ML13025A065

From kanterella
Jump to navigation Jump to search
Initial Exam 2012-302 Final Sim IN-Plant JPMs
ML13025A065
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/22/2013
From:
NRC/RGN-II
To:
Duke Energy Carolinas
References
Download: ML13025A065 (116)


Text

CR0-i 12 Page 1 of ii REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-i 12 ATWS WITH FAILURE OF C HPIP CANDIDATE EXAMINER

CR0-i 12 Page 2 of ii REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Respond to ATWS with Failure of C H PIP.

Alternate Path:

Yes Facility JPM #:

CR0-i 08 Modified K/A Rating(s):

System: BW/Ei3 K/A: EA1.1 Rating: 3.4/3.2 Task Standard:

Rule 1 successfully completed in response to ATWS with Failure of C H PIP..

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

EP/1/A/1800/001, Rule 1 Validation Time: 5 minutes Time Critical: NO Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time:

Examiner: /

NAME SIGNATURE DATE COMMENTS

CR0-i 12 Page 3 of ii SIMULATOR OPERATOR INSTRUCTIONS

1. Recall Snap 202
2. Import files for CRO1 12
3. Place a clean copy of Rule 1 on the front board.
4. Go to RUN when directed by lead examiner.

CR0-i 12 Page4o11 Tools/Equipment/Procedures Needed:

EOP Rule 1 READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS The Unit 1 Reactor is operating at 100% power.

INITIATING CUES The Control Room SRO directs you to perform Immediate Manual Actions (IMA5).

CR0-i 12 Page 5 of 11 START TIME:

STEP 1: IMAs Step 3.1 Depress REACTOR TRIP pushbutton.

SAT STANDARD: Candidate performs EOP IMAs from memory (per OMP 1-18) and depresses the REACTOR TRIP pushbutton located on UB1.

U N SAT COMMENTS:

STEP 2: IMAs Step 3.2 Verify reactor power < 5% FP and decreasing.

SAT STANDARD: Candidate performs EOP IMAs from memory and verifies reactor power

<5% and decreasing and determines that reactor power is > 5% on all Nis.

UNSAT Candidate Continues to Step 3.2 RNO.

COMMENTS:

STEP 3: RNO Step 3.2 GO TO Rule 1 (ATWS/Unanticipated Nuclear Power Production).

SAT STANDARD: Candidate Goes To Rule 1 Step 1.

U N SAT COMMENTS:

CRO-112 Page 6 of 11 STEP 4: Rule 1 Step 1 Verify y Power Range NI 5% FP.

SAT STANDARD: Candidate verifies any Power Range NI 5% FP and determines that all Power Range NIs are > 5% FP.

U N SAT COMMENTS:

STEP 5: Rule 1 Step 2 CRITICAL STEP Initiate manual control rod insertion to the IN LIMIT.

SAT STANDARD: Candidate initiates a manual control rod insertion by depressing the Manual pushbutton on the Diamond control panel and then locks the Control Rod Joystick in the INSERT (forward) position. UNSAT COMMENTS:

STEP 6: Rule 1 Step 3 Notify CR SRO to GO TO UNPP tab.

SAT STANDARD: Candidate notifies the Control Room SRO to go to the UNPP tab of the EOP.

UNSAT COMMENTS:

CR0-i 12 Page 7 of 11 STEP 7: Rule 1 Step 4 *CRITICAL STEP Open the following:

1HP-24 SAT 1HP-25 STANDARD: Candidate locates 1 HP-24 and 1 HP-25 on 1 UB1 and rotates the UNSAT switches to the open position. Verify that the GREEN closed lights go OFF and the RED open lights ILLUMINATE.

As long as one of the two suctions valves is opened the critical step is satisfied COMMENTS:

STEP 8: Rule 1 Step 5 Ensure only one of the following operating:

1AHPI PUMP SAT 1 B HPI PUMP STANDARD: Candidate ensures either the 1A or 1 B HPI pump is operating. UNSAT NOTE: The 1A HPI Pump is operating.

COMM ENTS:

STEP 9: Rule 1 Step 6 Start 1C HPI PUMP.

SAT STANDARD: Candidate locates the 1C HPI pump switch on 1UB1 and rotates the switch to the CLOSE position. Candidate notes that the 1 C HPI pump did not start (White open light still on, red closed lights still off and no UNSAT motor amps.

Candidate continues to Rule 1 RNO step 6.

COMMENTS:

CR0-i 12 Page 8 of ii ALTENATE PATH *CRITICAL STEP STEP 10: Rule 1 RNO step 6

1. Start the standby HPI pump.
2. IF at least two HPI pumps are operating, SAT
  • THEN open 1 HP-409 STANDARD: 1. - Candidate locates the 1 B HPI pump switch on 1 UB1 and rotates the UNSAT switch to the START position. Candidate notes that the 1 B HPI pump WHITE open light indicates OFF, and the RED closed lights are ILLUMINATED. 1 B HPIP motor amps are normal ( 60 amps).
2. - Candidate notes there are two HPI pumps operating and rotates the 1 HP-409 control switch to the open position and notes the RED open light ILLUMINATED, and the GREEN closed light OFF.

COMMENTS:

STEP 11: Rule 1 Step 7 Open the following: *CRITICAL STEP

  • 1 HP-26 1HP-27 SAT STANDARD: Candidate locates 1 HP-26 and 1 HP-27 on 1 UB1 and rotates the control switches to the open position. Verify the GREEN closed light indicates OFF and the RED open light is ILLUMINATED. UNSAT COMMENTS:

STEP 12: Rule 1 Step 8 Dispatch one operator without wearing Arc Flash PPE to open 600V CRD breakers on the following:

1X9-5C (U-i CRD Norm Fdr Bkr) (Ui Equipment Rm) SAT 2Xi -5B (U-i CRD Alternate Fdr Bkr) (T-3/Dd-28)

STANDARD: Candidate dispatches one operator to open Unit 1 normal and alternate UNSAT CRD feeder breakers without wearing Arc Flash PPE.

Candidate continues to Rule 1 Step 9.

COMMENTS:

CRO-112 Page 9 of 11 STEP 13: Rule 1 Step 9 Verify only two HPI pumps operating.

SAT STANDARD: Candidate verifies two HPI pumps are operating by verifying the RED lights are ILLUMINATED for the lAand lB HPI pumps. Verify HPI pump motor amps are normal for the operating HPI pumps. UNSAT COMMENTS:

END OF TASK STOP TIME:

CRO-112 Page 10 of 11 CRITICAL STEP EXPLANATIONS STEP # Expanation 5 Required to initiate a manual control rod insertion and start adding negative reactivity to the core.

7 Required to align emergency boration from the BWST to and add negative reactivity to the core.

10 Required to align flow to the B HPI header since the 1 C HPI pump failed to start.

11 Opening 1 HP-26 is required to initiate flow in the A HPI header.

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS The Unit 1 Reactor is operating at 100% power.

INITIATING CUES The Control Room SRO directs you to perform Immediate Manual Actions (IMAs).

CRO-21 4 Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-21 4 RCS LEAK WHILE ON DHR CANDIDATE EXAMINER

CRO-21 4 Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Respond to RCS Leak While on DHR.

Alternate Path:

Yes Facility JPM #:

New K/A Rating(s):

System: APE 025 K/A: AA1.02 Rating: 3.8/3.9 Task Standard:

Respond to RCS Leak While on DHR in accordance with AP/1/A/1700/026 (Loss of Decay Heat Removal), Enclosure 5.12 (RCS Makeup).

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator _X_ In-Plant Perform X Simulate

References:

AP/1/A/1700/026 Loss of Decay Heat Removal AP/1 /A/i 700/002 Excessive RCS Leakage Validation Time: 16 minutes Time Critical: NO Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time Examiner:

NAME SIGNATURE DATE COMMENTS

CRO-21 4 Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall snap 203
2. Import files
3. Update Boron Status Board: RCS = 2310 ppmB
4. Provide clean copy of Defense In Depth (DID) sheet, Plant Configuration sheet, and AP/26 End. 5.12
5. Go to Run and acknowledge alarms
6. Goto FREEZE
7. GO to RUN when directed by lead examiner

CRO-214 Page 4 of 12 Tools/Equipment/Procedures Needed:

AP/1/A/1700!026 (Loss of Decay Heat Removal), Enclosure 5.12 (RCS Makeup)

AP/1 /A/i 700/002 Excessive RCS Leakage Defense In Depth (DID) sheet Plant Configuration sheet READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 is in a normal DHR alignment.

PZR level is being maintained at 180 +/- 1 0.

RCS is vented and the loops are dropped BWST level is 37 feet HPI is available AP/2 (Excessive RCS Leakage) was entered and it directed entry into AP/26 (Loss of Decay Heat Removal)

AP/2 End 5.6 (RCS Makeup) was NOT initiated INITIATING CUE:

The Control Room SRO directs you to restore and maintain Pressurizer level to 170 190 -

using AP/1/A/1700/026 (loss of Decay Heat Removal) Enclosure 5.12 (RCS Makeup).

CRO-214 Page 5 of 12 START TIME:

STEP 1: Step 1 IAAT makeup is NO longer desired, THEN GO TO Step 67.

STANDARD: Makeup is desired as directed by Control Room SRO in Initiating Cue. SAT U N SAT COMMENTS:

NOTE (Step 2)

. Makeup methods listed below are in the order of preference.

. Each method is effective only as long as the limitations listed are met.

. If one source of makeup is NOT adequate, try another method.

  • It is acceptable to utilize methods in any sequence or in parallel, as needed, however, they are listed in the order of preference.

. If AP/2 (Excessive RCS Leakage) End 5.6 (RCS Makeup) is in progress, GO TO the Step associated with that makeup method.

STEP 2: Step 2 Utilize the appropriate Step as noted in table below to establish and maintain level within the desired band: SAT Method Maximum Pressure Other limitations GO TO Step 1A Bleed Transfer No Requirement 3 Pump UNSAT HPI Gravity makeup RCS vented HPI Available per DID sheet 9 to RCS BWST level > 43 HPI Injection No Requirement BWST level > 6 15 HPI Available per DID sheet BWST makeup to LPI RCS vented BWST level > 6 26 Pump LPI Pump operating in Normal (1 LP-21 /1 LP-22) Mode BWST Recirc Pump Decay Heat Line Unit 1 BWST, Unit 2 BWST, or 34 Pressure < 100 psig Unit 1&2 SFP in purification FTC_fill/drain_NOT_in_progress SF Cooling Pump Decay Heat Line Unit 1&2 SFP in purification with 51 from Unit 1&2 SEP Pressure < 150 psig SF Cooling Pump FTC_till/drain_NOT_in_progress STANDARD: Given the note above step 2, the candidate chooses the highest order of preference available (1A Bleed Transfer Pump) and proceeds to step 3.

