UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 August 1, 2012 LICENSEE:
FACILITY:
SUBJECT:
Tennessee Valley Authority (TVA)
Sequoyah Nuclear Plant, Units 1 and 2
SUMMARY
OF JULY 16, 2012, PUBLIC MEETING WITH TVA REGARDING USE OF THE UNIT STATION SERVICE TRANSFORMERS AS A POWER SUPPLY TO AN OFFSITE CIRCUIT FOR SEQUOYAH NUCLEAR PLANT (TAC NOS. ME8772 AND ME8773)
On July 16, 2012, a Category 1 public meeting was held between Nuclear Regulatory Commission (NRC) staff and representatives of Tennessee Valley Authority (TVA or the licensee) at the request of the licensee. The purpose of this meeting was to discuss the planned modifications to the plant design and operating configuration that will allow use of the unit station service transformers (USSTs) as a power supply to an offsite circuit for Sequoyah Nuclear Plant, Units 1 and 2. The enclosure contains a list of attendees. The licensee's presentation slides may be accessed from the NRC Agencywide Documents Access and Management System, Accession No. ML12214A199.
Background
By letter dated May 23,2012, TVA submitted a license amendment request (LAR) to revise the Sequoyah Nuclear Plant, Units 1 and 2 Technical Specification (TS) 3/4.8.1 to include a surveillance requirement to demonstrate the required offsite circuits OPERABLE at least once per 18 months by manually and automatically transferring the power supply to a 6.9 kilovolt unit board from the normal supply to the alternate supply. This change is necessary as a result of the planned modifications to the plant design and operating configuration thatwill allow use of the USSTs as a power supply to an offsite circuit.
TVA requested approval of the amendment by December 1, 2012, to support Unit 2 plant startup following its USST modification during the fall 2012 refueling outage. To support this schedule, TVA requested this meeting to provide more details for the NRC staff.
Summary The licensee presented its approach to perform modifications in two stages. Specifically, the Unit 2 USST modifications are scheduled to be implemented during the fall 2012 refueling outage. Unit 1 USST modifications are scheduled to be implemented during the fall 2013 refueling outage. The licensee is seeking NRC approval of the LAR by December 1, 2012, to support startup from the Unit 2 refueling outage. During the meeting, the NRC staff stated that until the modifications are completed in the fall 2013 refueling outage, the licensee has to
J.Shea
- 2 identify through a license condition that the two independent qualified power sources to meet the TS 3/4.8.1, AC [alternating current] Sources - Operating requirements will be the existing power sources from common station service transformers. The NRC staff also informed TVA that the NRC staff will submit its request for additional information to complete its review within 1 week of the meeting and asked TVA to provide its response expeditiously to complete the NRC staff's safety evaluation.
No commitments or regulatory decisions were made by the NRC staff during the meeting.
Members of the public were not in attendance. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-1564, or by email to siva.lingam@nrc.gov.
~<y.~
Siva P. Lingam, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328,
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv
LIST OF ATTENDEES U. S. NUCLEAR REGULATORY COMMISSION (NRC)
PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY (TVA),
REGARDING USE OF THE USSTs AS A POWER SUPPLY TO AN OFFSITE CIRCUIT FOR SEQUOYAH NUCLEAR PLANT July 16, 2012 NRC Jim Andersen Khadijah Hemphill George Lapinsky (By Phone)
Siva P. Lingam Roy Mathew Alfredo Matos Gerry Waig (By Phone)
TVA John M. Campbell Patrick Guevel Clyde Mackaman Joe Shea Mike Walker (By Phone)
Joe D. Williams Tamatha Womack Contractors Supporting TVA Dale Baese (Sargent & Lundy)
Roger Scott (Excel Services)
Enclosure
J. Shea
- 2 identify through a license condition that the two independent qualified power sources to meet the TS 3/4.8.1, AC [alternating current] Sources - Operating requirements will be the existing power sources from common station service transformers. The NRC staff also informed TVA that the NRC staff will submit its request for additional information to complete its review within 1 week of the meeting and asked TVA to provide its response expeditiously to complete the NRC staff's safety evaluation.
No commitments or regulatory decisions were made by the NRC staff during the meeting.
Members of the public were not in attendance. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-1564, or by email to siva.lingam@nrc.gov.
IRAI Siva P. Lingam. Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328,
Enclosure:
List of Attendees cc wlencl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL2-2 R/F RidsNrrDorlLpl2-2 RidsNrrLABClayton M. Pohida. NRO RidsNrrPMSequoyah RidsNrrDorl RidsRgn2MailCenter RidsAcrsAcnw_MailCTR M. Kotzalas, ACRS RidsAcrsAcnw_MailCTR RidsOgcRp S. Kennedy, EDO RidsNrrDeEeeb K. Hemphill. NRR G. Lapinsky, NRR A. Matos-Marin. NRR R. Mathew. NRR G. Waig, NRR T. Wertz. NRR Package Accession No.: ML12214A196 Meeting Notice Accession No.: ML12178A474 Meeting Summary Accession No.: ML12214A198 Slides Presentation Accession No'.. ML12214A199 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC (A)
LPL2-2/PM NAME SLingam BClayton JQuichocho SLingam DATE 08/01/12
~8/01/12 08/01/12 08/01/12 OFFICIAL RECORD COPY