFSI-Request for Additional Information Email, Indirect and Direct License Transfer Sand Conforming Amendments for Arkansas Nuclear One 1 and 2; Grand Gulf 1 and Early Site Permit; River Bend 1, and Waterford 3 (TAC Nos. Project stage: RAI CNRO-2013-00002, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-01-29029 January 2013 Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments Project stage: Response to RAI ML13044A0112013-01-31031 January 2013 Comment (1) of Mark Sokolow on Proposed Rules, Regulations or Agency Actions on Grand Gulf Early Site Permit Project stage: Request ML13058A6242013-02-27027 February 2013 ESP Site - Email Response to Public Comment from Mark Sokolow on Notice of Consideration of Approval of Indirect/Direct Transfer of Operating License and Conforming Amendment, and Opportunity for a Hearing Published 1/11/13 Project stage: Other CNRO-2013-00008, Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-04-16016 April 2013 Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments Project stage: Request ML13078A2682013-05-0303 May 2013 Order Approving Direct and Indirect Transfer of Facility Operating No. NPF-47 Project stage: Other ML13077A2212013-05-0303 May 2013 Order Approving Transfer of Renewed Facility Operating Nos. DPR-51 and NPF-6, Conforming Amendments and Indirect Transfers Project stage: Other NRC-2012-0319, Order Approving Direct and Indirect Transfer of Facility Operating No. NPF-29 and Conforming Amendment2013-05-0303 May 2013 Order Approving Direct and Indirect Transfer of Facility Operating No. NPF-29 and Conforming Amendment Project stage: Other ML13077A4252013-05-0303 May 2013 Order Approving Direct and Indirect Transfer of Facility Operating No. NPF-29 and Conforming Amendment Project stage: Other NRC-2012-0317, Order Approving Indirect and Direct Transfer of Facility Operating License No. NPF-382013-05-0303 May 2013 Order Approving Indirect and Direct Transfer of Facility Operating License No. NPF-38 Project stage: Other ML13078A3402013-05-0303 May 2013 Order Approving Indirect and Direct Transfer of Facility Operating License No. NPF-38 Project stage: Other ML13077A2372013-05-0303 May 2013 ESP Site; River Bend, Unit 1, and Waterford, Unit 3 - Letter, Orders, Draft Conforming Amendments, and Safety Evaluation; Direct and Indirect Transfer of Licenses Project stage: Draft Approval NRC-2012-0318, Order Approving Direct and Indirect Transfer of Facility Operating No. NPF-472013-05-0303 May 2013 Order Approving Direct and Indirect Transfer of Facility Operating No. NPF-47 Project stage: Other NRC-2012-0320, Order Approving Transfer of Renewed Facility Operating Nos. DPR-51 and NPF-6, Conforming Amendments and Indirect Transfers (TAC Nos. ME9710 and ME9711)2013-05-0303 May 2013 Order Approving Transfer of Renewed Facility Operating Nos. DPR-51 and NPF-6, Conforming Amendments and Indirect Transfers (TAC Nos. ME9710 and ME9711) Project stage: Other 2013-01-23
[Table View] |
|
---|
Category:Letter type:CNRO
MONTHYEARCNRO-2022-00015, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process2022-05-26026 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L CNRO-2021-00002, Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-01-28028 January 2021 Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L CNRO-2020-00023, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2020 Summary2020-12-17017 December 2020 Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2020 Summary CNRO-2020-00021, Response to Request for Additional Information Regarding Relief Requests GG-ISI-020 and RBS-ISI-0192020-11-0909 November 2020 Response to Request for Additional Information Regarding Relief Requests GG-ISI-020 and RBS-ISI-019 CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-08-12012 August 2020 Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) CNRO-2020-00015, Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019)2020-06-0808 June 2020 Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 CNRO-2020-00006, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 22020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 2 CNRO-2020-00008, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process CNRO-2019-00030, Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary2019-12-30030 December 2019 Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary CNRO-2019-00010, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2019-03-28028 March 2019 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2019-00007, Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report2019-03-28028 March 2019 Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report CNRO-2019-00013, Entergy Response to Confirmatory Order EA-17-132/EA-17-1532019-03-21021 March 2019 Entergy Response to Confirmatory Order EA-17-132/EA-17-153 CNRO-2019-00009, Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 22019-03-0707 March 2019 Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2 CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-01-31031 January 2019 Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 CNRO-2018-00051, Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K2018-12-28028 December 2018 Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K CNRO-2018-00039, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J2018-09-27027 September 2018 Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J CNRO-2018-00021, Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Submittal of Joint Plant Access Shared Information Table CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 12017-11-17017 November 2017 Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1 CNRO-2017-00010, Entergy Operations, Inc. - Decommissioning Funding Status Report2017-03-31031 March 2017 Entergy Operations, Inc. - Decommissioning Funding Status Report CNRO-2017-00007, Nuclear Property Damage Insurance (10 CFR 50.54(w)(3))2017-03-30030 March 2017 Nuclear Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2017-00005, and Isfsl - License Amendment Request for Administrative Change to Licensee Name2017-03-29029 March 2017 and Isfsl - License Amendment Request for Administrative Change to Licensee Name CNRO-2016-00023, Request EN-ISI-16-1: Use of Later Edition/Addenda of Amse Section XI Code for ISI Related Activities2016-12-0101 December 2016 Request EN-ISI-16-1: Use of Later Edition/Addenda of Amse Section XI Code for ISI Related Activities CNRO-2016-00017, Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual2016-07-19019 July 2016 Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual CNRO-2016-00016, Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated)2016-06-0202 June 2016 Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated) CNRO-2016-00008, Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2016-03-30030 March 2016 Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2016-00005, Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM)2016-02-25025 February 2016 Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2016-00004, Notice Regarding Acquisition of Title to Leased Interest2016-02-10010 February 2016 Notice Regarding Acquisition of Title to Leased Interest CNRO-2016-00002, Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Secti2016-01-29029 January 2016 Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Section Xl, CNRO-2015-00002, Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 12015-12-0404 December 2015 Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 1 CNRO-2015-00022, Entergy - Relief Request EN-ISI-15-1: Proposed Alternative to Maintain ISI-Related Activities to the 2001 Edition/2003 Addendum of ASME Section Xl Code2015-11-20020 November 2015 Entergy - Relief Request EN-ISI-15-1: Proposed Alternative to Maintain ISI-Related Activities to the 2001 Edition/2003 Addendum of ASME Section Xl Code CNRO-2015-00023, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM)2015-11-0606 November 2015 Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2015-00021, Confirmatory Order - Action H2015-11-0303 November 2015 Confirmatory Order - Action H CNRO-2015-00020, ISFSI and Waterford 3 Steam Electric Station and ISFSI Re Required Notification of Receipt of All Required Regulatory Approvals of the Proposed Transfer Actions and Documentary Evidence of Required Insurance2015-09-23023 September 2015 ISFSI and Waterford 3 Steam Electric Station and ISFSI Re Required Notification of Receipt of All Required Regulatory Approvals of the Proposed Transfer Actions and Documentary Evidence of Required Insurance CNRO-2015-00018, Entergy - Relief Request Number RR EN-15-2 - Proposed Alternative to Use ASME Code Case N-786-1, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, Section XI, Division 1.2015-08-20020 August 2015 Entergy - Relief Request Number RR EN-15-2 - Proposed Alternative to Use ASME Code Case N-786-1, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, Section XI, Division 1. CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D2015-06-0505 June 2015 Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, Division CNRO-2015-00012, Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual2015-04-30030 April 2015 Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual CNRO-2015-00011, Grand Gulf Nuclear Station Unit 1 and Waterford 3 Steam Electric Station Submittal of Decommssioning Funding Status Report for 20142015-03-27027 March 2015 Grand Gulf Nuclear Station Unit 1 and Waterford 3 Steam Electric Station Submittal of Decommssioning Funding Status Report for 2014 CNRO-2015-00010, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2015-03-27027 March 2015 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2015-00003, RBS Security Confirmatory Order - Action C2015-02-0505 February 2015 RBS Security Confirmatory Order - Action C CNRO-2015-00007, ISFSI, Waterford, Unit 3, and ISFSI, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License Amendments2015-01-30030 January 2015 ISFSI, Waterford, Unit 3, and ISFSI, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License Amendments CNRO-2014-00009, Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Operations, Inc., Independent Spent Fuel Storage Installations2014-07-24024 July 2014 Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Operations, Inc., Independent Spent Fuel Storage Installations CNRO-2014-00007, ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments2014-06-10010 June 2014 ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments CNRO-2014-00003, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2014-04-25025 April 2014 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G CNRO-2014-00004, Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/20142014-04-0303 April 2014 Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/2014 CNRO-2014-00001, Completion of Change to the Entergy Quality Assurance Program Manual with Regards of Confirmatory Order EA-11-0962014-02-26026 February 2014 Completion of Change to the Entergy Quality Assurance Program Manual with Regards of Confirmatory Order EA-11-096 CNRO-2013-00011, Notice Regarding Renewal of Lease2013-12-0303 December 2013 Notice Regarding Renewal of Lease 2022-05-26
[Table view] Category:Report
MONTHYEARW3F1-2023-0056, Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242023-12-19019 December 2023 Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1432023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23270B1892023-09-27027 September 2023 Evacuation Time Estimate Study 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 1CAN062302, Enclosure 2: ANO-1 SAR Amendment 31 - Redacted Version2023-06-20020 June 2023 Enclosure 2: ANO-1 SAR Amendment 31 - Redacted Version ML23180A1082023-06-20020 June 2023 ANO Unit 1 SAR Amendment 31, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report ML23088A2172022-12-31031 December 2022 Relief Request for Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 - Technical Report, ANP-4023NP, Revision 0, December 2022 W3F1-2022-0042, SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-06-27027 June 2022 SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days 2CAN022202, Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods2022-02-24024 February 2022 Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods ML22011A2982022-01-11011 January 2022 ANS Evaluation Report W3F1-2021-0064, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 2842021-11-30030 November 2021 Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 284 0CAN102102, Units 1 and 210 CFR 50.71(e) Report Revision 20 of the ANO Fire Hazards Analysis2021-10-0606 October 2021 Units 1 and 210 CFR 50.71(e) Report Revision 20 of the ANO Fire Hazards Analysis CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L W3F1-2021-0050, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt2021-10-0101 October 2021 Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt ML21272A3032021-09-30030 September 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Westinghouse Evinci; Micro-Reactor Tabletop Exercise Report ML21237A0512021-08-25025 August 2021 Follow-on Risk Informed Performance Based Implementation Guidance Needed for Advanced Non-Light Water Reactors ML21081A1922021-06-30030 June 2021 Enclosure - USNRC-CNSC Joint Report Concerning X-Energy's Reactor Pressure Vessel Construction Code Assessment 2CAN062103, Request for Alternative ANO2-PT-003 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping - Fifth Interval2021-06-29029 June 2021 Request for Alternative ANO2-PT-003 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping - Fifth Interval 0CAN052102, Annual 10 CFR 50.46 Report for Calendar Year 2020 Emergency Core Cooling System Evaluation Changes2021-05-10010 May 2021 Annual 10 CFR 50.46 Report for Calendar Year 2020 Emergency Core Cooling System Evaluation Changes GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 20202021-04-19019 April 2021 Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 ML21095A3112021-04-0808 April 2021 RB-2021-02 Exam Report Rev 1 ML21095A311 W3F1-2021-0004, License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual2021-04-0505 April 2021 License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual ML21272A3382021-04-0101 April 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Versatile Test Reactor Ticap Tabletop Exercise Report ML21090A0332021-03-31031 March 2021 Historical Context and Perspective on Allowable Stresses and Design Parameters in ASME Section III, Division 5, Subsection Hb, Subpart B (ANL/AMD-21/1) ML21083A1362021-03-23023 March 2021 Completed Activities ML21083A1442021-03-22022 March 2021 Strategy 6 ML21083A1432021-03-22022 March 2021 Strategy 5 ML21083A1422021-03-22022 March 2021 Strategy 4 ML21083A1412021-03-22022 March 2021 Strategy 3 ML21083A1402021-03-22022 March 2021 Strategy 2 ML21083A1392021-03-22022 March 2021 Strategy 1 ML21083A1382021-03-22022 March 2021 Rulemaking ML21083A1372021-03-22022 March 2021 NEIMA Reporting ML21063A2372021-03-0303 March 2021 RBS 2020 Annual Assessment Letter W3F1-2021-0015, Revised Vendor Oversight Plan Summary - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-01-29029 January 2021 Revised Vendor Oversight Plan Summary - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System ML21014A2672021-01-14014 January 2021 Preapplication Engagement to Optimize Application Reviews January 12 Version - Copy ML21075A2752020-12-22022 December 2020 FAQ 20-06 GGNS Scram - Final Approved ML21075A2672020-10-0909 October 2020 FAQ 20-05 River Bend Uswc - Final Approved W3F1-2020-0038, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2020-07-23023 July 2020 License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System 1CAN032001, Supplemental Information Related to License Amendment Request to Revise Loss of Voltage Relay Allowable Values2020-03-19019 March 2020 Supplemental Information Related to License Amendment Request to Revise Loss of Voltage Relay Allowable Values 0CAN121901, Summary of Lost Specimens Investigation Report2019-12-0303 December 2019 Summary of Lost Specimens Investigation Report RBG-47855, Submittal of Owner'S Activity Report Form for Cycle 202019-08-0808 August 2019 Submittal of Owner'S Activity Report Form for Cycle 20 W3F1-2019-0043, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20182019-07-0101 July 2019 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2018 W3F1-2019-0022, Resubmittal of Reactor Vessel Material Surveillance Program Capsule Test Results2019-03-14014 March 2019 Resubmittal of Reactor Vessel Material Surveillance Program Capsule Test Results ML18275A2342018-12-27027 December 2018 NRC Record of Decision for the License Renewal Application for Waterford, Unit 3 ML18284A3742018-12-20020 December 2018 NRC Record of Decision for the License Renewal Application for River Bend Unit 1 ML18215A1782018-06-30030 June 2018 WCAP-18169-NP, Rev 1, Arkansas Nuclear One Unit 2 Heatup and Cooldown Limit Curves for Normal Operation. RBG-47873, License Renewal Application, Revised Updated Safety Analysis Report Supplement, Appendix a, Section A.4, License Renewal Commitment List, Revised Commitment 52018-06-13013 June 2018 License Renewal Application, Revised Updated Safety Analysis Report Supplement, Appendix a, Section A.4, License Renewal Commitment List, Revised Commitment 5 2023-09-27
[Table view] Category:Administrative
[Table view] |
Text
Entergy Operations, Inc.
Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, New York 10601 Tel 914 272 3370 John F. McCann Vice President - Nuclear Safety, Emergency Planning and Licensing January 29, 2013 CNRO-2013-00002 10 CFR 50.80 10 CFR 52.28 10 CFR 50.92 Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852
SUBJECT:
Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments Arkansas Nuclear One, Units 1 & 2 and ISFSI Docket Nos. 50-313, 50-368, and 72-13 Grand Gulf Nuclear Station, ESP, and ISFSI Docket Nos. 50-416,52-009, and 72-50 River Bend Station Unit 1 and ISFSI Docket Nos. 50-458 and 72-49 Waterford 3 Steam Electric Station and ISFSI Docket Nos. 50-382 and 72-75
Dear Sir or Madam:
By letter dated September 27, 2012, Entergy Operations, Inc. (EOI), acting on behalf of Entergy Arkansas, Inc. (EAI), Entergy Gulf States Louisiana, L.L.C. (EGS-LA), Entergy Louisiana, LLC (ELL) and System Energy Resources, Inc. (SERI) (together, the Applicants, and EAI, EGS-LA, ELL and SERI each being an owner Licensee Entity), as well as their parent companies and itself, requested that the Nuclear Regulatory Commission (NRC) issue an Order approving the transfers of control of the Facility Operating Licenses for Arkansas Nuclear One, Units 1 & 2 (ANO), Grand Gulf Nuclear Station (GGNS), River Bend Station Unit 1 (RBS), and Waterford 3 Steam Electric Station (Waterford) (together, the Facilities), as well as the Early Site Permit (ESP) for GGNS and conforming license amendments for the ANO licenses and GGNS license and ESP. The license transfer approval and conforming amendments are necessary to support a proposed transaction whereby all of the transmission assets of Entergy Corporation (Entergy) in the States of Arkansas, Louisiana, Mississippi, Missouri, and Texas will become owned by ITC Holdings Corp. (ITC) and operated by MISO (Midwest Independent Transmission System Operator, Inc.).
CNRO-2013-00002 Page 2 of 2 On January 23, 2013, the NRC staff conducted a telephone conference to discuss a Request for Additional Information (RAI), which includes four questions regarding the proposed license transfers. The RAI was then provided by e-mail dated January 23, 2013. EOIs response, including answers to the four questions, is provided in the attachment.
This letter contains no new regulatory commitments.
If you have additional questions concerning this license transfer request, please contact Mr. Bryan Ford, Senior Manager, Nuclear Safety and Licensing, at (601) 368-5516.