COMMENTS:

CRO-21 4 Page 6 of 12 STEP 3: Step 3 Ensure the following:

  • 1HPl5in manual SAT

STANDARD: *Candidate ensures 1HP-15 in manual with demand at full open and valve indicates fully open. UNSAT COMMENTS:

STEP 4: Step 4 Open 1HP-16 SAT STANDARD: Candidate fully opens 1 HP-16, rotating its control switch to the open position and observing RED light ON and GREEN light OFF UNSAT COMMENTS:

STEP 5: Step 5 Start 1A BLEED TRANSFER PUMP.

SAT STANDARD: Candidate attempts to start the 1A Bleed Transfer Pump, but it will not start.

Candidate then refers to step 5 RNO UNSAT COMMENTS:

CRO-214 Page 7 of 12 ALTERNATE PATH STEP 6: Step 5 RNO GO TO Step 2 SAT STANDARD: Candidate returns to step 2 U N SAT COMMENTS:

STEP 7: Step 2 Utilize the appropriate Step as noted in table below to establish maintain level within the desired band SAT STANDARD: Candidate determines that the next order of priority available is HPI Gravity Makeup to RCS however the table requires BWST level to be>

43 feet. Candidate determines that the BWST does not meet this UNSAT requirement and proceeds to next option in table EXAMINER NOTE: Table is in JPM step 2 COMMENTS:

STEP 7: Step 2 Utilize the appropriate Step as noted in table below to establish maintain level within the desired band SAT STANDARD: Candidate determines that the next order of priority available is HPI Injection and proceeds to step 15 UNSAT EXAMINER NOTE: Table is in JPM step 2 COMMENTS:

CRO-21 4 Page 8 of 12 STEP8: Step 15 Verify power on jjy HPI Pump.

SAT STANDARD: Candidate verifies all 3 HPI Pumps have power available.

COMMENTS: UNSAT STEP 9: Step 16 CRITICAL STEP Open the following:

  • 1HP-25 STANDARD: Opens 1 HP-24 & 1 HP-25 by rotating switches on 1 UB1 to the open position and observing RED light illuminated and GREEN light OFF for UNSAT each.

COMMENTS:

STEP 10: Step 17 Close the following:

  • 1HP-410 STANDARD: Verifies 1 HP-409 and 1 HP-41 0 are closed by observing RED light OFF and GREEN light illuminated for both. (These valves are already closed) UNSAT COMMENTS:

CRO-21 4 Page 9 of 12 STEP 11: Step 18 Perform the following:

  • Reduce 1 HP-31 demand to 0.

STANDARD: Candidate verifies that 1 HP-31 is in HAND and demand is zero UN SAT COMMENTS:

STEP 12: Step 19 Perform the following:

  • Reduce 1 HP-120 demand to 0.

STANDARD: Candidate verifies that 1 HP-i 20 is in HAND and demand is zero UNSAT COMMENTS:

CRITICAL STEP NOTE:

An HPI Pump operating with 1 HP-363 open will provide 35 gpm of makeup through the HPI Pump minimum recirc lines.

STEP 13: Step2O SAT Start lApj lB HPI Pump.

STANDARD: Candidate starts either 1A or 1 B HPI Pump and notes RED running light for pump started. UNSAT COMMENTS:

CRO21 4 Page 10 of 12 STEP 14: Step2l Verify RCS loops dropped.

STANDARD: Candidate verifies RCS loops are dropped based on initial conditions SAT given U N SAT COMMENTS:

STEP 15: Step 22 CRITICAL STEP Throttle the following, as necessary without exceeding 475 gpm, to maintain RV level >10 within previous established level band, if possible: _SAT

  • 1HP-410 STANDARD: Candidate throttles 1 HP-409 and/or 1 HP-41 0 and stops the Pressurizer UNSAT level decrease and begins to return Pzr level to 170 to 190 without exceeding 475 gpm.

EXAMINER CUE: When PZR level is being controlled and has begun returning to 18O inform the candidate that another operator will continue with this procedure.

COMMENTS:

END TASK STOP TIME:

CRO-214 Page 11 of 12 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 9 Step is necessary to align HPI Injection to the RCS.

13 Step is necessary to provide driving head for HPI Injection flow to the RCS.

15 Step necessary to ensure HPI Injection flow is recovering RCS inventory.

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 is in a normal DHR alignment.

PZR level is being maintained at 180 +/- 10.

RCS is vented and the loops are dropped BWST level is 37 feet HPI is available AP/2 (Excessive RCS Leakage) was entered and it directed entry into AP/26 (Loss of Decay Heat Removal)

AP/2 End 5.6 (RCS Makeup) was NOT initiated INITIATING CUE:

The Control Room SRO directs you to restore and maintain Pressurizer level to 170- 190 using AP/1 IA/i 700/026 (loss of Decay Heat Removal) Enclosure 5.12 (RCS Makeup).

CRO-31 0 Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-310 ALIGN POST LOCA BORON DILUTION FLOW PATH.

CANDIDATE EXAMINER

CRO-31 0 Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Align Post LOCA Boron Dilution Flow Path.

Alternate Path:

YES Facility JPM #: CRO-073 and CRO-074 Modified K/A Rating(s:

System: EPE 011 K/A: EA1.11 Rating: 4.2/4.2 Task Standard:

Post LOCA Boron Dilution valve line-up is accomplished when 1LP-105, 1LP-2, and 1LP-1 are open.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform _X_ Simulate

References:

EP/1/A/1800/O01 EOP LOCA CD Tab Validation Time: 12 minutes Time Critical: NO Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time Examiner: /

NAME SIGNATURE DATE

- COMMENTS

CRO-31 0 Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall snap 204
2. Import files for CRO-31 0
3. Go to RUN to allow files to take affect
4. Goto FREEZE
5. Go to RUN when directed by lead examiner

CRO-31 0 Page 4 of 9 Tools/Equipment/Procedures Needed:

EP/1/A/1800/ool EOP LOCA CD Tab pages 5 and 7 of 59 READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

A Large Break LOCA has occurred on Unit 1.

RCPs have been secured.

HPI has been secured.

1 XS2-F3D (1 LP-1 04 Bkr (Post LOCA Boron Dilute)) has been closed An operator has been dispatched and has manned the SSF control room.

LOCA CD Tab has been completed up to step 22 INITIATING CUE:

The SRO directs you to line-up the normal Post LOCA Boron dilution flow path on Unit 1 beginning with step 22 of the EQP LOCA CD Tab.

CRO-31 0 Page 5 of 9 START TIME:

STEP 1: Step 22 WHEN breaker for 1LP-104 is closed, THEN open 1LP-104.

SAT STANDARD: The student located the control switch for LP-104 on VB2 in the unit 1 control room and rotates the switch in the OPEN direction. He then observes red OPEN indication is ON and the green CLOSED NS indication is OFF.

COMMENTS:

STEP 2: Step 23 Notify operator at SSF to open 1 LP-103 (Post LOCA Boron Dilute).

STANDARD: SSF operator notified SAT BOOTH/ EXAMINER NOTE: Valve will remain closed to simulate line blockage in the normal Post LOCA Boron Dilute line.

UN SAT COMMENTS:

STEP 3: Step 24 Verify 1LP-103 (Post LOCA Boron Dilute) is open.

SAT STANDARD: Candidate verifies the SSF operator observes red OPEN indication is ON and the green CLOSED indication is OFF for 1 LP-1 03.

U N SAT Cue: 1LP-103 indicates OPEN.

COMMENTS:

CRO-310 Page 6 of 9 STEP 4: Step 25 Verify flow through Post LOCA Boron Dilution valves by checking flow switch indication. SAT EXAMINER NOTE: There is a flow indicator on VB2 named FLOW/NO FLOW POST LOCA BORON DILUTION, NORM PATH (LP-103 & LP-104). Red = FLOW and Green

=No Flow. UNSAT STANDARD: Candidate observes the red FLOW light is OFF and the green NO FLOW light is ON, indicating no flow.

COMMENTS:

ALTERNATE PATH STEPS: Step 25 RNO Notify the TSC to provide guidance on use of the Alternate Post LOCA Boron Dilution flow path.

SAT STANDARD: Candidate notifies the SRO that the RNO is applicable U N SAT CUE: The SRO has consulted with the TSC and directs you to perform steps 27 and 28 to align the Alternate Post LOCA Boron Dilution flow path.

Examiner NOTE: Provide the candidate with a copy of Page 7 of 59 of the LOCA CD tab which contains the steps to be performed.

COMMENTS:

CRO-31 0 Page 7 of 9 STEP 6: Step 27 CRITICAL STEP Dispatch an operator to the Equipment Room to perform the following:

STANDARD: Candidate dispatches operator to the Equipment Room. UNSAT BOOTH CUE: Fire Timer 1 and inform the candidate that by using time compression breakers 1XSI-F5D, IXS1-F5C, and IXS1-F4D are closed. IF the candidate provides incorrect breaker nomenclature, repeat exactly what is directed by the candidate and only close those breakers that were correctly addressed.

COMMENTS:

STEP 7: Step 28 CRITICAL STEP WHEN breakers for the following are closed:

  • ILP-2

A. 1LP-105 B. 1LP-2 C. 1LP-1 UNSAT BOOTH CUE: Report to the CR that the breakers are closed for 1LP-105, ILP-1, and 1LP-2 STANDARD: Candidate confirms the breakers for 1 LP-1 05, 1 LP-1, and 1 LP-2 are closed by observing the green CLOSED indication ON and the red OPEN indication OFF for all three valves (indicates valves have power available).

Candidate then opens all three valves by rotating their respective control switches in the open direction and observing the red OPEN indication ON and the green CLOSED indication OFF for each valve.

EXAMINER CUE: Another operator will continue with this procedure.

COMMENTS:

I_________ END TASK STOP TIME:

CRO-310 Page 8 of 9 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 6 Critical to obtain boron dilution flow.

7 Critical to obtain boron dilution flow.

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

A Large Break LOCA has occurred on Unit 1.

RCPs have been secured.

HPI has been secured.

1 XS2-F3D (1 LP-1 04 Bkr (Post LOCA Boron Dilute)) has been closed An operator has been dispatched and has manned the SSF control room.

LOCA CD Tab has been completed up to step 22 INITIATING CUE:

The SRO directs you to line-up the normal Post LOCA Boron dilution flow path on Unit 1 beginning with step 22 of the EOP LOCA CD Tab.

CRO-401A Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0401 A FOLLOWING A LOSS OF ALL FDW, FEED A DRY SG WITH THE TDEFDWP CANDIDATE EXAMINER

CRO-401 A Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Following a loss of all FDW, Feed a Dry SG with the TD EFDWP Alternate Path:

No Facility JPM #:

CRO-401 modified KJA Rating(s):

System: APE-054 K/A: AA2.04 Rating: 42/4.3 Task Standard:

EFDW flow is established to the both SGs and the candidate has initiated a cooldown of the RCS to Tc <

550°F.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform _X Simulate

References:

EP/1/A/1800/001 Rule 3, (Loss of Main or Emergency FDW)

EP/1/A/1800/001 Rule 7, (SG Feed Control)

Validation Time: 15 minutes Time Critical: NO Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time Examiner: /

NAME SIGNATURE DATE COMMENTS

CRO-401 A Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS:

1. RECALL Snap 206
2. IMPORT files for CRO-401A
3. Activate Timer 1
4. Go to RUN and allow timer to take effect.
5. Place simulator in Freeze. Remaining in RUN during board walkdown may allow RCS pressure to increase to 2300 psig and require RULE 4 which is NOT the intent of this JPM
6. Go to RUN when directed by examiner.

CRO-401 A Page 4 of 9 Tools/Equipment/Procedures Needed:

EOP Rule 3, (Loss of Main or Emergency FDW)

EOP Rule 7, (SG Feed Control)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Loss of Main and Emergency Feedwater has occurred RULE 3 is in progress and complete up to Step 22 The Unit 1 TDEFDW pump has just been locally started.

INITIATING CUES:

The SRO directs you to complete RULE 3 beginning at Step 22.

CRO-401 A Page 5 of 9 START TIME:

STEP 1: Rule 3 Step 22 WHEN either exists:

SAT

  • Operator is in position at 1 FDW-31 3
  • Unit 1 TD EFDW PUMP has been manually started THEN continue.

UNSAT STANDARD: Candidate recognizes the WHEN step has been met.

COMMENTS:

STEP 2: Rule 3 Step 23 IAAT an operator is in position at1FDW-313, AND Unit 1 TD EFDW PUMP is NOT operating, SAT THEN notify the operator to open the oIIowing:

  • 1 FDW-313 (1A EFDW LINE DISCH TO 1A S/G X-CONN)
  • 1FDW-314(1BEFDWLINEDISCHTO1BS/GX-CONN) UNSAT STANDARD: Candidate recognizes that an operator is in NOT in position at 1 FDW 313 and the Unit 1 TD EFWP is operating, so he goes to the RNO step.

EXAMINER CUE: If asked, an operator is not yet in place at 1FDW-313.

COMMENTS:

STEP 3: Rule 3 Step 23 RNO GO TO Step 24 SAT STANDARD: Candidate proceeds to Step 24.

COMMENTS:

UNSAT

CRO-401 A Page 6 of 9 STEP 4: Rule 3 Step 24 Verify either exists:

SAT

  • HPI Forced Cooling is maintaining core cooling
  • CBP feed providing SG feed STANDARD: Candidate recognizes that neither of the above conditions are met and U N SAT proceeds to Step 24 RNO.

COMMENTS:

NOTE CRITICAL STEP Begin opening EFDW control valve when this step is reached. Flow to the SG will begin as soon as alternate unit valve is off closed seat. (N/A for this JPM plant conditions) AT 100 gpm could cause overcooling if adequate decay heat levels do NOT exist STEP 5: Rule 3 Step 24 RNO UNSAT

1. Establish a maximum of 100 gpm to each available intact SG using:

STANDARD: Candidate establishes a maximum of 100 gpm FW flow to each SG.

COMMENTS:

STEP 6: Rule 3 Step 24 RNO CRITICAL STEP

2. WHEN heat transfer is observed, THEN feed and steam SGs as necessary to stabilize Tc.

STANDARD: Once heat transfer is observed (SG pressure & temperature increasing) SAT candidate stops the temperature increase by adjusting FDW flow rate along with TBV position.

U N SAT EXAMINER NOTE: Heat transfer is observed when SG pressures begin to rise.

TB Vs are attempting to control pressure at 1010 psig. Since SQ pressure is below that the TB Vs are closed. When feed is initiated, SG pressure will begin to increase towards 1010 psig (assuming TB VS are left as-is). Once heat transfer is observed, FDW flow can be increased to stabilize Tc.

COMMENTS:

CRO-401 A Page 7 of 9 STEP 7: Rule 3 Step 24 RNO

3. IF SSF event in progress, AND SSF event occurred while in Mode 1 or 2, SAT THEN feed SGs per Rule 7 (SG Feed Control) Table 1 guidance.

STANDARD: Candidate determines SSF event not in progress so this step is N/A.

UNSAT EXAMINER CUE: If asked, the SSF is not manned and initiation of AP/25 has not been directed.

COMM ENTS:

STEP 8: Rule 3 Step 24 RNO CRITICAL STEP

4. IF SSF event NOT in progress AND Tc > 550 °F, THEN initiate cool down to 550°F by feeding steaming intact SAT SGs at a rate that prevents RCS saturation using either:
  • ADVs UNSAT STANDARD: Candidate notes that Tc is > 550°F, ensures Tc is no longer increasing, and initiates cooldown to < 550 °F by slowly increasing FDW and adjusting TBV position.

EXAMINER NOTE: Candidate will adjust feed rate and/or TBV position as required to establish a controlled cooldown. Tech Spec cooldown rate limits do apply.

EXAMINER CUE: As soon as candidate has control of Tc and begins cooldown toward <550°F, inform him that another operator will continue with this procedure.

COMMENTS:

END TASK STOP TIME:

CRO-401A Page 8 of 9 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 5 Required to initiate EFDW flow to the A & B SGs and critical 1 00 gpm.

6 Required to control T to stop heatup and to prevent overcooling when EFDW flow introduced to dry SGs.

8 Required to accomplish a controlled RCS cooldown.

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Loss of Main and Emergency Feedwater has occurred RULE 3 is in progress and complete up to Step 22 The Unit 1 TDEFDW pump has just been locally started.

INITIATING CUES:

The SRO directs you to complete RULE 3 beginning at Step 22.

CRO-41 2 Page 1 of 13 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-41 2 Align ECCS Suction with 1 LPSW-4 Failed Closed CANDIDATE EXAMINER

CRO-41 2 Page 2 of 13 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Align ECCS Suction to the Emergency Sump Alternate Path:

Yes Facility JPM #:

Modified CRO-405 K/A Rating(s):

System: BW!E08 K/A: EA1.1 Rating: 4.0/3.7 Task Standard:

EP/1/A/1 800/00 1 Enclosure 5.12, ECCS Suction Swap to RBES is properly completed to align ECCS to the Emergency sump.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform _X_ Simulate

References:

EP/1/A/1 800/001, LOCA CD tab .12 (EGOS Suction Swap to RBES) of the FOP Validation Time: 20 minutes Time Critical: NO Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time:

Examiner:

NAME SIGNATURE DATE COMMENTS

CRO-41 2 Page 3 of 13 SIMULATOR OPERATOR INSTRUCTIONS

1. Recall SNAP 205
2. Import files for CRO-41 2
3. ENSURE BWST on OAC (SHOWDIG 01 P1600)
4. Go to run when directed by examiner
5. Timer 3 will lower BWST Level to < 15 if needed at step 4
6. Timer 4 will lower BWST Level to <9 if needed at step 5
7. Timer 4 will lower BWST Level to <6 if needed at step 7

CRO-412 Page 4 of 13 Tools/Equipment/Procedures Needed .12, ECCS Suction Swap to RBES, of the EOP READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS A large break LOCA has occurred which is depleting the BWST.

BWST level is 19.0 feet INITIATING CUES The Control Room SRO directs you to Align ECCS Suction to the Emergency Sump per EOP .12, ECCS Suction Swap to RBES.

CRO-41 2 Page 5 of 13 START TIME:

STEP 1: Step 1 Start both of the following:

  • 1BLPIPump STANDARD: Locates control switches for 1A and 1 B LPI Pumps on 1 UB2 and SAT observes red ON lights are illuminated and pump amps indicated.

Continue to Step 2 UNSAT COMMENTS:

STEP 2: Step 2 Verify either:

  • LPI FLOWTRAINALPI FLOWTRAIN B3400gpm
  • Only one LPI header is operating, AND flow in that header is 2900 gpm STANDARD: Candidate should determine that step is met by observing LPI FLOW SAT TRAIN A pj LPI FLOW TRAIN B is 3400 gpm. Flow gauges are located on 1UB2.

Continue to Step 3 UNSAT COMMENTS:

STEP 3: Step 3 GO TO Step 52 STANDARD: GO TO Step 52. SAT Continue to Step 52 COMMENTS: UNSAT

CRO-41 2 Page 6 of 13 STEP 4: Step 52 CRITICAL STEP WHEN BWST level is 15, THEN stop aN HPI pumps.

STANDARD: Locates the BWST level gauges on 1 UB2. The candidate determines level to be 15.

or May obtain BWST level from the OAC (Operator Aid Computer), at 1 UB1, 1 UB2, or STA monitor. SAT or ICCM monitors on 1UB1.

UN SAT Candidate places control switch for any operating HPI pump in the TRIP position and observes Ji HPI pumps are not operating by the red ON lights not illuminated.

Continue to Step 53 Cue: If needed, inform candidate that using time compression BWST level will be lowered to < 15 and RB level will be increased.

COMMENTS:

NOTE RB level of 2 is expected when BWST level reaches 9.

STEP 5: Step 53 WHEN BWST level 9, AND RB level is rising, THEN continue procedure.

STANDARD: Observes BWST level <9 feet on gauges on 1 UB2 or from the OAC SAT (1 UB1, 1 UB2, or STA monitor) or the ICCM monitors on 1 UB1.

Continue to Step 54 UNSAT Cue: If needed, inform candidate that using time compression BWST level will be lowered to <9 and RB level will be increased.

COMMENTS:

CRO-41 2 Page 7 of 13 STEP 6: Step 54 CRITICAL STEP Simultaneously open the following:

STANDARD: Candidate locates the control switch for 1LP-19 (lA RX. BLDG.

SUCTION) on 1 UB2 and rotates the switch in the OPEN direction.

Observes red OPEN light comes on, and green CLOSED light goes off.

Then locates the control switch for 1 LP-20 (1 B RX. BLDG. SUCTION) SAT on 1 UB2 and rotates the switch in the OPEN direction. Observes red OPEN light comes on, and green CLOSED light goes off.

Continue to Step 55 U N SAT Note: The candidate should operate both valves at the same time.

COMMENTS:

STEP 7: Step 55 IAAT BWST level 6, THEN perform Steps 56 59.

STANDARD: Candidate verifies BWST level 6 using:

BWST level gauges on 1 UB2.

BWST level from the OAC, at 1 UB1, 1 UB2, or STA monitor.

ICCM monitors on 1UB1.

SAT When BWST level is 6 go to the IAAT step and then perform Steps 56 through 59 Continue to Step 56 UNSAT Cue: If needed, inform candidate that using time compression BWST level will be lowered to <6 and RB level will be increased.

COMMENTS:

STEP 8: Step 56 Verify 1 LP-1 9 open. (1A RB Suction)

STANDARD: Locates the control switch for 1LP-19 on 1 UB2 and observes red OPEN SAT light is illuminated.

Continue to Step 57 UNSAT COMMENTS:

CRO-41 2 Page 8 of 13 STEP 9: Step 57 Verify 1 LP-20 open. (1 B RB Suction)

STANDARD: Locates the control switch for 1 LP-20 on 1 UB2 and observes red OPEN light is illuminated. SAT Continue to Step 58 COMMENTS: UNSAT STEP 10: Step 58 CRITICAL STEP Simultaneously close the following:

o 1LP-21 (1A LPI BWST Suction)

STANDARD: The candidate locates the control switch for 1 LP-21 on 1 UB2 and rotates it in the CLOSE direction. Observes green closed light on and red open SAT light off The candidate then locates the control switch for 1 LP-22 on 1 UB2 and UN SAT rotates it in the CLOSE direction. Observes green closed light on and red open light off.

Note: The candidate should operate both valves at the same time.

COMMENTS:

STEP 11: Step 59 Dispatch an operator to close 1 LP-28 (BWST Outlet) (East of Unit 1 SAT BWST).

STANDARD: An operator is dispatch to close 1 LP-28 (BWST Outlet) (East of Unit 1 BWST). Should inform that EDLs are in effect UNSAT Booth cue: An operator has been dispatched to close 1LP-28.

COMM ENTS:

CRO-41 2 Page 9 of 13 STEP 12: Step 60 Verify any are open:

  • 1LPSW-5 STANDARD: Determines that 1 LPSW-5 is open based on light indications on 1VB2 UN SAT COMMENTS:

STEP 13: Step6l Verify both are open:

  • 1LPSW-5 STANDARD: Determines that 1LPSW-4 is closed based on light indications on 1VB2 and proceeds to RNO column. UNSAT COMMENTS:

STEP 14: Step 61 RNO *CRIT1CAL STEP

1. IF 1 LPSW-4 is closed, AND flow exists on LPI FLOW TRAIN B, THEN perform the following:
1. Open 1 LPSW-5. SAT
2. *Stop 1A LPI PUMP.
3. *Close 1LP-17.
4. GOTOStep67.

UNSAT STANDARD:

1. Determines flow exists in LPI Train B
2. Determines that 1 LPSW-5 is open based on light indications on 1 VB2
3. Uses pump controls on 1 UB2 and stops the 1A LPI Pump
4. Uses valve switch on 1 UB2 and closes 1 LP-1 7
5. Proceeds to step 67 COMMENTS:

CRO-41 2 Page 10 of 13 STEP 15: Step 67 IAAT an operating LPI Pump fails, Then perform steps 68-74 STANDARD: Determines that the 1 B LPI pump is still operating and the 1A LPI Pump SAT was secured by procedure therefore the IAAT is not met and proceeds to step 67 RNO.

UN SAT COMMENTS:

STEP 16: Step 67 RNO Go To step 75 STANDARD: Proceeds to step 75 SAT COMMENTS:

UNSAT STEP 17: Step 75 Open:

  • 1HP-940 STANDARD: Locates valve switches on 1 UB2 and opens both valves U N SAT COMMENTS:

STEP 18: Step 76 Notify Chemistry to periodically sample LPI discharge for boron concentration. SAT STANDARD: Chemistry is notified to periodically sample LPI discharge for boron concentration U N SAT COMMENTS:

CRO-41 2 Page 11 of 13 STEP 19: Step 77 Close:

  • 1LP-16 STANDARD: Locates valve indications 1 UB2 and determines that both valves are already closed. UNSAT COMMENTS:

STEP 20: Step 78 When 1 LP-28 is closed, Then continue with this procedure.

SAT STANDARD: Waits until notified that 1 LP-28 is closed prior to proceeding CUE: Another operator will continue with this procedure UNSAT COMMENTS:

END TASK STOP TIME:

CRO-41 2 Page 12 of 13 CRITICAL STEP EXPLANATIONS STEP # Explanation 4 Protects HPI pumps 6 Aligns LPI Pump suction to Reactor Building Emergency Sump.

10 Secures LPI Pump suction from the BWST.

14 Promotes core cooling by ensuring cooling water available to injection water

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS A large break LOCA has occurred which is depleting the BWST.

BWST level is 19.0 feet INITIATING CUES The Control Room SRO directs you to Align ECCS Suction to the Emergency Sump per EOP .12, ECCS Suction Swap to RBES.

CRO-600 Page 1 of 12 REGION N INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-600 RECOVER FROM SWITCHYARD ISOLATION CANDIDATE EXAMINER

CRO-600 Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Recover from Switchyard Isolation Alternate Path:

No Facility JPM #:

CR0-BOO K/A Rating(s):

System: BW/A05 K/A: AA1.1 Rating: 4.3/4.2 Task Standard:

Recovery from Switchyard Isolation is performed correctly including manually synchronizing the overhead Keowee Unit onto the 230 Ky Red Bus.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator _X_ In-Plant Perform X Simulate

References:

AP/1/A/1700/011 (Recovery From Loss of Power) Enclosure 5.3 Validation Time: 20 minutes Time Critical: NO Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time Examiner: /

NAME SIGNATURE DATE COMMENTS

CRO-600 Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS:

1. RECALL Snap 214
2. IMPORT files for CRO-600
3. Goto RUN
4. At Step 6, use QUICK STRIKE to transfer control of Keowee

CRO-600 Page 4 of 12 Tools/Equipment/Procedures Needed:

AP/1/A/1 700/011 (Recovery From Loss of Power) Enclosure 5.3 complete up to step 3 READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 and Unit 2 reactors have tripped
  • Unit 3 remains online at 100% power
  • Power has been restored to Unit 1 and Unit 2s Main Feeder Buses from Keowee Unit 1 via the overhead power path
  • The TCC has notified Oconee that the 230 Ky transmission system voltage and frequency has returned to normal and recovery from switchyard isolation may be initiated.
  • AP!1 IA/i 700/011 (Recovery From Loss of Power) has been entered and Enclosure 5.3 is complete up to step 3 INITIATING CUES:

The SRO in the control room instructs you to utilize Enclosure 5.3 of AP/Ol 1 (Recovery From Loss of Power) to recover from the Switchyard Isolation beginning at step 3.

Manual Synchronization of the Overhead KHU onto the 230 Ky grid has been directed by the Emergency Coordinator.

TCC has granted permission to connect the KHU to the grid.

CRO-600 Page 5 of 12 START TIME:

STEP 1: Step 3 Verify NO ES 1 or 2 actuation on y Oconee unit:

  • Unit2
  • Unit3 U N SAT STANDARD: Verify ES 1 or 2 has NOT actuated on Unit 1 by observing the RZ modules and/or statalarms. Contact Unit 2 and 3 to determine if ES 1 or 2 has actuated.

Continue to Step 4.

Booth/ Examiner cue: Unit 2 and 3 have not had an ES actuation.

COMMENTS:

STEP 2: Step 4 Position of the following AUTO/MAN transfer switches to MAN:

SAT V V UI U2 U3 Transfer Switch TA AUTO/MAN UNSAT TB AUTO/MAN STANDARD: Place the Unit 1 TA and TB AUTO/MAN transfer switches to MAN.

Contact Unit 2 and 3 by phone and have them ensure TA and TB AUTO/MAN transfer switches in MAN.

Continue to Step 5.

Booth/Examiner Cue: Unit 2 and 3 TA and TB AUTO/MAN transfer switches are in MANUAL.

COMMENTS:

CRO-600 Page 6 of 12 STEP 3: Step 5 *CRITICAL STEP Depress aM of the following RESET pushbuttons:

  • *GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL 1 RESET
  • *GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL 2 SAT RESET
  • GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 1 RESET
  • GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 2 RESET UNSAT STANDARD: The following RESET pushbuttons are depressed:
  • GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL 1 RESET
  • GRID TROUBLE PROTECTIVE SYSTEM U.V. CHANNEL 2 RESET
  • GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 1 RESET o GRID TROUBLE PROTECTIVE SYSTEM U.F. CHANNEL 2 RESET Continue to Step 6.

Note: Buttons are located on the electrical mimic board.

Critical COMMENTS:

STEP 4: Step 6 Verify the following statalarms are off:

  • SA-15/A-2 (CHANNEL #1 UNDERFREQUENCY)
  • SA-15/A-4 (CHANNEL #2 UNDERFREQUENCY) SAT
  • SA-15/C-1 (CHANNEL #1 UNDERVOLTAGE)
  • SA-15/C-3 (CHANNEL #2 UNDERVOLTAGE)

STANDARD: The above Statalarms are verified to be off. Statalarms are located on SA-1 5.

Continue to Step 7.

COMMENTS:

CRO-600 Page 7 of 12 STEP 5: Step 7 CRITICAL STEP Notify Keowee Operator to transfer control of Keowee units to Oconee. SAT STANDARD: Contact Keowee Operator, by phone, to transfer control of Keowee units to Oconee.

U N SAT Continue to Step 8.

BOOTH CUE: Use QUICK STRIKE to transfer control of both Keowee units to Oconee.

EXAMINER NOTE: When both Keowee units are transferred to Oconee, statalarms 2SA- 1 7/E- 1 and 2SA- 18/E- I actuate.

