1 NRR-PMDAPEm Resource From:
Feintuch, Karl Sent:
Friday, September 21, 2012 11:51 AM To:
'Jack Gadzala' Cc:
'Craig D Sly'; Cheruvenki, Ganesh; Feintuch, Karl
Subject:
ME7727 - Kewaunee RVI Inspection Plan review - enclosed Table for submitted information
- This message is identical to one sent a few minutes ago but corrects the TAC Number in the subject line**
=====
Based on the recent* telephone discussion, I produced a table to account for all the expected data. This is just a pointer to information and therefore need not be in the submittal that you are preparing.
It is a concise check on completeness, and it accommodates the dispersal of information that has occurred over the many submittals.
I propose that you send a filled-in version of the table below back to us in an email when you send the expected formal submittal intended for the docket. I will distribute it to the Reviewers. Besides speeding the review, it will assist with citations for the SE to be prepared.
Ganesh likes this approach. If it is not practical for you, please let me know. Note that to be sent should be used for future items to be entered later when submitted, so it will provide a status of completion as it is updated.
[enter to be sent for future submittals; enter letter ID, attachment, and page for present and past responses]
(1) KPS neutron fluence value (2) KPS stress (3) KPS temperature Lower Core Plate Core Barrel Flange Barrel-Former Bolts Upper Core Barrel Welds Lower Core Barrel Welds
2 Upper Core Plate Alignment Pins
- = conference call describe below:
Conference call: 9/18/2012, 1 PM ET Agenda:
Discuss RV Internals inspection plan RAI.
Discussion:
Participants discussed the status of the remaining two RAI responses (5 and 6). NRC staff discussed the need for plant specific information relative to bounded values available from the reactor vendor. Dominion Energy Kewaunee expects to deliver its 6th RAI response by September 28, 2012.
Participation:
Kewaunee Power Station and Dominion Energy:
Jack Gadzala Charles Tomes Phillip Bukes William Zipp Timothy Olson Rick Repshas Craig Sly NRC Staff:
Karl Feintuch James Medoff Alan Hiser Ganesh Cheruvenki Patrick Purtscher Steve Frankl Stacie Rosenberg
Hearing Identifier:
NRR_PMDA Email Number:
487 Mail Envelope Properties (26E42474DB238C408C94990815A02F099910685C93)
Subject:
ME7727 - Kewaunee RVI Inspection Plan review - enclosed Table for submitted information Sent Date:
9/21/2012 11:50:39 AM Received Date:
9/21/2012 11:50:00 AM From:
Feintuch, Karl Created By:
Karl.Feintuch@nrc.gov Recipients:
"'Craig D Sly'" <craig.d.sly@dom.com>
Tracking Status: None "Cheruvenki, Ganesh" <Ganesh.Cheruvenki@nrc.gov>
Tracking Status: None "Feintuch, Karl" <Karl.Feintuch@nrc.gov>
Tracking Status: None
"'Jack Gadzala'" <jack.gadzala@dom.com>
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 2350 9/21/2012 11:50:00 AM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: