MONTHYEARCNRO-2012-00007, Grand Gulf Nuclear Station & Waterford 3 Steam Electric Station Status of Decommissioning Funding - Entergy Operations, Inc2012-10-15015 October 2012 Grand Gulf Nuclear Station & Waterford 3 Steam Electric Station Status of Decommissioning Funding - Entergy Operations, Inc Project stage: Request ML12311A1342012-11-0505 November 2012 Entergy Fleet and ISFSI-Acceptance Review Email, Direct License Transfer and Conforming Amendments for Arkansas Nuclear Units 1 & 2; Grand Gulf Unit 1, and Grand Gulf Early Site Permit; Indirect License Transfer for River Bend and Waterford Project stage: Acceptance Review ML12325A2802012-12-21021 December 2012 FRN, Notice of Consideration of Approval of Indirect and Direct Transfer for Facility Operating License and Conforming Amendment, and Opportunity for a Hearing Project stage: Other ML12325A2782012-12-21021 December 2012 Letter, Notice of Consideration of Approval of Indirect and Direct Transfer for Facility Operating License and Conforming Amendment, and Opportunity for a Hearing Project stage: Other ML13023A3282013-01-23023 January 2013 Entergy Fleet and ISFSI-Request for Additional Information Email, Indirect and Direct License Transfer Sand Conforming Amendments for Arkansas Nuclear One 1 and 2; Grand Gulf 1 and Early Site Permit; River Bend 1, and Waterford 3 (TAC ME970 Project stage: RAI ML13044A0112013-01-31031 January 2013 Comment (1) of Mark Sokolow on Proposed Rules, Regulations or Agency Actions on Grand Gulf Early Site Permit Project stage: Request ML13077A2372013-05-0303 May 2013 ESP Site; River Bend, Unit 1, and Waterford, Unit 3 - Letter, Orders, Draft Conforming Amendments, and Safety Evaluation; Direct and Indirect Transfer of Licenses Project stage: Draft Approval ML13077A4252013-05-0303 May 2013 Order Approving Direct and Indirect Transfer of Facility Operating No. NPF-29 and Conforming Amendment Project stage: Other NRC-2012-0319, Order Approving Direct and Indirect Transfer of Facility Operating No. NPF-29 and Conforming Amendment2013-05-0303 May 2013 Order Approving Direct and Indirect Transfer of Facility Operating No. NPF-29 and Conforming Amendment Project stage: Other 2012-12-21
[Table View] |
|
---|
Category:Federal Register Notice
MONTHYEARML20335A0902020-12-21021 December 2020 Federal Register Notice - November 2020 COVID-19 Exemptions ML20304A2862020-11-20020 November 2020 Federal Register Notice for COVID-19 October 2020 Group Exemptions ML20092F6962020-04-0303 April 2020 Public Notice for Application of Exigent Amendment, Revise Technical Specification Requirements Related to Performing Integrated Leak Rate Test and Drywell Bypass Leak Rate Test ML19168A0842019-06-26026 June 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 07/02/2019 ML19085A2172019-03-29029 March 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 04/09/2019 ML19056A5352019-02-28028 February 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 03/12/2019 NRC-2019-0065, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 03/12/20192019-02-28028 February 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 03/12/2019 NRC-2018-0102, Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order for 6/5/18 Publication2018-05-17017 May 2018 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order for 6/5/18 Publication ML18124A0632018-05-17017 May 2018 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order for 6/5/18 Publication ML17340B1802017-12-26026 December 2017 Arkansas Units 1 & 2, Grand Gulf Unit 1, River Bend Unit 1, and Waterford Unit 3 - FRN - Consideration of Approval of Direct and Indirect Transfer of Licenses and Conforming Amendments (CAC Nos. MG0258-MG0262; EPID L-2017-LLM-0010) NRC-2017-0239, Arkansas Units 1 & 2, Grand Gulf Unit 1, River Bend Unit 1, and Waterford Unit 3 - FRN - Consideration of Approval of Direct and Indirect Transfer of Licenses and Conforming Amendments (CAC Nos. MG0258-MG0262; EPID L-2017-LLM-0010)2017-12-26026 December 2017 Arkansas Units 1 & 2, Grand Gulf Unit 1, River Bend Unit 1, and Waterford Unit 3 - FRN - Consideration of Approval of Direct and Indirect Transfer of Licenses and Conforming Amendments (CAC Nos. MG0258-MG0262; EPID L-2017-LLM-0010) ML17340B2582017-12-21021 December 2017 Arkansas 1 & 2, Grand Gulf Unit 1, River Bend Unit 1, and Waterford Unit 3 - Letter - Consideration of Approval of Direct and Indirect Transfer of Licenses and Conforming Amendments (CACs MG0258, MG0259, MG0260, MG0261, MG0262; EPID L-2017- ML16292A7212016-12-0101 December 2016 Federal Register Notice for License Renewal for Grand Gulf Nuclear