ML123200223
| ML123200223 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 11/21/2012 |
| From: | Richard Guzman Plant Licensing Branch 1 |
| To: | Entergy Nuclear Vermont Yankee, Entergy Nuclear Operations |
| Guzman R, NRR/DORL 415-1030 | |
| References | |
| TAC ME9012 | |
| Download: ML123200223 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 21,2012 Vice President, Operations Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station P.O. Box 250 Governor Hunt Road Vernon, VT 05354
SUBJECT:
VERMONT YANKEE NUCLEAR POWER STATION - CORRECTION LETTER TO LICENSE AMENDMENT NO. 251 RE: CYBER SECURITY PLAN IMPLEMENTATION SCHEDULE MILESTONE (TAC NO. ME9012)
Dear Sir or Madam:
On November 13,2012, the Nuclear Regulatory Commission (NRC) issued Amendment No. 251 to Renewed Facility Operating License No. DPR-28 for Vermont Yankee Nuclear Power Station.
The amendment revised the scope of Cyber Security Plan Implementation Schedule Milestone
- 6 and the existing license condition in the facility operating license. Subsequent to the issuance of the amendment, your staff pointed out that the last two lines on page 6 of the operating license were omitted from License Condition 3.J.
The corrected page 6 of the operating license is enclosed. Please feel free to contact me at 301-415-1030 if you have any questions.
Sincerely, Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-271
Enclosure:
Corrected Page 6 for VY Amendment No. 251 to License No. DPR-28 cc w/encl: Distribution via Listserv
- 6 Safety Analysis Report for the facility and as approved in the SER dated January 13, 1978, and supplemental SERs, dated 9/12/79, 2/20/80, 4/15/80, 7/3180, 10/24/80, 11/10/81, 1/13/83, 7/24/84, 3/25/86, 12/1/86, 12/8/89, 11/29/90, 8130195, 3/23/97, 6/9197, 8/12/97, 3/6198, 3/31/98, 9/2198, and 2/24/99, subject to the following provisions:
Entergy Nuclear Operations, Inc. may make changes to the approved Fire Protection Program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
G.
Security Plan Entergy Nuclear Operations, Inc. shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans \\
which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Vermont Yankee Nuclear Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 0,"
submitted by letter dated October 18, 2004, as supplemented by letter dated May 16, 2006.
Entergy Nuclear Operations, Inc. shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
Entergy Nuclear Operations, Inc. CSP was approved by License Amendment No. 247, as supplemented by a change approved by License Amendment No.
251.
H.
This paragraph deleted by Amendment No. 107,8/25/88.
I.
This paragraph deleted by Amendment No. 131, 10/7/91.
J.
License Transfer Conditions On the closing date of the transfer of Vermont Yankee Nuclear Power Station (Vermont Yankee), Entergy Nuclear Vermont Yankee, LLC shall obtain from Vermont Yankee Nuclear Power Corporation all of the accumulated decommissioning trust funds for the facility, and ensure the deposit of such funds into a decommissioning trust for Vermont Yankee established by Entergy Nuclear Vermont Yankee, LLC. If the amount of such funds does not meet or exceed the minimum amount required for the facility pursuant to 10 CFR 50.75, Entergy Nuclear Vermont Yankee, LLC shall at such time deposit additional funds into the trust andlor obtain a parent company guarantee (to be updated annually) andlor obtain a surety pursuant to 10 CFR 50.75(e)(1)(iii) in a form acceptable to the NRC and in an amount or amounts which, when combined with the decommissioning trust funds for the facility that have been obtained and deposited as required above, equals or 1 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.
Renewed Facility Operating License No. DPR-28 Amendment No. 247, 251 Corrected by letter dated November 21,2012
November 21, 2012 Vice President, Operations Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station P.O. Box 250 Governor Hunt Road Vernon, VT 05354
SUBJECT:
VERMONT YANKEE NUCLEAR POWER STATION - CORRECTION LETTER TO LICENSE AMENDMENT NO. 251 RE: CYBER SECURITY PLAN IMPLEMENTATION SCHEDULE MILESTONE (TAC NO. ME9012)
Dear Sir or Madam:
On November 13, 2012, the Nuclear Regulatory Commission (NRC) issued Amendment No. 251 to Renewed Facility Operating License No. DPR-28 for Vermont Yankee Nuclear Power Station.
The amendment revised the scope of Cyber Security Plan Implementation Schedule Milestone
- 6 and the existing license condition in the facility operating license. Subsequent to the issuance of the amendment, your staff pointed out that the last two lines on page 6 of the operating license were omitted from License Condition 3.J.
The corrected page 6 of the operating license is enclosed. Please feel free to contact me at 301-415-1030 if you have any questions.
Sincerely, IRA!
Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-271
Enclosure:
Corrected Page 6 for VY Amendment No. 251 to License No. DPR-28 cc w/encl: Distribution via Listserv Distribution:
PUBLIC RidsOgcRp RidsOGCMailCenter RidsNrrPMVermontYankee LPL1-1 R/F RidsNrrDorlLPL1-1 RidsNrrLAKGoldstein RidsRgn1 MailCenter RidsAcrsAcnw_MailCenter RidsNsirDspCsirb RidsNrrDorlDpr P. Pederson, NSIR/DSP M. Cotlin, NSIR/DSP ADAMS Accession No.: ML123200223
)FFICE LPL 1-1/PM LPL1-1/LA LPL1-1/BC
'lAME RGuzman KGoldstein BVaidya for GWilson
)ATE 11/21/12 11/16/12 11/21/12 OFFICIAL RECORD COpy