05/27-29/2012 Summary of Site Audit Related to the Environmental Review of the License Renewal Application for Grand Gulf Nuclear Station, Unit 1
ML12116A060
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/21/2012
From: David Drucker
License Renewal Projects Branch 2
To:
Drucker D, 415-6223
References
TAC ME7385, TAC ME7386
Download: ML12116A060 (5)


Text

",,1'1'\\ REGu~

UNITED STATES

~~"

....o?'

NUCLEAR REGULATORY COMMISSION f!

~

WASHINGTON, D.C. 20555-0001

<C 0

Ii;

~

f'i May 21,2012

'</.

fJ

"?

~o LICENSEE:

Entergy Operations, Inc.

FACILITY:

Grand Gulf Nuclear Station

SUBJECT:

SUMMARY

OF SITE AUDIT RELATED TO THE ENVIRONMENTAL REVIEW OF THE LICENSE RENEWAL APPLICATION FOR GRAND GULF NUCLEAR STATION, UNIT 1 (TAC NOS. ME7385 AND ME7386)

From March 27-29,2012, a review team consisting of staff from the U.S. Nuclear Regulatory Commission (NRC or the staff) and contractors from Argonne National Laboratories and the Center for Nuclear Waste Regulatory Analyses participated in a site audit at Grand Gulf Nuclear Station, Unit 1 (GGNS), related to the environmental review of the GGNS license renewal application. The primary goal of the site visit was to review documentation, gather information to ensure that the environmental requirements of license renewal as codified in Title 10 of the Code of Federal Regulations Part 51 (10 CFR Part 51) were met, and to interface with officials in Federal, State, and local government agencies to obtain related information. Enclosed is a list of representatives from the NRC, its contractors, other government agencies, and Entergy Operations, Inc. (Entergy) who participated in the site audit.

The audit began on March 27, 2012, with a kickoff meeting to introduce participants and to discuss logistics of the audit. Following the kickoff meeting, the environmental review team participated in a general site tour of GGNS with Entergy staff. The general site tour provided an ecological overview of the site and focused on areas relevant to the environmental review.

During the remainder of the site audit, the environmental review team examined data used by Entergy in preparation of the Environmental Report and met in smaller groups with Entergy representatives with corresponding environmental expertise. These groups participated in various activities including tours of onsite National Pollutant Discharge Elimination System-permitted outfalls, cultural resources, surface water and groundwater resources, and meteorological towers and monitoring equipment.

The environmental review team also met onsite with officials from Fish and Wildlife Services.

Information gathered through participation of these agencies will assist the environmental review team in its evaluation.

In addition, the team reviewed the GGNS process for identifying new and Significant information (information that would challenge the generic conclusions reached in the Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG-1437), GGNS cited no new and significant information, and the team's independent review during the course of the site audit did not identify any either.

- 2 At the conclusion of the site audit, the environmental review team summarized the status of the review with GGNS representatives. Most of the team's questions were answered through the conduct of the audit. Those that were not will be answered by GGNS as it responds to the team's request for additional information letter (ADAMS accession number ML12083A188).

While the NRC review team did not identify any significant issues during its site audit or during the meetings with other participants, the team indicated that the environmental review was ongoing and that any additional information necessary to support the review would be formally requested.

David Drucker, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-416

Enclosure:

As stated cc w/encl: Listserv

LIST OF PARTICIPANTS GRAND GULF NUCLEAR STATION LICENSE RENEWAL APPLICATION REVIEW ENVIRONMENTAL SITE AUDIT March 27-29,2012 PARTICIPANTS Briana Balsam Michelle Moser Emily Larsen Bill Ford David Drucker Dave Wrona Jerry Dozier Young-Soo Chang John Quinn Konnie Wescott Jeff Seiter Christina Perino John Lassiter Ted Ivy Lori Potts Garry Young Jill Lagace Rick Buckley Jim Thomas Amy Pittman Nick Lovelace Dennis Wiles Rosie Bevily Andrew Burgess Randall Westmoreland Kathleen Yhip Daniel Gregg Heather Sullivan Andy Sanderson ORGANIZATION U.S. Nuclear Regulatory Commission (NRC)

NRC NRC NRC NRC NRC NRC Argonne National Laboratory (ANL)

ANL ANL Entergy Operations, Inc. (Entergy)

Entergy Entergy Entergy Entergy Entergy Entergy Entergy Entergy Entergy Entergy Entergy Entergy Ameren Missouri DTE Energy Southern California Edison U.S. Fish and Wildlife MS Dept. of Wildlife, Fisheries & Parks MS Dept. of Wildlife, Fisheries & Parks ENCLOSURE

- 2 At the conclusion of the site audit, the environmental review team summarized the status of the review with GGNS representatives. Most of the team's questions were answered through the conduct of the audit. Those that were not will be answered by GGNS as it responds to the team's request for additional information letter (ADAMS accession number ML12083A188).

While the NRC review team did not identify any significant issues during its site audit or during the meetings with other participants, the team indicated that the environmental review was ongoing and that any additional information necessary to support the review would be formally requested.

IRA!

David Drucker, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-416

Enclosure:

As stated cc w/encl: Listserv DISTRIBUTION:

See next page ADAMS Accession No. ML12116A060 concurred via email*via e-mail OFFICE NAME DATE LA:DLR*

IKing 05/4/12 PM:RPB2:DLR DDrucker 05/15/12 BC:RPB2:DLR DWrona 05/17/12 PM:RPB2:DLR DDrucker 1112 OFFICIAL RECORD COpy

Memorandum to Entergy from D. Drucker dated May 21, 2012

SUBJECT:

SUMMARY

OF SITE AUDIT RELATED TO THE ENVIRONMENTAL REVIEW OF THE LICENSE RENEWAL APPLICATION FOR GRAND GULF NUCLEAR STATION, UNIT 1 (TAC NOS. ME7385 AND ME7386)

DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource NFerrer DDrucker DWrona AWang JSusco BMizuno, OGC