Exelon Nuclear Job Performance Measure High Control Room Radiation JPM Number: S-VC-01 Revision Number: 02 Date: 08/31/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-VC-01 Rev. 2 Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-VC-01 Rev. 2 Page 3 of 9 Revision Record (Summary)

Revision 00, New JPM written for 2010 Annual Exam by Gordon W. Beale Revision 01, Added cue about VC Makeup Run Timer not moving. Removed steps after the Emergency Makeup Train is placed on line.

Revision 02 Updated JPM to current procedures and JPM Template for the ILT 11-1 NRC Exam. The revised JPM is no longer considered Alternate Path.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-VC-01 Rev. 2 Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS

1. Reset to IC187, 30% power (NOTE: IC187 was saved from the 07/02/12 version of IC 25)

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

1. Go to RUN
2. Insert the following commands: (Commands contained in CAEP File JPM S-VC-01.cae)

The following will prevent VC from initiating:

  • ior q7d63rrg off (A VC EMU Fan Red/ON light overridden OFF)
  • ior q7d63lgg on (A VC EMU Fan Green/OFF light overridden ON)
  • ior q7d2612g off (A VC EMU Fan Run Time Meter overridden OFF)

The following will cause all VC Rad Monitors to alarm

The following will delete overrides

  • trgset 2 "k7d63wbg" (When A VC Emerg M/U Fan switch taken to START)
  • ior q7d63rrg (2 20) on (On Trigger 2 EMU Fan ON light overridden ON after 20 sec)
  • ior q7d63lgg (2 20) off (On Trigger 2 EMU Fan OFF light overridden OFF after 20 sec)
  • ior q7d2612g (2 20) on (On Trigger 2, A VC EMU Fan Run Time Meter overridden ON)

The following will allow the annunciators to respond correctly:

  • imf r1367 off (AEER HVAC TROUBLE 1PM06J A109 overridden off)
  • imf aa024 off (CR HVAC SYS TROUBLE 1PM06J B107 overridden off)
  • trgset 3 q7d63rrg.eq.1 (When the EMU Fan Red/On light comes on)
  • trgset 4 q7d63rrg.eq.1 (When the EMU Fan Red/On light comes on)
  • trg 3 dmf r1367 (On Trigger 3, Annunciator 1PM06J A109 override deleted)
  • trg 4 dmf aa024 (On Trigger 4, Annunciator 1PM06J B107 override deleted)
3. PLACE 0A CR EMER MU FAN Switch is in Normal After Trip.

(VERIFY that this is done after each JPM or the fan will start and invalidate subsequent JPM administration.)

4. Verify all four VC Rad Monitors are in alarm (Red Alarm light lit) and messages are on the SER.
5. Acknowledge annunciators.
6. This completes the setup for this JPM.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-VC-01 Rev. 2 Page 5 of 9 INITIAL CONDITIONS You are the Unit 1 Assistant NSO.

B VC/VE Train is Out of Service for a Work Window CR CAM PANEL TROUBLE, 1PM13J-B401, has just alarmed.

INITIATING CUE Your Unit Supervisor has directed you to respond to CR CAM PANEL TROUBLE Alarm.

Report to the Unit Supervisor when CR CAM PANEL TROUBLE Alarm LOR is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

This JPM tests a time critical operator action of placing the VC Recirculation Filter on line within the time frame (4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />) of the DBA LOCA. See LaSalle Operations Handbook, OP-LA-101-111-1002. It is not marked as time critical due to the four hours exceeding the NUREG 1021 guidance of a maximum JPM time.

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-VC-01 Rev. 2 Page 6 of 9 JPM Start Time:

STEP Comment (LOR- ELEMENT STANDARD SAT UNSAT 1PM13J- Number B401)

NOTE Step B.1 is Not Applicable because the B VC/VE train was given as Out-Of Service in the Initial Conditions.

1. CHECK alarm typer SER Points and VC Radiation ___ ___ ___

(B.2) printout to determine if Monitors checked for alarm alarm is due to Control conditions Room HVAC High (SER Points: R1387 & R1389)

Radiation, Reboiler High Radiation, or Rad (Rad Monitors: 1D18-K751A, B, Instrument Failure. C, & D)

NOTE The following actions take place at 1PM05J.

2. If alarm is due to Control 0A CR HVAC Emer MU Fan ___ ___ ___

(B.3.a.1) Room Outside Air High 0VC03CA recognized as NOT Radiation: running VERIFY 0A CR HVAC Emer MU Fan 0VC03CA is running.

  • 3. MOMENTARILY PLACE 0A CR HVAC Emer MU Fan, ___ ___ ___

(B.3.a.1) 0A CR HVAC Emer MU 0VC03CA, control switch taken Fan, 0VC03CA, control to START, then released switch to START, then RED/ON light is ON release.

GREEN/OFF light is OFF.

MANUALLY ALIGN CR

  • 4. 0A CR HVAC Charcoal Filter ___ ___ ___

HVAC Recirculation (B.3.a.2) Damper Control switch placed Charcoal Filter by placing in the FILTER position.

0A CR HVAC Charcoal Filter Damper Control switch to FILTER

5. VERIFY 0VC11YA, 0A CR 0VC11YA, 0A CR HVAC ___ ___ ___

HVAC Charcoal Filter Inlet, Charcoal Filter Inlet verified (B.3.a.3.a)

OPEN OPEN.

6. VERIFY 0VC12YA, 0A CR 0VC12YA, 0A CR HVAC Filter ___ ___ ___

HVAC Filter Outlet, OPEN Outlet verified OPEN.

(B.3.a.3.b)

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-VC-01 Rev. 2 Page 7 of 9 STEP Comment (LOR- ELEMENT STANDARD SAT UNSAT 1PM13J- Number B401)

7. VERIFY 0VC13YA, 0A CR 0VC13YA, 0A CR HVAC Filter ___ ___ ___

HVAC Filter Bypass, Bypass, verified CLOSED.

(B.3.a.3.c)

CLOSED

8. VERIFY 0A VC Purge 0A VC Purge Damper Control, ___ ___ ___

Damper Control, 0VC08YA/10YA/14YA switch (B.3.a.4) 0VC08YA/10YA/14YA verified in the PURGE OFF switch in OFF position. position.

Terminating Cue When the candidate begins directing the local actions at 0PA09J, inform the candidate that the JPM is complete.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-VC-01 Rev. 2 Page 8 of 9 JPM

SUMMARY

Operators Name:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

High Control Room Radiation JPM Number: S-VC-01 Revision Number: 2 Task Number and

Title:

117.016 Respond to High Rad in the VC System K/A Number and Importance: 290003 (Control Room HVAC) A2.03 3.4/3.6 Ability to (a) predict the impacts of the following on the CONTROL ROOM HVAC ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Initiation/reconfiguration failure Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): LOR-1PM13J-B401 CR CAM PANEL TROUBLE, Rev. 8 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 20 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-VC-01 Rev. 2 Page 9 of 9 INITIAL CONDITIONS You are the Unit 1 Assistant NSO.

B VC/VE Train is Out of Service for a Work Window CR CAM PANEL TROUBLE, 1PM13J-B401, has just alarmed.

INITIATING CUE Your Unit Supervisor has directed you to respond to CR CAM PANEL TROUBLE Alarm.

Report to the Unit Supervisor when CR CAM PANEL TROUBLE Alarm LOR is complete.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure 1B DG Fast Start Loading With A Trip of MCC 143-1 JPM Number: S-DG-11 Revision Number: 00 Date: 08/31/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-DG-11 Rev. 00 Page 2 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-DG-11 Rev. 00 Page 3 of 11 Revision Record (Summary)

Revision 00, This JPM was developed NEW for the ILT 11-1 NRC Exam. This JPM modifies bank JPM S-DG-09, Rev. 00, by the use of a new alternate path.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-DG-11 Rev. 00 Page 4 of 11 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC.

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Adjust speed droop of 1B DG to 50
  • mrf iaeedr1b 50%
3. Insert the following commands: (Commands are contained in CAE file S-DG-11.cae.
  • trgset 11 q1m01rrl (When 1B DG Output Breaker Red/Closed light comes on)
  • imf mee035 (11 30) (On Event Trigger 11 with a 30 second delay, Loss of MCC 143-1)
4. Complete the following steps to start the 1B DG per LOS-DG-M3 ATTACHMENT 1B-FAST:
  • Step 1.11, Verify Diesel Gen Selector switch in the REMOTE MANUAL position.
  • Step 1.12, Verify Diesel Gen Voltmeter Select switch in the DG position.
  • Step 2.1, Verify 1B DG Cooling Water Pump in the NORMAL position.
  • Step 2.2.3, Start the 1B DG.
  • Step 2.4, Verify the 1B DG Cooling Water Pump is running.
5. Provide a copy of LOS-DG-M3, for the candidate, completed as follows:
  • An Authorized Work Package for LOS-DG-M3 (3 pages) attached
  • All Steps in Sections B, C, and D circled and slashed
  • Step E.1 circled and slashed
  • ATTACHMENT 1B-FAST completed up to STEP 3.1.

o For all steps requiring a date, use Today o Use the following values:

Step 1.3: 18.8 feet Step 1.3.1: 31,802 gallons Step 1.4: 44 inches Step 1.9: 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Step 1.10 86 ºF (DG Room), 56 ºF (Outside)

Step 1.16: Jacket 141 ºF; Cooler Outlet 140 ºF Step 1.27: (Both) 240 psig Step 2.2.3: (Both) 9.9 seconds Step 2.6: (Both) 210 psig Step 2.7: (Both) 30 psig Step 2.8: 0 psid

6. Silence, acknowledge and reset annunciators. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
7. This completes the setup for this JPM.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-DG-11 Rev. 00 Page 5 of 11 INITIAL CONDITIONS

  • You are an NSO.
  • LOS-DG-M3 is in progress complete up to Step 3.2 of ATTACHMENT 1B-FAST.
  • West is the Equipment Operator supporting this test. (at ex 2999)

INITIATING CUE The Unit Supervisor has directed you to load the 1B DG IAW LOS-DG-M3.

Inform the Unit Supervisor when 1B DG is fully loaded.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-DG-11 Rev. 00 Page 6 of 11 JPM Start Time:

STEP Comment (LOS-DG- ELEMENT STANDARD SAT UNSAT M3 Att Number 1B-Fast)

NOTE All steps of this JPM are to be completed at control room panel 1H13-P601 unless otherwise noted.

1. Verify B DG Frequency 59.8 Examinee verifies B DG ___ ___ ___

(3.2) to 60.2 Hz on 1E22-R612 Frequency 59.8 to 60.2 Hz on 1E22-R62 CUE Wipe the Motor Operated Potentiometer once.

2. Wipe Motor Operated Potentiometer, using the 1B Examinee wipes Motor ___ ___ ___

(3.3) Diesel Gen Terminal Volt Operated Potentiometer, using Adjust control switch to do the 1B Diesel Gen Terminal Volt the following as read on Adjust control switch as 1E22-R610, 1B Diesel Gen described.

Volts:

  • Lower Diesel Generator volts to approximately 3900 volts.
  • Raise Diesel Generator volts to approximately 4500 volts.
  • Lower Diesel Generator volts to approximately 4050 to 4300 volts.
  • 3. Place Synchroscope Select Examinee places Synchroscope ___ ___ ___

(3.4) Switch to ON Select Switch to ON for breaker 1433

4. Adjust DG Speed with 1B Examinee adjusts DG Speed ___ ___ ___

(3.5) DG Governor Adjust switch with 1B DG Governor Adjust until synchroscope rotates at switch until synchroscope approximately 1-2 rpm in the rotates at approximately 1-2 FAST (clockwise) direction. rpm in the FAST (clockwise) direction.

CUE If the examinee does not meet the approximately 1-2 rpm band within 5 minutes, inform the examinee that the synchroscope has a 55 second rotation frequency.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-DG-11 Rev. 00 Page 7 of 11 STEP Comment (LOS-DG- ELEMENT STANDARD SAT UNSAT M3 Att Number 1B-Fast)

NOTE If the DG Output Breaker fails to close when it is closed due to voltage being too high, then the following step would be marked unsat

  • 5. Adjust BOP/Division 3 Examinee adjusts BOP/Division ___ ___ ___

(3.6) Incoming Volts with 1B 3 Incoming Volts with 1B Diesel Diesel Gen Terminal Volts Gen Terminal Volts Adjust Adjust switch until it is switch until it is slightly above slightly above BOP/Division BOP/Division III Running Volts.

III Running Volts.

  • 6. When synchro-scope is at Examinee closes ACB 1433 ___ ___ ___

(3.7) the 11 oclock position, close when synchro-scope is at 11 ACB 1433, 1B Diesel Gen to oclock by HOLDING the Bus 143 by holding the Control Switch to CLOSE.

Control Switch to CLOSE.

7. Promptly raise DG Load to 1B DIESEL GEN GOVERNOR ___ ___ ___

(3.7 greater than 200 KW adjusted until DG Load raised to Caution) greater than 200 KW NOTE ALTERNATE PATH BEGINS HERE NOTE MCC 143-1 trips 30 seconds after the 1B DG output breaker is closed.

Step 8 may not be completed due to the Fault.

8. Raise DG Load to 1000 kW Examinee raises DG Load to ___ ___ ___

(3.8) to 1300 kW and 350 KVAR

  • 1000 KW to 1300 KW and to 750 KVAR, MAINTAIN for
  • 350 KVAR to 750 KVAR two (2) minutes.

then waits for two minutes before continuing while maintaining DG parameters.

NOTE When MCC 143-1 trips the following 1H13-P601 annunciators come in:

A104; 1B DG CLG WTR PMP TROUBLE A202; 4KV BUS 143 BKR AUTO TRIP A402; 4KV BUS 143/143-1 UNDERVOLTAGE A501; 1B DG ENGINE TROUBLE A502; 1B DG FUEL OR FUEL OIL XFR PMP FAILURE

9. Monitor Diesel Generator 1B Diesel Generator 1B ___ ___ ___

LOR 1H13-P601-A104 temperatures temperatures monitored Step B.2

10. Determine the cause for the Loss of MCC 143-1 and/or 1B DG ___ ___ ___

LOR 1H13- annunciators Cooling Water Pump identified P601-A104 Step B.3 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-DG-11 Rev. 00 Page 8 of 11 STEP Comment (LOS-DG- ELEMENT STANDARD SAT UNSAT M3 Att Number 1B-Fast)

11. If no LOCA exists, shutdown LOP-DG-03 reference for 1B ___ ___ ___

LOR 1H13- Diesel Generator 1B per DG Shutdown P601-A104 Step B.4 LOP-DG-03.

12. If DG is loaded, perform the SAT feed Breaker to Bus 143 is ___ ___ ___

LOP-DG-03 E.5.2 &

following steps to unload the verified closed E.5.2.1 DG and open output breaker:

Verify bus is being supplied from its normal or alternate (not from DG) power supply

13. Concurrently perform the DIESEL GEN GOVERNOR and ___ ___ ___

following steps:

LOP-DG-03 DIESEL GEN VOLT ADJUST E.5.2.2

  • Reduce load on DG by switches adjusted until selecting lower on DIESEL GEN GOVERNOR adjust KW is between 500-200 KW switch. and
  • bserve DG load KVAR is less than or equal to decreasing on DIESEL 500 KVAR KILOWATTS meter.
  • Reduce KVAR load on DG by selecting lower on DIESEL GEN VOLT ADJUST switch.
  • Observe DG KVAR load decreasing on diesel GEN KILOVARS meter.
  • 14. When DG load is between ACB 1433, 1B DG Feed to Bus ___ ___ ___

LOP-DG-03 500 KW and 200 KW and 143 opened E.5.2.3 KVAR loading is less than or equal to 500 KVAR, open ACB 1433 1B DG Feed to Bus 143.

15. Set Engine Governor Speed EO directed to set Engine ___ ___ ___

LOP-DG-03 Droop to 0. Governor Speed Droop to 0.

E.5.3 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-DG-11 Rev. 00 Page 9 of 11 STEP Comment (LOS-DG- ELEMENT STANDARD SAT UNSAT M3 Att Number 1B-Fast)

SIMOP Role Play EO as necessary to set Engine Governor Speed Droop to 0.

Modify Speed Droop Remote Function to 0 (mrf iaeedr1b 0) and report completion

16. Verify Engine Speed at 900 Engine Speed verified at 900 RPM ___ ___ ___

LOP-DG-03 RPM (60Hz). (60Hz).

E.5.4 CUE (Without cooling water, the 1B DG would not be cooling down, making the next step Not Applicable)

Role Play Unit Supervisor as necessary:

If asked to shut down the 1B DG in less than 5 minutes, grant permission.

17. Check DG has operated DG operated for 5 minutes ___ ___ ___

LOP-DG-03 unloaded for 5 to 10 minutes to unloaded or as directed E.5.5 provide adequate cooldown.

18. Shutdown DG as follows: Diesel Gen Selector switch verified ___ ___ ___

LOP-DG-03 At Control Room Panel, verify in REMOTE.

E.5.6 & Diesel Gen Selector switch in E.5.6.1 REMOTE.

  • 19. Place Diesel Gen Control Diesel Gen Control switch placed ___ ___ ___

LOP-DG-03 switch to STOP position. in STOP E.5.6.2

20. Immediately place1E22B- EO directed to place Engine ___ ___ ___

LOP-DG-03 S001B, 1B DG Engine Maintenance Switch in MAINT.

E.5.7 Maintenance Switch, in MAINT.

CUE Role Play EO as necessary to place Engine Maintenance Switch in MAINT.

21. Check DG shuts down. DG verified shut down ___ ___ ___

LOP-DG-03 (Possible indicators: DG Speed, E.5.8 Amps, KW, and KVARs reading 0)

22. Informs Unit Supervisor of DG Informs Unit Supervisor of DG ___ ___ ___

status. status.

TERMINATING CUE:

This completes this JPM.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-DG-11 Rev. 00 Page 10 of 11 JPM

SUMMARY

Operators Name:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

1B DG Fast Start Loading with a Trip of MCC 143-1 JPM Number: S-DG-11 Revision Number: 00 Task Number and

Title:

11.008 Perform the Main Control Room actions for a Diesel Generator Start Failure.

K/A Number and Importance:264000 (Emergency Generators) A4.04 3.7/3.7 Ability to manually operate and/or monitor in the control room: Manual start, loading and stopping of emergency generators Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): LOS DG-M3, 1B Diesel Generator Operability Test, Rev 85 LOP DG-03, Diesel Generator Shutdown, Rev. 33 LOR-1H13-P601-A104, 1B DG CLG WTR PMP TROUBLE. Rev 3 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 11 of 11 INITIAL CONDITIONS

  • You are an NSO.
  • LOS-DG-M3 is in progress complete up to Step 3.2 of ATTACHMENT 1B-FAST.
  • West is the Equipment Operator supporting this test. (at ex 2999)

INITIATING CUE The Unit Supervisor has directed you to load the 1B DG IAW LOS-DG-M3.

Inform the Unit Supervisor when 1B DG is fully loaded.

Exelon Nuclear Job Performance Measure Complete the Low Pressure Core Spray System Operability Test JPM Number: S-LP-05 Revision Number: 00 Date: 08/31/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-LP-05 Rev. 00 Page 2 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-LP-05 Rev. 00 Page 3 of 11 Revision Record (Summary)

Revision 00, This JPM was developed NEW for the ILT 11-1 NRC Exam.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-LP-05 Rev. 00 Page 4 of 11 SIMULATOR SETUP INSTRUCTIONS NOTE: This Alternate Path JPM requires the candidate to recognize an annunciator on the opposite side of the Simulator. Concurrent JPM activities should be evaluated for potential impact on this JPM.

1. Reset to IC193, 100% power (NOTE: IC193 was saved from the 06/12/12 version of IC 81)

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. GO to RUN.
3. Insert the following commands: (Commands contained in CAEP File JPM S-LP-05.cae)
  • imf mdg022 (5) (On Manual Trigger 5, Trip of the 0 DG Cooling Water Pump breaker)
4. START LPCS pump and ESTABLISH 6350 - 6477 gpm flow by throttling 1E21-F012.

NOTE: Allow the LPCS pump to run as long as possible, preferably 30 minutes, before snapping the IC or starting the JPM, so that motor temperatures will have stabilized.

5. Prepare a copy of LOS-LP-Q1, Attachment 1A (including a Predefine Cover Sheet) as follows:
a. Steps A.1.1 through A.11.3 should be marked complete and/or performed for the given condition. Any step to be marked SAT/UNSAT should be marked SAT.
b. Steps requiring values:
  • A.1.2: Suppression Pool level from Computer Pt L124, -0.32, -0.01152, 10.85, Alternate Method marked N/A
  • A.1.5: 66
  • A.1.10: 66, 10.85, 55.15
  • A.1.11: 2/3
  • A.2.2: Upper= 0, Lower= -1/8
  • A.3: -0.32 inches
  • A.5: Suppression Pool level from Computer Pt L124, -0.35, -0.0126, 10.85, Alternate Method marked N/A
  • A.6.4: 6350
  • A.7.2: 6355
  • A.7.3: 6350
  • A.7.4: From Pt. A809, 313
  • A.7.5: 165
  • A.8.1: -0.32
  • A.8.2: -0.32, -0.01152, 10.85
  • A.9: 313, 10.85, 302.15
  • A.10.2: Upper=+1/8 Sat, Lower= 0 Sat
c. Photocopy the marked up surveillance, as necessary, based on the number of examinees and to submit to records with JPM.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-LP-05 Rev. 00 Page 5 of 11 (Continued)

6. Place Ramtex Picture # 21 in Monitor #2 per LOP-CX-72. Verify the following parameters are displayed:
  • W452 LPCS Pmp Mtr Up Gde Brg.
  • L450 LPCS Pmp Mtr Stat Wdg.
  • W453 LPCS Pmp Mtr Lo Gde Brg.
  • W451 LPCS Pmp Mtr Up Thst Brg.
7. Ensure the performance of this JPM does not interfere with the performance of any other JPMs.
8. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the noted steps on the Job Performance Measure Validation Checklist.
9. This completes the setup for this JPM.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-LP-05 Rev. 00 Page 6 of 11 INITIAL CONDITIONS

  • You are an Assist NSO on Unit 1.
  • 0 DG Cooling Water Pump is running only for LOS-LP-Q1.
  • LOS-LP-Q1, LPCS SYSTEM INSERVICE TEST is in progress this shift. The system walkdown step, A.11 of Attachment 1A, has just been completed.
  • The EO assisting you will call when he is ready to perform Step A.12, verifying the Discharge Check Valve 1E12-F033, has closed.

INITIATING CUE The Unit Supervisor has directed you continue the LPCS Operability Test at Step A.12.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-LP-05 Rev. 00 Page 7 of 11 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number (LOS-LP-Q1)

1. Perform the following to In-Plant Operator contacted to ___ ___ ___

(A.12 & verify 1E21-F033, Discharge close 1E12-F085A A.12.1) Check Valve has closed:

Close 1E12-F085A, A RHR/LPCS Water Leg Pump A RHR DSCH valve SIMOP ROLE PLAY the assisting EO:

Call the ANSO at extension 2307.

You are ready to close 1E12-F085A per Step A.12.1.

Stay on the line and inform the ANSO that 1E12-F085A is closed.

EO and ANSO wait 30 seconds to see if 1H13-P601-C405 comes in.

After 30 seconds with no alarm, report that PI-1E21-R500 is reading 65.5 psig.

2. Record LPCS Water Leg Local indicator PI-1E21-R500 ___ ___ ___

(A.12.1) Pump discharge pressure as pressure recorded read on local indicator PI-1E21-R500:

NOTE ALTERNATE PATH STARTS HERE SIMOP

  • Trip the 0 DG CWP:

o Activate Manual Trigger 5 to insert Malfunction mdg022 SIMOP NOTE: Wait as long as possible before calling up the Input Screen for CX-L1450 in order to achieve a smooth transition from the most current RAMP START VALUE to the upward trend.

  • When the DG CWP trips, initiate an upward trend on the Display #21 Value for 1A CS pump stator temp as follows:

o Using Action List (Green Button), under PPC, call up the Input Screen for Override CX-L1450 o Insert a SEVERITY VALUE of 150 on a RAMP TIME of 7:00 minutes SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-LP-05 Rev. 00 Page 8 of 11 Comment STEP ELEMENT STANDARD SAT UNSAT Number (LOS-LP-Q1)

NOTE The following 0 DG CWP Trip indications are available:

  • Monitor #2 Red/ALARM comes ON (in upper right hand corner)
  • Amber TRIP light on O DG CWP switch (at 1PM01J)
  • PPC SER Pt. 123 0 DG Cooling Water Pump Breaker Trip appears
  • Rising LPCS Motor Temperatures on Monitor #2 (overhead)
  • Rising LPCS Ventilation Temperatures on 1TI-VY021 & 022 NOTE When the candidate recognizes the trip of the 0 DG CWP, LOS Steps A.12.3 through Step A.14 are no longer applicable.

CUE If informed as the Unit Supervisor that the 0 DG CWP has tripped, ROLE PLAY as necessary to acknowledge this report.

  • 3. Throttle closed 1E21-F012, Prior to the completion of Step ___ ___ ___

(A.15.1) LPCS Test to SP Vlv. A.14, or Handswitch for 1E21-F012 held LOP-LP-04 in the CLOSE position until the E2.2.1.1.1 GREEN/CLOSED light is ON and the RED/OPEN light is off

4. When indicated flow Min Flow Valve 1E21-F011 ___ ___ ___

(A.15.2) decreases to less than 2000 verified opening as LPCS flow gpm: verify 1E21-F011, decreases or LPCS Min Flow Vlv opens LOP-LP-04 E2.2.1.1.1

5. Check Alarm LPCS PMP INJ LPCS PMP INJ FLOW HI ___ ___ ___

(A.15.2.2) FLOW HI (C508) clears (C508) verified clear SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-LP-05 Rev. 00 Page 9 of 11 Comment STEP ELEMENT STANDARD SAT UNSAT Number (LOS-LP-Q1)

  • 6. When indicated flow Prior to the completion of Step ___ ___ ___

(A.16) decreases to 0 gpm, stop A.14, LPCS Pump 1E21-C001 or and LOP-LP-04 when LPCS Flow is 0 gpm, E2.2.1.1.3 Handswitch for 1E21-C001 taken to the STOP position, The GREEN/OFF light is ON and the RED/ON light is off CUE TERMINATING CUE:

This completes this JPM.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-LP-05 Rev. 00 Page 10 of 11 Operators Name:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Complete the Low Pressure Core Spray System Operability Test JPM Number: S-LP-05 Revision Number: 00 Task Number and

Title:

63.012 Perform Control Room actions for the LPCS Inservice test K/A Number and Importance:209001 (LPCS) A4.01 3.8/3.6 Ability to operate and/or monitor in the control room: Core Spray Pump Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): LOS-LP-Q1 LPCS System Inservice Test, Rev. 53 LOP-LP-04, Low Pressure Core Spray System Normal Startup and Shutdown, Rev. 13 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 16 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 11 of 11 INITIAL CONDITIONS

  • You are an Assist NSO on Unit 1.
  • 0 DG Cooling Water Pump is running only for LOS-LP-Q1.
  • LOS-LP-Q1, LPCS SYSTEM INSERVICE TEST is in progress this shift. The system walkdown step, A.11 of Attachment 1A, has just been completed.
  • The EO assisting you will call when he is ready to perform Step A.12, verifying the Discharge Check Valve 1E12-F033, has closed.

INITIATING CUE The Unit Supervisor has directed you continue the LPCS Operability Test at Step A.12.

Exelon Nuclear Job Performance Measure Initiate ADS with a Failure of Two SRVs to Open JPM Number: S-NB-06 Revision Number: 00 Date: 08/31/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-NB-06 Rev. 00 Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-NB-06 Rev. 00 Page 3 of 9 Revision Record (Summary)

Revision 00, This JPM was updated to the current JPM template and modified for the ILT 11-1 NRC Exam. It was based on Bank JPM S-NB-05 Rev. 11.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-NB-06 Rev. 00 Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS

1. Reset to IC194, 40% power (NOTE: IC194 was saved from the 01/10/12 version of IC 82)

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Go to RUN.
3. Scram the reactor and perform applicable LGP 3-2 actions.
4. Insert the following commands: (Commands contained in CAEP File JPM S-NB-06.cae)
  • imf mes006 (ADS Timer K5A fails to count down)
  • imf mes007 (ADS Timer K5B fails to count down)
  • imf mes010 (SRV E ADS solenoids fail)
  • imf mes012 (SRV S ADS solenoids fail)
5. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the noted steps on the Job Performance Measure Validation Checklist located on page.
6. This completes the setup for this JPM.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-NB-06 Rev. 00 Page 5 of 9 INITIAL CONDITIONS You are the Assist NSO on Unit 1.

Unit 1 was at full power.

An accident has occurred that requires RPV Blowdown.

INITIATING CUE The Unit Supervisor has directed you to initiate ADS and verify proper operation.

You are to inform the Unit Supervisor when ADS has been initiated.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-NB-06 Rev. 00 Page 6 of 9 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE All steps of this JPM are to be completed at control room panel 1H13-P601 unless otherwise noted.

  • 1. Div I or Div II ADS pushbuttons Examinee arms Div I or Div II ___ ___ ___

are armed. ADS pushbuttons by turning the arming collars.

2. Alarm 1H13-P601 E201 Div 1/2 Examinee verifies alarm E201 ___ ___ ___

ADS Manual Initiation PB Div 1/2 ADS Manual Initiation Armed verified lit. PB Armed lights for each Division of ADS armed.

  • 3. Both pushbuttons per division Examinee depresses both ADS ___ ___ ___

depressed. initiation pushbuttons for the division(s) armed in step 1.

4. Div I or Div II ADS pushbuttons Examinee arms Div I or Div II ___ ___ ___

are armed. ADS pushbuttons by turning the arming collars.

5. Alarm 1H13-P601 E201 Div 1/2 Examinee verifies alarm E201 ___ ___ ___

ADS Manual Initiation PB Div 1/2 ADS Manual Initiation Armed verified lit. PB Armed lights for each Division of ADS armed.

6. Both pushbuttons per division Examinee depresses both ADS ___ ___ ___

depressed. initiation pushbuttons for the division(s) armed in step 4.

ALTERNATE PATH STARTS HERE.

7. VERIFY Seven ADS Valves are Less than Seven ADS Valves ___ ___ ___

OPEN. OPEN is identified.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-NB-06 Rev. 00 Page 7 of 9 Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • 8. Two Additional SRV is opened Examinee places the ___ ___ ___

using the handswitches. handswitch for two closed SRV to the open position and verifies they are open.

Preferred to open in Alphabetic sequence

9. Reports that ADS is initiated Examinee REPORTS that ADS ___ ___ ___

and Seven ADS valves are is initiated and SEVEN ADS open - may report two needed valves are open - MAY report to be opened manually. two needed to be opened manually.

CUE ROLE PLAY as Unit Supervisor to acknowledge this report.

TERMINATING CUE:

Considered JPM complete when 7 SRVs are open, and the Unit Supervisor is notified.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-NB-06 Rev. 00 Page 8 of 9 JPM

SUMMARY

Operators Name:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Initiate ADS with a failure of Two SRVs to Open JPM Number:S-NB-06 Revision Number: 00 Task Number and

Title:

428.000 Evaluate plant conditions and rapidly depressurize the RPV using SRVs via the ADS system K/A Number and Importance: 218000 (ADS) A4.01, 4.4/4.4 Ability to manually operate and/or monitor in the control room: ADS Valves Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

LGA-004 RPV Blowdown, Rev. 7 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 5 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 9 of 9 INITIAL CONDITIONS You are the Assist NSO on Unit 1.

Unit 1 was at full power.

An accident has occurred that requires RPV Blowdown.

INITIATING CUE The Unit Supervisor has directed you to initiate ADS and verify proper operation.

You are to inform the Unit Supervisor when ADS has been initiated.

Exelon Nuclear Job Performance Measure BYPASS A FAILED LOCAL POWER RANGE MONITOR (LPRM)

JPM Number: S-NR-01 Revision Number: 07 Date: 08/31/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-NR-01 Rev. 07 Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-NR-01 Rev. 07 Page 3 of 9 Revision Record (Summary)

1. Revision 02, Utilized new template & made minor editorial changes.
2. Revision 03, Changed JPM from S-NR-01 to B.1.d. Verified correct to current procedure.
3. Revision 04, Upadated JPM for Rev. 9 of LOA-NR-101. Changed title back to S-NR-01.
4. Revision 05, Changed Task number to correspond to vision Task list. Added additional LPRMs that were bypassed initially. This adds meaning to the determination whether the LPRM can be bypassed.
5. Revision 06, Changed initiating cue to say enter LOA-NR-101 instead of bypassLPRM 48-33C. Changed K/A value to more closely match the task being performed and corrected typos.
6. Revision 07, Updated format for ILT 11-1 NRC Exam. Added another bypassed Level C LPRM on APRM C in the setup. This makes APRM C administratively inoperable when the failed APRM is identified/bypassed and makes bypassing APRM C a Critical Step.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-NR-01 Rev. 07 Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC193.

(NOTE: IC193 was saved from the 06/12/12 version of IC 81.)

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Go to RUN.
3. To cause LPRM 48-33C to fail down scale - imf mni095. This will take about 2 minutes.
4. On Panel 1H13-P603, verify that A RPS APRM BYPASS is NOT selected to the C position.
5. Bypass the following LPRMs in APRM C:
  • 16-33C
  • 32-17C
  • 56-41D
  • 40-25D
6. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
7. This completes the setup for this JPM.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-NR-01 Rev. 07 Page 5 of 9 INITIAL CONDITIONS You are the Unit 1 ANSO.

The Unit 1 is operating near full power in a steady-state condition.

The following LPRMs are already OOS and bypassed:

16-33C 32-17C 56-41D 40-25D LPRM 48-33C has failed downscale.

INITIATING CUE The Unit Supervisor directs you to bypassLPRM 48-33C in accordance with LOA-NR-101.

Inform the Unit Supervisor when LPRM 48-33C has been bypassed.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-NR-01 Rev. 07 Page 6 of 9 STEP Comment (LOA-SAT UNSAT Number NR-101) ELEMENT STANDARD NOTE All steps are to be completed at control room panels 1H13-P603/8 unless otherwise noted.

1. Examinee obtains a copy of Examinee obtains copy of LOA-NR-101 LOA-NR-101
2. Stop all control rod motion / No rod motion or power (B.2.1) power changes changes verified by turnover information NOTE BYPASS light on 1H13-P603 will be lit for LPRM 48-33C when selected because of LPRM 48-33C being downscale.
3. Select control rod that will Examinee selects a rod that (B.2.2) display suspect LPRM on will display LPRM 48-33C four rod display (46-31, 46,35, 50-31, or 50-35)
4. If required, Review LPRM (Possible) LPRM Diagnostic (B.2.3) Diagnostic Screen on PPC to Screen on PPC referenced aid in determining LPRM operability
  • 5. Bypass APRM C APRM BYPASS selector (B.2.4.1) (The APRM fed by the failed switch placed in the C position LPRM) and NOT restored to neutral at the completion of this task
6. Operator locates and opens Door open for APRM C LPRM the door to access APRM C bypass switches LPRM bypass switches at panel 1H13-P608
  • 7. Operator places the bypass Bypass switch for LPRM 48-(B.2.4.2) switch for LPRM 48-33C to 33C placed in the BYPASS the BYPASS position position SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-NR-01 Rev. 07 Page 7 of 9 STEP Comment (LOA-SAT UNSAT Number NR-101) ELEMENT STANDARD

8. May verify Bypass Light is (Possible) Bypass Light for ON for LPRM 48-33C LPRM 48-33C verified ON
  • 9. Refer to Attachment B to Examinee determines from the (B.2.4.3) determine the operability of initial conditions and/or the the APRM. LPRM BYPASS switches in Equal to or greater than two APRM C that:

LPRMs per level APRM C is (administratively)

Equal to or greater than 14 INOPERABLE due to less than LPRMs per channel 2 operable LPRMs on Level C NOTE The following step is based on Operating Experience.

10. Select a control rod that One of the following control (B.2.4.4) displays the affected LPRM rods (adjacent to the LPRM detector and VERIFY a string at 48-33) is selected:

downscale reading on the 46-31, 46,35, 50-31, or 50-35 meter And a downscale reading on the meter is verified

11. Refer to: Unit Supervisor informed that:

(B.2.4.5) Tech Spec 3.3.2.1 Control APRM C is (administratively)

Rod Block Instrumentation inoperable Tech Spec 3.3.1.3 OPRM Instrumentation CUE ROLE PLAY the Unit Supervisor as necessary to acknowledge this report.

Inform the candidate that you will address Technical Specifications.

TERMINATING CUE The JPM is considered complete when the Unit Supervisor has been notified to reference Tech Specs.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-NR-01 Rev. 07 Page 8 of 9 JPM

SUMMARY

Operators Name:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Bypass a Failed Local Power Range Monitor (LPRM)

JPM Number:S-NR-01 Revision Number: 07 Task Number and

Title:

43.001 Perform Control Room actions for a Local Power Range Monitor failure K/A Number and Importance: 215005 (APRM/LPRM) A4.04 3.2/3.2 Ability to operate and/or monitor in the control room: LPRM backpanel switches, meters, and indicating lights Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):LOA-NR-101, Neutron Monitoring Trouble, Rev 19 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 16 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 9 of 9 INITIAL CONDITIONS You are the Unit 1 ANSO.

The Unit 1 is operating near full power in a steady-state condition.

The following LPRMs are already OOS and bypassed:

16-33C 32-17C 56-41D 40-25D LPRM 48-33C has failed downscale.

INITIATING CUE The Unit Supervisor directs you to bypassLPRM 48-33C in accordance with LOA-NR-101.

Inform the Unit Supervisor when LPRM 48-33C has been bypassed.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Upshift the Reactor Recirc Pumps IAW LOP-RR-05 JPM Number: S-RR-02 Revision Number: 13 Date: 08/31/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RR-02 Rev. 13 Page 2 of 15 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RR-02 Rev. 13 Page 3 of 15 Revision Record (Summary)

1. Revision 08, Utilized new template and made minor editorial changes.
2. Revision 09, Verified against current revision of LOP-RR-05 and revised procedure references. Revised task number to coincide with new task list.
3. Revision 10, Updated for LGP step changes, simulator IC sets and current version of LOP-RR-05.
4. Revision 11, Updated to match criteria of NuReg 1021, Rev. 9 Supplement 1 and NuReg 1123, Rev. 2, Supplement 1. Also performed minor formatting and editorial changes.
5. Revision 13, Updated JPM a.07-01 NRC SRO-RO SIM RR from the ILT 07-01 NRC Exam and Returned to original JPM number S-RR-02 for the ILT 11-1 NRC Exam.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RR-02 Rev. 13 Page 4 of 15 SIMULATOR SETUP INSTRUCTIONS

1. Reset to IC187, 30% power (NOTE: IC187 was saved from the 07/02/12 version of IC 25)

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

1. Go to Run.
2. Verify FCVs are not locked up.
3. Override annunciator 1PM01J-A417 off. (SAT 142 UNDERVOLTAGE)
4. Put RR pump display on simulator screen to monitor parameters per Step D.3:

o Motor winding temperatures o Motor amps o Motor bearing temperatures o Pump seal temperatures o Recirc Pump Flow

5. Freeze the simulator until the candidate is ready to begin.
6. After the above steps are completed for this and other JPMs to be run concurrently, validate the concurrently run JPMs using the noted steps on the Job Performance Measure Validation Checklist located on page 2.
7. This completes the setup for this JPM.

Materials:

The following materials are to be available to the examinee:

LOA-RR-101, Unit 1 Reactor Recirculation System Abnormal LORs 1H13-P602-A104 or 1H13-P602-B104 LORs 1H13-P602-A305 or 1H13-P602-B305 The following materials are to be provided to the examinee:

LOP-RR-05 marked up with steps B.1 through B.3 and C.8 marked complete.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RR-02 Rev. 13 Page 5 of 15 INITIAL CONDITIONS

  • Unit 1 is starting up following a refueling outage and the reactor is at approximately 32% power.
  • LGP 1-1 is in progress and has been completed to the point where RR pumps are directed to be upshifted per LOP-RR-05, Changing Reactor Recirc Pump speed From Slow to Fast Speed.
  • LOP-RR-05 Prerequisites, B.1, B.2, B.3, and B.4 are met.
  • Reactor water level is approximately 37 inches.
  • Both RR pumps are operating in slow speed.
  • OD-3 Flow Control Line < 66.7% has been verified.
  • Operators are standing by to assist you.
  • Another Operator and IMD have been briefed on LOA-RM-101 per LOP-RR-05 Precaution C.8.

INITIATING CUE The Unit Supervisor has directed you to upshift the "A" and "B" Reactor Recirc Pumps to fast speed IAW LOP-RR-05, beginning at Step E.1.

You are to INFORM the Unit Supervisor when the Low Power/Low Flow interlocks are returned to normal.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of page 13. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RR-02 Rev. 13 Page 6 of 15 JPM Start Time:

STEP ELEMENT STANDARD Comment (LOP- SAT UNSAT RR-05) Number Note:

All steps of this JPM are to be completed at control room panel H13-P602 unless otherwise noted.

The candidate can choose which pump to upshift first.

Steps 1-12 of this JPM apply to both RR pumps. The second RR pump upshift steps begin at step 19 of this JPM.

First RR Pump Transfer Slow speed operation and from Slow to Fast Speed flow control valve position from Panel 1H13-P602 verified by the following:

CHECK the following: - LFMG SET GEN BRKR 2A and 2B are closed Both RR pumps are in

1. SLOW speed and Flow - LFMG SET DRIVE Control Valves are full MOTOR BKR 1A and 1B are (E.1 &

open closed ____ ____ ____

E1.1 1st - "A" and "B" RR MOTOR Bullet) BKRs 3A and 3B are open

- "A" and "B" RR motor speeds are 450 rpm

- "A" and "B" RR Loop flow controllers indicate FCV position at 100%

2. CHECK the following: Control room panel H13-P603 APRM recorders are (E.1.1 Reactor power between verified to be indicating ____ ____ ____

25% and 35%

2nd between 25% and 35%

Bullet) reactor power IF examinee questions whether the FCL < 66.7%, remind him/her that initial CUE conditions provided the FCL <66.7%.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RR-02 Rev. 13 Page 7 of 15 STEP ELEMENT STANDARD Comment (LOP- SAT UNSAT RR-05) Number CHECK the following: Use initial conditions data Flow Control Line <66.7% -or-

3. Control room panel H13-P603 reactor power and (E.1.1 core flow indications are ____ ____ ____

2nd compared and reactor is Bullet) verified to be below the 66.7% flow control line using the graph on the rod sequence book CHECK the following: "A" and "B" Loop flow

4. controller "Manual" Both 1B33-P611A and B pushbuttons are verified (E.1.1 Flow Controller M/A backlit ____ ____ ____

3rd stations A and B in Bullet) MANUAL

5. CHECK the following: "A" RR MOTOR BKR 4A (E.1.1 and "B" RR MOTOR BKR Both RR MOTOR BKR 4A ____ ____ ____

4B verified closed 4th and 4B are closed Bullet)

6. CHECK the following: Feedwater flow verified to (E.1.1 be >2.83 Mlbm/hr at control Feedwater flow is greater ____ ____ ____

room panel H13-P603 5th than 2.83 Mlbm/hr.

