Letter Sequence Draft RAI |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement
|
MONTHYEARBW110021, Response to NRC Verification Inspection Report; 05000456/2011009; 05000457/20110092011-03-0202 March 2011 Response to NRC Verification Inspection Report; 05000456/2011009; 05000457/2011009 Project stage: Request ML1117900402011-04-12012 April 2011 Westinghouse Electric Company Affidavit Supporting Withholding, Attachment 6 to Braidwood Station, Units 1 & 2, Byron Station, Unit 1 & 2, Request for License Amendment Regarding Measurement Uncertainty Recapture (MUR) Power Uprate Project stage: Request ML1117900432011-05-0909 May 2011 Affidavit from Cameron International Corporation Supporting Withholding of Attachments 8a Through 8d Project stage: Request ML1117900422011-06-21021 June 2011 MUR Technical Evaluation, (Non-Proprietary Version), Attachment 7 to Braidwood Station, Units 1 & 2, Byron Station, