Online Reference Portal, License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition)
ML121020516
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/26/2012
From: Kalyanam N
Plant Licensing Branch IV
To:
Entergy Operations
Kalyanam N, NRR/DORL/LPL4, 415-1480
References
TAC ME8282
Download: ML121020516 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 26, 2012 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802

SUBJECT:

ARKANSAS NUCLEAR ONE, UNIT 2 - NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 LICENSE AMENDMENT APPLICATION ONLINE REFERENCE PORTAL (TAC NO. ME8282)

Dear Sir or Madam:

By letter dated March 27, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12087A113), Entergy Operations Inc. (Entergy, the licensee),

submitted a license amendment request (LAR) to adopt National Fire Protection Association (NFPA) 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition," for the Arkansas Nuclear One, Unit 2.

To improve the efficiency of the U.S. Nuclear Regulatory Commission (NRC) reviews, the licensee's representatives and the NRC staff have discussed the use of an online reference portal that would allow the NRC staff and its contractors limited read-only access to the basis documents and other reference materials cited in the application. The online reference portal would allow the NRC staff to audit basis documents to determine whether the information included in the documents support the application. Documents identified as necessary for analysis of the application will be identified by the NRC staff. The licensee will be formally requested to submit those documents on the NRC docket. Use of the online reference portal is acceptable as long as the following conditions are met:

  • The online reference portal will be password-protected and passwords will be assigned to those directly involved in the review on a need-to-know basis;
  • The online reference portal will be sufficiently secure to prevent staff from printing, saving, or downloading any documents; and
  • Conditions of use of the online reference portal will be displayed on the log-in screen and will require concurrence by each user.

The NRC staff would like to request that the portal be populated with the documents listed in the enclosure to this letter. This will help with the preparation for the site audits and increase effectiveness of the review prior to the audit. Once the NRC accepts the LAR for review, it would be helpful if the portal is ready for immediate access to the NRC staff. Therefore, we request that you send the information to access the portal, such as username and password, immediately after the LAR has been accepted by the NRC.

- 2 The conditions associated with the online reference portal must be maintained throughout the duration of the review process. Please provide written confirmation that the licensee agrees to the terms and conditions set forth in this letter.

If you have any questions, please contact me at (301) 415-1480 or via e-mail at kaly. kalyanam@nrc.gov.

Sincerely, N. Kaly Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-368

Enclosure:

As stated cc w/encl: Distribution via Ustserv

GENERIC LIST OF SHAREPOINT PORTAL REQUESTED DOCUMENTS FOR NFPA 805

1. National Fire Protection Association (NFPA) Code Deviations and Justifications
2. All applicable Probabilistic Risk Assessment (PRA) Peer Review Reports
3. All site calculations reference in the License Amendment Request (LAR)
4. Credited Fire Protection (FP) System and Feature Drawings
a. Layout Drawings: fire barriers, installed fire detection and suppression systems, fire areas, fire zones, stairwells, fire doors, fire dampers, etc.
b. Piping and Instrumentation Diagrams (P&IDs): FP Water System
c. System Descriptions for Fire Suppression, Water Supply, and Detection (including incipient or very early warning fire detection (VEWFD))
d. Hydraulic Calculations for Fire Service and Fire Suppression System Water Demand (if used to support non-fire water use in Title 10 of the Code of Federal Regulations, paragraph 50.48(c)(2)(vii))
5. Drawings related to systems credited in the Nuclear Safety Capability Assessment (NSCA) as well as those required to fully understand plant response:
a. P&IDs: Reactor Coolant System, Main Steam, Main Feedwater, Circulating Water, Service Water, etc.
b. Safe Shutdown/NSCA Logic Diagrams (if used)
c. Electrical Distribution System One-Lines (alternating current (AC) and direct current (DC))
6. Those documents that fulfill the NFPA 805 requirement for "Design Basis Document (DBD)"
a. Fire Area Calculations (e.g. Fire Safety Analyses, Fire Risk Analyses, Plant Change Evaluations, Fire Risk Evaluations, etc.)
b. NSCA Calculation (Safe Shutdown/Circuit Analysis)
c. Multiple Spurious Operation (MSO) Expert Panel Report
d. Thermo-hydraulic Analysis serving as the basis for Variance from Deterministic Requirements (VFDR) and recovery action (RA) timing
e. Evaluation of Recovery Actions for feasibility Enclosure

-2

f. Fire Hazards Analysis (FHA) (if separate from the fire area calculations)
g. Non-Power Operation (NPO) Calculation(s)
h. Radioactive Release Calculation(s)
i. Pre-fire Plans
7. Fire PRA Calculations
a. Plant Boundary/Partitioning Methods and Results (TASK 1)
b. Component Selection Calculation (TASK 2)
c. Cable Selection and Circuit Analysis (TASKS 3, 9, and 10)
d. Ignition Frequency Calculation (TASK 6)
e. Fire PRA Quantification Calculations (TASK 5) including:
i. Seismic Fire Interactions (TASK 13) Methodologies and results (including assumptions) ii. Screening Methodologies and Results (TASKS 4 and 7) (including assumptions) iii. Fire Risk Quantifications (TASK 14) Methodologies and Results (including assumptions) iv. Multi-compartment Screening and Analysis
v. Post-fire Human Reliability Analysis (HRA) Methodologies and Results (including assumptions) (TASK 12) vi. Detailed proposed modification descriptions (Engineering Change Requests/Records) sufficient to comprehend potential impact/improvement to Fire PRA
f. NFPA 805 Application Calculation (provides all the delta risk calculations for VFDRs)
g. Control Room Risk Calculation
h. Uncertainty and Sensitivity Calculations (TASK 15)
i. Fire Modeling Calculations used to support the Fire PRA (zone of influence (ZOI), hot gas layer, bounding, detailed fire modeling, etc.)

-3 ii Plant Specific Verification and Validation (V&V) Analysis iii. Non-public V&V References (e.g.; Electric Power Research Institute (EPRI) Fire Modeling, Generic Treatment) iv. Fire Modeling Assumptions and Calculations performed to support target selection (e.g.; lOI, secondary fires, transient combustible/ignition sources) including those that deviate from NUREG/CR-6850 (TASKS 8 and 11)

8. Fire Modeling used in the Fire Modeling Performance-based Approach
a. Plant Specific V&V Analysis performed
b. Non-public V&V References (e.g.; EPRI Fire Modeling, Generic Treatments ... )
c. Fire Modeling Assumptions and Calculations performed to support Performance Based Evaluations (e.g.; lOI, secondary fires, transient combustible/ignition sources ... ) considered outside NUREG/CR 6850 Assumptions and Parameters (TASKS 8 and 11)
d. Hot Gas Layer (HGL) Determination Calculations (including Assumptions)
9. Fire Protection Program Manual
10. Fire Protection Quality Assurance (QA) Program (including FP Structure System Components (SSCs) and FP Features)
11. NFPA 805 Monitoring Program Calculations and Procedures
12. Technical Requirements Manual (TRM)
13. Updated Final Safety Analysis Report (UFSAR) Changes (including current UFSAR 9.5.1 Fire Protection and Section 7.4 Alternate Shutdown/Instrumentation)

- 2 The conditions associated with the online reference portal must be maintained throughout the duration of the review process. Please provide written confirmation that the licensee agrees to the terms and conditions set forth in this letter.

If you have any questions, please contact me at (301) 415-1480 or via e-mail at kaly.kalyanam@nrc.gov.

Sincerely, IRN N. Kaly Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-368

Enclosure:

As stated cc w/encl: Distribution via Listserv DISTRIBUTION:

LPLIV Reading PUBLIC RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl4 Resource RidsNrrDraAfpb Resource RidsNrrLAJBurkhardt Resource RidsNrrPmANO Resource RidsOgcRp Resource RidsRgn4MailCenter Resource HBarrett, NRRIDRAJAFPB

,I Robinson, NRR/DRAJAFPB PLain, NRR/DRAJAFPB LFields, NRRIDRAJAFPB DPickett, DORL

  • via e-mail NRRIDRAlAFPB/ NRR/ORAIAPLAI NRR/LPL4/LA BC BC NRRlLPL4/BC NKalyanam JBurkhardt* AKlein DHarrison MMarkley 4/16/12 4/12/12 4/20/12 4/26/12 OFFICIAL RECORD COPY