ML12326A976

From kanterella
Jump to navigation Jump to search
Natural Resources Defense Council'S Petition, by Way of Motion, for Waiver of 10 C.F.R. 51.53(c)(3)(ii)(L) as Applied to Application for Renewal of Licenses for Limerick Units 1 and 2
ML12326A976
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 11/21/2012
From: Crystal H, Fettus G, Roisman A
Meyer Glitzenstein & Crystal, National Legal Scholars Law Firm, PC, Natural Resources Defense Council
To:
Atomic Safety and Licensing Board Panel
SECY RAS
Shared Package
ML12326A972 List:
References
RAS 23790, 50-352-LR, 50-353-LR, ASLBP 12-916-04-LR-BD01
Download: ML12326A976 (29)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of: )

)

EXELON GENERATION COMPANY, LLC ) Docket No. 50-352-LR

) Docket No. 50-353-LR (Limerick Generating Station, Units 1 and 2) )

November 21, 2012 (License Renewal Application)

NATURAL RESOURCES DEFENSE COUNCILS PETITION, BY WAY OF MOTION, FOR WAIVER OF 10 C.F.R. § 51.53(c)(3)(ii)(L) AS APPLIED TO APPLICATION FOR RENEWAL OF LICENSES FOR LIMERICK UNITS 1 AND 2 In accordance with the Commissions October 23, 2012 Memorandum and Order (CLI -

12-19) (hereafter Comm. Op.), see 2012 WL 5266118, and 10 C.F.R. § 2.335(b)-(d), the Natural Resources Defense Council (NRDC) respectfully submits this petition for waiver of 10 C.F.R. § 51.53(c)(3)(ii)(L). This waiver request is supported by the attached Declaration of Christopher Weaver, Ph.D, on behalf of NRDC (NRDC Decl.) and NRDCs Counsel, Geoffrey H. Fettus (Counsel Decl.).1 I. INTRODUCTION On October 23, 2012, the Commission reversed the Atomic Safety and Licensing Boards (ASLB) April 4, 2012 Memorandum and Order (ASLBP No. 12-916-04-LR-BD01) (hereafter ASLB Op.), which had admitted two bases for one of NRDCs November 22, 2011 Contentions concerning Exelon Generating Company LLCs (Exelon) license renewal 1

For convenience we are also attaching NRDCs Petition to Intervene and Contentions, along with the supporting technical declaration filed with that Petition (NRDC Cont.).

1

application for the Limerick Generating Station, Units 1 and 2 (Limerick). The ASLB had ruled that, in light of the plain language of 10 C.F.R. § 51.53(c)(3)(iv) - which provides that the environmental review of a nuclear plant license renewal application must consider any new and significant information regarding the environmental impacts of license renewal of which the applicant is aware - two basis for NRDCs Contention 1E regarding significant new information related to Exelons consideration of Severe Accident Mitigation Alternatives2 for Limerick should be admitted. ASLB Op. at 18-21. Reversing this determination, the Commission ruled that this provision is subservient to 10 C.F.R. § 51.53(c)(3)(ii)(L), which, in the Commissions view, exempts Exelon from any SAMDA analysis requirements in connection with the relicensing, including the need to defend its Environmental Report (ER) analysis of new and significant information that might bear on the adequacy of the 1989 SAMDA that was included in a Supplement to the Environmental Impact Statement for the Limerick Operating License. Comm. Op. at 11-15.

However, the Commission invited NRDC to submit a petition for waiver of 10 C.F.R. § 51.53(c)(3)(ii)(L), pursuant to 10 C.F.R. § 2.335(b). Comm. Op. at 13 (emphasis added).

Accordingly, while continuing to maintain that no waiver of 10 C.F.R. § 51.53(c)(3)(ii)(L) is necessary, NRDC hereby seeks such a waiver, respectfully requesting that the Commission grant this request to waive the application of the regulation to permit two of NRDCs Contentions to be admitted on several bases.

2 Severe Accident Mitigation Alternatives, or SAMAs are also referred to as Severe Accident Mitigation Design Alternatives, or SAMDAs, and will be so referred to here.

2

In particular, as detailed below, NRDC seeks a waiver regarding the two bases of Contention 1E admitted by the ASLB: (a) Exelon has omitted from its ER a required analysis of new and significant information regarding potential new severe accident mitigation alternatives previously considered for other BWR Mark II Containment reactors (Contention 1E-1); and (b)

Exelons reliance on data from Three Mile Island (TMI) in its analysis of the significance of new information regarding economic cost risk constitutes an inadequate analysis of new and significant information (Contention 1E-2).

NRDC also seeks a waiver regarding Contention 3E, as to the requirement that Exelon utilize modern techniques for assessing whether the newly considered severe accident mitigation alternatives are cost-beneficial. See NRDC Cont. at 22 (¶¶ 1 and 3).3 II. STATUTORY AND REGULATORY FRAMEWORK A. The National Environmental Policy Act Our Nations basic national charter for protection of the environment, 40 C.F.R.

§ 1500.1(a), NEPAs purpose is to help public officials make decisions that are based on understanding of environmental consequences, and take actions that protect, restore, and enhance the environment. Id. at § 1500.1(c). NEPAs twin aims are to force every agency to 3

The ASLB had denied the admissibility of Contention 3E in toto on the ground that the Contention is impermissible in light of 10 C.F.R. § 51.53(c)(3)(ii)(L), ASLB Op. at 31-34, but the Commission invited NRDC to seek a waiver of that regulation as to this contention.

The aspect of Contention 3E that is not already addressed by Contention 1E, as admitted by the ASLB, concerns the discrete issue of Exelons failure to use a probabilistic safety assessment severe accident consequences code system comparable to the MELCOR Accident Consequence Codes Systems 2 (MACCS2) in its analysis, as detailed in the first and third bases of this Contention. NRDC Cont. at 22, ¶¶ 1, 3. The portion of 3E that survives the ASLBs rulings and is eligible for waiver is the contention that any new analysis of additional mitigation alternatives and any new consideration of off-site economic impacts must use an advanced probabilistic safety assessment of severe accident consequences like MACCS2. The portion of 3E that was related to flaws in the 1989 SAMDA is not the subject of this waiver request.

3

consider every significant aspect of the environmental impact of a proposed action, and to inform the public that it has indeed considered environmental concerns in its decisionmaking process. Baltimore Gas & Elec. Co. v.NRDC, 462 U.S. 87, 97 (1983). Under NEPA, federal agencies are required to prepare an Environmental Impact Statement (EIS) for all major Federal actions significantly affecting the quality of the human environment . . . . 42 U.S.C. § 4332(C).

Among other issues, an EIS must analyze the environmental impact of the proposed action and reasonable alternatives. Id. at § 4332(C)(I).

The completion of an EIS for a proposed action does not end an agencys responsibility to weigh the environmental impacts of a proposed action. Marsh v. Ore. Natural Res. Council, 490 U.S. 360, 371-72 (1989). As the Supreme Court recognized in Marsh, it would be incongruous with NEPAs action-forcing purpose to allow an agency to put on blinders to adverse environmental effects, just because the EIS has been completed. Id. Accordingly, an agency must supplement its EIS if there is new information showing that the remaining federal action will affect the quality of the human environment in a significant manner or to a significant extent not already considered. Id. at 374; see also Warm Springs Dam Task Force v.

Gribble, 621 F.2d 1017, 1024 (9th Cir. 1980) (When new information comes to light the agency must consider it, evaluate it, and make a reasoned determination whether it is of such significance as to require implementation of formal NEPA filing procedures); Friends of the Clearwater v. Dombeck, 222 F.3d 552, 558 (9th Cir. 2000) (finding no evidence in the record that Forest Service had considered new information bearing on sufficiency of programmatic EIS to support individual timber sale).

4

Consistent with these duties, the Council on Environmental Qualitys (CEQ) implementing NEPA regulations require that even after a NEPA process is completed, where an agency learns of significant new circumstances, or new information relevant to environmental concerns and bearing on the proposed action or its impacts, 40 C.F.R. § 1502.9(c), it must supplement its NEPA review. This is a continuing obligation, and a NEPA process may require more than one supplement if new information comes to light even after an initial supplement is prepared. E.g., Marsh, 490 U.S. at 368 (if all of the information contained in the [two documents] was both new and accurate, the Corps would have been required to prepare a second supplemental EIS) (emphasis added); Deukmejian v. NRC, 751 F.2d 1287, 1298 (D.C. Cir.

1984) (explaining that The [NRCs] obligations under NEPA [include] a continuing duty to supplement EISs which have already become final whenever the discovery of significant new information renders the original EIS inadequate).

B. The Commissions NEPA Framework For Relicensing Nuclear Power Plants The scope of the NEPA review for the relicensing of nuclear power plants by the NRC is set out in 10 C.F.R. Part 51 and the NRCs Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GEIS) (NUREG-1437) (May 1996). NRCs NEPA regulations require an EIS for any major licensing action significantly affecting the quality of the human environment. 10 C.F.R. §§ 51.71, 51.91. Before the EIS is prepared, however, NRCs regulations require that the license applicant must prepare what amounts to a first draft of the EIS, i.e., the environmental report (ER), 10 C.F.R. § 51.53(c)(1), Duke Power Co. (Catawba Nuclear Station, Units 1 and 2), CLI-83-19, 17 NRC 1041, 1049 (1983), which generally must address all the same impacts, alternatives, and other environmental issues that will be addressed 5

later in the NRCs EIS. Compare 10 C.F.R. § 51.53(c)(2) with 10 C.F.R. § 51.71.

As provided in the NRC regulations, some environmental issues that might otherwise be germane in a license renewal proceeding have been resolved generically for all plants in the GEIS. These Category 1 issues are beyond the scope of a license renewal hearing. Fla.

Power and Light Co., 54 NRC at 3, 15 (2001); see 10 C.F.R. § 51.53(c)(3)(i).

For other issues, referred to as Category 2 issues, an ER must contain environmental analyses of the[ir] environmental impacts. 10 C.F.R. Pt. 51.53(c)(3)(ii). This includes the consideration of alternatives to mitigate severe accidents, including the consequences of atmospheric releases, fallout onto open bodies of water, releases to ground water, and societal and economic impacts from severe accidents. Id. at Table B-1, Postulated Accidents; see also, e.g. Limerick Ecology Action, Inc. v. NRC (LEA), 869 F.2d 719, 741 (3d Cir. 1989) (holding that SAMDAs must be given careful consideration in the NEPA process).

Central to the current dispute, the obligation for an Applicant and NRC Staff to consider severe accident mitigation alternatives contains a carve-out for plants seeking a renewed license if severe accident mitigation alternatives have been previously considered for that plant. Thus, 10 C.F.R. § 51.53(c)(3)(ii)(L) provides that these alternatives need only be considered [i]f the staff has not previously considered severe accident mitigation alternatives for the applicants plant in an [EIS] or related supplement. There are only three plants that arguably fall into this exception - Limerick, Comanche Peak, and Watts Barr.

Nonetheless, consistent with the CEQ regulations, the Commissions own NEPA regulations also provide that supplements to either a Draft EIS, or a Final EIS, will be prepared where there are, inter alia, new and significant circumstances or information relevant to 6

environmental concerns and bearing on the proposed action or its impacts. 10 C.F.R. §§ 51.72(a); 51.92(a). In the relicensing context, this obligation is codified at 10 C.F.R. § 51.53(c)(iv), which provides that the EIS for a license renewal must contain any new and significant information regarding the environmental impacts of license renewal of which the applicant is aware. See also, e.g., Union Elec. Co. et al., CLI-11-05, 2011 WL 4027741, 12 (Sept. 9, 2011) (further NEPA review required where new information presents a seriously different picture of the environmental impact of the proposed project from what was previously envisioned).

Previously the ASLB found, correctly in our view, that a Commission rule narrowly exempting the three particular plants from repeating a SAMA analysis that had only been performed at the initial licensing stage could not reasonably be construed as nullifying a fundamental NEPA obligation, binding on all license renewal applicants, to consider new and significant information on severe accident mitigation that may have come to light in the intervening decades since their initial licensing. However, in its recent decision, the Commission concluded that, in a license renewal proceeding, consideration of new and significant information related to a previously conducted analysis of severe accident mitigation alternatives would be in conflict with the exception written into § 51.23(c)(3)(ii)(L) and thus such new and significant information could not be considered absent a waiver being granted pursuant to 10 C.F.R. § 2.335.

C. The Commissions Regulatory Framework For Challenging License Renewal Applications In order to challenge a relicensing application, a party generally must file Contentions setting forth, inter alia, the specific issues to be raised, a brief explanation of the bases for those 7

issues, and sufficient evidence supporting those bases to demonstrate that the issue is material to the matters to be decided in a relicensing proceeding and is within the scope of the proceeding.

10 C.F.R. § 2.309(f). Among the issues that may not be raised in such a proceeding is a challenge to any rule or regulation of the Commission, or any provision thereof. 10 C.F.R. § 2.335(a).

If a party seeks to challenge a rule or regulation, then it must file a separate waiver petition requesting that the rule or regulations be waived or an exception made for the particular proceeding, based upon special circumstances with respect to the subject matter of the particular proceeding. 10 C.F.R. § 2.335(b). The petition must demonstrate that those special circumstances are such that the application of the rule or regulation (or a provision of it) in the particular instance would not serve the purposes for which the rule or regulation was adopted. Id.4 III. PROCEDURAL BACKGROUND A. The Commissions Prior Consideration of SAMAs for Limerick In 1980, in the wake of the TMI accident, the NRC issued a policy requiring the consideration of severe accidents in future NEPA reviews. LEA, 869 F.2d at 726. Five years later, the agency issued a Final Policy that excluded consideration of severe accident mitigation design alternatives from individual licensing proceedings. Id. at 727.

4 In promulgating the Category 1 and 2 regulations, the Commission noted that if presented with new, site-specific information which demonstrates that the analysis of an impact codified in the rule is incorrect with respect to the particular plant, the NRC staff will seek Commission approval to waive the application of the rule with respect to that analysis in that specific renewal proceeding. 61 Fed. Reg. 28,467, 28,470 (1996). Moreover, as the Commission noted in reversing the ASLBs admission of NRDCs contentions here, NRC Staff has an obligation to consider new information that could render invalid the original site-specific analysis . . . . Comm. Op. at 13, n.54 (emphasis added).

8

In the meantime, in 1981 LEA and others intervened in the licensing proceeding for Limerick. LEA raised several issues, including whether the NRC had adequately considered severe accident mitigation alternatives at the facility. In the Final Environmental Statement (FES) the staff rejected these arguments, and, as to severe accident mitigation alternatives in particular, concluded that there are no special or unique circumstances about the Limerick site and environs that would warrant consideration of such alternatives. 869 F.2d at 732 (quoting FES at 5-126 (emphasis added). On appeal, the Board also relied on the conclusion that there were no special or unique circumstances about the Limerick site that warranted further review.

Id. (emphasis added).

LEA filed a Petition for Review in the Third Circuit. LEA, 869 F.2d 719. The Court of Appeals first concluded that the Policy Statement did not preclude consideration of the issue, id.

at 733-736, and then also rejected the argument that no special or unique circumstances at Limerick warranted consideration of severe accident mitigation alternatives there. Id. at 738-39.

In particular, the Court found that: (a) the Commission itself has noted [that] the impact of SAMDAs on the environment will differ with the particular plants design, construction and location; and (b) the risk will vary with the potential consequences, which will vary tremendously across all plants. Id. (emphasis added).

The NRC subsequently issued a 1989 document entitled a Supplement to the FES for Limerick to address severe accident mitigation alternative issues, but the Supplement discovered no substantial changes in the proposed action as previously evaluated . . . that are relevant to environmental concerns nor significant new circumstances or information relevant to environmental concerns. NUREG-0974 at iii. Thus, the Commission found no new 9

information that would call into question the FES conclusion that there is no basis to further consider severe accident mitigation alternatives at Limerick. Id. at 1.

B. The Present Proceeding In response to a notice of opportunity for hearing, 76 Fed. Reg. 52,992 (2011), on November 22, 2011 NRDC submitted a petition to intervene and notice of intent to participate in the Limerick relicensing proceeding, submitting four contentions. See Att. A (NRDC Cont.).

Contention 1E contends that Exelons analysis, in its ER for the relicensing, of new and significant information related to the 1989 SAMDA was inadequate because it failed to properly analyze the significance of new information that Exelon conceded existed and because it failed to acknowledge other new information that was also significant. Id. at 16-19. As detailed in NRDCs expert declarations, other Boiling Water Reactor (BWR) plants have identified numerous severe accident mitigation alternatives that are cost-beneficial or potentially cost-beneficial such as, for example, portable generators for emergency power supply; providing alternative sources of water to address emergencies; and improvements to the connections between electric power systems to allow more flexible supply of critical power needs during an emergency. NRDC Decl. ¶¶ 12-14. Indeed, as the ASLB recognized, NRDC has shown there are numerous new SAMA candidates which should be evaluated for their significance. ASLB Op. at 21.

In Contention 1E, NRDC also argued that Exelon has improperly relied on data from an analysis done at TMI concerning the economic impacts of a severe accident. NRDC Cont. at 18.

NRDC explained that use of that analysis was not appropriate since TMI is a markedly different and less economically developed site than Limerick, which includes densely populated areas 10

including Philadelphia, PA. Id. NRDC also explained that the comparison is inappropriate because TMI is a Pressurized Water Reactor (PWR), with correspondingly different accident scenario source terms than the BWR at Limerick. Id.; see also NRDC Decl. ¶¶ 17-24.

In addition, in Contention 3E NRDC argued, inter alia, that the ER is inadequate in relying on the methodology used in the 1989 SAMDA analysis, both for that analysis and for consideration of any newly identified mitigation alternatives, in light of techniques that have been developed since that SAMDA was conducted to assess whether alternatives are cost-beneficial. NRDC Cont. at 21-23. In particular, Contention 3E asserted, inter alia, that the 1989 SAMDA was legally deficient because it failed to use a probabilistic safety assessment severe accident consequences code system comparable to the MELCOR Accident Consequence Codes Systems (MACCS) 2. Id. Contention 3E was based, in part, on the continuing obligation imposed by NEPA on federal agencies, to update and correct previous information when the agency becomes aware of new information that demonstrates the inadequacy of a prior analysis.

See, e.g., Deukmejian v. NRC, 751 F.2d at 1298. Thus, this aspect of Contention 3E sought, inter alia, to require Exelon and NRC Staff to use the more accurate and reliable methods available today for assessing the consequences of a severe accident, including economic consequences, and assessing the costs and benefits of the additional mitigation alternatives that are appropriate for BWRs - which has never been done for Limerick.5 5

NRDC only seeks waiver of 10 C.F.R. § 51.53(c)(3)(ii)(L) as it applies to two aspects of Contention 1E, i.e., the failure to consider the wider range of mitigation alternatives now identified for BWRs, and the failure to conduct a reliable off-site economic consequences analysis, and one aspect of Contention 3E, i.e., the need to use a modern methodology to assess the cost-benefit of new mitigation alternatives for Limerick, as it is this aspect of that Contention that qualifies for a waiver. As to other issues NRDC raised in its Contentions that were rejected by the ASLB and thus were not before the Commission, NRDC simply reserves the right to 11

The applicant and NRC staff opposed the motion to intervene, arguing, inter alia, that issues related to severe accident mitigation alternatives were precluded by 10 C.F.R. § 51.53(c)(3)(ii)(L).

On April 4, 2012 the Board rejected many of the applicants and NRCs arguments and admitted a modified version of Contention 1E. ASLB Op. With respect to the threshold argument that any contention concerning SAMAs is precluded by 10 C.F.R. § 51.53(c)(3)(ii)(L),

the Board concluded that the regulation[ ] cannot trump statutory mandates, id. at 15, and that NEPA mandates an analysis based on the best information available today. Id. The Board further recognized that Exelon had, in fact, identified new information relating to severe accident mitigation, and had included such information in its ER. Id. at 30.

Thus, the Board concluded that in the relicensing proceeding Exelon must abide by the regulatory requirement to consider any new and significant information regarding the environmental impacts of license renewal of which the applicant is aware. 10 C.F.R.

§ 51.53(c)(3)(iv). On that basis the Board admitted a modified Contention 1E focused on the consideration of two of the bases presented by NRDC. First, it found that NRDC had raised an admissible contention regarding the extent to which Exelon should have addressed in its ER the new severe accident mitigation alternatives previously considered for other BWR Mark II Containment reactors. ASLB Op. at 27. Second, the Board found admissible the issue of whether Exelons use of data from TMI in its analysis provides an adequate consideration of new and significant information regarding economic cost risk. Id. at 25, 27.

pursue those issues at the appropriate time.

12

The Commission reversed. Comm. Op. As an initial matter, the Commission recognized what it considered to be ambiguity in our regulations. Id. at 11. While the Commission characterized 10 C.F.R. § 51.53(c)(3)(ii)(L) as exempting Exelon from site-specific supplemental SAMDA analysis in the relicensing proceeding, it also recognized that the regulations mandate that the license renewal application must contain any significant new information relevant to environmental impacts, which may be challenged in individual adjudications. Comm. Op. at 11-12. The Commission also noted that Exelon has put forward in its license renewal application new information regarding it SAMDA analysis. Id. at 13 (emphasis added).

Particularly in light of that fact, and NRDCs claim that the information provided by Exelon is insufficient, the Commission ruled that NRDC may challenge the adequacy of the new information provided in the Limerick Environmental Report. Id. (emphasis added).

However, the Commission concluded that in light of 10 C.F.R. § 51.53(c)(3)(ii)(L), the proper procedural avenue for NRDC to raise its concerns is to seek a waiver of the relevant provision in that section. Id. The Board further invited NRDC to include other Contentions that had been rejected on the basis of 10 C.F.R. § 51.53(c)(3)(ii)(L). Id.

IV. ARGUMENT A. NRDC Is Entitled To Pursue Its Contention That Exelon Must Consider A Reasonable Range of Severe Accident Mitigation Alternatives As Mandated By NEPA.

At the outset, NRDC notes its strenuous disagreement with the Commissions ruling that the only way NRDC can seek to bring Exelon into compliance with NEPA in connection with the Limerick relicensing is to apply for a waiver of 10 C.F.R. § 51.53(c)(3)(ii)(L). However, the bottom line is that, to be consistent with NEPA, the Commission must either conclude that a 13

waiver is not necessary, or waive 10 C.F.R. § 51.53(c)(3)(ii)(L), for to decide that NRDC may not pursue these issues under either approach would violate NEPA.6 Consistent with NEPA, NRCs regulations provide that in conducting environmental review - be it in an initial EIS, a supplemental review, or a further supplemental stage - the Commission must consider any new and significant information regarding the environmental impacts of license renewal of which the applicant is aware. 10 C.F.R. § 51.53(c)(3)(iv)

(emphasis added). This regulation fulfills the NEPA obligation to supplement a NEPA review in appropriate circumstances, even when a prior NEPA review has been completed. E.g., Marsh v.

Oregon Natural Res. Council, 490 U.S. at 365.

This NEPA mandate - which simply may not be abrogated by a contrary NRC regulation

- requires that if presented with appropriate new and significant information regarding alternatives, including, as here, alternatives to help mitigate environmental harms such as the serious environmental harms associated with a severe accident at Limerick, the Commission must consider that information. Thus, while in NRDCs view the ASLB correctly concluded that because [r]egulations cannot trump statutory mandates, ASLB Op. at 15, NRDCs contention based on such new information must be permitted into the proceeding, irrespective of 10 C.F.R.

§ 51.53(c)(3)(ii)(L), at bare minimum a waiver of the regulation must be granted on that basis alone.7 6

NRDC reserves the right at the appropriate time to challenge the Commissions decision that a waiver is required here.

7 Indeed, the Commissions October 23, 2012 ruling strongly suggests that the waiver should be granted. The Commission noted that Exelon has put forward in its license renewal application new information regarding its SAMDA analysis. Comm. Op. at 13. The Commission then recognized that NRDC finds insufficient the information provided by Exelon, 14

Under these circumstances, the waiver petition should be granted. Indeed, were the Commission to deny the waiver petition, the result would be that, irrespective of the existence of new and significant information regarding mitigation alternatives for severe accidents, the NRC, and by extension Exelon, could not be required to come into compliance with NEPA.8 B. NRDC Satisfies The Criteria For A Waiver Of 10 C.F.R. § 51.53(c)(3)(ii)(L)

With Respect To Contention 1E As Admitted By The ASLB And Contention 3E.

In Dominion, CLI-05-24, which involved a request for a waiver of the NRCs emergency planning regulations, the Commission articulated a four-part waiver test: (i) strict application of the rule sought to be waived would not serve the purposes for which [it] was adopted; (ii) the movant has alleged special circumstances that were not considered, either explicitly or by necessary implication, in the rulemaking proceeding leading to the rule sought to be waived; (iii) those circumstances are unique to the facility rather than common to a large class of facilities; and (iv) a waiver of the regulation is necessary to reach a significant issue. Id. at 560; and therefore seeks to challenge the validity of the decades-old SAMDA analysis. Id.

Recognizing that, [t]o date, we have not been presented with precisely this scenario, the Commission stated that NRDC may challenge the adequacy of the new information provided in the Limerick Environmental Report. Id. (emphasis added). Then, in light of the Commissions view that 10 C.F.R. § 51.53(c)(3)(ii)(L) would otherwise bar such a challenge, the Commission concluded that the proper procedural vehicle for NRDC to raise its concerns is to seek a waiver of that rule. Id.

8 It is also critical to emphasize that at this stage NRDC need not demonstrate that it meets the significant new information standard, as the merits of NRDCs contentions are not at issue, but rather only whether the waiver criteria are satisfied.

15

see also, e.g. In re Millstone Nuclear Power Station Units 1 and 2, 62 N.R.C. 551, 559-60 (2005). NRDCs Contentions satisfy this test.9

1. Application of 10 C.F.R. § 51.53(c)(3)(ii)(L) in the manner interpreted by the Commission would not serve the purposes for which the regulation was adopted.

10 C.F.R. § 51.53(c)(3)(ii)(L) provides that, although severe accident mitigation is a Category 2 issue, and thus generally must be considered on a site-specific basis during relicensing, this requirement is only applicable [i]f the staff has not previously considered severe accident mitigation alternatives for the applicants plant in an environmental impact statement or related supplement. 10 C.F.R. § 51.53(c)(3)(ii)(L) (emphasis added). Put another way, the regulation provides that where SAMDAs were previously considered, they need not be considered on a site-specific basis during relicensing. As interpreted by the Commission, 10 C.F.R. § 51.53(c)(3)(ii)(L) therefore exempts Limerick from the obligation to revisit SAMDAs in connection with relicensing, because a SAMDA analysis was conducted in a 1989 supplement to the original EIS.

Assuming for purposes of this waiver request that this interpretation of 10 C.F.R. § 51.53(c)(3)(ii)(L) is correct, NRDC respectfully submits that the application of the regulation here would not serve the purpose for which the regulation was adopted. As noted, the Commission developed its Category 1 and 2 regulations to distinguish between issues that have been resolved generically for all plants, Turkey Point, 54 NRC at 15 (Category 1), and those 9

Since these precedents concerned safety issues, the fourth prong of the analysis was focused on whether a significant safety problem was at issue, but where, as here, the waiver request involves an environmental concern this last factor focuses on the significance of the potential environmental impacts involved. See In re Pacific Gas & Elec., LPB-10-15, at 35-36, 38 (ASLB Aug. 4, 2010).

16

that may requir[e] further analysis in light of significant new information. 10 C.F.R. § 51, preamble to App. B to Subpart A (Category 2). The Commission intended that consideration of mitigation alternatives, as to which the regulations provide for consideration of alternatives to mitigate severe accidents, be considered a Category 2 issue, and thus be adequately considered in the ER for relicensing.

Indeed, the Proposed Rule had put this issue into Category 1, and it was in response to comments that the Commission made it a Category 2 issue, recognizing that severe accident mitigation should generally be addressed on a site-specific basis. 61 Fed. Reg. at 28,480. Thus, in the regulatory preamble the Commission stated that the purpose of the regulatory exception here was simply to limit the analysis during relicensing to exclude consideration of such alternatives regarding plant operation that were previously considered. Id. (emphasis added).

Accordingly, despite its language, the purpose of 10 C.F.R. § 51.53(c)(3)(ii)(L) was simply to exempt companies such as Exelon from being forced to reconsider specific alternatives previously considered, from which it necessarily follows that any new alternatives that would mitigate severe accidents should be subject to the standard for new and significant information.

10 C.F.R. § 51.53(c)(3)(iv); see Counsel Decl. ¶¶ 1-3.

That this is the purpose of 10 C.F.R. § 51.53(c)(3)(ii)(L) is further confirmed by other portions of the regulatory preamble to these regulations. In multiple portions the Commission provided assurances that any new and significant information presented during the review of individual license renewal application will be considered. E.g. 61 Fed. Reg. at 28,468; see also id. at 28,472 (For individual plant reviews, information codified in the rule, information 17

developed in the GEIS, and any significant new information introduced during the plant-specific review . . . will be considered in reaching conclusions in the supplemental EIS)(emphasis added); id. at 28,470.10 This view of the purpose of the regulation is further confirmed by the Courts ruling in NJ Dept of Env. Prot. v. NRC, 561 F.3d 132, 135 (3d Cir. 2009), where the Court explained that the purpose of the Category 2 regulations, including this one, is to require evaluations of site-specific Category 2 issues - including a consideration of severe accident mitigation alternatives (SAMAs) for those issues that have not previously been considered. Id. (emphasis added).

Thus, since the purpose of the exemption for previously conducted SAMDAs, as explained both in the regulatory preamble and the case law, was to simply exempt those issues previously considered, rather than to wholly exempt from any future environmental impact statement consideration of severe accident mitigation alternatives that had not been previously considered, 10 After the rule was published several other plants complained that the Commission had erred in making severe accident mitigation alternatives a Category 2 issue, on the grounds that soon all plants will have considered the issue in an Individual Plant Examination (IPE) or an Individual Plant Examination of External Events (IPEE). 61 Fed. Reg. 66,547, 66,540 (Dec. 18, 1996). The Commission rejected this argument, reiterating that these issues must be considered in site-specific NEPA reviews, as an IPE or IPEE cannot substitute for NEPA review.

