Appendix C Job Performance Measure Form ES-C-i Worksrteet Facility: Shearon Harris Task No.: 333003H101 Task

Title:

Pull to POAHJTake Corrective JPM No.: 2012 NRC Exam Action For A >10% Steam Break Simulator JPM CR a K/A

Reference:

001 Al .07 RO 3.7 / SRO 4.0 ALTERNATE PATH-YES Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinci:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

. The plant is in Mode 2 for a reactor startup 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> post trip from a forced outage at the EOL

. The crew was performing GP-004, REACTOR STARTUP, and have completed Step 45 Initial Conditions:

  • The Reactor is critical
  • Control Bank D withdrawal was halted at 1 x i08 amps
  • Control Bank D is currently at 89 steps
  • The OAC reported to work feeling ill and his illness has now become so severe that he can no longer stand watch You have been directed to assume the OAC position.

The CRS has authorized the watch relief without a face-to-face turnover.

Initiating Cue: Continue the reactor startup to the POAH lAW GP-004, Step 46.

A second operator will acknowledge, silence, and report any alarms not related to the reactor startup.

2012 NRC Exam CR JPM a Rev. FINAL

Appendix C Job Performance Measure Form ES-C-i Workshet Task Standard:

  • Power raised to the POAH.
  • Maintain stable SUR 1 DPM.
  • Reactor trip initiated with a 10% load steam break in effect and Tavg> 10°F below Tref and no sign of turning.

Required Materials: Floor Operator to silence, acknowledge and report alarms.

General

References:

GP-004, Reactor Startup, Revision 52 OP-i 04, Rod Control System, Revision 30 Handouts: OP-i 04, Section 5.4 Simulator copy of GP-004, completed through Step 45 To expedite the examination schedule, the candidate should review the INITIAL CONDITIONS, INITIATING CUE, and the GP-004 prior to entering the simulator to perform the JPM.

Time Critical Task: N/A Validation Time: 15 minutes CRITICAL STEP JUSTIFICATION SUR above 1 DPM is not allowed by procedure and could potentially Step 2 place the Reactor in an unsafe condition where an automatic Reactor trip is generated.

Stabilizing power at the POAH (1% 3%) is required by procedure and Step 4 stabilization at a power level less than 5% is below a mode change from Mode 2to Model.

Determining Reactor Trip criteria is required to understand that the Step 5 Reactor is no longer in a safe controlled condition and is critical to determine that the system is not functioning properly.

2012 NRC Exam CR JPM a Rev. FINAL

Appendix C Job Performance Measure Form ES-C-i Worksheet 2012 NRC Exam SIMULATOR SETUP Simulator Operator

  • ResettolC-165
  • Password sandwich
  • Place reactivity data sheet for IC-i2 on plant status board (this will be used for obtaining boron concentrations for the RCS and BAT)
  • May have to update rods
  • Place Restricted Access signs on swing gates
  • Go to RUN and wait 10 seconds then silence and acknowledge alarms.

GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)

To recreate the IC setup for this JPM:

o Reset to IC-12, EOL Ready for Reactor Startup o Rod height CBD 89 steps o Withdraw Control Banks until Reactor Power is 1 x 108 amps steady state o GP-004 with Step 45 completed o Verify simulator copy of GP-004 marked up through step 45 o Select NR-45 to Power Range Instrument o Create Steam line break on Trigger 1 o imfsgno4b(i 00) 10000:00:100 o imf sgno4c (1 0 0)100 00:00:10 0 o Fail RX trip switch #1 to AS IS idi xcliO34 (n o o) asis o After the candidate has established the POAH and is stabilizing power, activate Trigger 1 2012 NRC Exam CR JPM a Rev. FINAL

Appendix C Page 4 of 10 Form ES-C-i

- RFORMANCE INFORMATION Simulator Operator: When directed by the Lead Examiner go to Run.

START TIME:

GP-004, Step 5.46 NOTE Performance Step: 1 NOTE: When performing startup with a positive Moderator Temperature Coefficient, all reactivity additions must be slow and controlled due to the compounding effects of the positive Moderator Temperature Coefficient.

NOTE: The point of adding heat is usually between 1 Xl 06 to 1X1 ci 5 amps. [R Reference 88H0766 (SOER 88-2)]

Standard:

  • Circles note, reads and then slashes note prior to performing step.

Comment:

GP-004, Step 5.46 J Performance Step: 2 ESTABLISH a startup rate not to exceed one decade per minute AND ALLOW power to increase to the point of adding heat.

Standard: Withdraws controls rods in MANUAL in the outward direction to raise reactor power.

Ensures steady state stable SUR does not exceed 1 DPM Comment:

V - Denotes Critical Steps 2012 NRC Exam CR JPM a Rev. FINAL

Appendix C Page 5 of 10 Form ES-C-i

- PERFORMANCE INFORMATION GP-004, Step 5.47 CAUTION Performance Step: 3 CAUTION Extended operation at low power can result in inadvertent subcriticality and other undesirable transients. Low power operation should be minimized unless approved by plant management. OPS-NGGC-1 306 has additional information on low power operations. [R Reference SOER 07-0 1 Recommendation 1]

Standard: Circles caution, reads and then slashes caution prior to performing step Comment:

When the candidate has stabilized Reactor power at the Point of Adding Heat cue the Simulator Operator to insert Trigger 1 (steam line leak)

Lead Evaluator:

NOTE: When the candidate attempts to manually trip the Reactor the Reactor trip switch located above Rod Control will NOT function. The second Reactor Trip switch must be used to trip the Reactor.

. When directed by the Lead Examiner actuate Trigger 1 Simulator Operator:

(steam line leak: sgnO4b and sgnO4c)

GP-004, Step 5.47 J Performance Step: 4 STABILIZE Reactor power at the Point of Adding Heat, 1 to 3%

Reactor power.

Standard: Steps control rods in as necessary to stabilize reactor power at 1 to 3%.

Comment:

V Denotes Critical Steps

- 2012 NRC Exam CR JPM a Rev. FINAL

Appendix C Page 6 of 10 Form ES-C-i PERFORMANCE INFORMATiON J Performance Step: 5 Determines that RCS Tavg is dropping in an uncontrolled manner, SUR is increasing, T is increasing, and Reactor power is increasing.

Standard: Initiates a MANUAL Reactor trip based on any of the following:

  • GP-004 Precautions and Limitations #19, or #20, or #21
  • Reactor trip low Pressurizer pressure approaching setpoint (1960 psig rate sensitive)
  • Approaching ESFAS SI setpoint for Low Pressurizer Pressure (1850 psig)

Comment: Tries RX trip switch #1 (fails) Tries RX trip switch #2 (success)

GP-004 Precautions and Limitations #19, #20 and #21:

19. If Tavg goes below 551°F and can not be restored to greater than 551°F, within 15 minutes, and in a controlled manner, the Reactor should be tripped. Excessive reactivity additions to restore Tavg could result in a rapid power increase.
20. If Tavg goes 10°F higher or lower than Tref and the trend shows no sign of turning the reactor should be tripped. A loss of temperature control could lead to an ESF actuation.
21. If a steam leak occurs, and reactor power is approaching 10%, the reactor should be tripped. This preemptive action is desired since the reactor should automatically trip, on TURBINE TRIP/REACTOR TRIP, at 10% power.

Failure criteria Failing to perform a manual Reactor trip Evaluator Note: prior to reaching an automatic trip or ESFAS actuation setpoint.

When the immediate actions of PATH-i commence:

Evaluator Cue:

Evaluation on this JPM is complete.

Direct Simulator Operator to place the Simulator in Freeze.

Simulator Operator: When directed by the Lead Examiner then go to Freeze.

STOP TIME:

V - Denotes Critical Steps 2012 NRC Exam CR JPM a Rev. FINAL

Appendix C Page 7 of 10 Form ES-C-i VERIFICATION OF COMPLETiON Job Performance Measure No.: 2012 NRC Exam JPM CR a Pull to POAH/Take Corrective Action For A >10% Steam Break (GP-004)

Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2012 NRC Exam CR JPM a Rev. FINAL

Appendix C Page 8 of 10 Form ES-C-i

  • The plant is in Mode 2 for a reactor startup 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> post trip from a forced outage at the EOL
  • The crew was performing GP-004, REACTOR STARTUP, and have completed Step 45 Initial Conditions:
  • The Reactor is critical
  • Control Bank D withdrawal was halted at 1 x 1 08 amps
  • Control Bank D is currently at 89 steps
  • The OAC reported to work feeling ill and his illness has now become so severe that he can no longer stand watch You have been directed to assume the OAC position. The CRS has authorized the watch relief without a face-to-face turnover.

Initiating Cue: Continue the Reactor startup to the POAH lAW GP-004, Step 46.

A second operator will acknowledge, silence, and report any alarms not related to the Reactor startup.

2012 NRC Exam CR JPM a Rev. FINAL

Appendix C Page 9 of 10 Form ES-C-i JPMCUESHT EOL Startup ReacUvity Plan is for a reactor startup 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> post trip with the reactor critical at 73 hours8.449074e-4 days <br />0.0203 hours <br />1.207011e-4 weeks <br />2.77765e-5 months <br /> and 90 steps on D bank. Step 1 below is at 73 hours8.449074e-4 days <br />0.0203 hours <br />1.207011e-4 weeks <br />2.77765e-5 months <br />, critical conditions.

POWERTRAX Operating Strategy Generator Module CY1 7EOCa/EOCTrip/Upl 572hr Date: Today Time: Now Page: 1 Step Date Time Power ppm B Gal Bor Gal Dii R Step AFD AC-XE K Effective 1 101001 040000 0.0 902 0 161 90 0.0 0.1 0.99731 2 101001 043000 1.0 899 0 378 92 0.7 0.1 0.99732 3 101001 050000 2.5 892 0 406 94 1.8 0.2 0.99731 4 101001 053000 4.0 885 0 285 96 2.8 1.0 0.99731 5 101001 060000 5.0 880 0 331 98 3.4 2.6 0.99731 6 101001 063000 6.0 874 0 506 100 4.0 4.7 0.99731 7 101001 070000 7.5 866 0 517 102 4.9 7.7 0.99731 8 101001 073000 9.0 857 0 373 104 5.7 11.4 0.99731 9 101001 080000 10.0 851 0 389 106 6.1 15.5 0.99731 10 101001 083000 11.0 844 0 532 108 6.5 20.0 0.99731 ii 101001 090000 12.5 836 0 557 lii 7.1 24.5 0.99731 12 101001 093000 14.0 827 0 425 113 7.6 28.7 0.99731 13 101001 100000 15.0 820 0 536 115 7.8 32.7 0.99731 2012 NRC Exam CR JPM a Rev. FINAL

Appendix C Page 10 of 10 Form ES-C-i EOL Startup Reactivity Plan is for a reactor startup 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> post trip with the reactor critical at 73 hours8.449074e-4 days <br />0.0203 hours <br />1.207011e-4 weeks <br />2.77765e-5 months <br /> and 90 steps on D bank. Step 1 below is ready to synchronize to grid. Power Ascension is at 2 Units/mm.

POWERTRAX Operating Strategy Generator Module CY1 7EOCaIEOCTrip/Upl 572hr/UpPwrd Date: Today Time: Now Page: 1 Step Date Time Power ppm B Gal Bor Gal Dii R Step AFD AC-XE K Effective 1 101001 100000 15.0 835 0 772 115 7.7 32.7 0.99623 2 101001 101500 18.0 822 0 749 120 8.5 34.4 0.99623 3 101001 103000 21.0 810 0 731 125 8.9 35.9 0.99623 4 101001 104500 24.0 799 0 758 129 9.1 37.3 0.99623 5 101001 110000 27.0 787 0 749 132 9.2 38.4 0.99623 6 101001 111500 30.0 776 0 788 135 9.2 39.3 0.99623 7 101001 113000 33.0 764 0 679 137 9.0 39.9 0.99623 8 101001 114500 36.0 754 0 682 141 8.7 40.2 0.99623 9 101001 120000 39.0 744 0 731 145 8.5 40.2 0.99623 10 101001 121500 42.0 733 0 751 148 8.1 40.0 0.99623 11 101001 123000 45.0 723 0 769 151 7.7 39.6 0.99623 12 101001 124500 48.0 712 0 681 154 7.3 39.0 0.99623 13 101001 130000 51.0 703 0 811 158 7.0 38.2 0.99623 14 101001 131500 54.0 692 0 817 161 6.6 37.3 0.99623 15 101001 133000 57.0 681 0 932 164 6.1 36.3 0.99623 16 101001 134500 60.0 668 0 953 166 5.4 35.3 0.99623 17 101001 140000 63.0 656 0 922 168 4.7 34.1 0.99623 18 101001 141500 66.0 644 0 938 171 4.1 33.0 0.99623 19 101001 143000 69.0 633 0 1064 174 3.6 31.7 0.99623 20 101001 144500 72.0 620 0 1008 176 2.7 30.5 0.99623 21 101001 150000 75.0 608 0 1053 179 2.1 29.3 0.99623 22 101001 151500 78.0 595 0 1082 182 1.5 28.1 0.99622 23 101001 153000 81.0 583 0 1243 185 0.9 26.9 0.99623 24 101001 154500 84.0 569 0 1202 187 -0.2 25.8 0.99622 25 101001 160000 87.0 556 0 659 190 -0.9 24.6 0.99622 26 101001 161500 90.0 549 0 720 197 -0.0 23.6 0.99624 27 101001 163000 93.0 541 0 961 204 1.0 22.5 0.99624 28 101001 164500 96.0 531 0 1960 211 1.3 21.4 0.99623 29 101001 170000 100.0 511 0 1914 218 -0.6 20.4 0.99621 30 101001 180000 100.0 492 0 2035 218 -0.7 16.9 0.99615 31 101001 190000 100.0 472 0 2140 218 -0.6 14.2 0.99615 32 101001 200000 100.0 453 0 2188 218 -0.5 12.1 0.99615 33 101001 210000 100.0 434 0 2198 218 -0.4 10.4 0.99615 34 101001 220000 100.0 415 0 2168 218 -0.3 9.2 0.99615 35 101001 230000 100.0 398 0 2151 218 -0.2 8.2 0.99616 2012 NRC Exam CR JPM a Rev. FINAL

Appendix C Page 1 of 10 Form ES-C-i Worksheet Facility: Shearon Harris Task No.: 006004H101 Task

Title:

Drain C Cold Leci Accumulator JPM No.: 2012 NRC Exam Simulator JPM CR b K/A

Reference:

006 A2.03 RO 3.3 SRO 3.7 ALTERNATE PATH- NO Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testincj:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

The plant is at 100 percent power. AOP-01 6, Excessive Primary Plant Leakage, has been entered due to increased RCS leakage.

Initial Conditions:

OST-i 506, Reactor Coolant System Isolation Valve Leak Test 18 Month Interval Mode 3 Or 4 is NOT in progress.

The C Cold Leg Accumulator level has increased to 76 percent. The Initiating Cue: SRO has directed you to lower the level in the C Cold Leg Accumulator to 70 percent lAW OP-hO, Safety Injection, Section 8.4.

2012 NRC Exam Simulator JPM CR b Rev. FINAL

Appendix C Page 2 of 10 Form ES-C-i Worksheet Task Standard: C Cold Leg Accumulator level lowered to -7O percent.

Required Materials: None General

References:

OP-i 10, Safety Injection, Rev. 36 Time Critical Task: No Validation Time: 10 minutes Critical Step Justification Step 5 Must open the check valve test return valves to establish a drain path.

Must open the check valve test valve to establish a drain path and start Step7 the accumulator drain.

Must close the accumulator check valve test valve to stop the Step 9 accumulator drain or level will continue to decrease making a fill necessary. (Not to go below 66%)

2012 NRC Exam Simulator JPM CR b Rev. FINAL

Appendix C Page 3 of 10 Form ES-C-i Worksheet -

2012 NRC Exam SIMULATOR SETUP Simulator Operator

  • ResettolC-166
  • Password sandwich
  • Gotorun
  • Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)

To recreate the IC setup for this JPM:

  • Initial Simulator IC was IC-19
  • Fill C Cold Leg Accumulator to 76 percent o The fastest way to fill is using the malfunction for check valve back leakage o Ensure the high pressure alarm is cleared (vent the accumulator if necessary).
  • Freeze and Snap these conditions to your exam IC 2012 NRC Exam Simulator JPM CR b Rev. FINAL

Appendix C Page 4 of 10 Form ES-C-i PERFORMANCE HJFORMAT1ON Simulator Operator: When directed by the Lead Examiner go to Run.

START TIME:

OP-lb Section 8.4 Initial Conditions Performance Step: 1 The associated Accumulator Discharge Valve is OPEN (1SI-246, 247 or 248).

Sufficient volume is available in the RWST for amount to be drained.

OST-i 506 is NOT in progress.

Standard: Sets ERFIS screen and or Computer monitor screens with OSI P1 to monitor C Accumulator level during drain.

Reviews the initial conditions of OP-i 10 section 8.4 and determines that they are met.

iSl-248 is OPEN RWST volume is sufficient to admit the drain volume from the accumulator OST-1506 is NOT in progress Comment:

OP-i 10, Section 8.4 Note prior to step 1 Performance Step: 2 To minimize any potential sluicing between Accumulators through leaking valves, Accumulator pressures should normally be left approximately equal (at or below 4 psid between lowest and highest ERFIS indications) at the completion of this Section.