Bullet)

CHECK the following: At 1DS001 Interlock panel, or on the Process Overview Differential temperature

7. screen:

between Reactor Recirc (E.1.1 Pump suction and Steam For the Recirc loop being ____ ____ ____

6th Dome >10.1° F for the upshifted, suction to steam Bullet) loop to be upshifted dome Ts verified to be

>10.1° F (not solid blue)

CHECK the following: Reactor water level is

8. verified to be 31.5" to 40.5" Reactor water level is at control room panel H13-(E.1.1 between the high and low P603 ____ ____ ____

7th level alarms (31.5" to Bullet) 40.5")

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RR-02 Rev. 13 Page 8 of 15 STEP ELEMENT STANDARD Comment (LOP- SAT UNSAT RR-05) Number At the 1DS001 Operator At the 1DS001, examinee Station RRFC Interlock selects Loop A "Low Flow

  • 9. screen, BYPASS both A & Bypass" and then (E.1.2 B RR Interlocks as follows: PRESSES the ACTIVATE button ____ ____ ____

& 1st Select Low Flow Bypass Bullet) for Loop A and then PRESS the Activate button

  • 10. Select Low Flow Bypass At the 1DS001, examinee for Loop B and then selects Loop B "Low Flow (E.1.2 PRESS the Activate Bypass" and then ____ ____ ____

2nd button PRESSES the ACTIVATE Bullet) button

  • 11. Select Low Power At the 1DS001, examinee Bypass for Loop A and selects Loop A "Low Power (E.1.2 then PRESS the Activate Bypass" and then ____ ____ ____

3rd button PRESSES the ACTIVATE Bullet) button

  • 12. Select Low Power At the 1DS001, examinee Bypass for Loop B and selects Loop B "Low Power (E.1.2 then PRESS the Activate Bypass" and then ____ ____ ____

4th button PRESSES the ACTIVATE Bullet) button DEPRESS the Lower A (B) RR loop flow control pushbutton on the RR station lower pushbutton Loop A/B M/A Station for depressed until the FCV

  • 13. loop in which pump speed indicates minimum position will be changed until 1B33- (<20% indicated) ____ ____ ____

(E.1.3)

F060A/B Flow Control Valve is at Minimum

(<20% indicated)

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RR-02 Rev. 13 Page 9 of 15 STEP ELEMENT STANDARD Comment (LOP- SAT UNSAT RR-05) Number At the 1DS001, Operator VERIFIES the following are Station Interlocks Screen, RESET:

verify the following A RR Loop Feedwater Flow interlocks are RESET: Low A RR Loop Feedwater B RR Loop Feedwater Flow

14. Flow Low Low B RR Loop Feedwater ____ ____ ____

(E.1.4) A RR Loop Suction Delta T Flow Low Low A RR Loop Suction Delta B RR Loop Suction Delta T T Low Low B RR Loop Suction Delta T Low

15. VERIFY HI Speed Start 1A (1B) RR PMP START Permissive indicating light PERMISSIVE "HI SPEED" ____ ____ ____

(E.1.5) 1B33-DS202A/B is ON light verified to be LIT PLACE Selected Breaker Control switch for 1A (1B)

  • 16. RR Motor Bkr 3A/B RR MOTOR BKR 3A (3B)

Control Switch to START taken to START and ____ ____ ____

(E.1.6) position and RELEASE RELEASED

17. OBSERVE the following in Sequence monitored by (E.1.7) the selected loop: observing the following:

____ 1A/B breaker opens (E.1.7.1) 1A/B breaker opens (E.1.7.2) 2A/B breaker opens ____ 2A/B breaker opens (E.1.7.3) 3A/B breaker closes after pump speed decreases to ____ 3A/B breaker closes 350 rpm after pump speed decreases (E.1.7.4) Pump speed increases to to 350 rpm approximately 1750 rpm ____ ____ ____

____ Pump speed (E.1.7.5) Reactor level drops then increases to approximately returns to level controller 1750 rpm setpoint ____ Reactor level drops (E.1.7.6) Reactor Power initially then returns to level increases then stabilizes controller setpoint

____ Reactor Power initially increases then stabilizes SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RR-02 Rev. 13 Page 10 of 15 STEP ELEMENT STANDARD Comment (LOP- SAT UNSAT RR-05) Number

18. If Reactor Recirc pump Step is identified to NOT (E.1.7.7) fails to upshift apply and is marked N/A ____ ____ ____

Note:

The candidate should allow plant conditions to stabilize prior to upshifting the second pump keeping in mind that LOP-RR-05 gives the following precaution:

DO NOT delay changing the speed of the second RR pump as the excessive temperature differential between loops may occur due to cooling of the slow speed loop.

If the student does not allow the plant to stabilize or does not display steady progress towards starting the second pump, document the occurrence in the comment section for consideration when assessing the examinees overall performance of the JPM.

Second RR Pump A (B) RR loop flow control Transfer from Slow to Fast station lower pushbutton Speed from Panel 1H13- depressed until the FCV P602 indicates minimum position

  • 19. (<20% indicated)

DEPRESS the Lower (E.2.1) pushbutton on the RR ____ ____ ____

Loop A/B M/A Station for loop in which pump speed will be changed until 1B33-F060A/B Flow Control Valve is at Minimum

(<20% indicated)

At the 1DS001, Operator VERIFIES the following are Station Interlocks Screen, RESET:

verify the following A RR Loop Feedwater Flow interlocks are RESET: Low A RR Loop Feedwater

20. B RR Loop Feedwater Flow Flow Low Low (E.2.2) B RR Loop Feedwater ____ ____ ____

A RR Loop Suction Delta T Flow Low Low A RR Loop Suction Delta B RR Loop Suction Delta T T Low Low B RR Loop Suction Delta T Low SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RR-02 Rev. 13 Page 11 of 15 STEP ELEMENT STANDARD Comment (LOP- SAT UNSAT RR-05) Number

21. VERIFY HI Speed Start 1A (1B) RR PMP START Permissive indicating light PERMISSIVE "HI SPEED" ____ ____ ____

(E.2.3) 1B33-DS202A/B is ON light verified to be LIT E.2.4 Control switch for 1A (1B

  • 22. PLACE second pumps RR MOTOR BKR 3A (3B)

Breaker 3A/B Control taken to START and ____ ____ ____

(E.2.4) RELEASED Switch to START position and RELEASE

23. OBSERVE the following: Sequence monitored by observing the following:

(E.2.5)

(E.2.5.1) 1A/B breaker opens ____ 1A/B breaker opens (E.2.5.2) 2A/B breaker opens (E.2.5.3) 3A/B breaker closes after ____ 2A/B breaker opens pump speed decreases to 350 rpm ____ 3A/B breaker closes (E.2.5.4) Pump speed increases to after pump speed decreases approximately 1750 rpm to 350 rpm (E.2.5.5) Reactor level drops then ____ Pump speed returns to level controller increases to approximately ____ ____ ____

setpoint 1750 rpm (E.2.5.6) Reactor Power initially ____ Reactor level drops increases then stabilizes then returns to level controller setpoint (E.2.5.7) Loop A flow is approximately the same as Loop B flow ____ Reactor Power initially increases then stabilizes

____ Loop A and B flows are approximately the same

24. E.2.6 Step is identified to NOT If Reactor Recirc Pump apply and is marked N/A ____ ____ ____

(E.2.6) fails to upshift The next step in LOP-RR-05, (E.2.7) directs the operator to increase power CUE per LGP 1-1. Inform the student that power will be increased by another RO, and to continue with the procedure.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RR-02 Rev. 13 Page 12 of 15 STEP ELEMENT STANDARD Comment (LOP- SAT UNSAT RR-05) Number OBSERVE Feedwater Feedwater flow is checked Flow from Control room to be >2.83 Mlbm/hr on

25. Recorder at the 1H13- control room panel H13-(E.2.8) P603 panel to ensure P603 ____ ____ ____

Feedwater Flow is >20%

of rated (>2.83 million pounds per hour)

At the 1DS001, Operator VERIFIES the following are Station Interlocks Screen, RESET:

verify the following A RR Loop Feedwater Flow Interlocks are RESET: Low A RR Loop Feedwater B RR Loop Feedwater Flow

26. Flow Low Low B RR Loop Feedwater ____ ____ ____

(E.2.9) A RR Loop Suction Delta T Flow Low Low A RR Loop Suction Delta B RR Loop Suction Delta T T Low Low B RR Loop Suction Delta T Low At the 1DS001 Operator At the 1DS001, examinee Station RRFC Interlock selects Loop A "Low Flow

  • 27. screen, PLACE both A & B Bypass" and then RR Interlocks in NORMAL PRESSES the (E.2.9.1 as follows: DEACTIVATE button ____ ____ ____

& 1st Select Low Flow Bypass Bullet) for Loop A and then PRESS the Deactivate button

  • 28. Select Low Flow Bypass At the 1DS001, examinee for Loop B and then selects Loop B "Low Flow (E.2.9.1 PRESS the Deactivate Bypass" and then ____ ____ ____

2nd button PRESSES the Bullet) DEACTIVATE button

  • 29. Select Low Power At the 1DS001, examinee Bypass for Loop A and selects Loop A "Low Power (E.2.9.1 then PRESS the Bypass" and then ____ ____ ____

3rd Deactivate button PRESSES the Bullet) DEACTIVATE button SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RR-02 Rev. 13 Page 13 of 15 STEP ELEMENT STANDARD Comment (LOP- SAT UNSAT RR-05) Number

  • 30. Select Low Power At the 1DS001, examinee (E.2.9.1 Bypass for Loop B and selects Loop B "Low Power then PRESS the Bypass" and then ____ ____ ____

4th Deactivate button PRESSES the Bullet) DEACTIVATE button (Per Initiating Cue) Unit Supervisor informed when the Low Power/Low

31. Inform the Unit Supervisor Flow interlocks are returned ____ ____ ____

when the Low Power/Low to normal Flow interlocks are returned to normal Note:

This JPM is complete when both RR pumps are operating in fast speed, and the Unit Supervisor is informed that the FW LOW FLOW/LOW POWER interlocks are returned to normal.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RR-02 Rev. 13 Page 14 of 15 JPM

SUMMARY

Operators Name:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Upshift the Reactor Recirc Pumps IAW LOP-RR-05 JPM Number: S-RR-02 Revision Number: 13 Task Number and

Title:

22.002, Given Unit Supervisor authorization, transfer Reactor Recirc Pumps from slow to fast speed IAW station procedures.

K/A Number and Importance:202001 (Recirculation System) A4.01 3.7/3.7 Ability to operate and/or monitor in the control room: Recirculation Pumps Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

LOP-RR-05, Changing Reactor Recirc Pump Speed from Slow to Fast Speed, Rev 43 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 40 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 15 of 15 STUDENT COPY INITIAL CONDITIONS

  • Unit 1 is starting up following a refueling outage and the reactor is at approximately 32%

power.

  • LGP 1-1 is in progress and has been completed to the point where RR pumps are directed to be upshifted per LOP-RR-05, Changing Reactor Recirc Pump speed From Slow to Fast Speed.
  • LOP-RR-05 Prerequisites, B.1, B.2, B.3, and B.4 are met.
  • Reactor water level is approximately 37 inches.
  • Both RR pumps are operating in slow speed.
  • OD-3 Flow Control Line < 66.7% has been verified.
  • Operators are standing by to assist you.
  • Another Operator and IMD have been briefed on LOA-RM-101 per LOP-RR-05 Precaution C.8.

INITIATING CUE The Unit Supervisor has directed you to upshift the "A" and "B" Reactor Recirc Pumps to fast speed IAW LOP-RR-05, beginning at Step E.1.

You are to INFORM the Unit Supervisor when the Low Power/Low Flow interlocks are returned to normal.

Exelon Nuclear Job Performance Measure Recover from a Group 10 Isolation JPM Number: S-IN-01 Revision Number: 02 Date: 08/31/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-IN-01 Rev. 02 Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-IN-01 Rev. 02 Page 3 of 9 Revision Record (Summary)

1. Revision 00, This JPM was written by G.W. Beale for the 2006 NRC Annual Examination and titled SIN01r00.
2. Revision 01, Minor editorial and formatting changes were made to the JPM. The JPM was also updated to reflect the criteria of NuReg 1021, Rev. 9, Supplement 1 and NuReg 1123 Rev. 2, Supplement 1.
3. Revision 02, Updated JPM e.07-01 NRC SRO RO Sim from ILT 07-01 NRC Exam and returned to original JPM number S-IN-01.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-IN-01 Rev. 02 Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any full power IC193.

(NOTE: IC193 was saved from the 06/12/12 version of IC 81)

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Place the simulator in RUN.
3. Close the following valves.
  • 1IN001A
  • 1IN001B
  • 1IN017
  • 1IN074
  • 1IN075
4. OPEN the 1IN059/1IN060 IA Cross-tie valves
5. Silence, Acknowledge and Reset the annunciators.
6. Acknowledge the Process Computer Alarms.
7. Clear BOTH Sequence of Events Recorder (SER) monitor screens.
8. After the above steps are completed for this and other JPMs to be run concurrently, validate the concurrently run JPMs using the JPM Validation Checklist.
9. This completes the setup for this JPM.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-IN-01 Rev. 02 Page 5 of 9 INITIAL CONDITIONS You are the Unit-1 Assist NSO:

There has been an inadvertent Group 10 isolation.

The cause has been corrected.

The rupture disc 1IN22M has been verified intact.

INITIATING CUE The Unit Supervisor has directed you to recover from the Group 10 Isolation per section B.3 of LOA-IN-101, Loss of Drywell Pneumatic Air Supply.

Inform the Unit Supervisor when the Group 10 Isolation is reset.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-IN-01 Rev. 02 Page 6 of 9 JPM Start Time:

STEP Comment UNSAT ELEMENT STANDARD (LOA- SAT Number IN-101)

Examinee obtains a copy of Examinee obtains a copy of

1. LOA-IN-101. ___ ___ ___

LOA-IN-101.

CUE Provide the examinee with a copy of LOA-IN-101 after the examinee locates the procedure.

CHECK a Group 10 Primary Examinee verifies RPV Level Containment Isolation -

2. greater than Level 1 NORMAL. ___ ___ ___

(B.3.1)

  • Greater than RPV Level 1 CHECK a Group 10 Primary Examinee verifies High Drywell Containment Isolation - Pressure less than the High
3. NORMAL. Drywell Pressure Setpoint.

(B.3.1)

  • Less than High DW Pressure Setpoint.

CHECK containment rad levels Examinee checks containment

4. - NORMAL. rad levels - NORMAL.

(B.3.2) (Various indications in Control Room can be used)

5. CHECK rupture disc 1IN22M - Examinee determines that the NORMAL. rupture disc is NORMAL based ___ ___ ___

(B.3.3) on initial conditions At 1H13-P601, DEPRESS the

  • 6. INBOARD isolation reset INBOARD isolation reset pushbutton depressed (B.3.4) pushbutton ___ ___ ___

Critical Step At 1H13-P601, DEPRESS the

  • 7. OUTBOARD isolation reset OUTBOARD isolation reset pushbutton depressed.

(B.3.4) pushbutton ___ ___ ___

Critical Step SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-IN-01 Rev. 02 Page 7 of 9 STEP Comment UNSAT ELEMENT STANDARD (LOA- SAT Number IN-101)

NOTE The following valves may be opened in any order.

  • 1IN001A
  • 1IN001B
  • 1IN017
  • 1IN074
  • 1IN075 At 1PM13J OPEN the following: 1IN001A DW Pneumatic
  • 8
  • 1IN001A Suction Upstream Isolation ___ ___ ___

(B.3.5) opened At 1PM13J OPEN the following:

  • 9 1IN001B DW Pneumatic
  • 1IN001B Suction Downstream Isolation ___ ___ ___

(B.3.5) opened At 1PM13J OPEN the following:

  • 10 1IN017 DW Pneumatic 100 lb
  • 1IN017 Header Isolation opened ___ ___ ___

(B.3.5)

At 1PM13J OPEN the following:

  • 11 1IN074 DW Dryer Purge Outlet
  • 1IN074 Downstream Isolation opened ___ ___ ___

(B.3.5)

At 1PM13J OPEN the following:

  • 12 1IN075 DW Dryer Purge Outlet
  • 1IN075 Upstream Isolation opened ___ ___ ___

(B.3.5)

CUE If the Examinee takes actions to restart the IN system, inform the examinee that subsequent steps in LOA-IN-101 will be completed by another NSO.

Reports to the Unit Supervisor Informs the Unit Supervisor that

13. the Group 10 isolation has been the Group 10 Isolation has been ___ ___ ___

reset. reset.

CUE Acknowledge report as Unit Supervisor.

Inform the Examinee that the JPM is complete.

Record the JPM Stop Time in the blank below.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-IN-01 Rev. 02 Page 8 of 9 JPM

SUMMARY

Operators Name:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Recover from a Group 10 Isolation JPM Number: S-IN-01 Revision Number: 02 Task Number and

Title:

97.015 Perform the Main Control Room actions to recover from a Group 10 Isolation K/A Number and Importance: 223002 (PCIS/NSSS) A4.03 3.6/3.5 Ability to operate and/or monitor in the control room: Reset system isolations Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): LOA-IN-101, Loss of Drywell Pneumatic Air Supply, Rev. 7 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 10 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 9 of 9 STUDENT COPY INITIAL CONDITIONS You are the Unit 1 Assist NSO:

There has been an inadvertent Group 10 isolation.

The cause has been corrected.

The rupture disc 1IN22M has been verified intact.

INITIATING CUE The Unit Supervisor has directed you to recover from the Group 10 Isolation per section B.3 of LOA-IN-101, Loss of Drywell Pneumatic Air Supply.

Inform the Unit Supervisor when the Group 10 Isolation is reset.

Exelon Nuclear Job Performance Measure Start the 1B RWCU Pump and Respond to a System Leak JPM Number: S-RT-04 Revision Number: 00 Date: 08/31/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RT-04 Rev. 00 Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RT-04 Rev. 00 Page 3 of 10 Revision Record (Summary)

Revision 00, This JPM was developed new for the ILT 11-1 NRC Exam.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RT-04 Rev. 00 Page 4 of 10 SIMULATOR SETUP INSTRUCTIONS

1. Reset to IC194, 40% power (NOTE: IC194 was saved from the 01/10/12 version of IC 82)

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. GO to RUN.
3. Scram the reactor and perform applicable LGP 3-2 actions.
4. Take RWCU Demins out of service.
5. Secure the 1B RWCU Pump.
6. Throttle open the Demin Bypass valve 1G33-F354.
7. Insert the following commands: (Commands contained in CAEP File JPM S-RT-04.cae)
  • trgset 10 k2h03jbk (When 1B RWCU Pump switch is taken to START)
  • trgset 11 k2j03jck (When 1G33-F001 switch is taken to CLOSE)
  • trgset 12 k2j02jck (When 1G33-F004 switch is taken to CLOSE)
  • imf mrw010(10 :20) 50 300 (RWCU leak starts on Trigger 10, with a 20 second delay)
  • set vmrw001r=1e6 (Movement of 1G33-F001 prevented)
  • set vmrw004r=1e6 (Movement of 1G33-F004 prevented)
  • trg 11 set vmrw001r=10 (Movement of 1G33-F001 returned to normal on Trigger 11)
  • trg 12 set vmrw004r=10 (Movement of 1G33-F004 returned to normal on Trigger 12)
8. Prepare a student copy of LOP-RT-02 marked up as follows:
  • Mark the following steps as Not Applicable (N/A) o C.7 bullet o E.1.2. 1st bullet o E.1.2.1, 1st bullet o E.1.2.2 through E.1.2.2.2.8
  • All other steps up to E.1.4 marked as completed.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RT-04 Rev. 00 Page 5 of 10 INITIAL CONDITIONS You are the Unit 1 Assist NSO.

A transient on Unit 1 resulted in a reactor scram and a trip of the 1B RWCU Pump.

LOP-RT-02 steps have been completed up to the point of starting a RWCU Pump at Step 1.4.

An EO is standing by to support the pump start.

INITIATING CUE Start the 1B RWCU Pump per LOP-RT-02.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RT-04 Rev. 00 Page 6 of 10 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number (LOP-RT-02)

NOTE Step E.1.4.1 may be marked N/A because the reactor is shutdown.

1. From Control Room Panel Reactor power verified to be ___ ___ ___

(E.1.4 & 1H13-P602, PERFORM the acceptable for RWCU Recirc E.1.4.1) following: pump start.

VERIFY reactor power acceptable for RWCU Recirc pump start.

2. FULLY CLOSE 1G33-F354, 1G33-F354 fully closed ___ ___ ___

RWCU Filter Demin Bypass (E.1.4.2)

Vlv.

3. VERIFY OPEN 1G33-F042, 1G33-F042 verified OPEN ___ ___ ___

RWCU Return Upstream Isol (E.1.4.3) Vlv.

  • 4. THROTTLE OPEN 1G33- 1G33-F354 throttled to ___ ___ ___

F354, RWCU Filter Demin approximately 10% open (E.1.4.4) Bypass Vlv until dual indication is received (approx 10% open).

pump, 1G33-C001B. START and (Blue) ON light (E.1.4.5) illuminated THROTTLE 1G33-F354,

6. 1G33-F354 throttled to achieve ___ ___ ___

Filter Demin Bypass Valve 270-300 gpm (E.1.4.6) as necessary, to maintain adequate flow at indicated on RWCU System flow indicator 1G33-R609. (Nominal 270 -

300 gpm, Maximum 360 gpm.)

CUE As the EO supporting the pump start, contact the ANSO to report a loud noise coming from the RWCU Pump Room.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RT-04 Rev. 00 Page 7 of 10 Comment STEP ELEMENT STANDARD SAT UNSAT Number (LOP-RT-02)

NOTE ALTERNATE PATH STARTS HERE After the 1B RWCU Pump is started, RWCU System Flow Indication, 1G33-R609, trends upscale and the following annunciators will activate:

7. Respond to DIV 1 and DIV 2 Abnormal conditions reported to ___ ___ ___

P601- RWCU FLOW HI Unit Supervisor B507/C411 annunciators Step 1 CUE Role Play Unit Supervisor as necessary to acknowledge reports from the candidate.

8. ATTEMPT to identify the Abnormal trend and value of ___ ___ ___

P601- cause and CORRECT High RWCU System Flow may be B507/C411 Differential flow condition. identified Step 1 NOTE The candidate may also check the DIV 1 and DIV 2 RWCU DIF FLOW ISOL TIMERS on 1H13PP632-02 and 1H13PP642-02. Both timers will be running or have timed out.

  • 9. VERIFY above automatic Recognizes that 1G33-F001 ___ ___ ___

P601-B507 actions occur. has not auto closed after 45 Step 2.a Verify that 1G33-F001 closes seconds.

1G33-F001 switch taken to CLOSE, CLOSED light ON and OPEN light OFF SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RT-04 Rev. 00 Page 8 of 10 Comment STEP ELEMENT STANDARD SAT UNSAT Number (LOP-RT-02)

  • 10. VERIFY above automatic Recognizes that 1G33-F004 ___ ___ ___

P601-C411 actions occur. has not auto closed after 45 Step 2.a Verify that 1G33-F004 closes seconds.

1G33-F004 switch taken to CLOSE, CLOSED light ON and OPEN light OFF

11. VERIFY Reactor Water Verified at 1G33-C001B switch: ___ ___ ___

P601- Cleanup Pump, 1G33- ON light is off B507/C411 C001B, TRIPS. and Step 2.b OFF light is on

12. DISPATCH operator to Operator dispatched ___ ___ ___

P601- Reactor Building to B507/C411 INSPECT Reactor Water Step 2.c Cleanup System Area for leaks or other abnormalities.

CUE As the EO supporting the pump start:

Acknowledge the directive to investigate If the RWCU leak was correctly isolated, report that there was a great deal of noise and steam from under the Pump Room door, but it is now dissipating.

NOTE If RWCU was isolated in a timely manner, the next step is Not Applicable.

13. Respond to RB RAD HI Abnormal conditions reported to ___ ___ ___

P601-B110 annunciator Unit Supervisor CUE Role Play Unit Supervisor as necessary to acknowledge reports from the candidate.

14. REFER to LOA-RT-101, LOA-RT-101, Loss of Reactor ___ ___ ___

P601- Loss of Reactor Water Water Cleanup referenced.

B507/C411 Cleanup.

Step 2.d TERMINATING CUE:

When LOA-RT-101 has been referenced, inform the candidate that the JPM is complete.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RT-04 Rev. 00 Page 9 of 10 JPM

SUMMARY

Operators Name:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Start the 1B RWCU Pump and Respond to a System Leak JPM Number: S-RT-04 Revision Number: 00 Task Number and

Title:

27.001 Given Unit Supervisor authorization, Perform the Main Control Room actions to Warm Up, Flush and Startup the Reactor Water Cleanup (RWCU) System IAW station procedures K/A Number and Importance: 204000 (RWCU) A2.13 3.4/3.4 Ability to (a) predict the impacts of the following on the RWCU System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences or those abnormal conditions or operations: Signal received which results in a system isolation Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): LOP-RT-02 Reactor Water Cleanup System Startup and Pump Transfer, Rev 40 LOR-H13-P601-B507, DIV 2 RWCU Flow HI, Rev 5 LOR-H13-P601-C411, DIV 1 RWCU Flow HI, Rev 6 LOR-1H13-P601-B110, RB RAD HI, Rev. 1 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 10 of 10 INITIAL CONDITIONS You are the Unit 1 Assist NSO.

A transient on Unit 1 resulted in a reactor scram and a trip of the 1B RWCU Pump.

LOP-RT-02 steps have been completed up to the point of starting a RWCU Pump at Step 1.4.

An EO is standing by to support the pump start.

INITIATING CUE Start the 1B RWCU Pump per LOP-RT-02.