I declare under penalty of perjury that the foregoing, and the information provided in the attachment, is true and correct; executed on January 29, 2013.
Sincerely, JFM/bsf/ghd/jm
Attachment:
Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments
ATTACHMENT CNRO-2013-00002 RESPONSES TO REQUEST FOR ADDITIONAL INFORMATION REGARDING APPLICATION FOR ORDER APPROVING TRANSFERS OF LICENSES AND CONFORMING LICENSE AND ESP AMENDMENTS
Attachment to CNRO-2013-00002 Page 1 of 7 RESPONSES TO REQUEST FOR ADDITIONAL INFORMATION REGARDING APPLICATION FOR ORDER APPROVING TRANSFERS OF LICENSES AND CONFORMING LICENSE AND ESP AMENDMENTS
RAI 1
Please provide information that states why other NRC licenses held by Entergy Corporation or its subsidiaries are not included in the Entergy Application [for Order Approving Transfers of Licenses and Conforming License and ESP Amendments (September 27, 2012)]. This should be in the form of a simplified organization chart (similar to figure 1 and figure 2 of the application) showing current and post-transfer status. In addition, a declarative statement confirming that the other NRC [li]censes are not involved, and the reason why.
Response
The current ownership structures for the other NRC licenses owned by subsidiaries of Entergy Corporation are reflected in Figure 1 attached to a letter entitled Supplemental Information #4 in Support of Application for Order Approving Indirect Transfer of Control of Licenses, dated March 17, 2008 (ML080810285), which was submitted in connection with a prior proposed license transfer. This Figure 1 reflects the current direct and indirect owners of the other NRC licenses, except that Entergy International Holdings LTD is now known as Entergy International Holdings LLC.1 A review of Figure 1 confirms that the entities holding the other NRC licenses and their intermediary holding companies are not involved in the proposed transfers that are the subject of the September 27, 2012 application. Other than Entergy Corporation being the same ultimate parent holding company, the companies identified in Figure 1 are not involved in the ownership of transmission assets, which are being transferred in 1
This entity indirectly holds a 25% interest in Entergy Holding Company #1, which is an intermediary holding company in the ownership chain for Pilgrim, FitzPatrick, and Indian Point 3. However, 75% of Entergy Holding Company #1 is owned directly by Entergy Corporation, and Entergy Corporation exercises control over Entergy Holding Company #1 without regard to the interest held by Entergy International Holdings LLC. Moreover, the conversion of this corporation to a limited liability company was effected by operation of Delaware law, and it survived as the same legal entity after the conversion, except with a new name and new corporate form. Therefore, the change from Entergy International Holdings LTD to Entergy International Holdings LLC did not involve any transfer of control of any NRC license and did not require any approval pursuant to 10 CFR 50.80.
Attachment to CNRO-2013-00002 Page 2 of 7 connection with the proposed transfers, and thus, these licenses are not included in the subject Entergy Application.
RAI 2
Starting with the fiscal year 2013, please provide a 5 year forecast of revenue and expenses for the 30% non-regulated portion of River Bend Station Unit 1, as required for a non-electric utility licensee under 10 CFR 50.33(f) and (f)(2). In association with this RAI, two scenario forecasts of revenue and expenses showing: (1) the results of a 10% reduction in the price of electricity sold; and (2) a 10% reduction in capacity generation.
Response
The 30% portion of River Bend Station Unit 1 (RBS) is sometimes referred to as the non-regulated portion. However, the energy from this 30% portion of RBS is sold pursuant to two cost-of-service based power purchase agreements pursuant to Schedule MSS-4 of the Entergy System Agreement, with two-thirds (approximately 200 MWe) being sold to Entergy Louisiana, LLC and one-third (approximately 100 MWe) being sold to Entergy New Orleans, Inc.
These agreements, known as the River Bend 30 PPAs, provide for cost-of-service based rate recovery for the 30% share of RBS formerly owned by Cajun Electric Cooperative. Thus, Entergy Gulf States Louisiana, L.L.C. (EGS-LA) qualifies as an electric utility for this portion of RBS, because it recovers the cost of this electricity, either directly or indirectly, through rates established . . . by a separate regulatory authority. 10 CFR 50.2. As an electric utility for this portion of RBS, EGS-LA is exempt pursuant to 10 CFR 50.33(f) from the financial review requirements of 10 CFR 50.33(f)(2).