Station, Unit 1 NRC-2016-0236, Federal Register Notice for License Renewal for Grand Gulf Nuclear Station, Unit 12016-12-0101 December 2016 Federal Register Notice for License Renewal for Grand Gulf Nuclear Station, Unit 1 ML16229A2552016-08-18018 August 2016 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations- Publication Date: August 30, 2016 NRC-2016-0180, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations- Publication Date: August 30, 20162016-08-18018 August 2016 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations- Publication Date: August 30, 2016 ML16061A3012016-03-0202 March 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: March 15, 2016 NRC-2016-0008, FRN- Withdrawal of an Amendment Request to Revise Battery Cell Resistances to Address Potential Non-Conservative Technical Specification2016-01-0505 January 2016 FRN- Withdrawal of an Amendment Request to Revise Battery Cell Resistances to Address Potential Non-Conservative Technical Specification ML15356A0832016-01-0505 January 2016 Cover Letter - Withdrawal of an Amendment Request to Revise Battery Cell Resistances to Address Potential Non-Conservative Technical Specification ML15356A0852016-01-0505 January 2016 FRN- Withdrawal of an Amendment Request to Revise Battery Cell Resistances to Address Potential Non-Conservative Technical Specification ML15356A5992015-12-29029 December 2015 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 5, 2016 ML15120A2272015-05-0101 May 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 12, 2015 NRC-2015-0104, Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication in April 28, 2015, Federal Register2015-04-20020 April 2015 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication in April 28, 2015, Federal Register ML15106A9162015-04-20020 April 2015 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication in April 28, 2015, Federal Register ML14310A3872014-12-0303 December 2014 FRN for GGNS FSEIS Adm Markup with David Drucker Responses (2) NRC-2014-0037, FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 20142014-03-0404 March 2014 FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014 ML14051A6712014-03-0404 March 2014 FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014 ML13330A4882013-12-11011 December 2013 Notice of Availability of the Draft Plant-Specific Supplement 50 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Grand Gulf Nuclear Station, Unit 1 ML13336A7342013-12-0606 December 2013 Notice of Availability of the Draft Plant-Specific Supplement 50 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Grand Gulf Nuclear Station, Unit 1 ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13228A3992013-08-12012 August 2013 Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109 NRC-2012-0319, Order Approving Direct and Indirect Transfer of Facility Operating No. NPF-29 and Conforming Amendment2013-05-0303 May 2013 Order Approving Direct and Indirect Transfer of Facility Operating No. NPF-29 and Conforming Amendment ML13077A4252013-05-0303 May 2013 Order Approving Direct and Indirect Transfer of Facility Operating No. NPF-29 and Conforming Amendment ML13025A3212013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction FRN, Biweekly Notice of Issuance of Amendments Published on 1/22/13, Revise QA Program Manual and Staff Quali ML12325A2782012-12-21021 December 2012 Letter, Notice of Consideration of Approval of Indirect and Direct Transfer for Facility Operating License and Conforming Amendment, and Opportunity for a Hearing ML12325A2802012-12-21021 December 2012 FRN, Notice of Consideration of Approval of Indirect and Direct Transfer for Facility Operating License and Conforming Amendment, and Opportunity for a Hearing ML12167A2692012-07-0909 July 2012 Environmental Assessment and Finding of No Significant Impact Related Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt NRC-2012-0105, Environmental Assessment and Finding of No Significant Impact Related Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt2012-07-0909 July 2012 Environmental Assessment and Finding of No Significant Impact Related Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt ML1210704372012-05-0202 May 2012 Draft Environmental Assessment and Finding of No Significant Impact Related Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML12056A0442012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML11342A0732011-12-22022 December 2011 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for License Renewal for the Grand Gulf Nuclear Station, Unit 1 ML11335A3402011-12-16016 December 2011 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Application from Entergy Operations, Inc. for Renewal of the Operating License for Gulf Nuclear Station, Uni ML11293A0142011-11-0909 November 2011 Receipt and Availability of the License Renewal Application for the Grand Gulf Nuclear Station, Unit 1 - FRN ML11293A0132011-11-0909 November 2011 Receipt and Availability of the License Renewal Application for the Grand Gulf Nuclear Station, Unit 1 - LTR NRC-2011-0230, FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations2011-09-22022 September 2011 FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations ML1126504892011-09-22022 September 2011 FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations NRC-2010-0082, Environmental Assessment and Finding of No Significant Impact, Related to 10 CFR Part 73 Exemption for Physical Security Requirements2010-02-25025 February 2010 Environmental Assessment and Finding of No Significant Impact, Related to 10 CFR Part 73 Exemption for Physical Security Requirements ML1001902362010-02-25025 February 2010 Environmental Assessment and Finding of No Significant Impact, Related to 10 CFR Part 73 Exemption for Physical Security Requirements NRC-2009-0230, Notice of Issuance of Environmental Assessment and Finding of No Significant Impact, Grand Gulf, ISFSI for One-Time Exemption Request from Requirements of 10 CFR 72.212(a)(2) and (b)(7)2009-06-0303 June 2009 Notice of Issuance of Environmental Assessment and Finding of No Significant Impact, Grand Gulf, ISFSI for One-Time Exemption Request from Requirements of 10 CFR 72.212(a)(2) and (b)(7) 2020-04-03
[Table view] |
Text
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[NRC-2012-0319]
In the Matter of )
South Mississippi Electric )
Power Association, System )
Energy Resources, Inc. )
) Docket No. 50-416 Grand Gulf Nuclear Station ) License No. NPF-29 Units No. 1 Order Approving Direct and Indirect Transfers of License and Approving Conforming Amendment I.
South Mississippi Electric Power Association, System Energy Resources, Inc. (SERI),
Entergy Mississippi, Inc. (EMI), and Entergy Operations, Inc. (EOI) (the licensees), are co-holders of Facility Operating License No. NPF-29. South Mississippi Electric Power Association and SERI are the owners and EOI is authorized to possess, use, and operate Grand Gulf Nuclear Station, Unit No. 1 (GGNS). The EMI has anti-trust responsibilities imposed in the license. The GGNS is located in Claiborne County, Mississippi.
II.
By application dated September 27, 2012, as supplemented by letters dated January 29 and April 16, 2013, EOI requested on behalf of itself, SERI, and their parent companies (together, the applicants), pursuant to § 50.80 of Title 10 of the Code of Federal Regulations (10 CFR), that the U.S. Nuclear Regulatory Commission (NRC) consent to certain license transfers to permit the direct transfer of GGNS, and associated Independent Spent Fuel Storage Installation, to a new limited liability company, System Energy Resource , LLC (SERL). The applicants also requested approval of a conforming license amendment that would replace references to SERI in the license with references to SERL to reflect the transfer of ownership.
The EMI has anti-trust responsibilities in the license and the application requested references to EMI in the license be replaced with the new limited liability company, Entergy Mississippi, LLC (EML). In addition, the applicants requested the NRCs consent to approve associated indirect license transfers to the extent such would be affected by the formation of a new intermediary holding company. Entergy Corporation (Entergy) will remain as the ultimate parent company, but a new intermediate company, Entergy Utilities Holdings, LLC, a Delaware limited liability company, will be created, which will be the direct parent company of SERL, EML, and EOI.
Ultimately, SERL and South Mississippi Electric Power Association will acquire ownership of the facility and EOI will remain responsible for the operation and maintenance of GGNS. The license transfers are necessary to support a proposed separation of the Entergy transmission system in Arkansas, Louisiana, Mississippi, Missouri, and Texas. Currently, the utility operating
company subsidiaries of Entergy (e.g. EMI) own the transmission assets. Following the proposed transactions, each of the Entergy subsidiaries will become a new limited liability company with the same assets except that the transmission assets will be owned by ITC Holdings Corp. and operated by Midwest Independent Transmission System Operator, Inc.
No physical changes to the facilities or operational changes are being proposed in the application. The interconnections that provide offsite power to GGNS do not change as a result of the proposed direct and indirect license transfers.
Approval of the direct and indirect transfers of the facility operating license was requested by EOI, acting on behalf of SERI, as well as their parent companies and itself. A notice entitled, Consideration of Approval of Application Regarding Proposed Creation of a Holding Company and Transfer of Facility Operating License and Conforming Amendment and Opportunity for a Hearing, was published in the Federal Register on January 3, 2013 (78 FR 325). No comments or hearing requests were received.
Under 10 CFR 50.80, no license, or any right thereunder, shall be transferred, directly or indirectly, through transfer of control of the license, unless the NRC shall give its consent in writing. Upon review of the information in the licensees application, and other information before the Commission, the NRC staff has determined that the proposed indirect license transfer of control of the subject license held by the licensees to the extent such will result from the proposed formation of the intermediary holding company in conjunction with the planned direct transfer of SERI to SERL, and EMI to EML, to the extent affected in order to support transfer of the Entergy transmission assets as described in the application, is otherwise consistent with the applicable provisions of law, regulations, and orders issued by the NRC, pursuant thereto, subject to the conditions set forth below. The NRC staff has further found that the application for the proposed license amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; the facilities will operate in conformity with the application, the provisions of the Act and the rules and regulations of the Commission; there is reasonable assurance that the activities authorized by the proposed license amendment can be conducted without endangering the health and safety of the public and that such activities will be conducted in compliance with the Commissions regulations; the issuance of the proposed license amendment will not be inimical to the common defense and security or to the health and safety of the public; and the issuance of the proposed amendment will be in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable
requirements have been satisfied. The findings set forth above are supported by a safety evaluation dated the same day as this Order.
III.
Accordingly, pursuant to Sections 161b, 161i, 161o, and 184 of the Atomic Energy Act of 1954, as amended, 42 U.S.C. 2201(b), 2201(i), 2201(o), and 2234; and 10 CFR 50.80, IT IS HEREBY ORDERED that the application regarding the indirect and direct license transfers related to the proposed corporate restructuring in connection with the separation of the Entergy transmission systems is approved, subject to the following conditions:
- 1. Before completion of the proposed transaction, EOI shall provide the Director of the Office of Nuclear Reactor Regulation satisfactory documentary evidence that SERL has obtained the appropriate amount of insurance required of the licensees under 10 CFR Part 140 of the Commissions regulations.
IT IS FURTHER ORDERED that consistent with 10 CFR 2.1315(b), the license amendment that makes a change, as indicated in Enclosure 5 to the cover letter forwarding this Order (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13077A237), to reflect the subject direct transfer, is approved. The amendment shall be issued and made effective at the time the proposed direct transfer action is completed.
IT IS FURTHER ORDERED that after receipt of all required regulatory approvals of the proposed direct transfer action, EOI shall inform the Director of the Office of Nuclear Reactor Regulation in writing of such receipt, and of the date of closing, no later than 1 business day before the closing of the direct transfer. Should the proposed direct transfer not be completed within 1 year of this Orders date of issuance, this Order shall become null and void, provided, however, upon written application and good cause shown, such date may be extended by Order.
This Order is effective upon issuance.
For further details with respect to this Order, see the initial application dated September 27, 2012 (ADAMS Accession No. ML12275A013), as supplemented by letters dated January 29 and April 16, 2013 (ADAMS Accession Nos. ML13030A204 and ML13107A010, respectively),
and the safety evaluation dated the same date as this Order (ADAMS Accession No. ML13077A237), which are available for public inspection at the Commission's Public Document Room (PDR), located at One White Flint North, Public File Area 01 F21, 11555 Rockville Pike (first floor), Rockville, Maryland 20852. Publicly available documents created or received at the NRC are accessible electronically through ADAMS in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC PDR reference staff by telephone at 1-800-397-4209, or 301-415-4737, or by e-mail to PDR.Resource@nrc.gov.
Dated at Rockville, Maryland this 3rd day of May 2013.
For The Nuclear Regulatory Commission.
/RA/