Standard: Circles note, reads and then slashes note prior to performing step Comment:

V Denotes Critical Steps

- 2012 NRC Exam Simulator JPM CR b Rev. FINAL

Appendix C Page 5 of 10 Form ES-C-i PERFORMANCE INFORMATiON OP-hO, Section 8.4, Step 1 Performance Step: 3 PERFORM the following Steps on only ONE Accumulator at a time.

Standard: Circles note, reads and then slashes note prior to performing step Comment:

OP-il 0, Section 8.4, Step 2 Performance Step: 4 DECLARE the associated Accumulator inoperable per Tech Spec 3.5.1, due to being connected to Non-Safety piping (a one hour action statement in Modes 1 through 3 above 1000 psig).

Standard: Reads step and informs SRO that the C Accumulator will become inoperable when connected to the Non-Safety piping.

SRO acknowledges that Tech Spec 3.5.1 will be entered for Evaluator Cue the C Accumulator becoming inoperable.

Comment:

OP-hO, Section 8.4, Step 3 V Performance Step: 5 At the MCB, OPEN the following valves:

iSl-263, ACCUM CHECK VALVE TEST RETURN.

1SI-264, ACCUM CHECK VALVE TEST RETURN.

Standard: Locates MCB switch for 151-263 and takes switch to OPEN Locates MCB switch for 151-264 and takes switch to OPEN Comment:

V - Denotes Critical Steps 2012 NRC Exam Simulator JPM CR b Rev. FINAL

Appendix C Page 6 of 10 Form ES-C-i PERFORMANCE INFORMATION OP-i 10, Section 8.4, Note and Caution prior to Step 4 Performance Step: 6 Note: Over ranging flow instruments Fl-944A and Fl-944B in this section does not affect instrument calibration therefore, the flow elements do not need to be isolated.

Caution: Do not allow Accumulator pressure to decrease below 600 psig while decreasing level Standard: Circles caution, reads and then slashes caution prior to performing step Comment:

Evaluator Note: The drain rate of the accumulators is 2% every minute.

OP-ho, Section 8.4, Step 4 V Performance Step: 7 At the MCB, OPEN the ACCUMULATOR CHECK VALVE TEST VALVE for the appropriate Accumulator:

1 Sl-259, ACCUMULATOR C CHECK VALVE TEST.

Standard: Locates MCB switch for 1 Sl-259 and opens valve Comment:

OP-hO, Section 8.4, Step 5 Performance Step: 8 LOWER Accumulator level to the desired level as indicated by the associated instruments:

Ll-928, 930, ACCUMULATOR C LEVEL.

Standard: Monitors C Accumulator level decrease during drain until 70%

level is reached.

Comment:

V - Denotes Critical Steps 2012 NRC Exam Simulator JPM CR b Rev. FINAL

Appendix C Page 7 of 10 Form ES-C-i PERFORMANCE iNFORMATION OP-hO, Section 8.4, Step 6 V Performance Step: 9 SHUT the ACCUMULATOR CHECK VALVE TEST VALVE for the Accumulator that was drained:

1 Sl-259, ACCUMULATOR C CHECK VALVE TEST.

Standard: Locates MCB switch for 1SI-259 and shuts valve (Critical to shut 1 Sl-259 prior to C Accumulator level decreasing to < 66%)

Comment:

OP-i 10, Section 8.4, Step 7 Performance Step: 10 At the MCB, SHUT the following valves:

1SI-263, ACCUM CHECK VALVE TEST RETURN.

1SI-264, ACCUM CHECK VALVE TEST RETURN.

Standard: Locates MCB switch for 1 SI-263 and takes switch to SHUT Locates MCB switch for 1SI-264 and takes switch to SHUT Comment:

OP-hO, Section 8.4, Step 8 Performance Step: IF desired, THEN DIRECT Chemistry to sample the affected Accumulator.

Standard: Contacts Chemistry to sample the C Accumulator Simulator Operator: Acknowledge request to sample the C Accumulator Comment:

V - Denotes Critical Steps 2012 NRC Exam Simulator JPM CR b Rev. FINAL

Appendix C Page 8 of 10 Form ES-C-i PERFOMANC lNEOFMAi1cN OP-hO, Section 8.4, Step 9 Performance Step: 12 COMPLETE Attachment 7.

Standard: Signs Attachment 7 Comment:

After completing Attachment 7: Evaluation on this JPM is complete.

Evaluator Cue:

END OF JPM Inform Simulator Operator to place the Simulator in Freeze.

STOP TIME:

Simulator Operator: When directed by the Lead Examiner then go to Freeze.

V - Denotes Critical Steps 2012 NRC Exam Simulator JPM CR b Rev. FINAL

Appendix C Page 9 of 10 Form ES-C-i VERIFICAflQN OFCOMPLET1ON Job Performance Measure No.: 2012 NRC Exam JPM CR b Drain C Cold Leci Accumulator lAW OP-hO, Safety Injection Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2012 NRC Exam Simulator JPM CR b Rev. FINAL

Appendix C Page 10 of 10 Form ES-C-i JPMCUSKEEr The plant is at 100 percent power. AOP-01 6, Excessive Primary Plant Leakage, has been entered due to increased RCS leakage.

Initial Conditions:

OST-1506, Reactor Coolant System Isolation Valve Leak Test 18 Month Interval Mode 3 Or 4 is NOT in progress.

The C Cold Leg Accumulator level has increased to 76 percent. The SRO has directed you to lower the level in the C Cold Leg Accumulator

.. . to 70 percent lAW OP-hO, Safety Injection, Section 8.4.

Initiating Cue:

OST-1506, Reactor Coolant System Isolation Valve Leak Test 18 Month Interval Mode 3 Or 4 is NOT in progress.

2012 NRC Exam Simulator JPM CR b Rev. FINAL

Appendix C Page 1 of 10 Form ES-C-i Wo< Sheet Facility: Shearon Harris Task No.: 301 073H401 Task

Title:

Pressurizer Pressure Master JPM No.: 2012 NRC Exam Controller Failure JPM CR c K/A

Reference:

APE 027 AA2.15 RO 3.7 SRO 4.0 ALTERNATE PATH YES -

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinQ:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The Reactor is at 100 percent power and all parameters are normal.

Initiating Cue: You are the QAC and are directed to maintain current plant conditions.

2012 NRC Exam JPM c Rev. FINAL

Appendix C Page 2 of 10 Form ES-C-i WorkSheet Task Standard: All steps necessary to mitigate the Pressurizer Pressure Master failure that caused a RCS low-pressure transient have been performed.

Required Materials: None General

References:

AOP-019 Rev. 22 Time Critical Task: No Validation Time: 10 minutes Critical Step Justification Establishes manual control of Pressurizer Master controller in order to control PRZ pressure decrease or the following automatic actions will Step 5 occur:

. Reactor Trip on OTAT

  • Safety Injection on Low RCS Pressure of 1850 psig 2012 NRC Exam JPM c Rev. FINAL

Appendix C Page 3 of 10 Form ES-C-i WorkSheet 2012 NRC Exam SIMULATOR SETUP Simulator Operator

  • ResettolC-167
  • Password sandwich
  • 100% power steady state conditions Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)

To recreate the IC setup for this JPM:

  • Initial Simulator IC was IC-19
  • Create Trigger 1 Fail Pressurizer Pressure Master to 100% ramp in over 3 minutes o imf prsl5 (1 00)10000:03:00
  • Freeze and Snap these conditions to your exam IC 2012 NRC Exam JPM c Rev. FINAL

Appendix C Page 4 of 10 Form ES-C-i PERFORMANCE INFORMATION Simulator Operator: Place Simulator in RUN when directed by Lead Examiner Evaluator Cue: Approximately 20 seconds after taking shift have Simulator Operator insert Trigger 1 (Pressurizer Master Controller Fails to 100)

Evaluator Note: Initial conditions: Pressurizer Master Controller at 35%

Both Pressurize Spray valves shut and PORV 444B shut When the controller begins failing to 100% open:

At 41 % Pressurizer Spray valves A and B will begin to open At 72% both Pressurizer Spray valves will be full open At 88% PORV 444B will go full open

  • Pressurizer pressure will begin to lower IF control is not placed in manual and the output lowered the Reactor will trip on OTAT and an Automatic Safety Injection will actuate on Low Pressure (1850 psig).

idJfr 4 1 4 ,p U4 I

i;i 1:c&

1 I

V - Denotes Critical Steps 2012 NRC Exam JPM c Rev. FINAL

Appendix C Page 5 of 10 Form ES-C-i PERFORMANCE [FORMATiON START TIME:

Annunciator Alarms Performance Step: 1 ALB 10-8-5a Cmptr Alarm Rx Coolant Standard: Announces annunciator and responds to alarm Identifies:

RCS pressure is lowering Both Pressurizer Spray valves are opening PK-444A is failing to 100%

Recognizes entry conditions to AOP-01 9 Evaluator Cue: Acknowledges annunciator and entry into AOP-019 (using proper communications)

Comment: The Immediate Action Steps of AOP-O1 9 are to be performed from memory WITHOUT the aid of the procedure.

AOP-019, Step 1 Performance Step: 2 NOTE: Steps 1 through 3 are immediate actions.

CAUTION: A pressure transmitter or indicator malfunction may exist. When referred to throughout this procedure, actual RCS pressure should be obtained by cross-checking of diverse instrumentation, such as P1-455.1, P1-456, and P1-457.

CHECK THAT BUBBLE EXISTS IN THE PRZ.

Standard: Verifies bubble in Pressurizer by checking parameters.

(Pressure, Temperature, and Level.) (YES)

Comment:

V Denotes Critical Steps

- 2012 NRC Exam JPM c Rev. FINAL

Appendix C Page 6 of 10 Form ES-C-i

. PERFORMANGE ORTIGN -

AOP-019, Step 2 Performance Step: 3 VERIFY ALL PRZ PORVs AND associated block valves properly positioned for current PRZ pressure and plant conditions.

Standard: Identifies PRZ PORV PCV-445A, PCV-445B, and PCV-444B all indicate SHUT and all associated block valves indicate OPEN.

Determines all valves are properly positioned for current conditions.

Comment:

Alternate Path Starts Here AOP-019, Step 3 Performance Step: 4 CHECK BOTH PRZ Spray Valves properly positioned for current PRZ pressure and plant conditions.

Standard: Determines both spray valves are not properly positioned (both are OPEN but should be SHUT in response to the low pressure condition) and transitions to RNO step.

Comment:

V - Denotes Critical Steps 2012 NRC Exam JPM c Rev. FINAL

Appendix C Page 7 of 10 Form ES-C-i PERFORMANCE lNFORMATIO14 AOP-019, Step 3 RNO v Performance Step: 5 CONTROL PRZ Spray Valves using ONE of the following methods (listed in order of preference):

  • AFFECTED Spray Valve controller in MANUAL (if only one is obviously malfunctioning) (NO BOTH)

OR

  • PK-444A, Master Pressure Controller, in MANUAL OR
  • BOTH individual Spray Valve controllers in MANUAL Standard:
  • Determines both spray valves are affected (not one);

moves to next method in order of preference.

  • Locates PK-444A Pressure Controller. Places controller in manual and decreases output signal to close the spray valves (and prevents PORV 444B from opening) as needed to stop the RCS pressure decrease.

With Pressurizer Master controller in manual OMM-001 Attachment 13 limits apply:

Pressurizer Pressure Control Band = 2210 2260 psig Trip Limits = 2250 psig (Low Limit) 2350 psig (High Limit)

Comment:

A Reactor Trip and Safety Injection results in JPM Failure.

IF the candidate ONLY places the PRZ spray valves controllers to manual and shuts each valve Master Pressure Controller PK-444A will continue to fail to 100%. As it continues to fail to 100% PORV 444B will open and most likely cause a Reactor Trip from OTAT and a Safety Injection on Low RCS Pressure.

Evaluator NOTE: IF the candidate identifies the PORV 444B open and closes the associated block valve in time a Reactor Trip maybe avoided.

In the case of preventing a Reactor Trip the candidate should be considered to PASS the JPM but with comments.

If the Reactor Trips allow the candidate to perlorm the immediate actions of PATH-i to verify that the Reactor has tripped and then end the JPM.

V - Denotes Critical Steps 2012 NRC Exam JPM c Rev. FINAL

Appendix C Page 8 of 10 Form ES-C-i

- PERFORMANCE [NFORMATION AOP-019, Section 3.0 Step 4 Performance Step: 6 Step 4. GO TO Section 3.1, Pressure Control Malfunctions While Operating With a Pressurizer Bubble Standard: Obtains AOP-019, enters procedure and reviews section 3.0 immediate action steps 1 -3.

Step 4. GO TO Section 3.1, Pressure Control Malfunctions While Operating With a Pressurizer Bubble End of Section 3.0 Transitions to Section 3.1 step 1 Comment:

After the candidate has completed the immediate actions and obtained AOP-019, read through step 4 and is ready to continue with Section 3.1 inform the candidate:

Evaluator Cue: End of JPM Direct the Simulator Operator to place the Simulator in Freeze.

STOP TIME:

Simulator Operator: When directed by the Lead Examiner place Simulator in FREEZE V - Denotes Critical Steps 2012 NRC Exam JPM c Rev. FINAL

Appendix C Page 9 of 10 Form ES-C-i

. VERIFICATION OF C-OMPLET[ON Job Performance Measure No.: 2012 NRC Exam JPM c Pressurizer Pressure Master Controller Failure (AOP-Oi 9)

Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2012 NRC Exam JPM c Rev. FINAL

Appendix C Form ES-C-i JPMCUESHEET The Reactor is operating at 100 percent power and all parameters Initial Conditions:

are normal.

Initiating Cue:

1 You are the QAC and are directed to maintain current plant conditions.

2012 NRC Exam JPM c Rev. FINAL

Appendix C Page 1 of 10 Form ES-C-i Worksheet -

Facility: HARRIS Task No.: 3011 70H601 Task

Title:

Initiate RCS Bleed and Feed JPM No.: 2012 NRC JPM CR d (FRP-H.1 K/A

Reference:

E05 EA1.1 RO 4.1 SRO 4.0 ALTERNATE PATH YES -

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

. The Reactor was operating at 100% power

. Motor Driven AFW Pump B is under clearance and partially disassembled for maintenance

. The Reactor tripped due to a loss of off-site power

. A EDG tripped when it started, the cause is being investigated

. The Turbine-Driven AFW Pump failed while starting Initial Conditions:

  • Adverse Containment values are in effect
  • The crew has transitioned from PATH-i to FRP-H.1, Response To Loss Of Secondary Heat Sink
  • The Foldout criteria for initiation of RCS Bleed and Feed have just been met You are the OAC. The CRS directs you to observe the procedure Inhiatin 1 g Cue-CAUTION prior to FRP-H.1, Step 16, then initiate RCS bleed and feed.

2012 NRC Exam Simulator JPM CR d Rev. FINAL

Appendix C Page 2 of 10 Form ES-C-i

-- Worksheet -

Task Standard: RCS feed established with maximum available bleed path.

Required Materials: Attach PATH-i GUIDE Attachment 1 to this JPM for use by the evaluator.

General

References:

FRP-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK, Revision 28 Handout: Use Simulator copy of FRP-H.1 and ensure it is replaced after each use or provide a paper copy.

Time Critical Task: No Validation Time: 15 minutes Critical Step Justification Step 4 Critical to allow operator control of equipmentlsignals.

Must energize the bus in order to have power to open / close valves Ste I 7 needed to complete task Step 11 Critical to establish the maximum available bleed path.

2012 NRC Exam Simulator JPM CR d Rev. FINAL

Appendix C Page 3 of 10 Form ES-C-i

- Worksheet 2012 NRC Exam SIMULATOR SETUP Simulator Operator

  • ResettolC-168
  • Password sandwich
  • Hang CIT on the B MDAFW Pump and place Star Placards lAW OMM-OOi on required equipment
  • Run AMS file Roll Gen 86 Relays to get the 86 relays to the trip condition
  • GotoRun
  • Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)

To recreate the IC setup for this JPM:

  • Initial Simulator IC was IC-19, stay in freeze
  • Remove power from the breaker on B MDAFW Pump o irfCFWll4cp_off
  • Insert a malfunction to prevent the A EDG from starting o 1mfDSGO1A
  • Insert a malfunction to trip TDAFW Pump during AUTO start o 1mfCFWO1C
  • Insert overrides to block MANUAL OPEN on PCV-445A, PCV-445B and PCV-444B o ldixa2ii36(noo)ASIS o ldixa2ii37(noo)ASIS o ldixa2ii38(noo)ASIS
  • Insert a loss of Off-site Power o imt epsOl w/o delay
  • Gotorun
  • Perform PATH-i with a transition to EPP-004, go to freeze
  • Insert a SBLOCA after entering FRP-H.i to get to adverse containment values.

o ImfRCS1BA1.5

  • Gotorun
  • Perform FRP-H.i without establishing any source of feed flow
  • Allow SG levels to reach feed and bleed Foldout (ADVERSE) criteria (<40%)
  • Run AMS file AIR\ACS to local
  • Roll 86 relays with AMS file o RoIl gen 86 relays
  • FREEZE and SNAP 2012 NRC Exam Simulator JPM CR d Rev. FINAL

Appendix C Page 4 of 10 Form ES-C-i PERFORMANCE INFORMATION Simulator Operator: When directed by the Lead Examiner go to Run.

START TIME:

FRP-H.1, Caution prior to Step 16 Performance Step: 1 Perform Steps 16 through 25 without delay to establish RCS heat removal by RCS bleed and feed.

Standard:

Comment:

FRP-H.1, Step 17 Performance Step: 2 Actuate SI.

Standard: (Already actuated) Verifies SI actuated or may actuate manual MCB switch.

Comment:

FRP-H.1, Step 18 Performance Step: 3 Verify RCS Feed Path:

a. SI flow > 200 GPM
b. Observe NOTE prior to Step 19 AND GO TO Step 19 Standard:
  • Verifies SI flow indication > 200 GPM (YES)

Comment:

V Denotes Critical Steps

- 2012 NRC Exam Simulator JPM CR d Rev. FINAL

Appendix C Page 5 of 10 Form ES-C-i ERFMANCE INFORMAT[ON FRP-H.1, Step 19 q Performance Step: 4 Reset SI.

Standard:

  • Places both SI Train RESET Switches in RESET and releases.
  • Verifies RESET on Bypass Permissive Panel.

Comment:

FRP-H.1, Step 20 Performance Step: 5 Manually Realign Safe-Guards Equipment Following A Loss Of Off-Site Power.

(Refer To PATH-i Guide, Attachment 2.)

Standard: Reads/acknowledges.

Comment:

FRP-H.1, Step 21 Performance Step: 6 Reset Phase A AND Phase B Isolation Signals.

Standard:

  • Places Train A and Train B Phase A RESET Switches in RESET and releases. (J)
  • Phase B has not actuated (may reset since procedure directs) o Places Train A and Train B Phase B RESET Switches in RESET and releases.

Comment:

V Denotes Critical Steps

- 2012 NRC Exam Simulator JPM CR d Rev. FINAL

Appendix C Page 6 of 10 Form ES-C-i PERFORMANCE INFORMATION FRP-H.1, Step 22 q Performance Step: 7 Energize AC Buses 1 Al AND 1 Bl Standard:

  • Energizes Bus 1 Bl by closing the cross-tie Emergency Bus B-SB to XFMR Bi -SB Breaker Bi A-SB.

(Bus 1A1 cannot be energized)

Comment:

FRP-H.l, Step 23 Performance Step: 8 Establish Instrument Air AND Nitrogen To CNMT:

a. Open the following valves:
  • lSl-287
b. Place air compressor 1A and 1 B in the local control mode.

(Refer to PATH-i GUIDE, Attachment 5.)

Standard:

  • Dispatches an AO to place 1 B Air Compressor in the LOCAL Control Mode. (1A Air Compressor has no power)

Acknowledge assignment to place Air Compressor to local Simulator Operator: Run AMS file to place 1A and 1 B Air compressors in the LOCAL Mode then report back that the 1 B Air compressor is in local control mode.

Comment:

V - Denotes Critical Steps 2012 NRC Exam Simulator JPM CR d Rev. FINAL

Appendix C Page 7 of 10 Form ES-C-i PERFORMANCE INFORMATION FRP-H.1, Step 24 Performance Step: 9 Establish all RCS bleed paths listed in table by performing the following:

1. Verify PRZ PORV Block valve OPEN
2. Open PRZ PORV RCS 1ee4 Pathe ed Q ?RZ PORV iND Aeaciated lxi Valve 1ee6 Path Bl Valve P11 PORV A raLu PRZ ?ORV 1RV-11J 110-118 (?UV-5* Si)

W Trdr PRZ PORY 110-113 110-114 t V-444 53)

!on Safety P92 EORV 110-115 110-116 (PcV-4458)

Standard:

  • Verifies block valves RC-i 17, RC-1 13 and RC-1 15 indicate OPEN (RED light)
  • Attempts to open PCV-445A, PCV-445B and PCV-444A o NONE WILL OPEN (ALL Green Lights)

. Informs CRS that none of the PZR PORVs will open and no RCS bleed paths through PORVs can be established.

Evaluator Cue: CRS acknowledges PORVs cannot be opened, continue with FRP-H.1.

Comment:

FRP-H.1, Step 25.a (ALTERNATE PATH begins)

Performance Step: 10 Check PRZ PORVs AND associated block valves ONE BLEED PATH OPEN Standard:

  • Determines no PRZ PORVs are OPEN.

o Proceeds to RNO o GO TO Step 25c Comment:

V Denotes Critical Steps

- 2012 NRC Exam Simulator JPM CR d Rev. FINAL

Appendix C Page 8 of 10 Form ES-C-i PERFORMANCE INFORMATiON Evaluator Note: There is no power available to 1 RC-900, 1 RC-902, 1 RC-904.

FRP-H.1, Step 25c J Performance Step: 11 Open all RCS vent valves to commence venting:

. 1 RC-903

  • 1RC-905 Standard: (Must take control switch out of Pull To Lock)

Opens:

  • 1 RC-903

. 1RC-905 Comment:

After RCS Vent Valves with power available are OPEN:

Evaluation on this JPM is complete.

Lead Evaluator Cue:

Inform the Simulator Operator to place the Simulator in Freeze.

Simulator Operator: When directed by the Lead Examiner then go to Freeze.

1 STOP TIME:

V - Denotes Critical Steps 2012 NRC Exam Simulator JPM CR d Rev. FINAL

Appendix C Page 9 of 10 Form ES-C-i

- VERLFICATIONOF COMPLETION Job Performance Measure No.: 2012 NRC JPM CR d Initiate RCS Bleed and Feed EOP-FRP-H. 1 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2012 NRC Exam Simulator JPM CR d Rev. FINAL

Appendix C Page 10 of 10 Form ES-C-i JPMCtJESHEET

. The Reactor was operating at 100% power

. Motor Driven AFW Pump B is under clearance and partially disassembled for maintenance

. The Reactor tripped due to a loss of off-site power

. A EDG tripped when it started, the cause is being investigated

    • .. . The Turbine-Driven AFW Pump failed while starting Initial Conditions:

. A SBLOCA occurred following the Reactor Trip

  • Adverse Containment values are in effect

. The crew has transitioned from PATH-i to FRP-H.1, Response To Loss Of Secondary Heat Sink

. No source of Feedwater is available

. The Foldout criteria for initiation of RCS Bleed and Feed have just been met You are the OAC. The CRS directs you to observe the procedure Initiating Cue: CAUTION prior to FRP-H.i, Step 16, then initiate RCS bleed and feed.

2012 NRC Exam Simulator JPM CR d Rev. FINAL

Appendix C Page 1 of 12 Form ES-C-i WOrkht Facility: Shearon Harris Task No.:

Task

Title:

Perform a Main Turbine Overspeed JPM No.: 2012 NRC Exam Trip Test Simulator JPM CR e K/A

Reference:

ALTERNATE PATH- NO Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

. The plant is operating at 6% Power during a startup following a refueling outage.

. Turnover took place with the performance of OPT-i 075, Main Turbine Overspeed Trip Test in progress.

Initial Conditions:

  • Communications has been established with the Turbine Building Operator at the Main Turbine front standard (the TB Operator has a cell phone ext. 4208)
  • A second AO is stationed at the Emergency Trip System Test Panel (contact via radio)

CRS has directed you to perform a Turbine Overspeed Trip Test lAW Initiatin g Cue OPT-i 075 starting at step 17.

2012 NRC Exam Simulator JPM CR e Rev. FINAL

Appendix C Page 2 of 12 Form ES-C-i Worksheet Task Standard: Perform a Turbine Overspeed Trip test and manually trip the Turbine when the Turbine fails to automatically trip at setpoint.

Required Materials: None General

References:

OPT-1075 Rev. 9 Time Critical Task: No Validation Time: 15 minutes Critical Step Justification Must place the OPC key to Overspeed Test Permissive to allow the Ste I 1 Turbine to exceed 105% of rated speed without the GVs closing.

Must initiate a manual Turbine Trip or contact the TB AC at the Front Standard to locally trip the Turbine (Turbine must be Tripped to meet the Step 10 critical step) then place the OPC key switch to the in service position to close the GVs and lower Turbine speed to prevent Turbine damage in the overspeed event.

2012 NRC Exam Simulator JPM CR e Rev. FINAL

Appendix C Page 3 of 12 Form ES-C-i Worksheet 2012 NRC Exam SIMULATOR SETUP Simulator Operator

  • ResettolC-169
  • Password sandwich
  • Gotorun
  • *This next step needs to be done with each reset
  • Open AMS file tovspd and run the file when directed in the JPM
  • Open Monitored parameters\plant status monitor to ensure that the AMS file runs correctly during the JPM Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)

To recreate the IC setup for this JPM:

  • Initial Simulator IC was lC-8 and borate/drive rods in to current reactivity plan with final Reactor power 6.5% then stabilize the plant
  • Turbine speed was ramped to 1800 rpm with GV in control

NOTE: you must run tovspd each time the Simulator is reset. The changes will not be saved in the snap.

o Tovspd changes should be monitored in Monitored plant parameters\Plant Status Monitor Normal. Lines 23 and 24. If these parameters are not present then add them before perForming the JPM.

o setcehospd35 o set cehotrip 2100

  • Trigger 1 turn on annunciator DEH Computer Power Supply Undervoltage (insert before starting the JPM so the alarm is in) o irf iann xn18a59 (1 0 0) ALARM_ON
  • Freeze and Snap these conditions to your exam IC 2012 NRC Exam Simulator JPM CR e Rev. FINAL

Appendix C Page 4 of 12 Form ES-C-i PERFORMANCE INFORMATiON Simulator Operator: Run AMS file tovspd ENSURE that cehospd has changed to 35 and cehotrip has

. changed to 2100 by viewing the setpoints in Monitored Parameters Simulator Operator: When directed by the Lead Examiner go to Run.

START TIME:

OPT-i 075 step 17 Performance Step: 1 On the DEH Control Panel, PLACE the OPC keyswitch (Key #42) to the OVERSPEED TEST PERMISSIVE position.

V Standard: Obtains key, locates keyswitch and PLACES the OPC keyswitch (Key #42) to the OVERSPEED TEST PERMISSIVE position.

Comment:

OPT-i 075 NOTE prior to step 18 Performance Step: 2 For Step 7.0.18, the key barrel has been known to turn slightly.

Proper key INHIBIT will have a distinct click with the notch pointing at the INHIBIT position. This will ensure that the trips are actually blocked.

Standard: Reads and circle/slashes Note.

Comment:

V - Denotes Critical Steps 2012 NRC Exam Simulator JPM CR e Rev. FINAL

Appendix C Page 5 of 12 Form ES-C-i PERFORMANCE INFORMATION OPT-i 075 Step 18 Performance Step: 2 On the Emer Trip Sys Test Panel, PLACE the OVERSPEED TRIP keyswitch (Key #50) to the INHIBIT position.

Standard: Contacts (via radio) the second AO at the Emer Trip Sys Test Panel and directs them to PLACE the OVERSPEED TRIP keyswitch (Key #50) to the INHIBIT position.

Comment:

Communicator: The OVERSPEED TRIP keyswitch is in the INHIBIT position.

OPT-i 075 step 19 Performance Step: 3 VERIFY RPM indications on the Turbine Speed RPM meter and the REFERENCE indicator are in agreement Standard: Verifies that the Turbine Speed RPM and the REFERENCE indicator both reads 1800 rpm and the HOLD light is lit.

Comment:

- Denotes Critical Steps 2012 NRC Exam Simulator JPM CR e Rev. FINAL

Appendix C Page 6 of 12 Form ES-C-i

- PERFORMANCE INFORMATION OPT-i 075 step 20.a and 20.b.

Performance Step: 4 At the MCB, PERFORM the following:

a. SET the acceleration rate at 50 RPM/MIN.
b. SET turbine DEMAND speed to 1998 RPM.

Standard: 20.a.Locates and Depresses the ACCEL RPM/MIN pushbutton and verifies that it is lit.

Enters 5-0 on the numeric key pad.

Depresses the ENTER pushbutton Ensures that 50 is displayed in the Reference Display 20.b Locates and Depresses the REF pushbutton and verifies that it is lit.

Enters 1-9-9-8 with the numeric key pad Depresses the ENTER pushbutton.

Verifies that the HOLD pushbutton is lit.

Comment:

OPT-i 075 CAUTION prior to step 20.c.

Performance Step: 5

  • To prevent a Reactor Trip, Turbine load and Reactor power must be monitored closely and maintained below 10%.
  • The HOLD push button must be depressed immediately if speed reaches 1998 RPM.
  • If turbine speed increases greater than 2000 RPM, then turbine should immediately be tripped per step 7.20.d Standard: Circles, Reads and Slashes the Cautions Comment:

If asked, inform the candidate that the OAC will closely Evaluator Cue: monitor Turbine Load and Reactor power to ensure it is maintained below 10%.

7- Denotes Critical Steps 2012 NRC Exam Simulator JPM CR e Rev. FINAL

Appendix C Page 7 of 12 Form ES-C-i PERFORMANCE INFORMATION OPT-i 075 step 20.c Performance Step: 6 20.c. IF speed increases to 1998 RPM, THEN IMMEDIATELY DEPRESS the HOLD push button.

Standard: Reads and understands step.

Comment:

OPT-i 075 step 20.d Performance Step: 7 20.d. IF speed increases greater than 2000 RPM, THEN IMMEDIATELY PERFORM the following Substeps:

(1) DIRECT the operator at the Turbine Front Standard to trip the turbine, AND (2) On the DEH Control Panel, PLACE the OPC keyswitch to the IN SERVICE position.

Standard: Reads and understands two steps.

Brief the TB Operator on his responsibilities concerning tripping the Turbine when directed by MCR.

Comment:

Communicator:

I TB understands that it Turbine speed increases to greater than 2000 rpm than you will direct me to trip the Turbine.

V - Denotes Critical Steps 2012 NRC Exam Simulator JPM CR e Rev. FINAL

Appendix C Page 8 of 12 Form ES-C-i PERFORMANCE INFORMATION OPT-i 075 step 20.e Performance Step: 8 20.e DEPRESS the GO push button to start speed increase.

Standard: Candidate informs the TB Operator on the radio that Turbine OverSpeed Testing will commence.

Makes a site wide PA announcement Tripping the Turbine for Testing.

Locates and Depresses the GO pushbutton.

Announces Crew Update that the Turbine is in GO.

Comment:

[ Evaluator Cue: Respond as Turbine Building Operator to MCR and acknowledge that Overspeed Testing will commence.

[ Evaluator Note:

Turbine speed will continue to increase and will peak at 2008 rpm if the Turbine is not tripped.

OPT-i 075 step 20.f.

Performance Step: 9 20.f MONITOR turbine speed on REFERENCE indicator until a trip occurs or 1998 RPM is indicated.

Standard: Monitors turbine speed as turbine approaches auto turbine trip overspeed setpoint.

When Turbine speed reaches 1998 RPM, then candidate will IMMEDIATELY DEPRESS the HOLD push button and check to ensure that HOLD light is lit and Turbine Speed is not increasing.

Turbine speed will continue to increase after the HOLD button is depressed.

Comment:

V - Denotes Critical Steps 2012 NRC Exam Simulator JPM CR e Rev. FINAL

Appendix C Page 9 of 12 Form ES-C-i PERFORMANCE INFORMATION OPT-i 075 Performance Step: 10 MONITOR turbine speed on REFERENCE indicator. Turbine speed exceeds auto trip setpoint with speed continuing to increase after the HOLD push buffon is depressed. Actions per step 7.20.d are required.

V Standard: Turbine speed continues past 1998 actions are to direct the operator at the Turbine Front Standard to trip the turbine, AND on the DEH Control Panel, PLACE the OPC keyswitch to the IN SERVICE position.

OR Takes the Turbine manual trip switch on the MCB to the TRIP position.

Comment:

When contacted by the candidate DO NOT respond to the

. call. WAIT UNTIL AFTER THE CANDIDATE PLACES THE Simulator Operator.

OPC KEYSWITCH TO THE IN SERVICE POSITION THEN

. INSERT TRIGGER 2 TO TRIP THE TURBINE LOCALLY.

V - Denotes Critical Steps 2012 NRC Exam Simulator JPM CR e Rev. FINAL

Appendix C Page 10 of 12 Form ES-C-i PERFORMANCE INFORMATION -

OPT-i 075 step 21 Performance Step: ii THEN PERFORM the following substeps.

a. INITIATE a manual turbine trip.
b. VERIFY that the following turbine valves have shut:

(1) Throttle valves (2) Governor valves (3) Reheat valves (4) Intercept valves

c. VERIFY that the following bistable status lights are lit on TRIP STATUS LIGHT Box-2:

(1) TURB STOP VLV 1 SHUT (2) TURB STOP VLV 2 SHUT (3) TURB STOP VLV 3 SHUT (4) TURB STOP VLV 4 SHUT Standard: Verifies that a turbine trip did not take place at 1998 rpm and performs and HAS performed either directing the TB Operator to trip the Turbine at the front standard OR takes the manual Turbine Trip switch on the MCB to TRIP.

Verifies all Throttle valves, Governor valves, Reheat valves Intercept valves are shut.

Comment:

After the candidate performs a manual Turbine Trip Evaluator Cue: announce: End of JPM, I have the Simulator.

Inform Simulator Operator to place the simulator in Freeze.

STOP TIME:

Simulator Operator: When directed by the Lead Examiner then go to Freeze.

V - Denotes Critical Steps 2012 NRC Exam Simulator JPM CR e Rev. FINAL

Appendix C Page 11 of 12 Form ES-C-i VERIFlCAT1ONOF COMPLETION Job Performance Measure No.: 2012 NRC Exam JPM CR e Perform a Main Turbine Overspeed Trip Test OPT-i 075 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2012 NRC Exam Simulator JPM CR e Rev. FINAL

Appendix C Page 12 of 12 Form ES-C-i

- JPMCUESHEET

. The plant is operating at 6% Power during a startup following a refueling outage.

Initial Conditions:

  • Communications has been established with the Turbine Building Operator at the Main Turbine front standard (the TB Operator has a cell phone ext. 4208)
  • A second AO is stationed at the Emergency Trip System Test Panel (contact via radio)

CRS has directed you to continue the Turbine Overspeed Trip Intatin 1 I g Cue Test lAW OPT-1075 starting at step 17.

2012 NRC Exam Simulator JPM CR e Rev. FINAL

Appendix C Page 1 of 13 Form ES-C-i

. Worksheet Facility: Shearon Harris Task No.: 022001H101 Task

Title:

Place Containment CoolinQ to Max JPM No.: 2012 NRC Exam Coolinci Mode Simulator CR JPM f K/A

Reference:

022 A4.01 RO 3.6 SRO 3.6 ALTERNATE PATH NO -

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinci:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

. The Reactor is at 100 percent power.

. A Containment entry will take place tomorrow on night shift and Initial Conditions Containment Cooling is required to be placed in the Maximum

. Cooling Mode.

. Train A fans are currently running in high speed, and service water is aligned to both A and B ESW headers.

The CRS directs you to place Containment Cooling in the Maximum Initiatin g Cue Cooling Mode per OP-169 Section 8.1.

Evaluator Note: Provide the candidate a copy of OP-i 69 Section 8.1 now.

2012 NRC Exam Simulator JPM CR f Rev. FINAL

Appendix C Page 2 of 13 Form ES-C-i Worksheet Task Standard: Containment cooling in the Maximum Cooling Mode.

Required Materials: None General

References:

OP-169, Section 8.1, Rev. 20 Time Critical Task: No Validation Time: 15 Minutes Critical Step Justification Must perform this step to start the Containment Fan Cooler. If the Fan Cooler is not started and in Hi Speed the Containment Dampers will Step 10 .

NOT automatically shift and the result will be that the Coolers will not be in MAX Cooling Mode.

Must stop ONE of the Containment Fan Coolers that was running in Hi Step 11 Speed. The final lineup will cause the accident dampers to shift and the coolers will be in MAX Cooling Mode.

Must perform this step to start the Containment Fan Cooler. If the Fan Cooler is not started and in Hi Speed the Containment Dampers will Step 15 NOT automatically shift and the result will be that the Coolers will not be in MAX Cooling Mode.

Must perform this (final) step to start the Containment Fan Cooler. If the Fan Cooler is not started and in Hi Speed the Containment Dampers will Step 19 . .

NOT automatically shift and the result will be that the Coolers will not be in MAX Cooling Mode.

2012 NRC Exam Simulator JPM CR f Rev. FINAL

Appendix C Page 3 of 13 Form ES-C-i Worksheet 2012 NRC Exam SIMULATOR SETUP Simulator Operator

  • ResettolC-170
  • Password sandwich
  • 100% power steady state conditions NOTE: There is nothing different on this IC than what is on IC-19. The IC was saved just for the convenience of having all the Simulator JPM ICs on the portable hard drive.

Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)

To recreate the IC setup for this JPM:

  • Initial Simulator IC was IC-19
  • Freeze and Snap these conditions to your exam IC 2012 NRC Exam Simulator JPM CR f Rev. FINAL

Appendix C Page 4 of 13 Form ES-C-i PERFORMANCE INFORMATiON

. Simulator Operator: Place Simulator in RUN when directed by Lead Examiner START TIME:

OP-i 69, Section 8.1 Initial Conditions Performance Step: 1 1. Fan Cooler Units in operation per Section 5.1 of this procedure.

2. Both ESW headers are in service.

Standard: Verifies the initial conditions are met Fan Cooler Units in operation as per Section 5.1 of this procedure (YES)

Both ESW headers are in service (YES)

Comment:

V - Denotes Critical Steps 2012 NRC Exam Simulator JPM CR f Rev. FINAL

Appendix C Page 5 of 13 Form ES-C-i

- PERFORMANCE INFORMATION OP-i 69 Section 8.1.2, Notes Prior to Step 1 Performance Step: 2 NOTE: If at any time, additional CNMT cooling is needed, one or both ESW pumps may be placed in service (preferably after fans have been started).

NOTE: During this mode of operation, both Train A and Train B are in operation. AH-3 and AH-4 will be discharging to the post accident dampers.

NOTE: When changing Containment Cooling modes, or swapping Containment Fan Cooler Trains, care must be taken to prevent the following:

  • Entering Technical Specification 3.6.1.4 at -1.0 inwg Containment pressure (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> action).
  • Opening the Containment Vacuum Breakers at -2.25 inwg Containment pressure.

This may be accomplished by performing the evolution slowly, monitoring CNMT pressure effects using ERFIS point PCP761 1.

Also, placing the Containment Normal Purge Exhaust flow controNer (FK-7624) in manual and shutting CP-B9, will allow CNMT pressure to slowly rise, thus compensating for the CNMT pressure drop that will occur during each fan start.

Standard: Reads and circle slashes notes:

Comment:

OP-169 Section 8.1.2, Step l.a Performance Step: 3 IF CNMT Normal Purge is in service AND manual control of purge flow is desired for CNMT pressure control,

a. THEN PERFORM the following:

PLACE FK-7624, NORM PURGE EXH FLOW, in MANUAL.

Standard: Locates control switch for FK-7624 and places switch to manual Comment:

V Denotes Critical Steps

- 2012 NRC Exam Simulator JPM CR f Rev. FINAL

Appendix C Page 6 of 13 Form ES-C-i

- PERFORMANCE1NFORMATION OP-i 69 Section 8.1.2, Step lb Performance Step: 4 Using FK-7624, SHUT CP-B9, NORM CONT PURGE MODULATING VALVE (SLB-7 I 5-3).

Standard: Uses control switch for FK-7624 and runs controller down to shut CP-B9. Verifies CP-B9 shuts using SLB-715-3.

Comment:

OP-i 69 Section 8.1.2, Step 1.c Performance Step: 5 IF CNMT Normal Purge needs to be restored at any time during the performance of this procedure section, THEN PERFORM the following:

IF CNMT Normal Purge has NOT tripped, THEN RESTORE FK-7624 to AUTO.

IF CNMT Normal Purge has tripped, THEN STARTUP CNMT Normal Purge per OP-i 68.

Standard: Reviews step and continues with procedure Comment:

OP-i 69 Section 8.1.2, Note prior to Step 2 Performance Step: 6 After any fan cooler is started in low speed, the fan should be allowed to come up to speed for approximately 15 seconds before shifting to fast speed.

This reduces the starting current required for high speed operation.

Standard: Reviews and circle slashes note Comment:

V - Denotes Critical Steps 2012 NRC Exam Simulator JPM CR f Rev. FINAL

Appendix C Page 7 of 13 Form ES-C-i PERFORMANCE INFORMATION OP-i 69 Section 8.1.2, Step 2.a Performance Step: 7 With Train A in operation as per Section 5.1 of this procedure, perform the following steps:

a. Place the control switch for one fan cooler in AH-1 to LO-SPD.

Standard: Locates control switch for one fan cooler in AH-1 and places the switch to the LO-SPD position.

Comment:

OP-i 69 Section 8.1.2, Note Prior to Step 2.b Performance Step: 8 Step 8.1 .2.2.c must be done without delay following Step 8.1 .2.2.b. The fan should not be allowed to coast down before being started in fast speed.

Standard: Reviews and circle slashes note Comment:

OP-i 69 Section 8.1.2, Step 2.b Performance Step: 9 Place control switch for fan started in step 8.1 .2.2.a TO STOP.

Standard: Places fan, started in step 8.1 .2.2.a, control switch to STOP position.

Comment:

V - Denotes Critical Steps 2012 NRC Exam Simulator JPM CR f Rev. FINAL

Appendix C Page 8 of 13 Form ES-C-i

. PERFORMANCE INFORMATION OP-i 69 Section 8.1.2, Step 2.c

/ Performance Step: 10 Place the control switch for the fan stopped in Step 8.1 .2.2.b to HI SPD.

Standard: Locates and places control switch for fan stopped in Step 8.1 .2.2.b to HI SPD position.

Comment: The fan must be in high speed in order for the dampers to auto align.

OP-i 69 Section 8.1.2, Step 2.d Performance Step: 11 Stop one fan in AH-2.

Standard: Locates and places one fan in AH-2 switch to the STOP position.

Comment:

OP-i 69 Section 8.1.2, Step 2.e Performance Step: 12 Place the control switches for fan cooler AH-4 A-SB to LO- SPD.

Standard: Locates and places control switches for AH-4 A-SB to LO SPD Comment:

V - Denotes Critical Steps 2012 NRC Exam Simulator JPM CR f Rev. FINAL

Appendix C Page 9 of 13 Form ES-C-i

- PERFORMANCE INFORMATION op-i 69 Section 8.1.2, Note prior to Step 2.f Performance Step: 13 Step 8.1 .2.2.g must be done without delay following Step 8.1 .2.2.f. The fan should not be allowed to coast down before being started in fast speed.

Standard: Reviews and circle slashes note Comment:

OP-169 Section 8.1.2, Step 2.f Performance Step: 14 Place the control switches for fan cooler AH-4 A-SB to STOP.

Standard: Locates and places control switches for AH-4 A-SB to STOP.

Comment:

OP-i 69 Section 8.1.2, Step 2.g v Performance Step: 15 Place the control switches for fan cooler AH-4 A-SB to Hl-SPD.

Standard: Locates and places control switches for AH-4 A-SB to HI-SPD.

Comment: The fan must be in high speed in order for the dampers to auto align.

OP-i 69 Section 8.1.2, Step 2.h Performance Step: 16 Place the control switch for fan cooler AH-4 B-SB to LO- SPD.

Standard: Locates and places control switch for AH-4 B-SB to LO-SPD Comment:

V - Denotes Critical Steps 2012 NRC Exam Simulator JPM CR f Rev. FINAL

Appendix C Page 10 of 13 Form ES-C-i PERFORMANCE IN FORMATION op-i 69 Section 8.1.2, Note prior to step 2.i Performance Step: 17 Steps 8.1 .2.2.j and 8.1 .2.2.i must be done without delay. The fan should not be allowed to coast down before being started in fast speed.

Standard: Reviews and circle slashes note Comment:

OP-i 69 Section 8.1.2, Step 2.i Performance Step: 18 Place the control switch for fan cooler AH-4 B-SB to STOP.

Standard: Locates control switch for fan cooler AH-4 B-SB and places switch to STOP Comment:

OP-i 69 Section 8.1.2, Step 2.j V Performance Step: 19 Place the control switch for fan cooler AH-4 B-SB to Hl-SPD Standard: Locates control switch for fan cooler AH-4 A-SB and places control switch to HI SPD.

(NOTE: expect annunciator ALB 029-4-2 for this fan configuration to occur. The candidate should state it is an expected alarm due to his/her action and review the APP when conditions allow)

Comment: The fan must be in high speed in order for the dampers to auto align.

Examiners Cue: (As CRS) Acknowledge annunciator with appropriate communications V - Denotes Critical Steps 2012 NRC Exam Simulator JPM CR f Rev. FINAL

Appendix C Page 11 of 13 Form ES-C-i PERFORMANCE INFORMATION OP-i 69 Section 8.1.2, Step 2.k Performance Step: 20 Verify CV-D5 is OPEN on Status Light Box 5.

Standard: Locates indications for CV-D5 and verifies damper is OPEN Comment:

OP-i 69 Section 8.1.2, Step 2.1 Performance Step: 21 Verify CV-D7 is OPEN on Status Light Box 6.

Standard: Locates indications for CV-D7 and verifies damper is OPEN Comment:

Evaluator Cue: After the candidate verifies damper CV-D7 is OPEN announce:

Another operator will complete the actions for the rest of this section.

End of JPM, I have the Simulator Inform the Simulator Operator to place the Simulator in FREEZE.

STOP TIME:

Simulator Operator: When directed by the Lead Examiner then go to Freeze.

V - Denotes Critical Steps 2012 NRC Exam Simulator JPM CR f Rev. FINAL

Appendix C Page 12 of 13 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2012 NRC Exam Simulator JPM CR f Place Containment Cooling to Max Cooling Mode OP-169 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2012 NRC Exam Simulator JPM CR f Rev. flNAL

Appendix C Page 13 of 13 Form ES-C-i JPM CUE SHEET - -

. The Reactor is at 100 percent power.

. A Containment entry will take place tomorrow on night shift and Containment Cooling is required to be placed in the Maximum Initial Conditions:

Cooling Mode.

. Train A fans are currently running in high speed, and service water is aligned to both A and B ESW headers.

The CRS directs you to place Containment Cooling in the Maximum Cooling Initiating Cue:

Mode per OP-i 69 Section 8.1.

2012 NRC Exam Simulator JPM CR f Rev. FINAL

Appendix C Page 1 of 1 1 Form ES-C-i Worksheet -

Facility: Shearon Harris Task No.:

Task

Title:

LOSP While Paralleling EDG from JPM No.: 2012 NRC Exam MCB for Testing Sim CR JPM g KJA

Reference:

064 A4.06 RO 3.9 SRO 3.9 ALTERNATE PATH YES -

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

  • The plant is operating at 100% power.

. Emergency Diesel Generator 1 B-SB has been started and is Initial Conditions: ready to be paralleled to the grid.

. An operator is on station to locally monitor B EDG in accordance with OP-155 attachments.

. You are the MCR 3 rd board operator, and the CRS has directed you to parallel EDG 1 B-SB to the grid in accordance with OP

. 155, section 5.3.

Initiating Cue: . .. ..

  • All initial conditions of Section 5.3.1 have been completed.

. The monthly voltage and governor controls exercise are required to be performed.

2012 NRC Exam Simulator JPM CR g Rev. FINAL

Appendix C Page 2 of 1 1 Form ES-C-i Worksheet Task Standard: EDG 1 B-SB output breaker 126 is operated in accordance with OP-i 55; breaker closed per section 5.3, and manually opened per Precaution and Limitation 4.0.24 upon LOSP.

Required Materials: OP-i 55 Rev. 53, sections 3.0, 4.0, 5.3, Att.9, and Att.i5 (pp.6-li, 22-26,167,179)

General

References:

OP-155, Rev. 53 Time Critical Task: No Validation Time: 15 minutes Critical Step Justification Step: 4 Without Sync, EDG output breaker will not close on energized bus Upon closing EDG output breaker, prompt loading is required to prevent Ste I 13 a reverse power automatic trip (30 seconds).

Must recognize the implications of LOSP without EDG output breaker Ste p. 16 126 tripping: Sequencer fails to load.

2012 NRC Exam Simulator JPM CR g Rev. FINAL

Appendix C Page 3 of 11 Form ES-C-i Worksheet 2012 NRC Exam SIMULATOR SETUP Simulator Operator

  • Reset to 10-171 password sandwich
  • GotoRUN
  • Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)

To recreate the IC setup for this JPM:

  • ResettolC-19
  • Insert malfunction to prevent EDG B breaker 126 from automatically opening on subsequent LOSP (allowing manual operation to open) o imf ZCR31 748 FAIL_ASIS
  • Set Trigger 1 for a loss of Offsite power to the plant o imf epsOl (1 0 0) W/O_DELAY
  • Set up a failure of the A EDG output breaker so it will trip prior to reaching load block 9 o Trigger 39 created for conditional trigger when A EDG starts
  • TRG= 39 DGAEMERSTART o A EDG output breaker trips 20 seconds after A EDG starts
  • irt dsg38 (39 00:00:20 00:00:00) TRIP
  • GotoRUN
  • Freeze and Snap these conditions to your exam IC 2012 NRC Exam Simulator JPM CR g Rev. FINAL

Appendix C Page 4 of ii Form ES-C-i

  • PERFORMANCE1NFORMATION
  • The candidates should be briefed outside of the Simulator prior to performing this JPM.
  • Provide them with a copy of the applicable procedure sections.
  • Inform them that ALL initial conditions are satisfied.

Evaluator Note:

This will allow them to review the Precautions and Limitations associated with OP-i 55 and have time for a task preview of the steps to accomplish paralleling the EDG. Expect that the candidates will take about 10 15 minutes to complete this review.

rSimulator Operator: When directed by the Lead Examiner go to Run.

START TIME:

OP-i55 Performance Step: 1 Obtains OP-i 55, Section 5.3, Diesel Synchronizing and Paralleling at MCB Standard: Reviews Prerequisites, Precautions and Limitations and Initial Conditions Evaluator Cue: All initial conditions have been satisfied.

Comment:

OP-i 55, Section 5.3.2 Step 1 Performance Step: 2 1. NOTIFY Load Dispatcher EDG 1 A-SA (1 B-SB) will be loaded.

Standard: Contacts Load Dispatcher Evaluator Cue: Load Dispatcher has been notified.

Comment:

V Denotes Critical Steps

- 2012 NRC Exam Simulator JPM CR g Rev. FINAL

Appendix C Page 5 of 1 1 Form ES-C-i PERFORMANCE INFORMATION OP-i 55, Section 5.3.2 Step 2 Performance Step: 3 2. PERFORM the following:

  • REVIEW Precaution 4.0.21 to determine if UPP-1A is aligned to its normal power source.
  • REVIEW Precaution 4.0.22 to determine if ALB-15-4-i is unlit.
  • REVIEW Precautions 4.0.24 and 4.0.25 before paralleling.

Standard: Reviews precautions Evaluator Cue: UPP-1A is aligned to its normal source.

(If asked when reviewing Precaution 4.0.21)

Comment:

OP-i 55, Section 5.3.2 Step 3 v Performance Step: 4 3. PLACE DIESEL GEN A-SA (B-SB) SYNCHRONIZER control switch to SYNC.

Standard:

  • Places Key in B-SB EDG sync switch and turns to SYNC.
  • Checks that Sync scope is on.

Comment:

OP-i 55, Section 5.3.2 Note prior to Step 4 Performance Step: 5 NOTE: Steps 5.3.2.4.a, 5.3.2.4.b, 5.3.2.5.a, and 5.3.2.5.b, which exercise the Voltage and Governor adjustment, only need to be accomplished once per month.

Standard: Reviews and circle/slashes note. Recognizes steps are required per the Initiating Cue.

Comment:

V - Denotes Critical Steps 2012 NRC Exam Simulator JPM CR g Rev. FINAL

Appendix C Page 6 of ii Form ES-C-i PERFORMANCE INFORMATION OP-i 55, Section 5.3.2 Steps 4.a,b Performance Step: 6 4. POSITION DIESEL GEN A-SA (B-SB) AUTO VOLTAGE ADJUST control switch to RAISE or LOWER as necessary to perform the following:

a. Lower voltage to 6.6kV
b. Raise voltage to 7.2kV Standard:
  • Lowers EDG B Auto Voltage Adjust until EDG voltage indicates 6.6 kV.
  • Raises EDG B Auto Voltage Adjust until EDG voltage indicates 7.2 kV.

Comment:

OP-i 55, Section 5.3.2 Note prior to Step 4.c Performance Step: 7 NOTE: EI-6953A SA (B SB) has a scaling factor of x300.

Therefore the range of the meter reflects an actual voltage range of -9000 VAC to +9000 VAC.

Standard: Reviews and Circle/Slash Note Comment:

OP-i 55, Section 5.3.2 Step 4.c Performance Step: 8 c. ADJUST EDG voltage to match the associated Emergency 6.9KV Bus voltage as indicated by zero differential voltage indicated on EI-6953A SA (B SB), A (B)

SYNC i VOLTS.

Standard: Precisely adjusts EDG B Auto Voltage Adjust until EDG voltage matches 6.9KV Bus 1 B-SB voltage (0 A VOLTS).

Comment:

- Denotes Critical Steps 2012 NRC Exam Simulator JPM CR g Rev. FINAL

Appendix C Page 7 of 11 Form ES-C-i PERFORMANCE INFORMATiON OP-i 55, Section 5.3.2 Step 5 Performance Step: 9 5. POSITION DIESEL GEN A-SA (B-SB) GOVERNOR CONTROL switch to RAISE or LOWER as necessary to perform the following:

a. LOWER frequency to 59hz
b. RAISE frequency to 61 hz
c. ADJUST EDG speed until the synchroscope is rotating slowly in the FAST direction (CLOCKWISE).

Standard:

  • Adjusts EDG B Governor Control until EDG B frequency is indicating 59 Hz.
  • Adjusts EDG B Governor Control until EDG B frequency is indicating 61 Hz.
  • Adjusts EDG B Governor Control until EDO B sync scope is indicating slow OW movement.

Comment:

OP-i 55, Section 5.3.2 Step 6 Performance Step: 10 6. CHECK synchronizing lights are cycling (OUT when the synchroscope is at the 12 oclock position) in agreement with the synchroscope rotation.

Standard: Checks sync lights are cycling properly.

Comment:

OP-i 55, Section 5.3.2 Step 7 Performance Step: ii 7. As necessary, POSITION DIESEL GEN A-SA (B-SB)

AUTO VOLTAGE ADJUST control switch to adjust EDO voltage to zero differential voltage is indicated on EI-6953A SA (B SB), A (B) SYNC ti VOLTS.

Standard: Verifies precisely 0 A VOLTS, using AUTO VOLTAGE ADJUST control switch as needed.

Comment:

V Denotes Critical Steps

- 2012 NRC Exam Simulator JPM CR g Rev. FINAL

Appendix C Page 8 of 1 1 Form ES-C-i PERFORMANCE [NFOlMATlON op-i 55, Section 5.3.2 Caution Prior to Step 8 Performance Step: 12 Performing the following three steps in rapid succession will prevent a reverse power trip of the EDG output breaker. The reverse power trip relay has a 30 second time delay from when the breaker is closed until trip.

Standard:

  • Reviews and Circle/Slash Caution
  • The candidate should review the next few steps and may use flagging to promptly pick up load sync Comment:

OP-i 55, Section 5.3.2 Steps 8,9,10,11 V Performance Step: 13 8. WHEN the synchroscope reaches the 12 oclock position and the synchronizing lights are TOTALLY DARK, THEN PLACE the DIESEL GEN A-SA (B-SB) BREAKER 106 SA (126 SB) control switch to CLOSE.

9. CHECK DIESEL GEN A-SA (B-SB) BREAKER 106 SA (126 SB) is CLOSED.
10. POSITION DIESEL GEN A-SA (B-SB) GOVERNOR CONTROL switch to increase generator load to 2.2 to 2.4 MW on EI-6957A1 SA (81 SB), A (B) POWER.

ii. POSITION DIESEL GEN 1 A-SA (1 B-SB) AUTO VOLTAGE ADJUST control switch to obtain 1.0 MVARs on EI-6958A SA (B SB), A (B) REACTIVE.

Standard:

  • Closes Breaker 126 when synchroscope is at 12 oclock
  • Promptly checks Breaker 126 is closed
  • Promptly raises generator load to 2.2 2.4 MW
  • Raises generator MVAR5 to 1.0
  • (Avoids reverse power trip)

Comment:

OP-i 55, Section 5.3.2 Step 12 Performance Step: 14 12. PLACE DIESEL GEN A-SA (B-SB) SYNCHRONIZER control switch to OFF.

Standard: Turns Sync key switch to OFF.

Comment:

V - Denotes Critical Steps 2012 NRC Exam Simulator JPM CR g Rev. FINAL

Appendix C Page 9 of 11 Form ES-C-i PERFORMANCE INFORMA11ON OP-i 55, Section 5.3.2 Step 13 Performance Step: 15 13. CHECK DIESEL GEN A-SA (B-SB) BREAKER 106 SA (126 SB) amber light is LIT.

Standard: Checks amber light lit for breaker 126.

Comment:

Evaluator Note: After performance of step 13, cue Simulator Operator to insert Loss of Off-site Power malfunction.

Simulator Operator: When directed by Lead Examiner, insert LOSP Trigger 1.

Loss of Off-site Power v Performance Step: 16 Recognize LOSP and evaluate proper response of breaker 126 lAW P&L 4.0.24 (breaker 126 should automatically trip and re-close to allow the sequencer to start loading)

Standard:

  • Recognize LOSP condition
  • Determine breaker 126 does not automatically trip as expected

. Notify CRS of breaker status

. Place breaker 126 to TRIP Evaluator Note: After LOSP, candidate may observe Rx Trip and perform immediate actions of PATH-i. These are not required for this task per the initiating cue (rd 3

board operator). However, breaker 126 should be tripped prior to referring to PATH-i.

Comment:

Evaluator Note: After candidate trips EDG output breaker 126, the JPM is complete.

Evaluator Cue: END OF JPM.

STOP TIME:

Simulator Operator: When directed by the Lead Examiner go to Freeze.

V - Denotes Critical Steps 2012 NRC Exam Simulator JPM CR g Rev. FINAL

Appendix C Page 10 of 11 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2012 NRC Exam Sim CR JPM p LOSP While Paralleling EDG from MCB for Testing OP-155, PATH-i Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2012 NRC Exam Simulator JPM CR g Rev. FINAL

Appendix C Page 1 1 of 1 1 Form ES-C-i JPMCUE SHEET

. The plant is operating at 100% power.

. Emergency Diesel Generator 1 B-SB has been started and Initial Conditions: is ready to be paralleled to the grid.

. An operator is on station to locally monitor B EDG lAW OP-i 55 attachments.

. You are the MCR 3 rd board operator, and the CRS has directed you to paralle EDG 1 B-SB to the grid lAW OP-i 55, section 5.3.

Initiating Cue:

  • All initial conditions of Section 5.3i have been completed.
  • The monthly voltage and governor controls exercise are required to be performed.

2012 NRC Exam Simulator JPM CR g Rev. FINAL

Appendix C Page 1 of 15 Form ES-C-i Worksheet Facility: Shearon Harris Task No.: 301 053H401 Task

Title:

Fuel Handling Accident (AOP-013) JPM No.: 2012 NRC Exam CR JPM h K/A

Reference:

034 A2.01 RO 3.6 SRO 4.4 ALTERNATE PATH Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

NOTE: We are simulating Mode 6 conditions. No equipment is in an off normal alignment. The unit is stable.

The unit has been taken off line and is shut down due to a fuel leak Current plant conditions are:

. Mode 6 and a core off-load in progress.

.. .. . Both A and B RHR pumps are in operation.

Initial Conditions:

. RCS temperature is 116°F

. RCS temperature band is 110°F 120°F

  • Cavity water level is 23 feet 10 inches

. A and B CT Spray pumps, B and C CSIPs, B RMW pump, A and B MDAFW pumps and the TDAFW pump are all under clearance lAW GP instructions.

. Work is being performed on the B RCP seal package The Refueling SRO has reported to the MCR that while the refuel crew was moving an assembly from the Reactor to the upender the assembly unlatched and has been dropped. The assembly has ruptured. One large bubble of gas and a lot of smaller gas bubbles have surfaced. The Initiatin Cue Refueling Bridge Crane rad monitor is in alarm as well as the local Containment area rad monitors on the refueling floor. The Refueling crew has all left the Refueling Bridge Crane. You are to take actions per AOP-013, Fuel Handling Accident.

2012 NRC Exam CR JPM h Rev. FINAL

Appendix C Page 2 of 15 Form ES-C-i Worksheet Task Standard: Containment Evacuation, plant announcements and alarms sounded. In addition, all required air handlers and dampers positioned for a dropped fuel assembly event.

Required Materials: None General

References:

AOP-013, Rev. 14 Time Critical Task: No Validation Time: 20 minutes Critical Step Justification Step 7 Must be able to warn plant personnel of dangerous situations.

Must be able to locate and isolate Containment Purge to prevent a Step 16 possible release of contamination.

Must be able to locate and isolate Containment Purge dampers that Step 17 have not correctly positioned to prevent a possible release of contamination.

2012 NRC Exam CR JPM h Rev. FINAL

Appendix C Page 3 of 15 Form ES-C-i

- Worksheet 2012 NRC Exam - SIMULATOR SETUP Simulator Operator

  • ResettolC-172
  • Password sandwich
  • GotoRUN
  • ERFIS screens put A RHR on one screen and INTEGRITY on another screen (normally the LTOP screen would be switched you can do this if you have time but you will have to switch back each time you reset to a different JPM)
  • Hang CITs (all under clearance lAW GP Instructions) o A and B CNMT Spray Pumps o B and C CSIPs o BRMUW pump o A and B MDAFW pumps o MS-70 and MS-72
  • Load but DO NOT RUN the following AMS file. The file will be initiated when the JPM is started.

o AMS file: 3502B increase Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)

  • Initial Simulator IC was IC-21 For this JPM the plant is being simulated to be in Mode 6 by changing Pressurizer level to correspond to a cavity level of 23 10. RCS temperature is -116°F and refueling cavity water level 23 10 (per GP-009).
  • irf mscO52 (n 0 0) REFUEL
  • Modify Pressurizer hot cal level channels 459, 460 and 461 to 92%

o imf lt:459 (n 00:00:00 00:00:00) 92.0 00:00:00 o imf lt:460 (n 00:00:00 00:00:00) 92.0 00:00:00 o imf lt:461 (n 00:00:00 00:00:00) 92.0 00:00:00

  • Modify Pressurizer cold cal level channel 462 to 56%

o imf lt:462 (n 00:00:00 00:00:00) 56.0 00:00:00

  • Insert malfunction to prevent the Pre-Entry Purge Exhaust Fan from auto stopping and Isolation Dampers to close on high radiation level on REM-Ol LT-3502B (Cnmt Pre-Entry Purge Monitor) o imf z2718k2 (n 00:00:00 00:00:00) FAIL_ASIS o imf zrpk6l4a (n 00:00:00 00:00:00) FAIL_ASIS o imf zrpk6l4b (n 00:00:00 00:00:00) FAIL_ASIS
  • On RM-1 1 rad monitor 3502B needs to have flow you must select the monitor and then push the flow button. Wait until both particulate and gas monitors are green.

2012 NRC Exam CR JPM h Rev. FINAL

Appendix C Page 4 of 15 Form ES-C-i

- Worksheet -

Run AMS file 3502 increase Run AMS file (3502B increase) to cause Containment Pre-entry purge rad monitor 3502B, Containment RCS Leak Detection rad monitor 3502A, and Containment Isolation rad monitors 356iA-D to go into high alarm simulating a dropped fuel assembly during fuel movement.

o REM-Ol LT-3502B (Cnmt Pre-Entry Purge Monitor) o REM-Ol LT-3502A (Cont RCS Leak Det) o REM-i CR-3561 A, B, C, D (Containment Isolation Sys. Rad. Monitors)

!Description of 3502B increase

+00:00:25 irf rmsOO9 (n 00:00:00 00:00:00) 6.2E-3 00:00:00 -

irf rmsOO7 (n 00:00:00 00:00:00) 4.4E-3 00:00:00 -

irt rmsl22 (n 00:00:00 00:00:00) 5.2E+2 00:00:00 -

irt rmsl23 (n 00:00:00 00:00:00) 4.7E+2 00:00:00 -

in rmsl24 (n 00:00:00 00:00:00) 4.9E+2 00:00:00 -

in rmsi25 (n 00:00:00 00:00:00) 5.4E+2 00:00:00 -

+00:00:02 mrf rmsOO9 (n 00:00:00 00:00:00) 9.1 E-2 00:04:30 -

mrt rmsOO7 (n 00:00:00 00:00:00) 7.4E-2 00:04:30 -

mrf rmsl22 (n 00:00:00 00:00:00) 6.2E+3 00:04:30 -

mrf rmsi23 (n 00:00:00 00:00:00) 5.7E+3 00:04:30 -

mrf rmsi24 (n 00:00:00 00:00:00) 5.5E+3 00:04:30 -

mrf rmsl25 (n 00:00:00 00:00:00) 5.6E+3 00:04:30 -

+00:04:32 mrt rmsOO9 (n 00:00:00 00:00:00) 6.6E-3 00:10:00 -

mrt rmsOO7 (n 00:00:00 00:00:00) 5.4E-3 00:10:00 -

mrt rmsl22 (n 00:00:00 00:00:00) 2.2E+2 00:10:00 -

mrt rmsl23 (n 00:00:00 00:00:00) 2.7E+2 00:10:00 -

mrt rmsi24 (n 00:00:00 00:00:00) 2.5E+2 00:10:00 -

mrt rmsi25 (n 00:00:00 00:00:00) 2.6E+2 00:10:00

  • Freeze and Snap to an IC for future use 2012 NRC Exam CR JPM h Rev. FINAL

Appendix C Page 5 of 15 Form ES-C-i PFQRMANC INDAMATION

1. After each reset turn on the flow to rad monitor 3502B.
2. Prior to starting each JPM place the Simulator in run and activate the APP file. Let the file run for 25 seconds so radiation conditions spike upwards on REM-01-3502A (CNMT RCS Leak Det) REM-Ol LT-3502B (CNMT Pre-Entry Simulator Operator: Purge Monitor) REM-1CR-3561A, B, C, D (CNMT Isolation Sys. Rad. Monitors).

Silence annunciators and GO TO FREEZE When directed by the Lead Examiner go to Run.

STARTTIME:

Over the next 4 minutes and 30 seconds these rad monitors will continue to increase. This will provide time for the candidate to perform the actions of AOP-013.

Evaluator and Simulator Operator: The rad monitors will then peak and during the next 10 minutes slowly start to trend back down. All of the rad monitors will level out at a value higher than what they started at.

Performance Step: 1 Implements AOP-0i3, Fuel Handling Accident as required.

Standard: Announces entry into AOP-013. Reads purpose and enters at Section 3.0 Evaluator Cue: Acknowledge communications as necessary.

Comment:

V - Denotes Critical Steps 2012 NRC Exam CR JPM h Rev. FINAL

Appendix C Page 6 of 15 Form ES-C-i V -

V FOMATC 1NFOMATION Section 3.0 note prior to Step 1 Performance Step: 2 NOTE: This procedure contains no immediate actions. An accident involving only new fuel will not produce a significant radiation hazard.

Standard: Reads and initials note Comment:

Section 30 Step 1 Performance Step: 3 CHECK for one of the following, to determine if a spent fuel assembly is involved in the accident:

  • A spent fuel assembly has been dropped
  • The Spent Fuel Cask has been dropped
  • A spent fuel assembly has collided with another object
  • Any other fuel handling occurrence suspected of causing damage to a spent fuel assembly Standard: Identifies that a report has been made of a spent fuel assembly being dropped.

Comment:

Section 3.0 Step 2 Performance Step: 4 CHECK that the fuel handling accident occurred in CNMT.

Standard: Identifies that a fuel handling accident has occurred in Containment by the report and the Alarming Containment Area Radiation monitors.

Comment:

Section 3.0 Step 3 Performance Step: 5 GO TO Section 3.2, Fuel Handling Accident in Containment.

Standard: Transitions to Section 3.2, Fuel Handling Accident in Containment Comment:

V - Denotes Critical Steps 2012 NRC Exam CR JPM h Rev. FINAL

Appendix C Page 7 of 15 Form ES-C-i PERFORMANCE INFORMATION Section 3.2, Step 1 Performance Step: 6 (Continuous Action step) CHECK that ALL CNMT area radiation monitor ALERT AND HIGH alarms are CLEARED. (NO)

Standard: Identifies that Containment area radiation monitors are currently in HIGH alarm Reads RNO GO TO STEP 3 Comment:

The candidate may determine that the Containment Pre Entry purge did not secure as expected and secure the Evaluator NOTE: lineup without a procedure lAW OMM-OO1 guidance. They will verify the air handlers and damper lineup using AOP-013 later.

Step 3 J Performance Step: 7 PERFORM an evacuation of CNMT:

  • SOUND local evacuation alarm (use of either Local or Containment evacuation alarm acceptable).
  • MAKE the following announcement on the PA:

Attention plant personnel: A fuel handling accident has occurred in Containment. All personnel not specifically directed to remain must evacuate Containment and report to HP at the Containment exit.

  • SOUND local evacuation alarm (Containment evacuation alarm) AND REPEAT announcement.
  • DIRECT Health Physics to survey personnel leaving the CNMT.
  • DIRECT Security to verify all personnel are clear of the CNMT.

Standard: Sounds local evacuation alarm, makes required PA announcements to evacuate the Containment. Repeats alarm and PA announcement. Contacts HP and security.

Comment:

- Denotes Critical Steps 2012 NRC Exam CR JPM h Rev. FINAL

Appendix C Page 8 of 15 Form ES-C-i PERFORMANCE INFORMATION Simulator Operator: Perform communications with candidate when Health Physics and Security are contacted appropriately.

NOTE prior to step 4 Performance Step: 8 NOTE: A fuel handling accident or high area radiation levels may require initiation of the HNP Emergency Plan.

Standard: Reads and initials note Comment:

Step 4 (AOP-002, Step 6.b)

Performance Step: 9 REFER TO PEP-i 10, Emergency Classification and Protective Action Recommendations, AND ENTER the EAL Matrix.

Standard: Informs Shift Manager to refer to PEP-il 0 Comment:

Evaluator Cue: Acknowledge communications (as needed)

V Denotes Critical Steps

- 2012 NRC Exam CR JPM h Rev. FINAL

Appendix C Page 9 of 15 Form ES-C-i

. PERFORMANCE FNFOAMATION Step 5 Performance Step: 10 REFER TO the following as necessary, AND CHECK CNMT closure ESTABLISHED:

  • ERFIS Safeguards Terminal
  • OST-1 029, Containment Penetration Test Outside Isolation Valve Verification Monthly Interval Modes 1-6
  • OST-1 034, Containment Penetrations Weekly Interval During Core Alterations and Movement of Irradiated Fuel Inside Containment
  • OST-i091, Containment Closure Test Weekly Interval During Core Alterations and Movement of Irradiated Fuel Inside Containment Standard: Using ERFIS Safeguards Terminal identifies that Cnmt Pre-Entry Purge has NOT secured.

NOTE: May use OP-i 68 Section 7.2 to secure Containment Pre Entry Purge, or could secure without procedure lAW OMM-001 or uses AOP-Oi 3 now or at a later time.

Contacts WCC to perform OST-1029, 1034, and 1091 (ESTABLISH CNMT closure within 120 minutes of event onset.)

Comment:

Another Operator will work with the WCC to establish Evaluator Cue: containment closure lAW the OSTs.

Continue with AOP-013.

V - Denotes Critical Steps 2012 NRC Exam CR JPM h Rev. FINAL

Appendix C Page 10 of 15 Form ES-C-i FORMANC iNFOMATiON Caution and Note prior to Step 6 Performance Step: 11 CAUTION: Airborne radiation may be present and gas bubbles may be visible if a fuel assembly is ruptured. Personnel should remain clear until Health Physics has established access controls.

NOTE: Kr-85 is the primary radiological concern for fuel off-loaded more than 6 months ago. Kr-85 is a beta hazard and will NOT be detected by personal dosimetry or area radiation monitors.

Standard: Reads and initials note and caution Comment:

Step 6 Performance Step: 12 DIRECT Health Physics to perlorm the following:

a. EVALUATE any radiation monitor alarms using HPP-780, Radiation Monitoring Systems Operators Manual.
b. SURVEY CNMT.
c. ESTABLISH CNMT access controls.
d. DETERMINE temporary shielding requirements.

Standard: Contacts Health Physics and asks them to perform the evaluation, survey, establish controls and determination of temporary shielding requirements.

Comment:

Simulator Operator: Communicate as HP as required.

V - Denotes Critical Steps 2012 NRC Exam CR JPM h Rev. FINAL

Appendix C Page 11 of 15 Form ES-C-i

. PERFORMANCEff4FOlMATlON Step 7 Performance Step: 13 CHECK REM-O1LT-3502A SA, Cnmt RCS Leak Detection Monitor, HIGH alarm CLEARED.

Standard: Checks RM-i 1 and determines that REM-Ol LT-3502A SA, Cnmt RCS Leak Detection Monitor is in ALARM and performs actions of RNO.

Comment:

Step 7 RNO Performance Step: 14 VERIFY Normal Containment Purge ISOLATED:

VERIFY BOTH of the following fans STOPPED:

AH-82 A, Cnmt Normal Purge Supply AH-82 B, Cnmt Normal Purge Supply VERIFY ALL of the following dampers SHUT:

1CP-5 SA, Normal Purge Discharge 1CP-9 SA, Normal Purge Discharge 1CP-3 SB, Normal Purge Discharge 1CP-6 SB, Normal Purge Discharge Standard: Verifies Normal Containment Purge is isolated:

AH-82 A, Cnmt Normal Purge Supply (OFF)

AH-82 B, Cnmt Normal Purge Supply (OFF) 1 CP-5 SA, Normal Purge Discharge (SHUT) 1CP-9 SA, Normal Purge Discharge (SHUT) 1CP-3 SB, Normal Purge Discharge (SHUT) 1CP-6 SB, Normal Purge Discharge (SHUT)

Comment:

V Denotes Critical Steps

- 2012 NRC Exam CR JPM h Rev. FINAL

Appendix C Page 12 of 15 Form ES-C-i PERFORMANCE INFORMATION Step 8 Performance Step: 15 CHECK REM-Ol LT-3502B, Cnmt Pre-Entry Purge Monitor, HIGH alarm CLEARED.

Standard: Checks RM-1 1 and determines that REM-Ol LT-3502B, Cnmt Pre-Entry Purge Monitor, is still in HIGH ALARM Performs actions of RNO Comment:

Step 8 RNO q Performance Step: 16 VERIFY Containment Pre-Entry Purge ISOLATED:

a. VERIFY BOTH of the following fans STOPPED:
  • E-5A, Cnmt Pre-Entry Purge Exhaust
  • E-5B, Cnmt Pre-Entry Purge Exhaust Standard: Locates and verifies fans E-5A and E-5B are STOPPED STOPS E-5A (May report to CRS that fan did not stop as expected)

Comment:

Step 8 RNO continued Performance Step: 17 b. VERIFY ALL of the following dampers SHUT:

  • 1CP-4 SA, Pre-Entry Purge Isolation
  • 1CP-1O SA, Pre-Entry Purge Isolation (OPEN MUSTSHUT)
  • lop-i SB, Pre-Entry Purge Isolation
  • 1CP-7 SB, Pre-Entry Purge Isolation V Standard: Locates and verifies all dampers are SHUT except for 1CP-iO SA, Pre-Entry Purge Isolation which is OPEN. Takes MOB switch to SHUT, verifies green light ON and red light OFF.

(May report to CRS that 1 OP-i 0 needed to be repositioned.)

Comment:

V - Denotes Critical Steps 2012 NRC Exam CR JPM h Rev. FINAL

Appendix C Page 13 of 15 Form ES-C-i PERFORMANCE INFORMATION Evaluator Cue: Acknowledge any communications and after verification of Pre-Entry Purge Isolation: Evaluation on this JPM is complete. Announce I have the shift ENDOFJPM Direct Simulator Operator to place the Simulator in FREEZE.

STOP TIME:

Simulator Operator: When directed by the Lead Examiner place the Simulator in FREEZE.

V - Denotes Critical Steps 2012 NRC Exam CR JPM h Rev. FINAL

Appendix C Page 14 of 15 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2012 NRC Exam CR JPM h Fuel Handling Accident (AOP-01 3)

Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2012 NRC Exam CR JPM h Rev. FINAL

Appendix C Page 15 of 15 Form ES-C-i JPM CUE SHEET -

NOTE: We are simulating Mode 6 conditions. No equipment is in an off normal alignment. The unit is stable.

The unit has been taken off line and is shut down due to a fuel leak Current plant conditions are:

. Mode 6 and a core off-load in progress.

Initial Conditions:

  • Both A and B RHR pumps are in operation.
  • RCS temperature is -116°F
  • RCS temperature band is 110°F 120°F-
  • Cavity water level is 23 feet 10 inches
  • A and B CT Spray pumps, B and C CSIPs, B RMW pump, A and B MDAFW pumps and the TDAFW pump are all under clearance lAW GP instructions.

Work is being performed on the B RCP seal package The Refueling SRO has reported to the MCR that while the refuel crew was moving an assembly from the Reactor to the upender the assembly unlatched and has been dropped. The assembly has ruptured. One large bubble of gas and a lot of smaller gas Initiating Cue: bubbles have surfaced. The Refueling Bridge Crane rad monitor is in alarm as well as the local Containment area rad monitors on the refueling floor. The Refueling crew has all left the Refueling Bridge Crane. You are to take actions per AOP-01 3, Fuel Handling Accident.

2012 NRC Exam CR JPM h Rev. FINAL

Appendix C Page 1 of 10 Form ES-C-i Worksheef Facility: Shearon Harris Task No.: 061 003H104 Task

Title:

Shift AFW Pump Suction Locally JPM No.: 2012 NRC Exam In-Plant JPM i KJA

Reference:

061 K4.01 4.1 RO 4.2 SRO ALTERNATE PATH NO -

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinci:

Simulated Performance: X Actual Performance:

Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

A LOCA has occurred and EOP-EPP-009, Post-LOCA Cooldown and Depressurization, is being performed.

Initial Conditions:

AFW Pump A-SA (B-SB) is being used to maintain SG levels.

Makeup to the CST cannot be established and CST level is decreasing.

MCC 1A35-SA (1 B35-SB) is deenergized.

. CST level has decreased to 9%.

. The CRS has directed you to locally align ESW to A-SA (B-SB)

MD AFW pumps lAW OP-i 37 Section 8.1.

Initiating Cue: . The A (B) ESW header is in service.

  • Steps 8.1.2.1 .a f (or steps 8.1.2.2. a f) have been completed by the MCR.
  • You are to start at step 8.1.2.1 .g (8.1 .2.2.g) and continue This JPM was developed to use on EITHER the A or B AFW pump (one train maybe protected). ONLY one pump will be aligned to have ESW provided to the pump suction. Contact the MCR prior Evaluator Note: to the JPM, to determine which train is protected.

At this time provide the candidate with a copy of OP-i 37 Section 8.1 2012 NRC Exam In-Plant JPM i Rev. FINAL

Appendix C Page 2 of 10 Form ES-C-i Worksheet Task Standard: AFW Pump A-SA (B-SB) suction is aligned to ESW.

Required Materials: OP-137 Section 8.1 General

References:

OP-137 Section 8.1 Rev. 30 Time Critical Task: No Validation Time: 10 minutes Critical Task Justification Required to be repositioned to establish a flow path from the ESW Step header in order to maintain the AFW system a functional heatsink Required to be repositioned to establish a flow path from the ESW Step 4 header in order to maintain the AFW system a functional heatsink Required to be repositioned to establish a flow path from the ESW Step 7 header in order to maintain the AFW system a functional heatsink Required to be repositioned to establish a flow path from the ESW Step 8 header in order to maintain the AFW system a functional heatsink 2012 NRC Exam In-Plant JPM i Rev. FINAL

Appendix C Page 3 of 10 Form ES-C-i PERFORMANCE INFORMATION SAFETY CONSIDERATIONS: Do NOT operate actual plant equipment unless specifically authorized to do so. Follow standard ALARA practices in the RCA.

START TIME:

Performance Step: 1 OBTAIN PROCEDURE Standard: Obtains OP-i 37 Section 8.1 and reviews the initial conditions

1. Condensate storage tank unavailable or level < 10%
2. Service Water System in operation per OP-i 39 (Initial conditions were met with the initiating cues)

Comment:

A MDAFW Pump OP-137 Section 8.1 Step 1.g Performance Step: 2 SHUT 1SW1 22, AFWP 1A SW Drain Isol.

Standard: Locates 1SW-i 22, and demonstrates shutting valve.

1SW-i 22 handwheel has rotated in the clockwise direction Evaluator Cue:

and the valve stem has come to a hard stop.

Comment:

V - Denotes Critical Steps 2012 NRC Exam In-Plant JPM i Rev. FINAL

Appendix C Page 4 of 10 Form ES-C-i PERFORMANCE INFORMATION To engage the handwheels for the Service Water MOVs, the operator must turn the small handle (UNDER the body of 1SW-12i and on the side of 1SW-123). The valve handwheel Evaluator Note: will NOT be engaged and the valve will NOT open unless the small handle is turned to engage. Valve position indication is located on the top of the valve next to the wall. The operator should check this indication to ensure the valve has OPENED.

OP-i 37 Section 8.1 Step 1.h v Performance Step: 3 OPEN 1SW121SA, SW HEADER A TO AUX AN MOTOR PMP A-SA.

Standard: Locates 1SW-12i, engages handwheel, and opens valve.

(NOTE: You can cue them by the position arrow IF they are checking the position with the arrow.)

CUE:(lf handwheel is properly engaged) 1SW-121 handwheel has rotated in the counter clockwise direction and has come to a hard stop.

Evaluator Cue: If the device to engage the handwheel is NOT turned then CUE: 1SW-121 handwheel has rotated in the counter clockwise direction and the handwheel spins freely.

(provide the cue for when the handwheel is properly engaged when the candidate engages the handwheel first)

Comment:

V Denotes Critical Steps

- 2012 NRC Exam In-Plant JPM i Rev. FINAL

Appendix C Page 5 of 10 Form ES-C-i PERFORMANCE INFORMATION OP-137 Section 8.1 Step 1.i V Performance Step: 4 OPEN 1SW123SA, SW HEADER A TO AUX FW MOTOR PMP A-SA.

Standard: Locates 1SW-123, engages handwheel, and opens valve.

(NOTE: You can cue them by the position arrow IF they are checking the position with the arrow.)

CUE:(If handwheel is properly engaged) 1SW-i 23 handwheel has rotated in the counter clockwise direction and has come to a hard stop.

Evaluator Cue: If the device to engage the handwheel is NOT turned then CUE: 1SW-123 handwheel has rotated in the counter clockwise direction and the handwheel spins freely.

(provide the cue for when the handwheel is properly engaged when the candidate engages the handwheel first)

Comment:

OP-137 Section 8.1 Step 1.j Performance Step: 5 MONITOR AFW system parameters to ensure proper operation.

Standard: Contacts MCR and informs them that OP-i 37 Section 8.1 Steps 1 .g i are complete and to monitor the AFW system parameters to ensure proper operation.

Control Room acknowledges that ESW is aligned to A MDAFW Pump.

Evaluator Cue: Evaluation on this JPM is complete.

ENDOFJPM Comment:

STOP TIME:

V - Denotes Critical Steps 2012 NRC Exam In-Plant JPM i Rev. FINAL

Appendix C Page 6 of 10 Form ES-C-i PERFORMANCE INFORMATION B MDAFW Pump OP-i 37 Section 8.1 Step 2.g Performance Step: 6 SHUT 1 Sw-i 31, AAiVP i B sw Drain Isol.

Standard: Locates 1 SW-i 31, and demonstrates shutting valve.

1SW-131 handwheel has rotated in the clockwise direction Evaluator Cue:

and the valve stem has come to a hard stop.

Comment:

To engage the handwheels for the Service water MOVs the operator must turn the small handle (UNDER the body of 1 Sw-i 30 and on the side of 1 SW-i 32). The valve handwheel Examiners Note: will NOT be engaged and the valve will NOT open unless the small handle is turned to engage. Valve position indication is located on the top of the valve next to the wall. The operator should check this indication to ensure the valve has OPENED.

V - Denotes Critical Steps 2012 NRC Exam In-Plant JPM i Rev. FINAL

)

Appendix C Page 7 of 10 Form ES-C-i PERFORMANCE INFORMATION OP-i 37 Section 8.1 Step 2.h Performance Step: 7 OPEN 1SW13OSB, SW HEADER B TO AUX AN MOTOR PMP B-SB.

v Standard: Locates 1SW-130, engages handwheel, and opens valve.

(NOTE: You can cue them by the position arrow IF they are checking the position with the arrow.)

CUE:(If handwheel is properly engaged) 1SW-130 handwheel has rotated in the counter clockwise direction and has come to a hard stop.

Evaluator Cue: If the device to engage the handwheel is NOT turned then CUE: 1SW-130 handwheel has rotated in the counter clockwise direction and the handwheel spins freely.

(provide the cue for when the handwheel is properly engaged when the candidate engages the handwheel first)

Comment:

V Denotes Critical Steps

- 2012 NRC Exam In-Plant JPM i Rev. FINAL

Appendix C Page 8 of 10 Form ES-C-i PERFORMANCE INFORMATION OP-i 37 Section 8.1 Step 2.i Performance Step: 8 OPEN 1 sw-i 32SB, SW HEADER B TO AUX AN MOTOR PMP B-SB.

V Standard: Locates 1 SW-i 32, engages handwheel, and opens valve.

(NOTE: You can cue them by the position arrow IF they are checking the position with the arrow.)

CUE:(If handwheel is properly engaged) 1SW-i 32 handwheel has rotated in the counter clockwise direction and has come to a hard stop.

Evaluator Cue: It the device to engage the handwheel is NOT turned then CUE: 1SW-132 handwheel has rotated in the counter clockwise direction and the handwheel spins freely.

(provide the cue for when the handwheel is properly engaged when the candidate engages the handwheel first)

Comment:

OP-i 37 Section 8.1 Step 2.j Performance Step: 9 MONITOR AFW system parameters to ensure proper operation.

Standard: Notifies Control Room ESW is aligned to both MDAFW Pumps 1A-SA and 1 B-SB and to monitor for proper operation.

Control Room acknowledges that ESW is aligned to AFW Pump lB-SB.

Evaluator Cue:

Evaluation on this JPM is complete.

END OF JPM Comment:

STOP TIME:

V - Denotes Critical Steps 2012 NRC Exam In-Plant JPM i Rev. FINAL

Appendix C Page 9 of 10 Form ES-C-i

. VERIRCATION OF COMPLETION Job Performance Measure No.: 2012 NRC Exam In-Plant JPM i Shift AFW Pump Suction Locally lAW OP-137 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2012 NRC Exam In-Plant JPM i Rev. FINAL

Appendix C Page 10 of 10 Form ES-C-i

- JPMCUESHEET SAFETY CONSIDERATIONS: Do NOT operate actual plant equipment unless specifically authorized to do so. Follow standard ALARA practices in the RCA.

A LOCA has occurred and EOP-EPP-009, Post-LOCA Cooldown and Depressurization, is being performed.

AFW Pump A-SA (B-SB) is being used to maintain SG levels.

Initial Conditions:

Makeup to the CST cannot be established and CST level is decreasing.

MCC 1A35-SA (1 B35-SB) is de-energized.

  • CST level has decreased to 9%.
  • The MCR has directed you to locally align ESW to A-SA (B-SB) MD AFW pumps lAW OP-137 Section 8.1.

Initiating Cue:

  • Steps 8.1.2.1 .a f (or steps 8.1.2.2. a f) have been completed by the MCR.
  • You are to start at step 8.1 .2.1 .g (8.1 .2.2.g) and continue 2012 NRC Exam In-Plant JPM i Rev. FINAL

Appendix C Job Performance Measure Form ES-C-i Worksheet Facility: Shearon Harris Task No.: 3441 59H404 Task

Title:

Locally Reset Safeguards Signal at JPM No.: 2012 NRC Exam SSPS InPlant JPM i K/A

Reference:

012.A2.05 3.1 RO 3.2 SRO Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: X Actual Performance:

Classroom Simulator Plant X This JPM is written to support performance on either train.

  • Coordinate with the MCR to determine if either train is protected, xaminers ote.

and if a preferred train exists. Then designate the desired train in the blank on the Operators Direction Sheet. (Initiating Cues)

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

A SB LOCA has occurred resulting in a Reactor Trip and Safety Injection. Both Reactor Trip Breakers are verified open and both trains Initial Conditions:

of Safety Injection operated as designed. The MCR is implementing Step 30 of EOP-PATH-i. One train of SSPS Train failed to reset.

The MCR has directed you to reset SSPS Train A (B) lAW Initiating Cue:

EOP-PATH-i GUIDE, Attachment 12 To minimize control room distraction the Evaluator should have a SSPS key checked out for this JPM (see next page). Contact the MCR and determine which Train to perform and insert the Evaluator Directions:

selected Train in the appropriate spaces provided in the JPM.

Detach the candidate sheet and allow the operator to review it, and answer questions if required.

2012 NRC Exam JPM j Rev. FINAL

Appendix C Job Performance Measure Form ES-C-i Worksheet Task Standard: All actions complete for selected Train as directed by Attachment 12.

Required Materials: One of the SSPS cabinet keys (40, 41, 94, 95, 96, OR 97)

General

References:

PATH-i Guide Attachment 12, Rev. 33 Time Critical Task: No Validation Time: 10 minutes (not including time for logging out key)

Examiners Note: SSPS Cabinet Key CH 751 labeled as key numbers 40, 41, 95, 96 or 97. Anyone of these keys can be checked out and is required to open the SSPS cabinets.

Prior to exam administration, a key will be checked out by someone from the Exam Development team and given to the NRC Lead Examiner. The key will be checked back in at the end of the day by the person that originally checked the key out.

Details of how to obtain a key will be left to the Examiner. One method to obtain a key and return it after use is listed below:

  • Obtain Safety Key Locker key from the CRSs desk
  • Identify which key is required based on the list in key locker area
  • Unlock the Safety Key Locker door and obtain proper key (in this case key CH 751 NOTE: there are more than one CH 751 keys, key #40 is one of them) then re-lock the key locker door
  • Sign key out
  • Return the Safety Key Locker key to the CRSs desk
  • At conclusion of task the key to the Safety Key Locker should again be obtained from the CRSs desk
  • Unlock the Safety Key Locker and return key (CH 751) to its Safety Key Locker location and re-lock the locker door
  • The key should be signed back in
  • The Safety Key Locker CRS key should be returned to the desk By geffing a key ahead of time and just asking the candidates how to obtain a key will alleviate the need to check out and check in the key each time the JPM is administered to the candidates for this JPM. This will reduce the overall time required to perform this JPM.

2012 NRC Exam JPM j Rev. FINAL

Appendix C Job Performance Measure Form ES-C-i Worksheet CRITICAL STEP JUSTIFICATION Removes power from the associated train logic cabinet within SSPS Step 3 preventing Output signal from being generated. If not performed SI signal will continue to be generated.

Allows for the output relays to reposition to the non-actuated position Step 4 following removal of the Output signal for the Logic cabinet, If not performed SI signal would not reset.

Required to prevent the associated equipment from receiving an SI Step 5 actuation once power is restored following local opening of the Rx Trip Breakers 2012 NRC Exam JPM j Rev. FINAL

Appendix C Page 4 of 16 Form ES-C-i PERFORMANCE INFORMATION (TRAIN A)

The candidates copy of PATH-i Attachment 1 2 is attached after the candidate cue sheet.

Note: The candidate will need to check out key (CH 751) to open the SSPS cabinet. Allow the candidate to either start to Evaluator Cue obtain a cabinet door key OR go to the cabinets then realize the need for a key when the cabinets are attempted to be opened.

When the need for a key is determined ask the candidate how to obtain the proper key and note the response. (See details on previous page for obtaining a cabinet door key). Then provide the candidate with the cabinet key.

Performance Step: 1 Obtain key to open SSPS cabinet (this may not happen until the candidate gets to the cabinet and determines a key is required)

Standard: Discuss how to obtain key see previous page write up.

Obtains key from CRSs desk to unlock Safety Key locker and checks out key #40 (CH 751). Proceeds to Protection System Train A (B) Logic Cabinet and opens the cabinet door.

Comment:

PlC CAB5 PlC CAB1 PlC CAB 7 PlC CAB PlC CAB 11 PIG CAB6 PlC CAB2 PlC CABIS PlC CAB 8 PlC CAB 4 PlC CAB 12 I

PlC CAB 10 SB I PlC CAB 14 SBI PlC CABI5 I PlC CAB13 1

SA PlC CAB9 ISOLCAB 131 ISOLCAB2B1 ISOLCAS3 ISOLCABIAI SOLCAE2AI 181 182 1 281 2B2 3A1 3A2 1A1 1A2 I 2A1 2A2 ANN. CAB-i - ANN. CAB- 2 1 NSB SA I NSB[NSB.[NSB NSAj BAYIBAYIBAYI BAY BAY BAY BAY BAY NAINSIN1IA NIAI I I- -

I-I I SB SB SB SB SB SA I 2 I 1 2 I SA I SA I BA SA TRAIN B AIJX RELAY RACKS TRAINA INPUT LOGIC oIsnu11ouw154 TEST TEST AR-3 AR-2 INPUT LOGIC OUTPIJ]IOUTPUTI TEST TEST I #2 #2 IE #1 I I #1 SOLID STATE PROTECTION SYSTEM RACKS Display PlC ROOM LAYOUTI .PD1, 211912009 09:47

- Denotes Critical Steps 2012 NRC Exam JPM j Rev. FINAL

Appendix C - Page 5 of 16 Form ES-C-i PERFORMANCE INFORMATION (TRAIN A)

SAFETY CONSIDERATIONS: Do Not operate actual plant equipment unless specifically authorized to do so. Follow standard ALARA practices in the RCA.

NOTE: Beginning of actions for Train A Start time should begin when candidate has opened the Evaluator Note:

SSPS cabinet and is ready to place the Train in Test.

START TIME:

PATH-i GUIDE Attachment 12, NOTE Prior to Step 1 Performance Step: 2

  • Steps 1, 2 AND 3 reset output signals from A Train SSPS. Step 4, 5 AND 6 reset output signals from B Train SSPS.
  • IF SI will NOT reset due to failure of the associated reactor trip breaker to OPEN, THEN attempts to manually or locally OPEN the breaker should be completed before performing this attachment.
  • SI is considered RESET if Bypass Permissive Panel light 4-1 SI ACTUATED is extinguished.

Standard: Reads and initials note Identifies that steps 1-3 will be performed and steps 4-6 apply to Train B (do not apply).

Comment:

- Denotes Critical Steps 2012 NRC Exam JPM j Rev. FINAL

Appendix C Page 6 of 16 - Form ES-C-i PERFORMANCE INFORMATION (TRAIN A)

PATH-i GUIDE Attachment 12, Step 1 v Performance Step: 3 At Protection System Train A, Logic Cabinet, Place The Following Breakers In OFF:

  • Tripped O.V.P Breaker 48V (top power supply)

. Tripped O.V.P Breaker 48V (bottom power supply)

Standard: Unlocks door and opens Protection System Train A, Logic Cabinet, locates switch and places Tripped O.VP Breaker 48V (top power supply) breaker to down (OFF) position Locates switch and places Tripped O.V.P Breaker 48V (bottom power supply) breaker to down (OFF) position CUE: Tripped O.V.P. Breaker 48V (top power supply) switch is in the down (OFF) position Evaluator:

Tripped O.V.P. Breaker 48V (bottom power supply) switch is in the down (OFF) position Comment:

If the candidate states that the cabinet door 48 volt power supply green lights de-energize and the red General Warning light has energized (when the first power supply Evaluator Note: breaker is turned OFF) then:

CUE: The green light 48 Volt power supply light is off and the red General Warning light is lit.

- Denotes Critical Steps 2012 NRC Exam JPM j Rev. FINAL

Appendix C Page 7 of 16 Form ES-C-i PERFORMANCE INFORMATION (TRAIN A)

PATH-i GUIDE Attachment 12, Step 2 v Performance Step: 4 At Protection System Safeguards Test Train A, Cabinet No.1, Momentarily Position Switch S821 To RESET.

Standard: Unlocks door with key and locates switch S82i and momentarily positions the switch to the RESET position (to the right)

CUE: Switch S821 has been taken to RESET and spring E va uator.

returns to NORMAL.

Comment:

PATH-i GUIDE Attachment 12, Step 3 Performance Step: 5 At the Protection System Train A, Output Cabinet No. 1, Place the Mode Selector Switch To TEST.

Standard: Unlocks door with key and locates Protection System Train A, Output Cabinet No. 1, and places the Mode Selector Switch To TEST (to counter clockwise direction)

Evaluator: CUE: Mode selector switch has been taken to TEST Comment:

V Denotes Critical Steps

- 2012 NRC Exam JPM j Rev. FINAL

Appendix C Page 8 of 16 Form ES-C-i PERFORMANCE INFORMATION (TRAIN A)

Performance Step: 6 Contact MCR Standard: Contacts MCR and reports that Attachment 12 (Safeguards has been reset at SSPS) for A Train of SSPS is complete CUE: CRS acknowledges that Train A Safeguards has Evaluator: been reset at SSPS.

JPM is complete (For A Train)

PRIOR to leaving the area, ensure that the candidate relocks Evaluator Note: all 3 cabinet doors AND then returns the key back to the Examiner.

STOP TIME:

- Denotes Critical Steps 2012 NRC Exam JPM j Rev. FINAL

Appendix C Page 9 of 16 Form ES-C-i PERFORMANCE INFORMATION (TRAIN B)

The candidates copy of PATH-i Attachment 12 is attached after the candidate cue sheet.

Note: The candidate will need to check out key (CH 751) to open the SSPS cabinet. Allow the candidate to either start to Evaluator Cue obtain a cabinet door key OR go to the cabinets then realize the need for a key when the cabinets are attempted to be opened.

When the need for a key is determined ask the candidate how to obtain the proper key and note the response. (See details on previous page for obtaining a cabinet door key). Then provide the candidate with the cabinet key.

Performance Step: 1 Obtain key to open SSPS cabinet (this may not happen until the candidate gets to the cabinet and determines a key is required)

Standard: Discuss how to obtain key see previous page write up.

Obtains key from CRSs desk to unlock Safety Key locker and checks out key #40 (CH 751). Proceeds to Protection System Train A (B) Logic Cabinet and opens the cabinet door.

Comment:

PIG DAB5 PIG CAB1 PlC CAB 7 PlC CAB 3 PIG CAB 11 PlC CABS PIG CAB2 PIG CAB 16 PlC CABS PIG CAB 4 PIG CAB 12 PlC CABID PlC CABI4 PlC CAB 15 PlC CAB 13 PIG CAB9 SB SB 1 SA 1 SA SOLCAB1SI [SOLCAB2BI ISOLA3 soLCA81AI sOLCA2AI 181 1B2 281 282 3A1 3A2 I IAI 1A2 2A1 2A2 ANN CAB-I ANN CAB -2 I NSBNSBjNS8jNSB SA NSA_j INSAI 1NsAINSA NSA r SB SB SB SB SB SA yyIyI 11213 lacy IBAY I 12 I8M314 IBAY IBAY 5 IsAlsAlsA H SA TRAIN B AOX RELAY RACKS TRAINA NPUT LOGC OUWUIIOUTPtJ1j TEST TEST AR-3 AR-2 AR-I INPUT LOGIC OIJTFU1jOUTPUT TEST TEST I I #2 [R # #2 SOLIO STATE PROTECTION SYSTEM RACKS Display PIG ROOM LAYOUTI P01,2/19120090947

- Denotes Critical Steps 2012 NRC Exam JPM j Rev. FINAL

Appendix C Page 10 of 16 - Form ES-C-i PERFORMANCE INFORMATION (TRAIN B)

SAFETY CONSIDERATIONS: Do Not operate actual plant equipment unless specifically authorized to do so. Follow standard ALARA practices in the RCA.

NOTE: Beginning of actions for Train B

  • Start time should begin when candidate has opened the Evaluator Note.

SSPS cabinet and is ready to place the Train in Test.

START TIME:

PATH-i GUIDE Attachment 12, NOTE Prior to Step 1 Performance Step: 2

  • Steps 1, 2 AND 3 reset output signals from A Train SSPS. Step 4, 5 AND 6 reset output signals from B Train SSPS.
  • IF SI will NOT reset due to failure of the associated reactor trip breaker to OPEN, THEN attempts to manually or locally OPEN the breaker should be completed before performing this attachment.
  • SI is considered RESET if Bypass Permissive Panel light 4-1 SI ACTUATED is extinguished.

Standard: Reads and initials note Identities that steps 4-6 will be performed and steps 1-3 apply to Train A (do not apply).

Comment:

v - Denotes Critical Steps 2012 NRC Exam JPM j Rev. FINAL

Appendix C Page 11 of 16 Form ES-C-i PERFORMANCE INFORMATION (TRAIN B)

PATH-i GUIDE Attachment 12, Step 4 Performance Step: 3 At Protection System Train B, Logic Cabinet, Place The Following Breakers In OFF:

. Tripped O.V.P Breaker 48V (top power supply)

. Tripped O.V.P Breaker 48V (bottom power supply)

Standard: Unlocks door and opens Protection System Train B, Logic Cabinet, locates switch and places Tripped O.V.P Breaker 48V (top power supply) breaker to down (OFF) position Locates switch and places Tripped O.V.P Breaker 48V (bottom power supply) breaker to down (OFF) position CUE: Tripped O.V.P. Breaker 48V (top power supply) switch is in the down (OFF) position Evaluator: .

Tripped O.V.P. Breaker 48V (bottom power supply) switch is in the down (OFF) position Comment:

If the candidate states that the cabinet door 48 volt power supply green lights de-energize and the red General Warning light has energized (when the first power supply Evaluator Note: breaker is turned OFF) then:

CUE: The green light 48 Volt power supply light is off and the red General Warning light is lit.

- Denotes Critical Steps 2012 NRC Exam JPM j Rev. FINAL

Appendix C - Page 12 of 16 Form ES-C-i PERFORMANCE INFORMATION (TRAIN B)

PATH-i GUIDE Attachment 12, Step 5 V Performance Step: 4 At Protection System Safeguards Test Train B, Cabinet No. 1, Momentarily Position Switch S821 To RESET.

Standard: Unlocks door with key and locates switch S82i and momentarily positions the switch to the RESET position (to the right)

CUE: Switch S821 has been taken to RESET and spring Evaluator:

returns to NORMAL.

Comment:

PATH-i GUIDE Attachment 12, Step 6 V Performance Step: 5 At the Protection System Train B, Output Cabinet No. 1, Place the Mode Selector Switch To TEST.

Standard: Unlocks door with key and locates Protection System Train B, Output Cabinet No. 1, and places the Mode Selector Switch To TEST (to counter clockwise direction)

Evaluator: CUE: Mode selector switch has been taken to TEST Comment:

v - Denotes Critical Steps 2012 NRC Exam JPM j Rev. FINAL

Appendix C Page 13 of 16 Form ES-C1 PERFORMANCE INFORMATION (TRAIN B)

Performance Step: 6 Contact MCR Standard: Contacts MCR and reports that Attachment 12 (Safeguards has been reset at SSPS) for B Train of SSPS is complete CUE: CRS acknowledges that Train B Safeguards has Evaluator: been reset at SSPS.

JPM is complete (For B Train)

PRIOR to leaving the area, ensure that the candidate relocks Evaluator Note: all 3 cabinet doors AND then returns the key back to the Examiner.

STOP TIME:

- Denotes Critical Steps 2012 NRC Exam JPM j Rev. FINAL

Appendix C Page 14 of 16 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2012 NRC InDlant JPM i Locally Reset Safeguards Signal at SSPS -Train A or B PATH-i GUIDE, Attachment 12 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2012 NRC Exam JPM j Rev. FINAL

Appendix C Page 15 of 16 Form ES-C-i JPMCUESHEET SAFETY CONSIDERATIONS: Do Not operate actual plant equipment unless specifically authorized to do so. Follow standard ALARA practices in the RCA.

. A SB LOCA has occurred resulting in a Reactor Trip and Safety Injection.

Initial Conditions:

  • Both Reactor Trip Breakers are verified open and both trains of Safety Injection operated as designed.
  • The MCR is implementing Step 30 of EOP-PATH-i. One train of SSPS Train failed to reset.

The MCR has directed you to reset SSPS Train A (B) lAW Initiating Cue

. EOP-PATH-i GUIDE, Attachment 12 (see next page) 2012 NRC Exam JPMj Rev. FINAL

Appendix C Page 16 of 16 Form ES-C-i JPMCUESHEET Attaliment 12 Sheet I of I Resettin Safequards Signais At SSPS NOTE

  • Stepsl,2 AND 3 reset output signals from W Train SSPS, Step 4,5 AND 6 reset output signals from Train SSPS
  • S will jQ] reset due 1* failure of the associated reactor trip breaker to OPEN, ThEN attampts to manually or locally OPEN the breaker should be completed before peddmiing tNs altachrneni
  • St ls considered RESET it Bypass Pernilosive Panel ligId 4-I St ACTUATED is extinguished.

I., At Protection System Train A, Logic Cabinet, Place The Following Breakers In OFF

  • Thpped OV.P Breaker 48V (top power supply)
  • Tripped OVP Breaker 4V (bettorn power supply)
2. At Protection System Safeguards Test Train A, Cabinet No 1, Momentarily Poswtlon Swftth 5821 To RESET I At the Protection System Train A, Output Cabinet No.1, Place the Mode Selector Swttdi To TEST.
4. At Protection System Train B, Logic Cabinet, Place The Following Breakers In OFF:
  • Tripped OMP Breaker 48V (top power supply)

- Tripped OVP Breaker 48V (bottom power supply) 5.. At Protection System Safeguards Test Train B, Cabinet No.. 1, Mornentanly Position Switch 5821 To RESET.

8 Al the Protection System Train B, Output Cabinet No.. 1, Place the Mode Selector Swrfttl ThTESt

-END EOP-GUDE-1 I Rev. 33 I Page 96 of 97 2012 NRC Exam JPMj Rev. FINAL

Appendix C Page 1 of 12 Form ES-C-i Worksheet Facility: Shearon Harris Task No.: 01 201 OH1O1 Task

Title:

Place Failed Pressurizer Pressure JPM No.: 2012 NRC Exam Channel 455 In TEST In-Plant JPM k K/A

Reference:

APE 027 AA2.16 RO 3.6 SRO 3.9 ALTERNATE PATH NO -

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: X Actual Performance:

Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

The plant was operating at 100% power when Pressurizer Pressure Initial Conditions Channel 455 failed low.

. You are directed to perform OWP-RP-02 for troubleshooting and

.. . tripping bistables for PT-455 to meet Technical Specifications.

Initiating Cue: . .

. The CRS directs that the applicable Master Test Switches are to be placed_in test for_troubleshooting.

2012 NRC Exam In-Plant JPM k Rev. FINAL

Appendix C Page 2 of 12 Form ES-C-i Worksheet - -

Task Standard: Place the PlC Cabinet Master Test switches and bistables in the Test position.

Required Materials: OWP-RP-02 Rev.15 (pp.12-18)

General

References:

OWP-RP-02, Reactor Protection Rev. 15 Time Critical Task: No Validation Time: 20 minutes Critical Task Justification Master Test Switch is required to be placed in test per CRS direction for Ste p 4 troubleshooting in the Initiating Cue.

Steps 5-1 1 Tripping card bistables is required to meet Tech Specs.

2012 NRC Exam In-Plant JPM k Rev. FINAL

Appendix C Page 3 of 12 Form ES-C-i PERFORMANCE INFORMATiON START TIME:

Performance Step: 1 OBTAIN PROCEDURE Standard: Obtains OWP-RP-02 and refers to Section for Pressurizer Pressure Provide operator with a copy of the procedure after Evaluator Cue

. demonstration of ability to obtain copy.

Comment:

OWP-RP-02 Performance Step: 2 PRECAUTION:

1) To prevent a Reactor Trip insure only one channel is taken out of service at a time, by verifying corresponding Trip Status Lights for the other channels are de-energized
2) With more than one channel out of service, verify P-i 1 is in its required state for existing plant conditions by observation of the associated permissive annunciators window.

Candidate may attempt to verify MCB TSLB Status to insure only one channel will be out of service at a time.

Evaluator Note:

If asked (or going to MCR to check) about more than one channel being out (by MCR Trip Status Light Boxes):

Evaluator Cue: No other Pressurizer Pressure Channels are out of service.

Standard: Reviews precautions Comment:

V - Denotes Critical Steps 2012 NRC Exam In-Plant JPM k Rev. FINAL

Appendix C Page 4 of 12 Form ES-C-i PERFORMANCE lr1FORMAT1Or\T -

OWP-RP-02, Pressurizer Press Channel I (P1-455)

Performance Step: 3 NOTE:

Master Test Switches may be positioned to TEST for troubleshooting. They are not required to be in TEST to meet Tech Specs. Operating these switches before operating the bistable switches aids in troubleshooting by maintaining system conditions the same as they were when the trouble occurred.

Concurrent verification is preferred while tripping bistables.

Standard: Reviews and annotates note (should request concurrent verification during this JPM)

For this JPM only, assume that concurrent verification is Evaluator Cue: being performed and that verifier agrees with all actions taken.

Comment:

OWP-RP-02, Pressurizer Press Channel I (P1-455)

V Performance Step: 4 In PlC 17 on Card Cl 7-836: 5W5 (PS/455H Master Test Switch for PS/455F) in TEST Standard: Locates Card Cl 7-836 and places SW5 in TEST position Evaluator Cue: SW5 IS IN TEST POSITION.

Comment:

V - Denotes Critical Steps 2012 NRC Exam In-Plant JPM k Rev. FINAL

Appendix C Page 5 of 12 Form ES-C-i PERFORMANCE INFORMATION -

OWP-RP-02, Pressurizer Press Channel I (P1-455)

V Performance Step: 5 In PlC 17 on Card Cl 7-844: BS1 (PS/455F1) Master Test Switch for PS/455 in TEST Standard: Locates Card Cl 7-844 and places BS1 in TEST position Evaluator Cue: BS1 IS IN TEST POSITION. LED is lit.

Comment:

OWP-RP-02, Pressurizer Press Channel I (P1-455)

V Performance Step: 6 In PlC 1 on Card Cl -844: BS1 (PS/455D PRZ Low Press SI) in TEST Standard: Locates Card Cl -844 and places BS1 in TEST position Evaluator Cue: BS1 IS IN TEST POSITION. LED is lit.

Corn ment:

OWP-RP-02, Pressurizer Press Channel I (P1-455)

V Performance Step: 7 In PlC 1 on Card Ci -844: BS2 (PS/455B PRZ Press lntlk P-il) in TEST Standard: Locates Card Ci -844 and places BS2 in TEST position Evaluator Cue: BS2 IS IN TEST POSITION. LED is lit.

Comment:

V - Denotes Critical Steps 2012 NRC Exam In-Plant JPM k Rev. FINAL

Appendix C Page 6 of 12 Form ES-C-i PERFORMANCE [NFORMATION OWP-RP-02, Pressurizer Press Channel I (P1-455)

V Performance Step: 8 In PlC 1 on Card Cl -844: BS3 (PS/455A PRZ High Press RX Trip) in TEST Standard: Locates Card Cl -844 and places BS3 in TEST position Evaluator Cue: BS3 IS IN TEST POSITION. LED is lit.

Comment:

OWP-RP-02, Pressurizer Press Channel I (P1-455)

V Performance Step: 9 In PlC 1 on Card Cl -844: BS4 (PS/455C PRZ Low Press RX Trip) in TEST Standard: Locates Card Cl -844 and places BS4 in TEST position Evaluator Cue: BS4 IS IN TEST POSITION. LED is lit.

Comment:

OWP-RP-02, Pressurizer Press Channel I (P1-455)

V Performance Step: 10 In PlC 1 on Card Cl -822: BS3 (TB/412Ci OTDT Rx Trip) in TEST Standard: Locates Card Cl -822 and places BS3 in TEST position Evaluator Cue: BS3 IS IN TEST POSITION. LED is lit.

Comment:

V - Denotes Critical Steps 2012 NRC Exam In-Plant JPM k Rev. FINAL

Appendix C Page 7 of 12 Form ES-C-i PERFORMA1CE INFORMATiON OWP-RP-02, Pressurizer Press Channel I (P1-455)

V Performance Step: i In PlC 1 on Card Ci -822: BS4 (TB/412C2 OTDT C-3) in TEST Standard: Locates Card Ci -822 and places BS4 in TEST position Evaluator Cue: BS4 IS IN TEST POSITION. LED is lit.

Corn ment:

If candidate reports completion of placing bistables in test, Evaluator Note: acknowledge completion and direct the candidate to continue.

OWP-RP-02, Pressurizer Press Channel I (P1-455)

Performance Step: 12 On Recorder Panel: TS-412Z TR-412 Selector Switch (circle position selected)

Standard: Locates recorder panel TS-412Z, TR-412 selector switch, verifies selected either LOOP B or C, and circles selected position.

Evaluator Cue.

. TR-412 selector switch is in the LOOP B or LOOP C POSITION.

Comment:

Use the picture of TSLB-3 at the end of this JPM for the Evaluator Note following TSLB checks to minimize MCR distraction.

OWP-RP-02, Pressurizer Press Channel I (P1-455)

Performance Step: 13 On TSLB-3 check the following: TRIP PRZ HI PRESS PB4S5A (Window 14-1) LIT Standard: Locates TSLB-3 and verifies window 14-1 lit Evaluator Cue: TSLB-3 window 14-1 is lit Comment:

V - Denotes Critical Steps 2012 NRC Exam In-Plant JPM k Rev. FINAL

Appendix C Page 8 of 12 Form ES-C-i PERFORMANCE INFORMATtON OWP-RP-02, Pressurizer Press Channel I (P1-455)

Performance Step: 14 On TSLB-3 check the following: P11 PAZ HI PRESS PB455B (Window 14-2) LIT Standard: Locates TSLB-3 and verifies window 14-2 lit Evaluator Cue: TSLB-3 window 14-2 is lit Comment:

OWP-RP-02, Pressurizer Press Channel I (P1-455)

Performance Step: 15 On TSLB-3 check the following: TRIP PRZ LOW PRESS PB455C (Window 14-3) LIT Standard: Locates TSLB-3 and verifies window 14-3 lit Evaluator Cue: TSLB-3 window 14-3 is lit Comment:

OWP-RP-02, Pressurizer Press Channel I (P1-455)

Performance Step: 16 On TSLB-3 check the following: SI PAZ LOW PRESS PB455D (Window 14-4) LIT Standard: Locates TSLB-3 and verifies window 14-4 lit Evaluator Cue: TSLB-3 window 14-4 is lit Comment:

V - Denotes Critical Steps 2012 NRC Exam In-Plant JPM k Rev. FINAL

Appendix C Page 9 of 12 Form ES-C-i PERFORMANCE INFORMATION OWP-RP-02, Pressurizer Press Channel I (P1-455)

Performance Step: 17 On TSLB-3 check the following: A TRIP 0/TEMP AT TB412C1 (Window 7-1) LIT Standard: Locates TSLB-3 and verifies window 7-i lit Evaluator Cue: TSLB-3 window 7-1 is lit Comment:

OWP-RP-02, Pressurizer Press Channel I (P1-455)

Performance Step: 18 On TSLB-3 check the following: A RUNBACK 0/TEMP AT TB412C2 (Window 7-3) LIT Standard: Locates TSLB-3 and verifies window 7-3 lit Evaluator Cue: TSLB-3 window 7-3 is lit Comment:

Standard: Reports to CRS that test switches have been positioned lAW OWP-RP-02 for Channel 455 CRS acknowledges completion of the OWP section.

Evaluator Cue:

END OFJPM Comment:

After window 7-3 on TSLB-3 is verified: Evaluation on this Terminating Cue:

JPM is complete.

STOP TIME:

V - Denotes Critical Steps 2012 NRC Exam In-Plant JPM k Rev. FINAL

Appendix C Page 10 of 12 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2012 NRC Exam In-Plant JPM k Place Failed Pressurizer Pressure Channel 455 In TEST Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2012 NRC Exam In-Plant JPM k Rev. FINAL

Appendix C Page 11 of 12 Form ES-C-i JPM CUE SI-tEET SAFETY CONSIDERATIONS: Do Not operate actual plant equipment unless specifically authorized to do so. Follow standard ALARA practices in the RCA.

Initial Conditons The plant was operating at 100% power when Pressurizer I

Pressure Channel 455 failed low.

. You are directed to perform OWP-RP-02 for troubleshooting and tripping bistables for PT-455 to meet Technical

. . . Specifications.

Initiating Cue:

. The CRS directs that the applicable Master Test Switches are to be placed in test for troubleshooting.

2012 NRC Exam In-Plant JPM k Rev. FINAL

Appendix C Page 12 of 12 Form ES-C-i JPM CUE SHEET 2012 NRC Exam In-Plant JPM k Rev. FINAL