Id. Several years later, the Nuclear Energy Institute submitted a formal rulemaking petition seeking to make severe accident mitigation alternatives a Category 1 issue, and, again, the Commission expressly rejected that proposal. 66 Fed. Reg. 10,834 (Feb. 20, 2001).

Moreover, as noted, see supra at 8, n.4, the preamble also suggests that if a commenter puts forward new, site specific information which demonstrates that the analysis of an impact codified in the rule is incorrect with respect to the particular plant, the NRC staff will seek Commission approval to waive the application of the rule with respect to that analysis in that specific renewal proceeding. 61 Fed. Reg. at 28,470. Thus, since the ASLB has already concluded that NRDC meets this standard, NRC staff should be joining NRDC in presenting this waiver petition.

18

it would not serve the purpose of 10 C.F.R. § 51.53(c)(3)(ii)(L) to apply it in a way that would prevent NRC from considering newly identified mitigation alternatives, from evaluating those newly identified mitigation alternatives in light of their off-site economic consequences and from using the most advanced and established methodologies for evaluating the costs and benefits of those newly identified mitigation alternatives and that would prevent NRDC from challenging Exelons ER for its failure to properly fulfill these obligations. NRDC Counsel Decl. ¶¶ 1-3.11 Finally, the regulatory preamble also recognizes that, in light of inevitable changes that occur over time, 10 years is a suitable period to delimit the outer bounds of when the Commission will assume that changes in condition and technology do not warrant additional NEPA review. 61 Fed. Reg. at 28,471. The last consideration of mitigation alternatives for severe accidents at Limerick occurred in 1989 - more than twenty years ago. Accordingly, it would plainly be inconsistent with the purpose of these regulations to limit the scope of these severe accident mitigation alternatives, the offsite economic impacts of severe accidents, and the methodology for assessing the costs and benefits of such mitigation alternatives to alternatives to those that were considered so long ago.

Indeed, for the reasons explained above, see supra at 13-14, the Commission cannot reasonably conclude that purposes of 10 C.F.R. § 51.53(c)(3)(ii)(L) would be served by applying 11 It bears noting in this regard that, consistent with NEPA, the NRCs regulations require that an ER consider appropriate alternatives to recommended courses of action, including alternatives available for reducing or avoiding adverse environmental effects. 10 C.F.R. § 51.45(b)(3) and (b)(5); see also 10 C.F.R. § 51.103 (requiring discussing of alternatives in the Record of Decision, including, inter alia, the preferences among alternatives and whether the Commission has taken all practicable measures . . . to avoid or minimize environmental harm from the alternative selected). This of course includes alternatives that mitigate against severe accidents. E.g. LEA, 869 F.2d at 741.

19

the regulation to exclude consideration of new and significant information, in light of the overarching NEPA mandate to consider such information even when prior NEPA review has been completed. E.g., Marsh v. Oregon Natural Res. Council, 490 U.S. at 365. Rather, to reach a result that does not defy NEPA the Commission must conclude that the purpose of the regulation would not be served by applying it to reject NRDCs Contentions based on such information.

Accordingly, it would be contrary to the purpose of 10 C.F.R. § 51.53(c)(3)(ii)(L) to deny the following NRDC Contentions (for portions of 1E, as modified by the ASLB, and portions of 3E):

a. Exelon has omitted from its ER a required analysis of new and significant information regarding potential new severe accident mitigation alternatives previously considered for other BWR Mark II Containment reactors (Contention 1E-1)

NRDCs Contention 1E, and supporting declaration, contends that the ER is deficient because it ignores new severe accident mitigation alternatives previously considered for other BWR Mark II Containment reactors. NRDC Cont. at 16-19; see also ASLB Op. at 40; NRDC Decl. ¶¶ 5-13. For the foregoing reasons it would not serve the purposes of 10 C.F.R. § 51.53(c)(3)(ii)(L) for this regulation to bar consideration of this basis for Contention 1E here.

See also NRDC Counsel Decl. ¶ 1.

b. Exelons reliance on data from TMI in its analysis of the significance of new information regarding economic cost risk constitutes an inadequate analysis of new and significant information (1E-2).

NRDCs Contention 1E, and supporting declaration, also contends that the ER is deficient in relying on data from TMI in order to consider the significance of the new information concerning economic cost risks. NRDC Cont. at 18 (¶ 5); see also ASLB Op. at 40; 20

NRDC Decl. ¶¶ 17-24. For the foregoing reasons, it would not serve the purposes of 10 C.F.R. § 51.53(c)(3)(ii)(L) for this regulation to bar consideration of this basis for Contention 1E here either. See also NRDC Counsel Decl. ¶ 2.

c. A legally sufficient analysis of newly identified severe accident mitigation alternatives for Limerick must utilize modern techniques for assessing whether those alternatives are cost-beneficial, and Exelons ER erroneously concluded that new mitigation alternatives can be evaluated without use of those modern techniques (3E)

As noted, the Commission invited NRDC to seek a waiver of 10 C.F.R.

§ 51.53(c)(3)(ii)(L) not only as to the two modified bases for Contention 1E that were admitted by the ASLB, but also as to Contention 3E. NRDC seeks a waiver as to one basis for Contention 3E not covered by Contention 1E - the adequacy of the ER vis--vis techniques used to assess whether SAMDAs are cost-beneficial. NRDC Cont. at 22 (¶¶ 1, 3). In particular, this basis for Contention 3E contends that the 1989 SAMDA failed to use a probabilistic safety assessment severe accident consequences code system comparable to the MELCOR Accident Consequence Codes Systems (MACCS) 2. Id. This basis for Contention 3E seeks to require Exelon and NRC Staff to use the more accurate and reliable methods available today for assessing the consequences of a severe accident, including economic consequences, and assessing the costs and benefits of the additional mitigation alternatives that are appropriate for BWRs. Id. For the foregoing reasons, it would also not serve the purposes of 10 C.F.R. § 51.53(c)(3)(ii)(L) for this regulation to bar consideration of this basis for Contention 3E. See also NRDC Counsel Decl.

¶ 3.

21

In sum, having interpreted 10 C.F.R. § 51.53(c)(3)(ii)(L) to preclude admission of NRDCs contentions, the Commission must waive the regulation to insure that the purpose of the regulations - which are designed to implement NEPA - are fulfilled. Otherwise, in contradiction of NEPA dictates, assertions by Exelon in its ER concerning the economic impacts of severe accidents and the scope of mitigation alternatives will be unchallengeable, and, as a result, Limerick will be allowed to be relicensed even though, unlike every other BWR in the country, it did not have to consider either the economic impacts of a severe accident, the full range of potential mitigation alternatives or the use of much more updated and robust accident consequences analysis. The notion that NRC would in that event make a decision with regard to major federal action without considering the significance of new information that might well modify the proposal to substantially reduce its environmental impacts is so antithetical to NEPAs fundamental mandates that the regulation must be waived to fulfill the fundamental purposes of the Commissions NEPA implementing regulations.

2. There are special circumstances unique to Limerick that warrant the waiver and were not considered in the rulemaking leading to 10 C.F.R. § 51.53(c)(3)(ii)(L).

NRDC also plainly meets the special circumstances test here with respect to all three Contentions. As a threshold matter, this issue was arguably resolved in the LEA case, where the 3d Circuit considered the argument that the Commission need not consider mitigation for severe accidents at Limerick specifically because there were no special circumstances warranting such an individual review. As noted, the Commission had concluded that there [we]re no special or unique circumstances warranting consideration of these alternatives at Limerick, and the Board similarly concluded that there were no special or unique circumstances about the Limerick site 22

that warranted further review. 859 F.2d at 732 (emphasis added). The Third Circuit rejected this conclusion, finding that addressing severe accident mitigation at Limerick is unique, because, inter alia, these issues vary tremendously across all plants, and at Limerick in particular in light of its particular plants design, construction and location. Id. at 738; see also id. at 738 (population affects the magnitude and location of potential consequences from radiation releases, which is particularly true for plants such as Limerick which were built near densely populated areas) (emphasis added).

In any event, it is evident that NRDCs Contentions raise issues that are both unique to Limerick and were not considered in the 10 C.F.R. § 51.53(c)(3)(ii)(L) rulemaking. NRDCs fundamental concern, reflected in its Contentions, is that there are a number of potentially cost-beneficial measures to address severe accidents at Limerick that, to date, Exelon has refused to consider; that the evaluation of the costs and benefits of these mitigation alternatives must include offsite economic consequences that reflect the Limerick site; and that the methodology used to assess the cost and benefits of these additional mitigation alternatives must be the most advanced techniques available for such analyses . Thus, NRDCs Contentions are that the ER is deficient because, to date, Exelon has refused to consider the costs and benefits of these measures at Limerick; has relied on inappropriate economic data from TMI to substitute for a site-specific analysis of off-site economic consequences; and has refused to utilize appropriate methodologies to evaluate these severe accident mitigation alternatives.

Every other BWR nuclear power plant in the country that has undergone relicensing has conducted an analysis of severe accident mitigation alternatives that is more inclusive of potential alternatives, includes the offsite economic consequences of a severe accident and 23

utilizes the advanced computer methodology of MACCS2 to determine costs and benefits.

NRDC Decl. ¶¶ 5-13. Thus, the Contentions apply only to Limerick, and, more importantly, absent the waiver sought here, the Limerick plant will be the only BWR nuclear power plant that will be relicensed without the operator or the NRC giving NEPA consideration to the most recent mitigation alternatives, assessment methodologies, and economic considerations regarding severe accident mitigation alternatives. Rather, while all other plants conduct such analyses, and provide them to the public for public comment, the millions of people living near Limerick during the license extension period will be forced to rely on an analysis conducted up to forty years ago, in 1989. NRDC Counsel Decl. ¶ 4.

Absent a waiver, by the time Limerick Unit 2 completes its license renewal period, in 2049, its required NEPA analysis of severe accident mitigation alternatives will conceivably have gone for sixty years without facing a requirement for updating in the light of new and significant information, and without affording the public its due process right under NEPA to challenge the licensees use of such information and/or failure to apprehend its importance to identification of cost-effective measures for mitigating the environmental consequences of a severe accident. Such anomalous, highly prejudicial, and NEPA-noncompliant outcomes are a possible and readily forseeable result of failing to waive application of Subpart L to the relicensing of Limerick, and thus also comprise the special circumstances satisfying this prong of the waiver analysis.

These issues certainly were not considered in the 10 C.F.R. § 51.53(c)(3)(ii)(L) rulemaking. To the contrary, as discussed above, the Commission was focused first and foremost on insuring that these kind of alternatives are considered in relicensing proceedings 24

(which is why they became Category 2 issues), and, secondarily, sought to avoid duplicative NEPA processes by exempting specific mitigation alternatives that had previously been considered from being subject to reconsideration. See supra at 17-19. Nothing in the regulatory preamble suggests that the Commission contemplated that the regulation would forever preclude Exelon from being required to consider new mitigation alternatives during relicensing.12 Exelons own contradictory approach to this issue is also a special circumstance plainly not contemplated when this regulation was adopted. NRDC Counsel Decl. ¶ 4. It is critical to recognize in this regard that the ER does discuss alternatives to mitigate for severe accidents.

See ER at 5-1 to 5-9. In conducting this analysis, Exelon recognized that it has an obligation to identify any new and significant information of which it is aware. Id. at 5-2. According to Exelon, it was because it did not identify any information that met the standard that no specific design alternatives were identified or discussed. Id. at 5-9.

However, NRDCs Contentions focus both on the flaws in the way the ER analyzed the significance of the new information, and the failure to consider all the relevant new information related to severe accident mitigation alternatives. Had Exelon claimed that the new and significant information standard in 10 C.F.R. § 51.53(c)(3)(iv) does not apply at all in light of 10 C.F.R. § 51.53(c)(3)(ii)(L), then it would not have conducted this review, and its position regarding the need to consider NRDCs information would at least be consistent with its approach to preparing the ER. See also NRDC Counsel Decl. ¶ 4.