COMM ENTS:

STEP 6: Step 8 Verify both channels of all Oconee units Main Feeder Bus Monitor Relay Panels reset as indicated by the following statalarms off:

SAT Ui U2 U3 Statalarms 1 (2)(3)SA-15/D-4 (LOAD SHED CHNL A LOGIC UNSAT I N IT lATE) 1 (2)(3)SA-14/D-4 (LOAD SHED CHNL B LOGIC INITIATE) 1 (2)(3)SA-15/D-6 (TRANS TO SBCHNLALOGIC INITIATE) 1 (2)(3)SA-14!D-6 (TRANS TO SB CHNL B LOGIC INITIATE)

STANDARD: Both channels of Oconee unit 1 Main Feeder Bus Monitor Relay Panel is verified reset as indicated by observing the above statalarms off. Contact Unit 2 and 3 and have them verify their alarms are off to verify their Main Feeder Buses are reset.

Continue to Step 9.

Booth/Examiner cue: Unit 2 and 3 Statalarms are off.

COMMENTS:

CRO-600 Page 8 of 12 STEP 7: Step 9 Verify overhead Keowee unit energizing gy Oconee unit MFB SAT STANDARD: Determine that Keowee Unit 1 is energizing Oconee Unit 1 MFBs via the overhead path, by observing Keowee Unit 1 has emergency started and ACB-1 is closed energizing unit ls MFBs. UNSAT Continue to Step 10.

COMMENTS:

STEP 8: Step 10 GO TO Step 23 STANDARD: Candidate goes to Step 23. SAT COMMENTS:

U N SAT STEP 9: Step 23 Verify Keowee overhead unit is energizing y Oconee unit MFB.

SAT STANDARD: Determine that Keowee Unit 1 is energizing Oconee Unit 1 MFBs via the overhead path, by observing Keowee Unit 1 has emergency started and ACB-1 is closed energizing Unit ls MFBs.

U N SAT Continue to Step 24.

COMMENTS:

CRO-600 Page 9 of 12 STEP 10: Step 24 Notify Emergency Coordinator to determine which of the following is desired:

  • Manually synchronize overhead Keowee unit onto the 230 KV Red SAT Bus
  • Disconnect overhead Keowee unit from the 230 KV Yellow Bus and reconnect (dead bus transfer) 230 Ky Yellow Bus to the System Grid U N SAT STANDARD: Refers to candidate Cue sheet and determines that Manual Synchronization is desired.

Continue to Step 25.

Booth/Examiner Cue: If asked, the Emergency Coordinator determines that manually synchronizing the overhead Keowee unit onto the 230 KV Red Bus is desired.

COMMENTS:

STEP 11: Step 25 Verify manual synchronization of the overhead Keowee Unit onto the System Grid via the 230 KV Red Bus is desired.

SAT STANDARD: Determine from previous discussion with the Emergency Coordinator and/or Candidate Cue sheet that manual synchronization of the overhead Keowee Unit onto the System Grid via the 230 KV Red Bus is desired. UNSAT Continue to Step 26.

COMMENTS:

STEP 12: Step2G Obtain permission from TCC to connect overhead Keowee unit (230 KV Yellow Bus Supply) to the System Grid. SAT STANDARD: From Candidate Cue sheet determines that permission from TCC has been granted. UNSAT Continue to Step 27.

Booth/Examiner Cue: If asked, the TCC gives permission to connect overhead Keowee unit (230 KV Yellow Bus Supply) to the System Grid.

COMMENTS:

CRO-600 Page 10 of 12 STEP 13: Step 27 *CRITICAL STEP Perform the following to sync and tie overhead Keowee unit (Yellow Bus Supply) to 230 KV Red Bus:

SAT A. Establish communications with Keowee Operations.

B. Press and hold PCB-8 SYNC push button.

C. Make the following adjustments concurrently as required: UNSAT

1. Adjust overhead Keowee unit SPEED CHANGER MOTOR to establish a slow clockwise rotation of the 230 Ky switchyard SYNCHROSCOPE.
2. Utilize overhead Keowee unit AUTO VOLTAGE ADJUSTER to increase/decrease 230 KV switchyard BUS SIDE SYNC POT to match 230 Ky switchyard LINE SIDE SYNC POT when the 230 KV switchyard SYNCH ROSCOPE pointer is vertical.

D. WHEN 230 Ky switchyard SYNCHROSCOPE pointer is 5° before reaching vertical, THEN close PCB-8.

E. Release PCB-8 SYNC push button.

STANDARD: The overhead Keowee unit (Yellow Bus Supply) is synced and tied to the 230 1KV Red Bus by:

Establishing communications with Keowee Operations.

Examiner Cue: The second operator is available to depress the PCB-8 SYNC button as directed by the candidate. All other manipulations must be performed by you.

  • Depressing and holding the PCB-8 SYNC push button.
  • Adjusting the overhead Keowee unit SPEED CHANGER MOTOR to synchronize overhead Keowee unit to 230 KV Red Bus.
  • WHEN synchronization is achieved, THEN perform the following:

> *Close PCB-8 (Red closed light illuminated).

Release PCB-8 SYNC push button.

Note: The SYNC CHECK provides only indication, NOT protection against out of phase closure.

EXAMINER CUE: Inform candidate that another operator will continue with this procedure.

COMMENTS:

END TASK STOP TIME:

CRO-600 Page 11 of 12 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 3 Reset buttons must be pushed to reset the Switchyard Isolation circuit to allow PCBs to be repositioned.

5 Oconee must have Keowee control to operate any Keowee Unit.

13 Manually syncing of the Keowee Unit is required to put the Oconee axillaries on the switch yard.

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Unit 1 and Unit 2 reactors have tripped
  • Unit 3 remains online at 100% power
  • Power has been restored to Unit 1 and Unit 2s Main Feeder Buses from Keowee Unit 1 via the overhead power path
  • The TCC has notified Oconee that the 230 Ky transmission system voltage and frequency has returned to normal and recovery from switchyard isolation may be initiated.
  • AP/1/A/1700/011 (Recovery From Loss of Power) has been entered and Enclosure 5.3 is complete up to step 3 INITIATING CUES:

The SRO in the control room instructs you to utilize Enclosure 5.3 of AP/Ol 1 (Recovery From Loss of Power) to recover from the Switchyard Isolation beginning at step 3.

Manual Synchronization of the Overhead KHU onto the 230 Ky grid has been directed by the Emergency Coordinator.

TCC has granted permission to connect the KHU to the grid.

CRO-701 Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-701 Adjust RIA-40 Setpoints CANDIDATE EXAMINER

CRO-701 Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Adjust RIA-40 Setpoints.

Alternate Path:

No Facility JPM #:

New K/A Rating(s):

System: APE 061 K/A: AA2.03 Rating: 3.0/3.3 Task Standard:

RIA-40 setpoint adjusted to allow alarm if SG tube leakage increases.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator _X_ In-Plant Perform X Simulate

References:

AP/1/A/1 700/03 1 Primary to Secondary Leakage Validation Time: 18 minutes Time Critical: NO Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time Examiner: /

-- NAME SIGNATURE DATE COMM ENTS

CRO-701 Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall SNAP 208
2. Import files for CRO-701
3. Go to RUN and allow the simulator to RUN long enough to ensure the following QAC points are in alarm:

o Est Total Pri to Sec Leak Rate (15 mm avg) o 1RIA-59 MS-lA N-16 Mon High Alarm.

4. Goto FREEZE
5. Go to RUN when directed by lead examiner

CRO-701 Page 4 of 9 Tools/Equipment/Procedures Needed:

AP/1/A/1700/031 (Primary to Secondary Leakage) completed up to step 4.49 and Enclosure 5.8 (Resetting 1 RIA-40 and OAC Setpoints)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 is at 100% power and is experiencing a SG tube leak of about 13 gpd on the 1A SG.

AP/31 (Primary to Secondary Leakage) is in progress and has been completed up to step 4.49 The latest Primary Chemistry RCS sample shows RCS Xe 133 equivalent corrected to be 1 jiCi/mI 3.75E INITIATING CUE:

The Control Room SRD directs you to perform step 4.49 of AP/31 (Primary to Secondary Leakage).

CRO-701 Page 5 of 9 START TIME:

STEP 1: 4.49 PERFORM End 5.8 (Resetting 1 RIA-40 and OAC Setpoints) to set the following alarm setpoints:

  • 1 RIA-40 Alert 30 gpd
  • OAC point 01 Ki 430 (TOTAL PRI TO SEC LEAKRATE ADMIN LIMIT) -30 gpd UNSAT STANDARD: Candidate notes setpoints and proceeds to End 5.8.

COMMENTS:

NOTE:

RCS Xe 133 equivalent corrected is required for this calculation.

STEP 2: End 5.8 Step 1 Obtain RCS Xe 133 equivalent corrected from latest available Primary SAT Chemistry RCS sample.

STANDARD: Candidate enters 3.75E 1 or .375 from given initial conditions. UNSAT COMMENTS:

STEP 3: End 5.8 Step 2 CRITICAL STEP Determine 1 RIA-40 High setpoint from the following formulas:

SAT High RCS Xe 133 eq coir (iiCin1) 2.71E+3 (fi)(da)(cpni)

Lthate IRJA.40 High Selpoint (cpm X 100 X (giCinI) UNSAT (gpd)

IRLA-40 High Setpoini pci/mi 2,71E+3 (&)(day)(cpth)

(cp1ll X = cpm 100 fi hnin 3 (gal)(nnn)(pCiiml)

STANDARD: Candidate enters 75 in gpd block (given in initial conditions) and enters

.375 in pCi/mI block (from step 1) and performs calculation which yields an answer of 762 (+/-1) cpm.

COMMENTS:

CRO-701 Page 6 of 9 STEP 4: End 5.8 Step 3 CRITICAL STEP Determine 1 RIA-40 Alert setpoint from the following formulas:

SAT RCS Xe 133 eqcQtr flE3 (XdaXcp I.eha IRIA4O ?Je Setpoint cpa X too Wu X (Ci U NSAT (gp 1Ri40AkiiSqoiiit x

100 Wiiiiu (aCin1)

STANDARD: Candidate enters 30 in gpd block (given in initial conditions) and enters

.375 in iCi/mI block (from step 1) and performs calculation which yields an answer of 305 (+/-1) cpm.

COMMENTS:

STEP 5: *CRITICAL STEP End 5.8 Step 4 Enter the new 1 RIA-40 Alert and High Setpoints in the AlA View Node.

