ML12128A364
| ML12128A364 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 05/07/2012 |
| From: | Billoch-Colon A Division of Operating Reactor Licensing |
| To: | Caves J Progress Energy Co |
| References | |
| TAC ME8523 | |
| Download: ML12128A364 (3) | |
Text
1 NRR-PMDAPEm Resource From:
Billoch, Araceli Sent:
Monday, May 07, 2012 11:01 AM To:
Caves, John
Subject:
Shearon Harris Nuclear Power Plant, Unit No. 1 - Acceptance Review for Relief request I3R-09 Reactor Vessel Closure Head Nozzles (TAC No. ME8523)
Attachments:
image001.gif
Dear Mr. Caves,
By letter dated May 3, 2012, Carolina Power and Light Company, submitted a relief request for Shearon Harris Nuclear Power Plant, Unit No. 1. The relief request proposes to repair four nozzles of the reactor vessel closure head penetrations utilizing the inside diameter temper bead welding method.
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-3302.
Araceli T. Billoch Colón Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Tel. 301-415-3302
Hearing Identifier:
NRR_PMDA Email Number:
367 Mail Envelope Properties (Araceli.Billoch@nrc.gov20120507110000)
Subject:
Shearon Harris Nuclear Power Plant, Unit No. 1 - Acceptance Review for Relief request I3R-09 Reactor Vessel Closure Head Nozzles (TAC No. ME8523)
Sent Date:
5/7/2012 11:00:49 AM Received Date:
5/7/2012 11:00:00 AM From:
Billoch, Araceli Created By:
Araceli.Billoch@nrc.gov Recipients:
"Caves, John" <john.caves@pgnmail.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1996 5/7/2012 11:00:00 AM image001.gif 1332 Options Priority:
Standard Return Notification:
No Reply Requested:
Yes Sensitivity:
Normal Expiration Date:
Recipients Received:
Page 1 of 1 5/7/2012 file://c:\\EMailCapture\\NRR_PMDA\\367\\attch1.gif