The River Bend 30 PPAs have been specifically approved by the Federal Energy Regulatory Commission (FERC), and this rate recovery is subject to ongoing regulation by FERC. Entergy Services, Inc., Order No. 485 (Docket Nos. ER03-583, et al.), 116 FERC
¶61,296, at PP14-15 & P103 (2006), affd Order No. 485-A (Docket Nos. ER03-583, et al.),
Attachment to CNRO-2013-00002 Page 3 of 7 119 FERC ¶61,019 (2007), affd Louisiana Public Service Commn v. Federal Energy Regulatory Commn, 551 F.3d 1042 (D.C. Cir. 2008).
Pursuant to a settlement, it was agreed that the River Bend 30 PPAs would be priced using the Service Schedule MSS-4 formula rates, which are cost-of-service based rates.
Entergy Services, Inc., 116 FERC at P14. Thus, upon reviewing these PPAs, the FERC noted that the Presiding Officer had found that (4) the Entergy Gulf States River Bend agreements, which Entergy contracted outside the 2002 RFP [request for proposal], were just and reasonable since they will be priced consistent with the Service Schedule MSS-4 cost-of-service rate formula. Id. at P15 (emphasis added). The FERC then affirmed the presiding judges finding that the Entergy Gulf States River Bend 30 PPAs are just and reasonable and not unduly discriminatory as repriced under Service Schedule MSS-4 of the System Agreement, noting that [t]he MSS-4 Settlement produced just and reasonable rates which would be applied to the River Bend 30 capacity and, in turn, would always result in oversight (i.e., regulation) by the Commission. Id. at P103.
RAI 3
Foreign ownership, control, or domination:
According to the application dated September 27, 2012, Entergy stated the following:
Blackrock, Inc., a Delaware corporation, reports that as of December 31, 2011, it owned 7.83% of the voting common stock of Entergy and that an undisclosed number of these shares are held by one or more foreign-domiciled subsidiaries. In addition, State Street Corporation, a Massachusetts corporation, reports that as of December 31, 2011, it owned 5.2% of the voting common stock of Entergy and that an undisclosed number of these shares are held by one or more foreign-domiciled subsidiaries, and Franklin Resources, Inc., a Delaware corporation, reports that as of December 31, 2011, it owned 5.3% of the voting common stock of Entergy and that an undisclosed number of these shares are held by one or more foreign-domiciled subsidiaries.
Attachment to CNRO-2013-00002 Page 4 of 7 Section 103d of the Atomic Energy Act prohibits the NRC from issuing a license to:
[a]n alien or any corporation or other entity if the Commission knows or has reason to believe it is owned, controlled, or dominated by an alien, a foreign corporation or a foreign government.
The Commissions regulations under Title 10 of the Code of Federal Regulations (10 CFR)
Section 50.38 state:
Any person who is a citizen, national, or agent of a foreign country, or any corporation, or other entity which the Commission knows or has reason to believe is owned, controlled, or dominated by an alien, a foreign corporation, or a foreign government, shall be ineligible to apply for and obtain a license.
To complete its review, the NRC staff requires the following additional information:
a) State what rights Blackrock, Inc., State Street Corporation, and Franklin Resources, Inc. will have to participate in matters affecting the management or operation of the Entergy, including, but not limited to, the right to vote on or nominate any Director(s) to EOIs Board of Directors.
b) Provide a description of the procedures in place to assure that Blackrock, Inc., State Street Corporation, and Franklin Resources, Inc. shareholder rights in EOI do not result in their participation in decisions concerning nuclear safety or security; obtaining responsibility for special nuclear material; or gaining access to restricted data in order for the NRC staff to determine if the aforementioned statute and regulatory requirements have been met.
c) State whether there are any unanimous consent requirements for decisions made by the Board of Directors and whether Blackrock, Inc., State Street Corporation, and Franklin Resources, Inc. will have any right to participate in unanimous decisions. If applicable, provide a list of their rights.
d) Describe the legal, contractual or financial arrangements, if any, between EOI, and Blackrock, Inc., State Street Corporation, and Franklin Resources, Inc., or any foreign entity or any entity that is owned, controlled, or dominated, directly or indirectly, by a foreign entity.