SAT STANDARD: Candidate enters new setpoints in RIA View Node as follows:

1. Cursor to RIA-40 and depresses keyboard ENTER key
2. Cursor to ENABLE CONTROLS and depresses keyboard ENTER key. UNSAT
3. Cursor in ALERT box and depresses numbers pad ENTER.
4. numerical value 305 and depresses numbers pad ENTER.
5. Cursor in HIGH box and depresses numbers pad ENTER.
6. *Enters numerical value 762 and depresses numbers pad ENTER.

E)(AMINER NOTE: Adjusting the above setpoints clears 1RIA-40 statalarms (iSA 8/B-9 and 1SA-8/DiO). Candidate may depress the ESC key to return to the main menu. Exact methodology in the above standard is not critical and may be performed from any computer terminal the candidate desires. Critical steps are getting new setpoints of 305 and 762 entered.

COMMENTS:

CRO-701 Page 7 of 9 STEP 6: End 5.8 Step 5 *CRITICAL STEP Enter the new OAC TOTAL PRI TO SEC LEAKRATE ADMIN LIMIT by performing the following:

  • A Enter MVU. SAT
  • B Select PRI-LEAK PRIMARY TO SECONDARY LEAKAGE MANUAL INPUTS.
  • C Select UPDATE. UNSAT
  • D. Select 01 K1430 (TOTAL PRI TO SEC LEAKRATE ADMIN LIMIT).
  • E. Enter the new TOTAL PRI TO SEC LEAKRATE ADMIN LIMIT.

F. Enter your LAN identification and reason for change.

  • G. Select SAVE.

STANDARD: Candidate enters 30 gpd as new PRI TO SEC LEAKRATE ADMIN LIMIT in accordance with above A G.

EXAMINER NOTE: The OAC alarm(s) for 1RIA-40 clears after its next computer point refresh is complete. It also clears 1RIA-40 statalarms (ISA -8/8-9 and iSA 8/DIO) When the new setpoint has been properly saved in G above, the OAC will display a message that says Value Has Been Updated.

COMMENTS:

STEP 7: End 5.8 Step 6 EXIT this enclosure.

SAT STANDARD: Candidate exits this enclosure, informs the CR SRO that he has completed Enclosure 5.8, and returns cue sheet to examiner.

COMMENTS: UNSAT END TASK STOP TIME:

CRO-70 1 Page 8 of 9 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 3 Accurate calculation required to enter correct number for new setpoint in step 5 4 Accurate calculation required to enter correct number for new setpoint in step 5 5 Setpoint changed correctly gives crew an indication of increased SG tube leakage.

6 Adjusts the QAC alarm setpoint and therefore provides the operator a cue if SGTL size increases

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 is at 100% power and is experiencing a SG tube leak of about 13 gpd on the 1A SG.

AP/31 (Primary to Secondary Leakage) is in progress and has been completed up to step 4.49 The latest Primary Chemistry RCS sample shows RCS Xe 133 equivalent corrected to be 1 pCi/mI 3.75E INITIATING CUE:

The Control Room SRO directs you to periorm step 4.49 of AP/31 (Primary to Secondary Leakage).

CRO-802 Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-802 RESPOND TO A FUEL HANDLING ACCIDENT IN THE REACTOR BUILDING CANDIDATE EXAMINER

CRO-802 Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Respond to a fuel handling accident in the Reactor Building.

Alternate Path:

No Facility JPM #:

New K/A Rating(s):

System: APE 036 K/A: AA1.01 Rating: 3.3/3.8 Task Standard:

Containment evacuated and RB purge secured in accordance with direction in AP/1/AI1 700/009 (Spent Fuel Damage).

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

AP/1/A/1700/009 Spent Fuel Damage Validation Time: 14 minutes Time Critical: NO Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time Examiner: /

NAME SIGNATURE DATE COMMENTS

CRO-802 Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall SNAP 209
2. Import files
3. Change NI chart to Source Range
4. Place RB Evacuation Alarm to Enable
5. GOTO RUN

CRO-802 Page 4 of 11 Tools/Equipment/Procedures Needed:

AP/1/A/1700/009 Spent Fuel Damage READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide iniflating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 is in Mode 6 with fuel movement in progress A fuel assembly was dropped in the Unit 1 RB and the CR SRO has announced entry into AP/1/A/1700/009 Spent Fuel Damage 1 RIA-49 is in Alarm INITIATING CUE:

The Control Room SRO directs you to perform AP/1/A/1700/009 Spent Fuel Damage.

CRO-802 Page 5 of 11 START TIME:

STEP 1: Step 4.1 Verify affected area is Units 1 & 2 SFP.

SAT STANDARD: Candidate notes that the dropped fuel assembly is in the RB, and therefore proceeds to Step 4.1 RNO U N SAT EXAMINER NOTE: The dropped fuel assembly caused 1SA-8/B-9 (RM Process Monitor Radiation High) and 1SA-8/E-9 (RM Reactor Building Normal Sump Isolate) to come into alarm. The candidate may note that the Reactor Building Evacuation alarm (1SA-8/E-8) should have also actuated and may choose to actuate it by placing its switch to test at this time. That is acceptable, but is not required until step 3 (step 4.14) below.

COMMENTS:

STEP 2: Step 4.1 RNO GO TO Step 4.14.

STANDARD: Candidate goes to Step 4.14. SAT COMMENTS:

UNSAT STEP 3: Step 4.14 CRITICAL STEP Place REACTOR BUILDING EVACUATION switch to TEST.

STANDARD: Candidate places REACTOR BUILDING EVACUATION switch to TEST. SAT EXAMINER NOTE: This will actuate the Reactor Building Evacuation Alarm (RBEA) and statalarm 1SA-8/E-8 (RM Reactor Building Evacuation), since 1RIA-49 failed to UNSAT actuate the RBEA.

COMMENTS:

CRO-802 Page 6 of 11 NOTE Due to relaxed refueling Tech Spec requirements, penetration openings are allowed during fuel movement of fuel that has been sub critical for> 72 hrs. Any open penetrations must be isolated within 30 minutes of fuel damage. SAT STEP 4: Step 4.15 Notify Containment Closure Coordinator to ensure containment isolated per OP/i/Ni 502/009 (Containment Closure Control). {2} UNSAT STANDARD: Containment Closure Coordinator notified.

EXAMINER CUE: Containment Closure Coordinator notified.

COMMENTS:

STEP 5: Step 4.16 Announce Plant conditions using PA System including areas requiring evacuation.

STANDARD: Candidate announces dropped fuel assembly in RB and entry into SAT AP/09. He should also announce evacuation of the entire RB at this time.

COMMENTS: UNSAT STEP6: Step4.i7 Notify the OSM to reference the following:

  • NSD-202 (Reportability)

STANDARD: Candidate notifies OSM U N SAT COMMENTS:

CRO-802 Page 7 of 11 STEP7: Step4.18 Start the following: {1}

  • A Outside Air Booster Fan SAT
  • B Outside Air Booster Fan STANDARD: Candidate places the A & B Outside Air Booster Fan control switches to the ON position and verifies they both started by observing their RED UNSAT lights ILLUMINATED.

COMMENTS:

STEP 8: Step 4.19 Notify Unit 3 to start the following: {1}

  • 3A Outside Air Booster Fan SAT
  • 3B Outside Air Booster Fan STANDARD: Candidate notifies Unit 3.

UNSAT COMMENTS:

NOTE Stopping the RB purge may cause increase of SFP level if compressed air is open in the RB. SAT STEP 9: Step 4.20 Stop Unit 1 RB Purge Fan.

UNSAT STANDARD: Candidate rotates the Unit 1 RB Purge Fan control switch to the STOP position and verifies GREEN light ILLUMINATED and RED light OFF.

COMMENTS:

CRO-802 Page 8 o11 STEP 10: Step 4.21 *CRITICAL STEP Close the following:

  • 1PR-6 STANDARD: Candidate rotates control switches for 1 PR-i, 1 PR-2, 1 PR-4, 1 PR-5, and 1 PR-6 to the CLOSE position and verifies each valve closed by observing GREEN light ILLUMINATED and RED light OFF. He also rotates knob for 1 PR-3 fully counterclockwise (in the decrease direction) to ensure zero demand (valve closed).

Examiner Note: Closing either 1PR-1, 1PR-2, OR 1PR-3 AND closing either IPR-4, 1PR-5, OR 1PR-6 satisfies the Critical Step since it would result in isolating both the intake and discharge flowpaths of the RB Purge.

COMMENTS:

STEP 11: Step 4.22 Notify RP to obtain and evaluate airborne particulate and gaseous samples from the Ui RB atmosphere. SAT STANDARD: Candidate notifies RP COMMENTS: UNSAT

CRO-802 Page 9 of 11 STEP 12: Step 4.23 Monitor the following Rad Monitors for an increase in radiation levels in the affected area:

1 RIA-3 (Fuel Transfer Canal Area Monitor) SAT 1 RIA-4 (RB Personnel Hatch Area Monitor) 1 RIA-47 (RB Particulate) 1RIA-48 (RB Iodine) 1 RIA-49 (RB Gas) UNSAT 1 RIA-49A (RB Gas HR).

STANDARD: Candidate notes that 1 RIA-49 (RB Gas) is in alarm.

EXAMIINER CUE: Inform the candidate that another operator will complete this procedure. If asked, another operator will also perform AP/18 to respond to the RIA alarm(s).

COMM ENTS:

END OF TASK STOP TIME:

CRO-802 Page 10 of 11 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 3 Necessary to evacuate personnel from the RB to prevent radiation exposure.

10 Necessary to isolate Containment to protect the public.

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 is in Mode 6 with fuel movement in progress A fuel assembly was dropped in the Unit 1 RB and the CR SRO has announced entry into AP/1/A/1700/009 Spent Fuel Damage 1 RIA-49 is in Alarm INITIATING CUE:

The Control Room SRO directs you to perform AP/1/A!1 700/009 Spent Fuel Damage.

NLO-300 Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE NLO-300 Swapping In Service Seal Return Coolers CANDIDATE EXAMINER

NLO-300 Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Swap In Service Seal Return Coolers from 3A to 3B Alternate Path:

No Facility JPM #:

New K/A Rating(s):

System: 002 (SF2)

K/A: A2.01 Rating: 4.3/4.4 Task Standard:

Seal Return Cooler 3B is in service and Seal Return Cooler 3A is isolated Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant _X Perform Simulate X

References:

AP/3/A/1 700/002 Excessive RCS Leakage AP!3/A/1700/018 Abnormal Release of Radioactivity Validation Time: 19 minutes Time Critical: NO Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time:

Examiner: /

NAME SIGNATURE -- DATE COMMENTS

NLO-300 Page 3 of 1 1 SIMULATOR OPERATOR INSTRUCTIONS:

None

NLO-300 Page4of 11 Tools/Equipment/Procedures Needed:

AP/3/A/1 700/002 (Excessive RCS Leakage)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit #3 is at 100% power The CR crew has noticed a small RCS leak and has entered AP/3/A/1 700/002 (Excessive RCS Leakage).