12 The fact that the issue is unique is also highlighted by the fact that although three plants are arguably covered by the exception - Limerick, Comanche Peak, and Watts Bar. 61 Fed. Reg. at 28,481 - only Limerick is a BWR, while the other two are Pressurized Water Reactors. Accordingly, the mitigation measures at issue only apply to Limerick.

25

In adopting 10 C.F.R. § 51.53(c)(3)(ii)(L) the Commission certainly did not contemplate that in a license renewal, an applicant could, on the one hand, recognize that 10 C.F.R. § 51.53(c)(3)(iv) does apply, and on the other hand claim that an intervenor has no right to challenge the adequacy of that analysis. Rather, such an approach is plainly contrary to both the regulations and NEPA mandates, particularly where, as here, the new and significant information is uniquely relevant to this one plant, since all other plants are looking at the full range of relevant mitigation alternatives, are conducting analyses of off-site economic consequences, and are using the most up-to-date the methodology for analyzing the costs and benefits of severe accident mitigation alternatives Accordingly, NRDC meets this part of the test as well.

3. Waiver of the regulation is necessary here to address a significant environmental concern.

Finally, the issues NRDC seeks to raise also plainly address a significant environmental concern. See In re Pacific Gas & Elec., LPB-10-15, at 35-36, 38 (ASLB Aug. 4, 2010) (finding that this factor should be construed in this instance to permit a waiver if it is necessary to reach a significant environmental issue). By definition, NRDCs Contentions concern how to best mitigate for severe accidents. Courts, including LEA, have repeatedly rejected the notion that a small risk of a severe accident is an insignificant problem that need not be addressed in the NEPA process. LEA, 869 F.2d at 738 (risk equals the likelihood of an occurrence times the severity of the consequences) (emphasis added); see also New York v. Nuclear Regulatory Comm'n, 681 F.3d 471, 478-79 (D.C. Cir. 2012); cf. Mountain States Legal Found. v. Glickman, 92 F.3d 1228, 1235 (D.C. Cir. 1996) (the more drastic the injury that government actions makes more likely, the lesser the increment in probability necessary to establish standing).

26

As explained in NRDCs Declaration, during the life of a relicensed Limerick plant the surrounding population within 50 miles will grow to over 9 million people, including more than 400,000 people living within 10 miles of the site. NRDC Decl. ¶¶ 14-16. It is vital that appropriate mitigation alternatives be considered to ameliorate the risks to these residents.

The alternatives NRDC contends Exelon must consider are all designed to address these risks, which is why they have been considered for other BWR Mark II Containment plants.

Severe accidents could result from external events such as tornadoes, floods, earthquakes, fires, or even sabotage, and could result in substantial damage to the reactor core. Where there are inadequate means to achieve backup power in the event of a power failure, for example, that power failure could lead to a severe accident, as at Fukushima. Or where inadequate training allows operation of a reactor while auxillary feed pumps are closed for maintenance, an error in the primary pumps can lead to a severe accident, as occurred at TMI. The mitigation alternatives NRDC has identified from the SAMA analyses for other BWRs are designed either to reduce the likelihood of severe accidents or to mitigate the severity of their consequences should they nonetheless occur, NRDC Decl. ¶¶ 16, and thus because, absent the waiver, Exelon will not be required to consider these measures, the waiver is plainly necessary to address significant environmental issues regarding cost-beneficial mitigation alternatives. See also NRDC Counsel Decl. ¶ 5.

27

V. CONCLUSION For the foregoing reasons NRDC respectfully requests that the Commission grant this waiver petition, and admit Contention 1E-1 and 1E2, as admitted by the ASLB, as well as that aspect of Contention 3E that concerns appropriate techniques to analyze SAMDAs, by waiving application of 10 C.F.R. § 51.53(c)(3)(ii)(L).

Respectfully Submitted, s/ (electronically signed)

Howard M. Crystal Meyer Glitzenstein & Crystal 1601 Connecticut Ave., N.W., Suite 700 Washington, D.C. 20009 (202) 588-5206 hcrystal@meyerglitz.com s/ (electronically signed) s/(electronically signed)

Anthony Z. Roisman Geoffrey H. Fettus National Legal Scholars Law Firm, P.C. Natural Resources Defense Council 241 Poverty Lane, Unit 1 1152 15th Street, NW, Suite 300 Lebanon, NH 03766 Washington, D.C. 20005 603-443-4162 202-289-2371 aroisman@nationallegalscholars.com gfettus@nrdc.org Filed this date of November 21, 2012 28

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing PETITION, BY WAY OF MOTION, FOR WAIVER OF 10 C.F.R. § 51.53(c)(3)(ii)(L) AS APPLIED TO APPLICATION FOR RENEWAL OF LICENSES FOR LIMERICK UNITS 1 AND 2 and supporting documents in the captioned proceeding were served via the Electronic Information Exchange (EIE) on the 21 day of November 2012, which to the best of my knowledge resulted in transmittal of same to those on the EIE Service List for the captioned proceeding.

Chief Judge Roy Hawkens U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Office of the Secretary of the Commission Mail Stop: T-3F23 Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 hearingdocket@nrc.gov Roy.Hawkens@nrc.gov U.S. Nuclear Regulatory Commission Exelon Generation Company, LLC Office of Commission Appellate Adjudication 4300 Warrenville Road Mail Stop: O-16C1 Warrenville, IL 60555 Washington, DC 20555-0001 J. Bradley Fewell, Deputy General Counsel ocaamail@nrc.gov Bradley.Fewell@exeloncorp.com Morgan, Lewis & Bockius LLP Office of the General Counsel 1111 Pennsylvania Avenue, N.W. U.S. Nuclear Regulatory Commission Washington, DC 20004 Mail Stop O-15D21 Alex S. Polonsky, Esq. Washington, DC 20555-0001 apolonsky@morganlewis.com ogcmailcenter@nrc.gov Kathryn M. Sutton, Esq. Catherine Kanatas ksutton@morganlewis.com catherine.kanatas@nrc.gov Brooke E. Leach Brian Newell bleach@morganlewis.com brian.newell@nrc.gov Maxwell Smith maxwell.smith@nrc.gov Mary Spencer mary.spencer@nrc.gov Ed Williamson edward.williamson@nrc.gov

/Signed (electronically) by/

Geoffrey H. Fettus 29