Response
a) Other than rights as voting shareholders of Entergy Corporation, Blackrock, Inc., State Street Corporation, and Franklin Resources, Inc. have no rights to participate in matters affecting the management or operation of the Entergy Corporation, EOI or any of Entergys operating companies including no right to vote on or nominate any Director(s) to EOIs Board of Directors.
Attachment to CNRO-2013-00002 Page 5 of 7 b) Blackrock, Inc., State Street Corporation, and Franklin Resources, Inc. have voting rights as shareholders of Entergy Corporation, e.g., voting rights along with all other shareholders to approve the directors of Entergy Corporation. They do not have any rights with respect to the management or operation of the nuclear units by Entergy Operations, Inc., and therefore, they: (1) have no right or ability to participate in decisions concerning nuclear safety or security; (2) have no right or ability to obtain access to or responsibility for special nuclear material; and (3) have no right or ability to gain access to restricted data.
c) Neither Blackrock, Inc., nor State Street Corporation, nor Franklin Resources, Inc. has any unanimous consent rights relating to the governance of Entergy Corporation or its subsidiaries.
d) Other than their status as shareholders of its parent, Entergy Corporation, EOI is not aware of any legal, contractual or financial arrangements, between EOI and Blackrock, Inc., State Street Corporation, and Franklin Resources, Inc. Moreover, EOI has no reason to believe that either Blackrock, Inc., or State Street Corporation, or Franklin Resources, Inc. is owned, controlled, or dominated, directly or indirectly, by any foreign entity. Rather, the filings by these entities with the Securities and Exchange Commission indicate that each of these entities is a U.S. company.
RAI 4
Decommissioning Financial Assurance In its filings with the Texas Public Utility Commission, docket 40346, Entergy indicated that it intends to withdraw from the Entergy Systems Agreement (ESA) and has agreed to give notice by October 31, 2013, to exit the ESA. State how the exit from the ESA will affect the terms under the MSS-4 contract for River Bend Station and/or how the withdraw[al] from the ESA will impact decommissioning funding assurance for River Bend, including but not limited to whether this will constitute a change to the method of providing decommissioning funding assurance.
Attachment to CNRO-2013-00002 Page 6 of 7
Response
Entergy Texas, Inc. (ETI) has committed to withdraw from the Entergy Services Agreement (ESA) in connection with the transfer of transmission assets to ITC Holdings Corp.
(ITC), which are to be operated by MISO (Midwest Independent Transmission System Operator, Inc.). However, ETIs withdrawal from the ESA is not intended to impact any of the terms or conditions of MSS-4, and this is specifically acknowledged as a Finding of Fact in an Order of the Public Utility Commission of Texas (PUCT) dated October 26, 2012, in PUC Docket No. 40346. See Order, para 22.e, page 14. This Order is a public record maintained by the PUCT and available electronically at:
http://interchange.puc.state.tx.us/WebApp/Interchange/Documents/40346_410_740074.PDF.
This PUCT finding acknowledges:
For all other Schedule MSS-4 contracts to which ETI is a party - which are River Bend, Carville, and EAI WBL - ETI's position is that exit from the ESA is not intended to affect the terms, pricing, or energy entitlements under these contracts, and the pricing under these contracts will continue to be based on a cost-based formula filed at and approved by the FERC.
Order, para. 22, page 14 (emphasis added).
Even if the MSS-4 contract is modified in some respect, or replaced with a substitute contract, it is expected that the basic terms of the MSS-4 and cost-of-service rate regulation will continue unchanged pursuant to a cost-of-service tariff with the FERC. As such, EOI does not expect that ETIs withdrawal from the ESA will affect the terms under the MSS-4 contract for RBS, and EOI does not expect that ETIs withdrawal from the ESA will impact decommissioning funding assurance for RBS. It also does not expect any change that will constitute a change to the method of providing decommissioning funding assurance.
Attachment to CNRO-2013-00002 Page 7 of 7 The current level of collection of decommissioning funds from Texas ratepayers was specifically acknowledged as a Finding of Fact in an Order of the PUCT dated December 13, 2010, in PUC Docket No. 37744. See Order, para 32, page 9 and para 46, page 12 (recovery of $2,019,000 annually for decommissioning costs . . . is reasonable). This Order and other relevant filings with the FERC are included as Attachments 3-E, 3-F, and 3-G to the decommissioning status report submitted pursuant to 10 CFR 50.75(f)(1) by letter dated October 15, 2012 (CNRO-2012-00007) (ML12292A283).