The CR crew has determined the leak to be in the Aux building and believe it is coming from the in service Seal Return Cooler due to a High Radiation Alarm on 3RIA-42 (RCW).

INITIATING CUES:

The Control Room Supervisor directs you to Swap Seal Return Coolers from 3A in service to 3B in service in accordance with AP/3/A/1 700/002 (Excessive RCS Leakage) Enclosure 5.7.

(Swapping In Service Seal Return Coolers).

NLO-300 Page 5 of 11 START TIME:

STEP 1: Step 1 Verify it is desired to place the 3B Seal Return Cooler in service SAT AND remove 3A Seal Return Cooler from service, STANDARD: Candidate confirms direction to swap Seal Return Coolers from 3A in service to 3B in service UNSAT COMMENTS:

STEP 2: Step 2 Ensure 3RCW-179 Controller (3HPI-ML-0029) (3B Seal Return Cir Temp Controller) set at 100°F. (A-i-Cal P91) SAT STANDARD: Locates controller in hallway on west wall and ensures the temperature setpoint is set at 100°F.

UN SAT COMMENTS:

STEP 3: Step 3 CRITICAL STEP Perform the following (A-i -Waste Disposal Sample Hood Area):

  • Open 3RCW-1 80 (3B Seal Return Cooler Temp Cont Outlet)

STANDARD: Ensures both valves are open by rotating their handwheels fully counterclockwise UNSAT COMMENTS:

N LO-300 Page 6 of ii STEP 4: Step 4 CRITICAL STEP Close 3RCW-1 81 (3B Seal Return Cooler Temp Cont Byp) (A-i -Waste Disposal Sample Hood Area).

STANDARD: Closes 3RCW-i81 by rotating its handwheel fully clockwise. SAT COMMENTS:

U N SAT STEP 5: Step 5 CRITICAL STEP Perform the following (A-i-N End LPI CIr Rm):

A. Close 3HP-75 (3B Seal Return CIr Inlet). SAT B. Close 3HP-77 (3B Seal Return CIr Outlet).

STANDARD: Closes 3HP-75 and 3HP-77 by rotating their handwheels fully clockwise.

U N SAT COMMENTS:

STEP 6: Step 6 CRITICAL STEP Perform the following to drain 3B Seal Return Cooler (A-i -N End LPI Clr Rm):

SAT A. Open 3GWD-57 (3B Seal Return Cooler Vent).

B. Open 3LWD-228 (RCP Seal Return Cooler B Drain).

C. Open 3LWD-461 (RCP Seal Return Cooler Drain Block).

U N SAT STANDARD: Opens 3GWD-57, 3LWD-228, and 3LWD-46i by rotating their handwheels fully counterclockwise.

COMMENTS:

NLO-300 Page 7 of 11 STEP 7: Step 7 WHEN 3B Seal Return Cooler is drained, THEN continue. SAT STANDARD: Applicant continues to next step E)(AMINER CUE: Inform the candidate that HA WT level has stopped increasing. UN SAT EXAMINER NOTE: Seal Return Coolers drain to the HAWT. To determine if when the cooler is drained, the candidate would either have to contact the control room to monitor for HAWT level or use the waste disposal panel indication of HAWT level which is located just north of the north exit of the room you are in.

COMMENTS:

STEP 8: Step 8 CRITICAL STEP Perform the following (A-i-N End LPI Cir Rm):

UNSAT STANDARD: Closes 1 GWD-56, 1 LWD-227, and 1 LWD-461 by rotating their handwheels fully clockwise.

COMMENTS:

NOTE 3B Seal Return Cooler volume is 43 gallons.

SAT STEP 9: Step 9 Notify CR to expect LDST to decrease 1 .4 due to filling and venting the 3B Seal Return Cooler. UNSAT STANDARD: Applicant simulates contacting the CR CUE: Once the applicant has simulated making the communication with the CR, inform him/her that the CR has been notified to expect the LDST to decrease 1.4.

COMMENTS:

NLO-300 Page 8 of 11 STEP 10: Step 10 CRITICAL STEP Open 3HP-75 (3B Seal Return Cir Inlet) (A-i-N End LPI Clr Rm).

SAT STANDARD: Opens 3HP-75 by rotating its handwheel fully counterclockwise.

COMMENTS:

U N SAT STEP 11: Step 11 CRITICAL STEP Vent 38 Seal Return Cooler using 3GWD-57 (3B Seal Return Cooler Vent) (A-i-N End LPI Cir Rm).

SAT STANDARD: Cracks open 3GWD-57 (counterclockwise) until air is removed. When venting complete, rotates 3GWD-57 fully clockwise to the closed position UNSAT CUE: If asked, in form the applicant that the 3B Seal Return Cooler has been vented (if not already described, examiner may ask applIcant how he/she would know the cooler was properly vented (HA WT level)).

COMMENTS:

STEP 12: Step 12 CRITICAL STEP Open 3HP-77 (3B Seal Return Cir Outlet) (A-i-N End LPI CIr Rm).

SAT STANDARD: Opens 3HP-77 by rotating its handwheel fully counterclockwise.

COMMENTS: UNSAT STEP 13: Step i3 CRITICAL STEP Close 3HP-72 (3A Seal Return Cooler Inlet) (A-i-N End LPI Cir Rm).

STANDARD: Closes 3HP-72 by rotating its handwheel fully clockwise.

SAT COMMENTS:

UN SAT

N LO-300 Page9of 11 STEP 14: Step 14 CRITICAL STEP Close 3HP-74 (3A Seal Return Cooler Outlet) (A-i-N End LPI Cir Rm).

STANDARD: Closes 3HP-74 by rotating its handwheel fully clockwise. SAT COMMENTS:

UNSAT STEP 15: Step 15 Notify Control Room of the following:

. 3A Seal Return Cooler is isolated.

SAT

. Update Component Boron Concentration Log that 3B Seal Return Cooler placed in service.

STANDARD: Applicant simulates contacting the CR UNSAT CUE: Once the applIcant has simulated making the communication with the CR, inform them that the CR has been notified that the 3A Seal Return Cooler has been isolated and the 3B Seal Return Cooler is in service.

COMM ENTS:

STEP 16: Step 16 Verify it is desired to place the 3A Seal Return Cooler in service, AND remove the 3B Seal Return Cooler from service SAT STANDARD: Candidate determines it is NOT desired and refers to RNO which says GO TO Step 31 UNSAT COMMENTS:

STEP 17: Step3l WHEN directed by Control Room, THEN EXIT this enclosure.

SAT STANDARD: Candidate exits enclosure and returns cue sheet to examiner.

COMMENTS:

UNSAT STOP TIME:

N LO-300 Page 10 of 11 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 3 Valves in cooling water supply to the 3B Seal Return Cooler.

4 Completes Valve lineup to valve in cooling water supply to the 3B Seal Return Cooler 5 Necessary to drain the 3B cooler 6 Drains the 3B cooler 8 Secures draining the 3B cooler.

10 Aligns seal return flow to the inlet of the 3B cooler in order to fill & vent the 3B cooler..

11 Venting the 3B Seal Return Cooler 12 Completes alignment of seal return flow through the 3B Seal Return Cooler.

13 Necessary to isolate the 3A Seal Return Cooler.

14 Completes isolation of the 3A Seal Return Cooler.

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit #3 is at 100% power The CR crew has noticed a small RCS leak and has entered AP/3/N1 700/002 (Excessive RCS Leakage).

The CR crew has determined the leak to be in the Aux building and believe it is coming from the in service Seal Return Cooler due to a High Radiation Alarm on 3RIA-42 (RCW).

INITIATING CUES:

The Control Room Supervisor directs you to Swap Seal Return Coolers from 3A in service to 3B in service in accordance with AP/3/A/1 700/002 (Excessive RCS Leakage) Enclosure 5.7. (Swapping In Service Seal Return Coolers).

NLO-605 Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE N LO-605 STARTUP A VITAL BUS INVERTER CANDIDATE EXAMINER

NLO-605 Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

STARTUP A VITAL BUS INVERTER Alternate Path:

No Facility JPM #:

NLO-036 K/A Rating(s:

System: 062 (SF6)

K/A: A3.04 Rating: 2.7/

Task Standard:

Vital Bus Inverter placed in service correctly.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant _X Perform Simulate X

References:

OP/2/A11 107/04 Enclosure 4.2 (Startup of Vital Bus Inverters)

Validation Time: 12 minutes Time Critical: NO Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time:

Examiner: /

NAME SIGNATURE DATE COMMENTS

NLO-605 Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS:

None

N LO-605 Page 4 of 9 Tools/Eciui pment/Procedures Needed:

OP/2/A/1 107/04 Enclosure 4.2 (Startup of Vital Bus Inverters)

Picture of the 2DIA inverter READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit #2 is at 100% power Earlier today the 2DIA Vital Bus Inverter on Unit 2 was shutdown for maintenance.

I&E personnel have just notified the Control Room SF10 that they have completed their work on the inverter and it is ready to be returned to service.

All tags have been cleared.

The affected 1 2OVAC Vital Instrumentation Power Panelboard is being supplied by Regulated AC Panelboard 2KRA.

INITIATING CUES:

The Control Room SRO directs you to startup the 2DIA Vital Bus lnverter per OP!2/A/1 107/004 .2.

NLO-605 Page 5 of 9 START TIME:

STEP1: Step2.1.

EXAMINER CUE: Once the 2DIA inverter is located, if desired provide the included picture to establish the as-found condition of the inverter. SAT IF DC power to inverter was isolated, close breaker #33 on associated 2DIA DC panelboard (2DIA, 2DIB, 2DIC, 2DID).

UNSAT EXAMINER CUE: DC power to the inverter has been isolated STANDARD: Candidate proceeds to step 2.2 COMMENTS:

CRITICAL STEP NOTE Pressing PRECHARGE SWITCH pushbutton charges the inverter input filter capacitors and will cause the PRECHARGE light to come on. When pushbutton is released SAT capacitors will begin to discharge. Closing DC Input breaker should be performed in a timely manner before PRECHARGE light goes off and input filter capacitors discharge.

Steps 2.2.1 and 2.2.2 need to be performed prior to placekeeping/signing 2.2.2. This is UNSAT an exception to standard circle/slash methodology.

STEP 2: Step 2.2.1 Press PRECHARGE SWITCH pushbutton hold for 10- 12 seconds after PRECHARGE light comes on before releasing.

STANDARD: The candidate presses the PRECHARGE SWITCH pushbutton until the PRECHARGE light comes on and keeps the button depressed for an additional 10- 12 seconds before releasing.

EXAMINER CUE: Indicate to the candidate that the PRECHARGE light is ON. If the pushbutton is not held for an additional 10 12 seconds, inform the candidate that the PRECHARGE light is now OFF.

COMMENTS:

NLO-605 Page 6 of 9 STEP 3: Step 2.2.2 CRITICAL STEP CLOSE the DC IN PUT circuit breaker STANDARD: The DC INPUT circuit breaker is CLOSED SAT EXAMINER CUE: Indicate to the candidate that the DC INPUT breaker is in the ON position.

UNSAT EXAMINER NOTE: If the DC INPUT breaker is not closed in a timely manner, the PRECHARGE light will go back OFF and the DC INPUT circuit breaker will trip back open.

COMMENTS:

STEP 4: Step 2.3 Verify INVERTER OUTPUT volt meter increases to 120 Volts.

SAT STANDARD: INVERTER OUTPUT voltmeter, AC volts, is observed and verified to indicate approximately 120 volts AC.

EXAMINER CUE: Indicate to candidate that inverter voltage INCREASES from 0 to UNSAT 120 volts AC, as indicated on the INVERTER OUTPUT voltmeter.

COMMENTS:

STEP 5: Step 2.4 CRITICAL STEP CLOSE the INVERTER OUTPUT circuit breaker.

SAT STANDARD: The INVERTER OUTPUT circuit breaker is CLOSED.

EXAMINER CUE: Indicate to the candidate that the INVERTER OUTPUT breaker is in the ON position.

UNSAT COMMENTS:

NLO-605 Page 7 of 9 STEP 6: Step 2.5 VERIFY the IN SYNC light is on.

STANDARD: SAT Green IN SYNC. light is verified ON.

EXAMINER CUE: Indicate to candidate that the IN SYNC light is ON.

COMMENTS: UN SAT STEP 7: Step 2.6 CRITICAL STEP POSITION the MANUAL BYPASS SWITCH to the NORMAL SOURCE position. SAT STANDARD: Candidate rotates the Manual Bypass Switch from the ALTERNATE SOURCE position to the NORMAL SOURCE position. UNSAT EXAMINER CUE: Indicate to the candidate that the Manual Bypass Switch is in the NORMAL SOURCE position.

COMMENTS:

STEP 8: Step 2.7 VERIFY the following indications:

SAT

  • INVERTER OUTPUT volt meter 120 volts
  • Inverter Output frequency meter 60.6 60 59.4Hz
  • INVERTER OUTPUT amp meter increases and stabilizes to match SYSTEM OUTPUT amp meter. UNSAT STANDARD: The following indications are verified:
  • INVERTER OUTPUT volts 120.
  • INVERTER OUTPUT frequency 60 Hz.
  • INVERTER OUTPUT amp meter increases and stabilizes to match SYSTEM OUTPUT amp meter.

EXAMINER CUE: Provide the following indications to the candidate:

  • INV. OUTPUT volts = 120
  • INV. OUTPUT freq. = 60
  • INV. OUTPUT amps = 30
  • SYS. OUTPUT amps =30 COMMENTS:

END TASK STOP TIME:

N LO-605 Page 8 of 9 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 2 Must precharge the capacitors on the DC Bus so there will not be a low voltage when the DC Breaker is closed.

3 Necessary to provide DC input voltage to the inverter.

5 Necessary to apply NORMAL SOURCE voltage up to the Manual Bypass switch.

7 Applies Inverter AC output voltage from the NORMAL SOURCE to the Vital Bus Panelboards (Loads the lnverter).

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit #2 is at 100% power Earlier today the 2DIA Vital Bus Inverter on Unit 2 was shutdown for maintenance.

I&E personnel have just notified the Control Room SRO that they have completed their work on the inverter and it is ready to be returned to service.

All tags have been cleared.

The affected 1 2OVAC Vital Instrumentation Power Panelboard is being supplied by Regulated AC Panelboard 2KRA.

INITIATING CUES:

The Control Room SRO directs you to startup the 2DIA Vital Bus Inverter per OP/2/A/1 107/04 .2.

NLO-801 Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE N LO-801 HPSW AND LPSW AB FLOOD ISOLATION CANDIDATE EXAMINER

NLO-801 Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Isolate HPSW and LPSW during an AB Flood.

Alternate Path:

Yes Facility JPM #:

Modified NLO-800 K/A Rating(s):

System: N/A K/A: BW/AO7AA2.2 Rating: 3.3/3.7 Task Standard:

AP/3/A/1700/030 End. 5.1 is used isolate HPSW during an ABflood.

AP/3/A/1 700/030 End. 5.2 is used isolate LPSW during an AB flood.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant X Perform Simulate X

References:

AP/3/A/1700/030 (Auxiliary Building Flood) End. 5.1 and End 5.2 Validation Time: 16 minutes Time Critical: NO Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time:

Examiner: /

NAME SIGNATURE DATE COMMENTS

NLO-801 Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS:

None

NLO-801 Page 4 of 10 Tools/Equipment/Procedures Needed:

AP/3/A/1700/030 End. 5.1 and End. 5.2 READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

All 3 units are at 100% power.

Unit 3 Auxiliary Building flooding is occurring.

The source of flood water has not yet been determined.

INITIATING CUES:

The Control Room Supervisor directs you to perform AP/3/A/1 700/030 End. 5.1 (HPSW AB Flood Isolation) AND End. 5.2 (LPSW AB Flood Isolation).

NLO-801 Page 5 of 10 START TIME:

ENCLOSURE 5.1 STEP 1: Step 1 SAT IAAT the source of flooding is isolated, THEN notify Control Room.

STANDARD: The candidate notes the source of flooding is not isolated and proceeds UNSAT to step 2 CUE: If asked, flooding is still occurring.

COMMENTS:

NOTE Keys for valve locks are available in y Emergency Equipment cabinet.

SAT STEP 2: Step 2 Close HPSW-959 (HPSW SUPPLY TO FLOW LIMITER BLOCK VALVE)

(T-1/M-21 south, west of RCW Heat Exchangers). UNSAT STANDARD: The candidate locates and attempts to close HPSW-959.

Examiner Note: Operators carry Keys to these locks.

Examiner Cue: When the candidate locates and attempts to close HPSW-959, inform candidate that HPSW-959 chain will not move. Candidate proceeds to RNO COMMENTS:

NLO-801 Page 6 of 10 STEP 3: Step 2 RNO CRITICAL STEP Close HPSW-962 (HPSW SUPPLY TO AUX BLDG BLOCK VALVE) (T 1/M-21 south, west of RCW Heat Exchangers).

STANDARD: The candidate locates and closes HPSW-962 rotating it in the clockwise SAT direction until it stops.

Cue: When the candidate indicates that HPSW-962 is closed, in form the candidate UNSAT that HPSW is fully clockwise and on the hard stop.

COMMENTS:

STEP 4: Step 3 Notify control Room HPSW isolation is complete.

STANDARD: The candidate notifies the control Room HPSW isolation is complete. SAT COMMENTS:

STEP 5: Step 4 EXIT this enclosure.

STANDARD: Candidate EXITS enclosure 5.1 and proceeds to Enclosure 5.2. SAT COMMENTS:

UNSAT

NLO-801 Page 7 of 10 ENCLOSURE 5.2 STEP6: Step 1 SAT IAAT the source of flooding is isolated, THEN notify Control Room.

STANDARD: The candidate notes the source of flooding is not isolated and proceeds UNSAT to step 2 CUE: If asked, flooding is still occurring.

COMMENTS:

STEP 7: Step 2 CRITICAL STEP Close 3LPSW-844 (AUX BLDG AHU SUPPLY) (T-1/M-46, 6 SE).

STANDARD: The candidate locates and closes 3LPSW-844 rotating it in the clockwise direction until it stops. SAT Cue: When the candidate indicates that 3LPSW-844 is closed, inform the candidate that the valve is fully clockwise and on the hard stop. UNSAT COMMENTS:

STEP 8: Step 3 CRITICAL STEP Close 3LPSW-770 (AUX BLDG AHU SUPPLY) (T-1/M-46, 8 S).

STANDARD: The candidate locates and closes 3LPSW-770 rotating it in the clockwise direction until it stops.. SAT Cue: When the candidate indicates that 3LPSW-770 is closed, in form the candidate that the valve is fully clockwise and on the hard stop. UNSAT COMMENTS:

NLO-801 Page 8 of 10 STEP 9: Step 4 Open 3LPSW-501 (UNIT 3 AHU RETURN TO STORM DRAINS) (T-1/L-47,W12up). SAT STANDARD: The candidate locates and opens 3LPSW-501 rotating it in the counter clockwise direction until it stops.

UN SAT COMMENTS:

STEP 10: Step 5 CRITICAL STEP Close 3LPSW-500 (UNIT 3 AHU RETURN TO CCW DISCHARGE) (T 1/L-47, NW 12 up).

STANDARD: The candidate locates and closes 3LPSW-500 rotating it in the clockwise SAT direction until it stops.

Cue: When the candidate indicates that 3LPSW-500 is closed, inform the UNSAT candidate that it is fully clockwise and on the hard stop.

COMMENTS:

STEP11: Step6 Notify control Room LPSW isolation is complete.

STANDARD: The candidate notifies the control Room LPSW isolation is complete. SAT COMMENTS:

STEP 12: Step 7 EXIT this enclosure.

STANDARD: Candidate EXITS enclosure 5.2 and returns CUE Sheet to examiner.. SAT COMMENTS:

END TASK STOP TIME:

NLO-801 Page 9 of 10 CRITICAL STEP EXPLANATIONS:

STEP# Explanation 3 Step ensures proper soIation of HPSW leak.

7 Step ensures proper isolation of LPSW leak.

8 Step ensures proper isolation of LPSW leak.

10 Step ensures proper isolation of LPSW leak.

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

All 3 units are at 100% power.

Unit 3 Auxiliary Building flooding is occurring.

The source of flood water has not yet been determined.

INITIATING CUES:

The Control Room Supervisor directs you to perform AP!3/A!1 700/030 End. 5.1 (HPSW AB Flood Isolation) AND End. 5.2 (LPSW AB Flood Isolation).