ML12270A335

From kanterella
Jump to navigation Jump to search
Agenda for Forthcoming Public Meeting with the U.S. Nuclear Regulatory Commission and the Technical Specifications Task Force (TSTF)
ML12270A335
Person / Time
Site: Technical Specifications Task Force
Issue date: 10/05/2012
From: Michelle Honcharik
Licensing Processes Branch (DPR)
To:
Honcharik M
Shared Package
ML12275A040 List:
References
Download: ML12270A335 (2)


Text

Agenda Technical Specifications Task Force (TSTF) and U.S. Nuclear Regulatory Commission (NRC) Meeting October 19, 2012 9:00 a.m. - 4:00 p.m.

I. Administrative (9:00 a.m. - 9:15 a.m.) (NRC)

A. Introductions B. Agenda Review C. Other Administrative Issues II. Process Issues (9:15 a.m. - 9:30 a.m.)

A. Applicability of LIC-109, Acceptance Review Procedures, to Travelers (TSTF)

B. Status of Draft Regulatory Issue Summary on the Relationship Between the General Design Criteria and Technical Specifications (TS) (NRC)

III. Issues with Previously Approved Travelers (9:30 a.m. - 9:40 a.m.)

A. NRC Response to March 28, 2012, TSTF letter regarding TSTF-510 (ADAMS Accession No. ML12088A082) (NRC)

IV. Active Traveler Review Status (9:40 a.m. - 10:30 a.m.)

A. Discuss Status of All Travelers Currently Under NRC Staff Review (All)

B. TSTF Traveler Review Priority (TSTF)

BREAK V. Technical Issues (10:45 a.m. - 12:00 p.m.)

A. Status of BWROG Letter Requesting Changes to Enforcement Guidance Memorandum (EGM) EGM 11-003 (NRC)

B. Status of TSTF-493 Implementation Guidance (NRC)

C. Discussion of Mode 3 End State Traveler for Pressurized Water Reactors (TSTF)

D. Proposal to Create Expanded Basis in Improved STS NUREGs (TSTF)

LUNCH (12:00 p.m. - 1:00 p.m.)

V. Technical Issues (continued) (1:00 p.m. - 3:30 p.m.)

E. Discussion on Surveillance Control Frequency Program Implementation (All)

F. NRC Staff Concerns with TS Required Actions that Allow Operation with a Loss of Safety Function (e.g., TSTF-412 , "Provide Actions for One Steam Supply to Turbine Driven AFW/EFW [Auxiliary Feedwater/Emergency Feedwater] Pump Inoperable") (NRC)

ENCLOSURE

G. Status of NRC Staff Review of Risk Informed TSTF Initiative 6 Travelers: TSTF-426, TSTF-538, and TSTF-540 (NRC)

VI. Future Planning (3:30 p.m. - 3:45 p.m.)

A. Proposed Dates for TSTF/NRC Quarterly Meetings in 2013 (All)

B. Future Traveler submittals (TSTF)

VII. Designated Time for Public Comments VIII. Closing Remarks (All)

IX. Adjourn (4:00 p.m.)