Status of 90-Day Response to Request for Information Regarding Recommendation 9.3 of Near-Term Task Force Related to the Fukushima Dai-ichi Nuclear Power Plant Accident
ML12200A106
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, Comanche Peak, Quad Cities, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000026, Crane
Issue date: 07/26/2012
From: Marilyn Evans
Division of Operating Reactor Licensing
To:
Arizona Public Service Co, Calvert Cliffs, Carolina Power & Light Co, Detroit Edison, Dominion Energy Kewaunee, Dominion Nuclear Connecticut, Duke Energy Carolinas, Energy Northwest, Entergy Nuclear Operations, Entergy Operations, Exelon Generation Co, Exelon Nuclear, FirstEnergy Nuclear Operating Co, Florida Power Corp, Luminant Generation Co, Nebraska Public Power District (NPPD), NextEra Energy Duane Arnold, Point Beach, Nine Mile Point, Northern States Power Co, Omaha Public Power District, Pacific Gas & Electric Co, Susquehanna, Progress Energy Carolinas, Progress Energy, Public Service Enterprise Group, Ginna, South Carolina Electric & Gas Co, Southern Nuclear Operating Co, Tennessee Valley Authority, Union Electric Co, Virginia Electric & Power Co (VEPCO)
References
Download: ML12200A106 (12)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 26,2012 The Operating Power Reactors and Holders of Construction Permits on Enclosed List

SUBJECT:

STATUS OF 90-DAY RESPONSE TO REQUEST FOR INFORMATION REGARDING RECOMMENDATION 9.3 OF THE NEAR-TERM TASK FORCE RELATED TO THE FUKUSHIMA DAI-ICHI NUCLEAR POWER PLANT ACCIDENT By letter dated March 12, 2012 (Agencywide Documents Access and Management System Accession No. ML12053A340), the U.S. Nuclear Regulatory Commission (NRC) issued a Request for Information (RFI) pursuant to Section 50.54, paragraph (f) of Title 10 of the Code of Federal Regulations (10 CFR), regarding Recommendations 2.1 (seismic and flooding evaluations), 2.3 (seismic and flooding walkdowns), and 9.3 (emergency preparedness communication and staffing) of the Near Term Task Force review of insights from the Fukushima Dai-ichi accident. With respect to Recommendation 9.3, Enclosure 5 to the NRC's letter requested licensees to assess their means to power communications equipment onsite and offsite during a prolonged station blackout event and to perform a staffillg study to determine the staff required to fill all necessary positions in response to a multi-unit event. The licensees responded to the NRC by letters dated no later than June 11, 2012.

The RFI required responses pursuant to the provisions of 10 CFR 50.54(f) including communication item 2, and staffing items 3, 4, and 5. Item 2 of the communication enclosure pertains to interim actions to power supplies. Items 3, 4, and 5 of the staffing enclosure pertain to notification methods for augmented staff, methods of access to the site, and interim actions prior to the completion of the staffing assessment. The responses to the remaining items to be submitted are expected to be consistent with the schedule provided in the 60-day response letters which were received by the NRC May 11, 2012.

The NRC staff acknowledges that the licensee provided the information requested in the RFI regarding the 90-day response for Recommendation 9.3 for communication item 2, and staffing items 3, 4, and 5, within the time requested. The NRC has reviewed the responses by the licensee for adequacy and has no additional questions.

- 2 Should you have any questions regarding this letter, please contact Ms. Jessica Kratchman at (301) 415-5112.

Sincerely, Michele G. Evans, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation cc: Distribution via Listserv

Letter from Michele Evans to All Operating Power Reactor Plants dated July 26, 2012

SUBJECT:

STATUS OF 90-DAY RESPONSE TO REQUEST FOR INFORMATION REGARDING RECOMMENDATION 9.3 OF THE NEAR-TERM TASK FORCE RELATED TO THE FUKUSHIMA DAI-ICHI NUCLEAR POWER PLANT ACCIDENT Distribution:

PUBLIC LPL1-1 RlF LPL1-2 RlF LPLl2-1 R/F LPL2-2 RlF LPL3-1 RlF LPL3-2 RlF LPL4 RlF RidsNroOd RidsNrrDorl RidsNrrDorlLpl1-1 RidsNrrDorlLpl1-2 RidsNrrDorlLpl2-1 RidsNrrDorlLpl2-2 RidsNrrDorlLpl3-1 RidsNrrDorlLpl3-2 RidsNrrDorlLpl4 RidsNrrOd RidsNsirOd RidsOeMailCenter RidsOgcMailCenter SBloom, NRO JShea, NRO CGratton, NRR

~IKratchman, NRR RLaura, NRR GEMiller, NRR RPascarelli, NRR LRegner, NRR DSkeen, NRR RTaylor, NRR CMurray, NSIR KWilliams, NSIR RidsNrrLAABaxter RidsNrrLAJBurkhardt RidsNrrLABClayton RidsNrrLASFigueroa RidsNrrLAKGoldstein RidsNrrLASRohrer RidsNrrLABTully RidsNrrPMANO RidsNrrPMBeaverValley RidsNrrPMBraidwood RidsNrrPMBrownsFerry RidsNrrPMBrunswick RidsNrrPMByron RidsNrrPMCallaway RidsNrrPMCalvertCliffs RidsNrrPMCatawba RidsNrrPMClinton RidsNrrPMColumbia RidsNrrPMComanchePeak RidsNrrPMCooper RidsNrrPMCrystalRiver RidsNrrPMDavisBesse RidsNrrPMDiabloCanyon RidsNrrPMDresden RidsNrrPMDuaneArnold RidsNrrPMFarley RidsNrrPMFermi2 RidsNrrPMFitzPatrick RidsNrrPMFortCalhoun RidsNrrPMGrandGulf RidsNrrPMHatch RidsNrrPMHopeCreek RidsNrrPMlndianPoint RidsNrrPMKewaunee RidsNrrPMLaSalle RidsNrrPMLimerick RidsNrrPMMcGuire RidsNrrPMMillstone RidsNrrPMMonticello RidsNrrPMNineMilePoint RidsNrrPMNorthAnna RidsNrrPMOconee RidsNrrPMOysterCreek RidsNrrPMPalisades RidsNrrPMPaloVerde RidsNrrPMPeachBottom RidsNrrPMPerry RidsNrrPMPilgrim RidsNrrPMPointBeach RidsNrrPMPrairielsland RidsNrrPMQuadCities RidsNrrPMREGinna RidsNrrPMRiverBend RidsNrrPMRobinson RidsNrrPMSalem RidsNrrPMSequoyah RidsNrrPMShearonHarris RidsNrrPMSouthTexas RidsNrrPMStLucie RidsNrrPMSummer RidsNrrPMSurry RidsNrrPMSusquehanna RidsNrrPMThreeMilelsland RidsNrrPMTurkeyPoint RidsNrrPMVermontYankee RidsNrrPMVogtle RidsNrrPMWaterford RidsNrrPMWattsBar1 RidsN rrPMWattsBar2 RidsOgcRp Resource RidsRgn1 MailCenter Resource RidsRgn2MailCenter Resource RidsRgn3MailCenter Resource RidsRgn4MailCenter Resource

POWER REACTOR LICENSEES AND HOLDERS OF CONSTRUCTION PERMITS IN ACTIVE OR DEFERRED STATUS Arkansas Nuclear One Entergy Operations, Inc.

Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Mr. Christopher J. Schwarz Vice President, Operations Entergy Operations, Inc.

Arkansas Nuclear One 1448 S.R. 333 Russellville, AR 72802 Beaver Valley Power Station First Energy Nuclear Operating Co.

Docket Nos. 50-334 and 50-412 License Nos. DPR-66 and NPF-73 Mr. Paul A. Harden Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077 Braidwood Station Exelon Generation Co., LLC Docket Nos. STN 50-456 and STN 50-457 License Nos. NPF-72 and NPF-77 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Browns Ferry Nuclear Plant Tennessee Valley Authority Docket Nos. 50-259, 50-260 and 50-296 License Nos. DPR-33, DPR-52 and DPR-68 Mr. Joseph W. Shea Corporate Manager, Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Brunswick Steam Electric Plant Carolina Power & Light Co.

Docket Nos. 50-325 and 50-324 License Nos. DPR-71 and DPR-62 Mr. Michael J. Annacone Vice President Carolina Power & Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461 Byron Station Exelon Generation Co., LLC Docket Nos. STN 50-454 and STN 50-455 License Nos. NPF-37 and NPF-66 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Callaway Plant Union Electric Co.

Docket No. 50-483 License No. NPF-30 Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company P. O. Box 620 Fulton, MO 65251 Calvert Cliffs Nuclear Power Plant Calvert Cliffs Nuclear Power Plant, LLC Docket Nos. 50-317 and 50-318 License Nos. DPR-53 and DPR-69 Mr. George H. Gellrich Vice President Calvert Cliffs Nuclear Power Plant, LLC Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702

Catawba Nuclear Station Duke Energy Carolinas, LLC Docket Nos. 50-413 and 50-414 License Nos. NPF-35 and NPF-52 Mr. James R. Morris Site Vice President Duke Energy Carolinas, LLC Catawba Nuclear Station 4800 Concord Road York, SC 29745 Clinton Power Station Exelon Generation Co., LLC Docket No. 50-461 License No. NPF-62 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Columbia Generating Station Energy Northwest Docket No. 50-397 License No. NPF-21 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest MD 1023 P.O. Box 968 Richland, WA 99352 Comanche Peak Nuclear Power Plant Luminant Generation Co., LLC Docket Nos. 50-445 and 50-446 License Nos. NPF-87 and NPF-89 Mr. Rafael Flores Senior Vice President and Chief Nuclear Officer Luminant Generation Company, LLC Attn: Regulatory Affairs P. O. Box 1002 Glen Rose, TX 76043

- 2 Cooper Nuclear Station Nebraska Public Power District Docket No. 50-298 License No. DPR-46 Mr. Brian J. O'Grady Vice President Nuclear and Chief Nuclear Officer Nebraska Public Power District 72676 648A Avenue P.O. Box 98 Brownville, NE 68321 Crystal River Nuclear Generating Plant Florida Power Corp.

Docket No. 50-302 License No. DPR-72 Mr. Jon A. Franke Vice President Attn: Supervisor, Licensing & Regulatory Affairs Progress Energy, Inc.

Crystal River Nuclear Plant (NA2C) 15760 West Power Line Street Crystal River, FL 34428-6708 Davis-Besse Nuclear Power Station First Energy Nuclear Operating Co.

Docket No. 50-346 License No. N PF-3 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company clo Davis-Besse NPS 5501 N. State Route 2 Oak Harbor, OH 43449-9760 Diablo Canyon Power Plant Pacific Gas & Electric Co.

Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82

- 3 Edward D. Halpin Senior Vice President Chief Nuclear Officer Pacific Gas and Electric Company P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424 Dresden Nuclear Power Station Exelon Generation Co., LLC Docket Nos. 50-237 and 50-249 License Nos. DPR-19 and DPR-25 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Duane Arnold Energy Center NextEra Energy Duane Arnold, LLC Docket No. 50-331 License No. DPR-49 Mr. Rich Anderson Site Vice President NextEra Energy Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785 Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Co.

Docket Nos. 50-321 and 50-366 License Nos. DPR-57 and NPF-5 Mr. M. J. Ajluni Licensing Manager - SNC Fleet 40 Inverness Center Parkway P.O. Box 1295 - Bin 038 Birmingham, AL Fermi Detroit Edison Co.

Docket No. 50-341 License No. NPF-43 Mr. Jack M. Davis Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166 Fort Calhoun Station Omaha Public Power District Docket No. 50-285 License No. DPR-40 Mr. David J. Bannister Vice President and Chief Nuclear Officer Mail Stop FC-2-4 9610 Power Lane Blair, NE 68008 Grand Gulf Nuclear Station Entergy Operations, Inc.

Docket No. 50-416 License No. NPF-29 Vice President, Operations Entergy Operations, Inc.

Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 H. B. Robinson Steam Electric Plant Carolina Power & Light Co.

Docket No. 50-261 License No. DPR-23 Mr. William R. Gideon Vice President Carolina Power & Light Company 3581 West Entrance Road Hartsville, SC 29550

- 4 Hope Creek Generating Station PSEG Nuclear, LLC Docket No. 50-354 License No. NPF-57 Mr. Thomas Joyce President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038 Indian Point Energy Center Entergy Nuclear Operations, Inc.

Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64 Mr. John Ventosa Vice President, Operations Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 James A. FitzPatrick Nuclear Power Plant Entergy Nuclear Operations, Inc.

Docket No. 50-333 License No. DPR-59 Vice President Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 Joseph M. Farley Nuclear Plant Southern Nuclear Operating Co.

Docket Nos. 50-348 and 50-364 License Nos. NPF-2 and NPF-8 Mr. Tom Lynch Vice President - Farley Southern Nuclear Operating Company, Inc.

Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319 Kewaunee Power Station Dominion Energy Kewaunee, Inc.

Docket No. 50-305 License No. DPR-43 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 LaSalle County Station Exelon Generation Co., LLC Docket Nos. 50-373 and 50-374 License Nos. NPF-11 and NPF-18 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Limerick Generating Station Exelon Generation Co., LLC Docket Nos. 50-352 and 50-353 License Nos. NPF-39 and NPF-85 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Millstone Nuclear Power Station Dominion Nuclear Connecticut, Inc.

Docket Nos. 50-336 and 50-423 License Nos. DPR-65 and NPF-49 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

- 5 Monticello Nuclear Generating Plant Northern States Power Company Docket No. 50-263 License No. DPR-22 Mr. Mark A. Schimmel Site Vice President Northern States Power Company - Minnesota Monticello Nuclear Generating Plant 2807 West County Road 75 Monticello, MN 55362-9637 Nine Mile Point Nuclear Station Nine Mile Point Nuclear Station, LLC Docket Nos. 50-220 and 50-410 License Nos. DPR-63 and NPF-69 Mr. Ken Langdon Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P. O. Box 63 Lycoming, NY 13093 North Anna Power Station Virginia Electric & Power Co.

Docket Nos. 50-338 and 50-339 License Nos. NPF-4 and NPF-7 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Oconee Nuclear Station Duke Energy Carolinas, LLC Docket Nos. 50-269, 50-270 and 50-287 License Nos. DPR-38, DPR-47 and DPR-55 Mr. Preston Gillespie Site Vice President, Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672 Oyster Creek Nuclear Generating Station Exelon Generation Co., LLC Docket No. 50-219 License No. DPR-16 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Palisades Nuclear Plant Entergy Nuclear Operations, Inc.

Docket No. 50-255 License No. DPR-20 Vice President, Operations Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Palo Verde Nuclear Generating Station Arizona Public Service Company Docket Nos. STN 50-528, STN 50-529 and STN 50-530 License Nos. NPF-41, NPF-51 and NPF-74 Mr. Randall K. Edington Executive Vice President Nuclear and Chief Nuclear Officer Arizona Public Service Co.

P. O. Box 52034, MS 7602 Phoenix, AZ 85072-2034 Peach Bottom Atomic Power Station Exelon Generation Co., LLC Docket Nos. 50-277 and 50-278 License Nos. DPR-44 and DPR-56 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville,IL 60555

- 6 Perry Nuclear Power Plant First Energy Nuclear Operating Co.

Docket No. 50-440 License No. NPF-58 Mr. Vito A. Kaminskas Site Vice President - Nuclear - Perry FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant 10 Center Road, A290 Perry, OH 44081 Pilgrim Nuclear Power Station Unit No.1 Entergy Nuclear Operations, Inc.

Docket No. 50-293 License No. DPR-35 Mr. Robert Smith Vice President and Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Point Beach Nuclear Plant NextEra Energy Point Beach, LLC Docket Nos. 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Mr. Larry Meyer Site Vice President NextEra Energy Point Beach, LLC Point Beach Nuclear Plant, Units 1 & 2 6610 Nuclear Road Two Rivers, WI 54241-9516 Prairie Island Nuclear Generating Plant Northern States Power Co. Minnesota Docket Nos. 50-282 and 50-306 License Nos. DPR-42 and DPR-60 Mr. James Molden Site Vice President Northern States Power Company - Minnesota Prairie Island Nuclear Generating Plant 1717 Wakonade Drive East Welch, MN 55089-9642 Quad Cities Nuclear Power Station Exelon Generation Co., LLC Docket Nos. 50-254 and 50-265 License Nos. DPR-29 and DPR-30 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 R E. Ginna Nuclear Power Plant RE. Ginna Nuclear Power Plant, LLC Docket No. 50-244 License No. DPR-18 Mr. Joseph E. Pacher Vice President RE. Ginna Nuclear Power Plant, LLC RE. Ginna Nuclear Power Plant 1503 Lake Road Ontario, NY 14519 River Bend Station Entergy Operations, Inc.

Docket No. 50-458 License No. NPF-47 Vice President, Operations Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 Salem Nuclear Generating Station PSEG Nuclear, LLC Docket Nos. 50-272 and 50-311 License Nos. DPR-70 and DPR-75 Mr. Thomas Joyce President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038 Sequoyah Nuclear Plant Tennessee Valley Authority Docket Nos. 50-327 and 50-328 License Nos. DPR-77 and DPR-79 Mr. Joseph W. Shea Manager, Corporate Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Shearon Harris Nuclear Power Plant Carolina Power & Light Co.

Docket No. 50-400 License No. NPF-63 M~ Chri~opherL. Burton Vice President Progress Energy Carolinas, Inc.

Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 South Texas Project STP Nuclear Operating Co.

Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80 M~ Kevin D. Richards President and Chief Executive Officer STP Nuclear Operating Company South Texas Project P. O. Box 289 Wadsworth, TX 77483 S1. Lucie Plant Florida Power & Light Co.

Docket Nos. 50-335 and 50-389 License Nos. DPR-67 and NPF-16 M~ Mano Nazar Executive Vice President and Chief Nuclear Officer NextEra Energy 700 Universe Boulevard P. O. Box 14000 Juno Beach, FL 33408-0420 Surry Power Station Virginia Electric & Power Co.

Docket Nos. 50-280 and 50-281 License Nos. DPR-32 and DPR-37 Mr. David A Heacock President and Chief Nuclear Officer Dominion Nuclear Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Susquehanna Steam Electric Station PPL Susquehanna, LLC Docket Nos. 50-387 and 50-388 License Nos. NPF-14 and NPF-22 Mr. Timothy S. Rausch Senior Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard NUCSB3 Berwick, PA 18603-0467 Three Mile Island, Unit 1 Exelon Nuclear Docket No. 50-289 License No. DPR-50 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Turkey Point Florida Power & Light Co.

Docket Nos. 50-250 and 50-251 License Nos. DPR-31 and DPR-41 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer NextEra Energy 700 Universe Boulevard P. O. Box 14000 Juno Beach, FL 33408-0420

Vermont Yankee Nuclear Power Station Entergy Nuclear Operations, Inc.

Docket No. 50-271 License No. DPR-28 Mr. Christopher J. Wamser Site Vice President Entergy Nuclear Operations, Inc.

Vermont Yankee Nuclear Power Station 320 Governor Hunt Road Vernon, VT 05354 Virgil C. Summer Nuclear Station South Carolina Electric & Gas Co.

Docket No. 50-395 License No. NPF-12 Mr. Thomas D. Gatlin Vice President Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Post Office Box 88, Mail Code 800 Jenkinsville, SC 29065 Vogtle Electric Generating Plant. Units 1 & 2 Southern Nuclear Operating Co.

Docket Nos. 50-424 and 50-425 License Nos. NPF-68 and NPF-81 Mr. A.J. Ajluni Licensing Manager - SNC Fleet 40 Inverness Center Parkway P.O. Box 1295 Bin - 038 Birmingham, AL 35201 Vogtle Electric Generating Plant. Units 3 & 4 Southern Nuclear Operating Co.

Docket Nos.52-025 and 52-026 License Nos. NPF-91 and NPF-92 Mr. B. L. Ivey Vice President, Regulatory Affairs Southern Nuclear Operating Company, Inc. '

40 Inverness Center Parkway Bin B022 Birmingham, AL 35242

- 8 Waterford Steam Electric Station Entergy Operations, Inc.

Docket No. 50-382 License No. NPF-38 Vice President, Operations Entergy Operations, Inc.

Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-0751 Watts Bar Nuclear Plant. Unit 1 and Unit 2 Watts Bar Nuclear Plant, Unit 1 Tennessee Valley Authority Docket No. 50-390 License No. NPF-90 Watts Bar Nuclear Plant, Unit 2 Tennessee Valley Authority Docket No. 50-391 Construction Permit No. CPPR No. 092 Mr. Joseph W. Shea Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 William B. McGuire Nuclear Station Duke Energy Carolinas, LLC Docket Nos. 50-369 and 50-370 License Nos. NPF-9 and NPF-17 Mr. Regis T. Repko Vice President Duke Energy Carolinas, LLC McGuire Nuclear Site 12700 Hagers Ferry Road Huntersville, NC 28078

ML12200A106

  • Via e*mail OFFICE JLD/PM LPLlI*21PM LPLlI*21LA NSIRlDPRlNRLB/BC LPLI*1/BC LPLI*2/BC NAME JKratchman EBrown BClayton KWilliams*

GWilson MKhanna DATE 07/25/12 07/24/12 07/24/12 07/16/12 07/23/12 07/20/12 OFFICE LPLlI-1/BC*

LPLlI-21BC(A)

LPLlII-1/BC LPLlII-21BC(A)

LPLlVlBC NRRlD NAME NSalgado JQuichocho SFrankl MDudek MMarkley MEvans (LLund for) i

. DATE 07/23/12 07/23/12 07/23/12 07/23/12 07/23/12 07/26/12