NOC-AE-12002922, Request for Relief from ASME Section XI Code Requirements for Reactor Pressure Vessel Head Flange O-Ring Leakoff Lines Non-Destructive Examination (Relief Request RR-ENG-3-10)

From kanterella
(Redirected from ML12321A021)
Jump to navigation Jump to search

Request for Relief from ASME Section XI Code Requirements for Reactor Pressure Vessel Head Flange O-Ring Leakoff Lines Non-Destructive Examination (Relief Request RR-ENG-3-10)
ML12321A021
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 11/01/2012
From: Rencurrel D
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-12002922
Download: ML12321A021 (7)


Text

Nuclear Operating Company South Texas Pro/ect Electric Generating Station PO Box 289 Wadsvorth, Texas 77483 - v-l-- --

November 1, 2012 NOC-AE-12002922 File No.: G25 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Request for Relief from ASME Section XI Code Requirements for Reactor Pressure Vessel Head Flange O-Ring Leakoff Lines Non-Destructive Examination (Relief Request RR-ENG-3-10)

In accordance with the provisions of 10 CFR 50.55a(a)(3)(ii), the STP Nuclear Operating Company (STPNOC) requests relief for South Texas Project (STP) Units 1 and 2, for the third inspection interval, from the ASME Section XI code non-destructive examination pressure requirement for the system leakage test applicable to the reactor pressure vessel (RPV) head flange 0-ring leakoff lines. STPNOC has determined that compliance with code inspection requirements is impractical and would result in unnecessary hardship without a compensating increase in the level of quality and safety. As an alternative to a system leakage test at system operating pressure, STPNOC proposes to examine the accessible portions of the system using the VT-2 visual examination method, conducted at ambient conditions after the refueling cavity has been filled to its normal refueling water level for at least four hours, as described in the attached relief request.

STPNOC requests NRC review and approval of this relief request by November 6, 2012, to support use of the proposed alternative when authorized, as required by 10 CFR 50.55a(a)(3),

during the current refueling outage for STP Unit 1 while plant conditions are appropriate for the proposed alternative examination, in order to meet the examination requirements for STP Unit 1 that cover the first period of the third inspection interval ending in September 2013.

There are no commitments in this letter.

If there are any questions, please contact Marco Ruvalcaba at 361-972-7904, or me at 361-972-7867.

Senior Vice President ccc

Attachment:

Request for Relief from ASME Section XI Code Requirements for Reactor Pressure Vessel Head Flange O-Ring Leakoff Lines Non-Destructive Examination (Relief Request RR-ENG-3-1 0) A-0(17 STI: 33617053

NOC-AE-12002922 Page 2 of 2 cc: (paper copy) (electronic copy)

Regional Administrator, Region IV A. H. Gutterman, Esquire U. S. Nuclear Regulatory Commission Morgan, Lewis & Bockius LLP 612 East Lamar Boulevard Arlington, TX 76011-4511 Balwant K. Singal Carl F. Lyon U. S. Nuclear Regulatory Commission Balwant K. Singal John Ragan Senior Project Manager Chris O-Hara U.S. Nuclear Regulatory Commission Jim von Suskil One White Flint North (MS 8 B1) NRG South Texas LP 11555 Rockville Pike Rockville, MD 20852 NRC Resident Inspector Kevin Polio U. S. Nuclear Regulatory Commission Richard Pena P. O. Box 289, Mail Code: MN116 City Public Service Wadsworth, TX 77483 C. M. Canady Peter Nemeth City of Austin Crain Caton & James, P.C.

Electric Utility Department 721 Barton Springs Road C. Mele Austin, TX 78704 City of Austin Carl F. Lyon Richard A. Ratliff Project Manager Texas Department of State Health Services U.S. Nuclear Regulatory Commission One White Flint North (MS 8 B1A) Alice Rogers 11555 Rockville Pike Texas Department of State Health Services Rockville, MD 20852

Attachment NOC-AE-12002922 Page 1 of 5 SOUTH TEXAS PROJECT UNITS 1 AND 2 REQUEST FOR RELIEF FROM ASME SECTION XI CODE REQUIREMENTS FOR REACTOR PRESSURE VESSEL HEAD FLANGE O-RING LEAKOFF LINES NON-DESTRUCTIVE EXAMINATION (RELIEF REQUEST RR-ENG-3-10)

A. Components Affected (a) Component: Reactor Pressure Vessel (RPV)

(b)

Description:

RPV Head Flange O-Ring Leakoff Lines The leakoff lines material specification is Alloy 600 and stainless steel. Piping is %-inch ASME Class 2, schedule 160S, design pressure 2485 psig; Material specification BB2, SA-312 Grade 304 or 316. Monitor tubes supplied by vessel OEM are 1-inch Class 2 schedule 160S, SA-312 Grade 316 and 1.5-inch Class 2 Alloy 600 SB-166.

(c) Class: ASME Code Class 2 B. Applicable Code Requirement The applicable code is ASME Section XI, 2004 Edition (no addenda).

IWC-5220 requires that the system leakage test shall be conducted at the system pressure obtained while the system, or portion of the system, is in service performing its normal operating function or at the system pressure developed during a test conducted to verify system operability (e.g., to demonstrate system safety function or satisfy technical specification surveillance requirements).

Examination of the RPV head flange O-ring leakoff lines is required each Inspection Period.

C. Basis for Relief from Code Requirements In accordance with the provisions of 10 CFR 50.55a(a)(3)(ii), STPNOC requests relief from the Section XI code requirement for system leakage tests of the RPV head flange O-ring leakoff lines on the basis that compliance with the code specified pressure requirement to test the leakoff lines at system operating pressure is impractical and would result in unusual difficulty without a compensating increase in the level of quality and safety.

The RPV head flange O-ring leakoff lines are separated from the reactor coolant system operating pressure by an inner O-ring and an outer O-ring (see Figures 1 and 2 below).

With the RPV head flange O-rings installed and performing their intended function, the leakoff lines are not expected to be pressurized during the system pressure test following a refueling outage.

With the RPV head removed, the configuration of the leakoff piping would require the lines to be plugged at the RPV flange to establish a boundary for a leakage test at system operating

Attachment NOC-AE-12002922 Page 2 of 5 pressure. Performance of such a test would require installation and removal of the plugs that would result in significant radiation exposure, estimated at 1000-2000 mrem per test.

Applying system pressure to the leakoff lines is also not practical with the RPV head installed, since it would require either intentionally failing the O-rings or pressurization in the direction opposite to the intended design function of the O-rings that could damage O-ring material. Purposely failing the O-rings to perform the code required pressure test would require purchase of a new set of O-rings, and additional time and radiation exposure to remove the RPV head, install new O-rings, and reinstall the head. This is considered to impose an undue hardship and burden.

D. Alternative Examination:

In accordance with the provisions of 10 CFR 50.55a(a)(3)(ii), STPNOC proposes to examine the Class 2 portions of the leak detection system, consisting of the accessible portions of the RPV head flange O-ring leakoff lines (refer to Figures 1 and 2). The leakoff lines shall be examined using the VT-2 visual examination method. The test shall be conducted at ambient conditions after the refueling cavity has been filled to its normal refueling water level for at least four (4) hours, when the piping is subjected to the static pressure head when the reactor cavity is filled.

E. Justification for Granting Relief STP tests the RPV flange O-ring leakoff lines every outage at normal operating temperature and pressure with the RPV flange O-rings installed. ASME Section XI Committee has acknowledged that these lines may not be subjected to system pressure in this mode and has issued Code Case N-805 for alternate testing. The proposed alternative examination method was developed using the guidance provided in N-805.

As described in the Updated Final Safety Analysis Report (UFSAR) section 5.2.5.1.3, leakage from the RPV flange is collected in the reactor coolant system drain tank (RCDT) and is identified by an increase in temperature that is monitored in the flange leakoff line.

The UFSAR section 5.3.3.1 description of reactor vessel design states: "The reactor vessel flange and head are sealed by two hollow metallic O-rings. Seal leakage is detected by means of two leakoff connections: one between the inner and outer ring and one outside the outer O-ring. For Unit 1, a 1/8 in. threaded plug made of stainless steel has been installed and seal welded in the reactor vessel flange drain hole for the inner O-ring leakoff line."

The flange seal leakoff lines are essentially a leakage collection/detection system and would only function as a Class 2 pressure boundary in the event of failure of the O-rings separating the lines from reactor coolant system operating pressure. Any significant leakage in this condition would be expected to clearly exhibit boric acid accumulation that would be discernible during the proposed alternate VT-2 visual examination that will be performed.

The static head developed with the leak detection line filled with water will allow for the detection of any gross indications in the line.

F. Implementation Schedule STPNOC requests NRC review and approval of this relief request by November 6, 2012, to support use of the proposed alternative when authorized, as required by 10 CFR

Attachment NOC-AE-12002922 Page 3 of 5 50.55a(a)(3), during the current refueling outage for STP Unit 1 while plant conditions are appropriate for the proposed alternative examination. Since the examination requirements cover the first period of the third inspection interval ending in September 24, 2013, the current plant conditions in STP Unit 1 provide the last practical opportunity to meet the required examination frequency of once per inspection period.

Relief is requested for the duration of the third ten-year inservice inspection interval for STP Units 1 and 2. The third interval began September 25, 2010 (Unit 1) and October 19, 2010 (Unit 2), and ends September 24, 2020 and October 18, 2020, respectively.

G. Precedents Similar relief requests have been previously approved by the NRC for the following (with ADAMS Accession No. references):

(1) Comanche Peak Nuclear Power Plant, Second Inspection Interval Relief Request C-9, "Alternative Pressure Testing Requirements for the Reactor Pressure Vessel Flange Leak-off Piping", as approved by NRC letter dated December 19, 2011 (ML113110092).

(2) LaSalle County Station, Third Inspection Interval Relief Request 13R-08, "Request for Relief for Inservice Inspection Impracticality of Pressure Testing the RPV Head Flange Seal Leak Detection System," as approved by NRC letter dated January 30, 2008 (ML073610587).

(3) Susquehanna Steam Electric Station, Third 10-Year Inservice Inspection (ISI) Interval Program Plan Request for Relief 3RR-07, "Exemption from Pressure Testing Reactor Pressure Vessel Head Flange Seal Leak Detection System," as approved by NRC letter dated September 24, 2004 (ML042680078).

Note: The following precedents were for similar lines designated Class 1:

(4) Millstone Power Station Unit 3, Relief Request IR-3-1 1, "Alternative Pressure Testing Requirements for the RPV Flange Leak-Off Piping," approved by NRC letter dated April 29, 2010 (ML101040042).

(5) North Anna, Relief Request SPT-013, "Examination Category B-P Pressure Retaining Components in the Reactor Coolant System," approved by NRC letter dated February 9, 2006 (ML060450517).

(6) Limerick, Second Interval Relief Request RR-33, "Relief for Pressure Testing the RPV Head Flange Seal Leak Detection System," as approved by NRC letter dated January 27, 2009 (ML090060218).

Attachment NOC-AE-12002922 Page 4 of 5 Figure 1. STP Unit 1 RPV Head Flange O-Ring Leakoff Lines Note the plug installed in Unit 1 inner O-ring leakoff line during 1RE14 in April 2008 (reference DCP 08-6364-5 Supplement 1).

Attachment NOC-AE-12002922 Page 5 of 5 Figure 2. STP Unit 2 RPV Head Flange O-Ring Leakoff Lines