MONTHYEARML11188A1452011-07-0101 July 2011 Request for License Amendment to Adopt National Fire Protection Association 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Request ML11256A0302011-09-0202 September 2011 Supplement to Request for License Amendment to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Supplement ML11255A0222011-09-13013 September 2011 Informs Licensee That Application for Amendment to Change Fire Protection Licensing Basis to NFPA 805 Is Acceptable for Review Project stage: Other ML1131302622011-11-0808 November 2011 List of Plant Components for Walkdown Project stage: Other ML1131302612011-11-0808 November 2011 Additional Questions/Comments on the Monitoring Program, Documentation, Etc Project stage: Other ML1131302602011-11-0808 November 2011 Questions and Comments About the Probabilistic Risk Analysis Project stage: Acceptance Review ML1131302592011-11-0808 November 2011 Questions and Issues to Be Addressed During the Audit Project stage: Acceptance Review ML1131302492011-11-0808 November 2011 E-mail Transmitting 4 NRC Staff Documents to Support the Audit of the Proposed Conversion of the Fire Protection Program to NFPA 805 Project stage: Other ML1131204962011-11-0808 November 2011 Transmit Audit Plan for the Proposed Amendment Converting the Fire Protection Program to NFPA 805 Project stage: Other ML1131205002011-11-0808 November 2011 Audit Plan - D.C. Cook Proposed Amendment to Convert Fire Protection Program to NFPA 805 Project stage: Other ML1135607092012-01-27027 January 2012 Letter Transmitting an RAI on the Application for Amendment to Transition the Fire Protection Program to NFPA 805 Project stage: RAI ML12017A2512012-01-27027 January 2012 RAI for the Proposed Amendment to Transition the Fire Protection Program to NFPA 805 Project stage: RAI AEP-NRC-2012-29, Response to Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 8052012-04-27027 April 2012 Response to Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: Response to RAI AEP-NRC-2012-58, Response to Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 8052012-08-0909 August 2012 Response to Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: Response to RAI ML12230A3032012-08-14014 August 2012 Draft Redacted Second-round RAI Re NFPA 805 Amendment Project stage: Draft RAI ML12255A3952012-09-0606 September 2012 Redacted Draft Second-Round RAI the Proposed NFPA 805 Amendment Project stage: Draft Approval ML12285A1792012-10-11011 October 2012 D C Cook NFPA 805 RAI Project stage: Other ML12276A3002012-10-11011 October 2012 RAI on the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Standard 805 Project stage: RAI AEP-NRC-2012-92, Response to Second Round Request for Additional Information Regarding Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 8052012-10-15015 October 2012 Response to Second Round Request for Additional Information Regarding Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: Request ML12326A9992012-11-0909 November 2012 Donald C, Cook, Units 1 and 2 - Enclosure 1, 2 & 4 to AEP-NRC-2012-101, Response to Second-Round RAI Item 54.b, and Submittal of Revised Tables Re the Application for Amendment to Transition to National Fire Protection Association Standard Project stage: Request ML12326B0002012-11-0909 November 2012 Donald C, Cook, Units 1 and 2 - Enclosure 4 (Cont.) to AEP-NRC-2012-101, Response to Second-Round RAI Item 54.b, and Submittal of Revised Tables Re the Application for Amendment to Transition to National Fire Protection Association Standard Project stage: Request ML12326A9982012-11-0909 November 2012 Donald C. Cook, Units 1 and 2 - Response to Second-Round Request for Additional Information Item 54.b and Submittal of Revised Tables Re the Application for Amendment to Transition to National Fire Protection Association Standard 805 Project stage: Request ML12345A3272012-12-13013 December 2012 Request for Additional Information on the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: RAI ML13028A1132013-01-14014 January 2013 Response to Third Round Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: Request AEP-NRC-2013-09, Revised Response to First Round Request for Additional Information Re Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 8052013-02-0101 February 2013 Revised Response to First Round Request for Additional Information Re Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: Request ML13014A5492013-02-0101 February 2013 Request for Additional Information on the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: RAI ML13085A1842013-04-22022 April 2013 Review and Conclusion of Indiana Michigan Power Company'S Resolution of Facts and Observations in Support of DC Cook'S Transition to NFPA 805 Project stage: Other ML13085A2462013-04-22022 April 2013 DC Cook Table V-1 & V-2 Record of Review March 22 2013 Project stage: Request ML13085A1902013-04-22022 April 2013 DC Cook Table U Record of Review March 22 2013 Project stage: Other AEP-NRC-2013-17, Response to a Request for Additional Information (RAI 29.01, 61, and 62) Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 8052013-05-0101 May 2013 Response to a Request for Additional Information (RAI 29.01, 61, and 62) Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: Response to RAI AEP-NRC-2013-55, Response to a Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 TAC (ME6629 and ME6630).2013-06-21021 June 2013 Response to a Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 TAC (ME6629 and ME6630). Project stage: Response to RAI ML13210A2042013-09-0606 September 2013 Request for Additional Information on the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: RAI AEP-NRC-2013-75, Response to a Request for Additional Information (RAI 63) Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 8052013-09-16016 September 2013 Response to a Request for Additional Information (RAI 63) Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: Response to RAI ML13140A3982013-10-24024 October 2013 Issuance of Amendment Nos. 322 and 305 - Transition to NFPA 805 Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) and NFPA 805 Project stage: Approval 2012-08-14
[Table View] |
Similar Documents at Cook |
---|
Category:Letter type:AEP
MONTHYEARAEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-56, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2022-10-12012 October 2022 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2022-30, Core Operating Limits Report2022-10-0606 October 2022 Core Operating Limits Report AEP-NRC-2022-51, Evacuation Time Estimate Analysis2022-08-31031 August 2022 Evacuation Time Estimate Analysis AEP-NRC-2022-50, Form OAR-1, Owner'S Activity Report2022-08-25025 August 2022 Form OAR-1, Owner'S Activity Report AEP-NRC-2022-35, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2022-08-18018 August 2022 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes AEP-NRC-2022-47, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan, Revision 472022-08-0202 August 2022 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan, Revision 47 AEP-NRC-2022-42, Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2022-07-18018 July 2022 Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements AEP-NRC-2022-29, Annual Radiological Environmental Operating Report for 20212022-05-13013 May 2022 Annual Radiological Environmental Operating Report for 2021 AEP-NRC-2022-15, CFR 72.48(d)(2) Summary Report of 10 CFR 72.48 Evaluations2022-05-0404 May 2022 CFR 72.48(d)(2) Summary Report of 10 CFR 72.48 Evaluations AEP-NRC-2022-28, 2021 Annual Radioactive Effluent Release Report2022-04-29029 April 2022 2021 Annual Radioactive Effluent Release Report AEP-NRC-2022-27, Annual Report of Individual Monitoring2022-04-27027 April 2022 Annual Report of Individual Monitoring AEP-NRC-2022-05, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-04-0707 April 2022 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements AEP-NRC-2022-18, Annual Report of Property Insurance2022-03-28028 March 2022 Annual Report of Property Insurance AEP-NRC-2022-20, Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-14014 March 2022 Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2022-12, Commitment Schedule Change Related to Seismic PRA Distributed Ignition Backup Power Source2022-03-0202 March 2022 Commitment Schedule Change Related to Seismic PRA Distributed Ignition Backup Power Source AEP-NRC-2022-02, Unit 2 - Supplement to Application to Revise Technical Specifications to Adopt TSTF-5, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2022-02-0101 February 2022 Unit 2 - Supplement to Application to Revise Technical Specifications to Adopt TSTF-5, Revision 1, Revised Frequencies for Steam Generator Tube Inspections AEP-NRC-2022-01, Quality Assurance Program Change Request for Internal Audit Frequency2022-02-0101 February 2022 Quality Assurance Program Change Request for Internal Audit Frequency AEP-NRC-2022-03, Final Supplemental Response to NRC Generic Letter 2004-022022-01-20020 January 2022 Final Supplemental Response to NRC Generic Letter 2004-02 AEP-NRC-2021-68, Response to Request for Additional Information on Requested Change Regarding Containment Water Level Instrumentation2021-12-16016 December 2021 Response to Request for Additional Information on Requested Change Regarding Containment Water Level Instrumentation AEP-NRC-2021-67, Unit 2 - Decommissioning Funding Plan for Independent Spent Fuel Storage Installation2021-12-0909 December 2021 Unit 2 - Decommissioning Funding Plan for Independent Spent Fuel Storage Installation AEP-NRC-2021-66, 2020 Annual Radioactive Effluent Release Report Correction2021-11-17017 November 2021 2020 Annual Radioactive Effluent Release Report Correction AEP-NRC-2021-65, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2021-11-0808 November 2021 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-47, Unit 2 - Application to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2021-11-0808 November 2021 Unit 2 - Application to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections AEP-NRC-2021-60, Registration of Dry Spent Fuel Storage Cask2021-10-12012 October 2021 Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-55, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2021-09-20020 September 2021 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-48, Cycle 26 Core Operating Limits Report, Revision 02021-09-14014 September 2021 Cycle 26 Core Operating Limits Report, Revision 0 AEP-NRC-2021-53, Registration of Dry Spent Fuel Storage Cask2021-08-26026 August 2021 Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-50, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2021-08-25025 August 2021 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes AEP-NRC-2021-44, Form OAR-1, Owner'S Activity Report2021-08-12012 August 2021 Form OAR-1, Owner'S Activity Report 2024-01-08
[Table view] |
Text
E7 'DIANA Indiana Michigan Power One Cook Place A unit of American Electric Power Bridgman, MI49106 IndianaMichiganPower.com August 9, 2012 AEP-NRC-2012-58 10 CFR 50.90 Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 Response to Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 (TAC Nos. ME6629 and ME6630)
References:
- 1. Letter from M. H. Carlson, Indiana Michigan Power Company (I&M), to U. S. Nuclear Regulatory Commission (NRC) Document Control Desk, "Request for License Amendment to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition),"
AEP-NRC-2011-1, dated July 1, 2011, NRC Agencywide Documents Access and Management System (ADAMS) Accession No. ML1 11188A145.
- 2. Letter from P. S. Tam, U. S. NRC, to L. J. Weber, I&M, "Donald C. Cook Nuclear Plant, Units 1 and 2 - Request for Additional Information on the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 (TAC Nos. ME6629 AND ME6630)," dated January 27, 2012, ADAMS Accession Nos.
ML113560709, ML12003A186, and ML12017A251.
- 3. Letter from M. H. Carlson, I&M, to NRC Document Control. Desk, "Donald C. Cook Nuclear Plant Units 1 and 2, Response to Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805, (TAC Nos. ME6629 AND ME6630),"
AEP-NRC-2012-29, dated April 27, 2012, ADAMS Accession No. ML12132A390.
By Reference 1, I&M, the licensee for Donald C. Cook Nuclear Plant (CNP) Units 1 and 2, proposed to amend Facility Operating Licenses DPR-58 and DPR-74 to adopt a new fire protection program Security-Related Information -Withhold From Public Disclosure Under 10 CFR 2.390.
Enclosure 2 to this letter contains security-related information.
Upon removal of Enclosure 2, this letter is uncontrolled.
U. S. Nuclear Regulatory Commission AEP-NRC-2012-58 Page 2 based on NFPA Standard 805, in accordance with 10 CFR 50.48(a) and (c). Reference 1, (hereafter referred to as the Transition Report) provided information associated with the CNP transition to NFPA 805. By Reference 2, the NRC transmitted a request for additional information (RAI) regarding the proposed amendment. As stated in Reference 2, I&M agreed to provide responses to all information requests within 90-days of the date of Reference 2, with the exception of RAI-14, -20, -29, and -31. I&M agreed to provide responses to these RAIs within 180 days of the date of Reference 2. I&M informed the NRC staff in a teleconference on April 12, 2012, and via e-mail on April 19, 2012, that the responses to RAI-15(b) and RAI-16 would also be provided within 180 days of the date of Reference 2. Reference 3 transmitted I&M's responses to the 90 day information requests. On July 23, 2012, I&M informed the NRC that responses to the "180 day" RAls would be provided no later than August 9, 2012. This letter provides I&M's responses to those information requests, i.e., RAI-14, -15(b), -16, -20, -29, -31, and -34. to this letter provides an affirmation statement. Enclosure 2 to this letter provides I&M's responses to the information requests. Enclosure 3 provides a revision of Attachment M, "License Condition Changes," to the Transition Report in response to RAI-15(b). Enclosure 4 provides a revision of Attachment S, "Plant Modifications and Items to be Completed During Implementation," to the Transition Report, also response to RAI 15(b).
Copies of this letter and its enclosures are being transmitted to the Michigan Public Service Commission and Michigan Department of Environmental Quality, in accordance with the requirements of 10 CFR 50.91. This letter contains no new or modified regulatory commitments.
Should you have any questions regarding this proposed amendment, please contact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.
Sincerely, Michael H. Carlson Site Support Services Vice President JRW/kmh
Enclosures:
- 1. Affirmation.
- 2. Responses to Information Requests Re. NFPA 805 Transition.
- 3. Revision 2 of Attachment M, "License Condition Changes," to the Transition Report, Provided in Response to RAI-15(b).
- 4. Revision 2 of Attachment S, "Plant Modifications and Items to be Completed During Implementation," to the Transition Report, Provided in Response to RAI-15(b).
Security-Related Information -Withhold From Public Disclosure Under 10 CFR 2.390.
Enclosure 2 to this letter contains security-related information.
Upon removal of Enclosure 2, this letter is uncontrolled.
U. S. Nuclear Regulatory Commission AEP-NRC-2012-58 Page 3 c: C. A. Casto, NRC Region III J. T. King, MPSC S. M. Krawec, AEP Ft. Wayne, w/o enclosures MDEQ - RMD/RPS NRC Resident Inspector P. S. Tam, NRC Washington, DC Security-Related Information -Withhold From Public Disclosure Under 10 CFR 2.390.
Enclosure 2 to this letter contains security-related information.
Upon removal of Enclosure 2, this letter is uncontrolled.
Enclosure I to AEP-NRC-2012-58 AFFIRMATION I, Michael H. Carlson, being duly sworn, state that I am Site Support Services Vice President of Indiana Michigan Power Company (I&M), that I am authorized to sign and file this request with the Nuclear Regulatory Commission on behalf of I&M, and that the statements made and the matters set forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief.
Indiana Michigan Power Company Michael H. Carlson Site Support Services Vice President SWORN TO AND SUBSCRIBED BEFORE ME THIS. DAYOF , 2012 DANIELLE BURGOYNE Notary Public. State of Michigan County of Berrien My commission Expires 04-04-2018 Notary e - "c Acting In the County ofa My Commission Expires .\ -