MONTHYEARML11249A0612011-08-31031 August 2011 Application for Temporary Change to TS to Allow Use of Penetrations in Shield Building Dome During Modes 1 Through 4;and Request for Specific Usage of Alternate Source Term Methodology for Calculating Radiation Doses Associated Project stage: Request ML11249A0462011-08-31031 August 2011 Organization Topical Report, TVA-NPOD89-A Project stage: Request ML11273A1692011-09-29029 September 2011 Application to Revise Sequoyah Nuclear Plant, Unit 1, Operating License and Technical Specification 3.7.5, Ultimate Heat Sink, to Support Steam Generator Replacement Project (TS-SQN-2011-05) Project stage: Request ML11285A0042011-10-11011 October 2011 NRR E-mail Capture - Sequoyah 2 - Acceptance Review of LAR Requesting to Allow Use of One of the SB Dome Penetrations Project stage: Acceptance Review ML11334A0542011-11-28028 November 2011 Request for Expedited Review of a Licensing Amendment Request Supporting the Unit 2, Steam Generator Replacement Project Project stage: Request ML11356A2262011-12-29029 December 2011 Request for Additional Information Regarding the Proposed Technical Specification Changes to Allow Use of Shield Building Dome Penetrations During Modes 1 Through 4 Project stage: RAI ML12032A2702012-01-27027 January 2012 Response to NRC Request for Additional Information Regarding Proposed Technical Specification Changes to Allow Use of Shield Building Dome Penetrations During Modes 1 Through 4 Project stage: Response to RAI ML12011A0272012-01-30030 January 2012 Request for Additional Information Regarding the Proposed Technical Specification Changes to Allow Used of Shield Building Dome Penetrations During Modes 1 Through 4 Project stage: RAI ML12038A2492012-02-0707 February 2012 NRR E-mail Capture - Sequoyah, Unit 2 - Allow Use of Penetrations in SB Dome During Modes 1 Through 4 Project stage: Other ML12074A0362012-02-29029 February 2012 Response to NRC Second Request for Additional Information Regarding the Proposed Technical Specification Changes to Allow Use of Shield Building Dome Penetrations During Modes 1 Through 4 Project stage: Request ML12072A2362012-03-0808 March 2012 Response to NRC Third Request for Additional Information Regarding the Proposed Technical Specification Changes to Allow Use of Shield Building Dome Penetrations During Modes 1 Through 4 Project stage: Request ML12121A3442012-05-15015 May 2012 Request for Additional Information Regarding the Proposed Technical Specification Changes to Allow Use of Shield Building Dome Penetrations During Modes 1-4 Project stage: RAI ML12160A3572012-06-0707 June 2012 Response to Request for Additional Information on License Amendment Regarding Proposed Technical Specification Changes to Allow Use of Shield Building Dome Penetrations During Modes 1 Through 4; Withdrawal of Request Project stage: Withdrawal ML12165A6932012-06-27027 June 2012 Federal Register Notice - Notice of Withdrawal of an Amendment Project stage: Withdrawal ML12165A6912012-06-27027 June 2012 Letter - Withdrawal of an Amendment Request to Allow Use of Shield Building Dome Penetrations During Modes 1 Through 4 Project stage: Withdrawal NRC-2012-0160, Federal Register Notice - Notice of Withdrawal of an Amendment2012-06-27027 June 2012 Federal Register Notice - Notice of Withdrawal of an Amendment Project stage: Withdrawal 2012-01-30
[Table View] |
Text
7590-01-P NUCLEAR REGULATORY COMMISSION
[Docket No. 50-328; NRC-2012-0160]
Tennessee Valley Authority Notice of Withdrawal of Application for Amendment to Facility Operating License The U.S. Nuclear Regulatory Commission (NRC or the Commission) has granted the request of Tennessee Valley Authority (the licensee) to withdraw its August 31, 2011, application as supplemented by letters dated November 28, 2011, January 27, February 29, and March 8, 2012, for proposed amendment to Facility Operating License No. DPR-79 for the Sequoyah Nuclear Plant, Unit 2, located in Hamilton County, Tennessee.
The proposed change would have revised the Technical Specifications to allow opening of one of the penetration hatches in the shield building dome for up to five hours per day, six days per calendar week while in modes 1 through 4 during SQN, Unit 2 Cycle 18, and until entering Mode 5 at the start of the SQN, Unit 2 fall 2012 refueling outage.
The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the Federal Register on November 15, 2011 (76 FR 70775).
However, by letter dated June 7, 2012, the licensee withdrew the proposed change.
For further details with respect to this action, see the application for amendment dated August 31, 2011, and the licensee's letter dated June 7, 2012, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRC=s Public Document Room (PDR), located at One White Flint North, Room O1-F21, 1555 Rockville Pike (first floor), Rockville, Maryland 20852. Publicly available documents created or received at the NRC are accessible electronically through the Agencywide Documents Access and Management System (ADAMS) in the NRC Library at http://www.nrc.gov/reading-
rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr.resource@nrc.gov.
Dated at Rockville, Maryland, this 27th day of June 2012.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Siva P. Lingam, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation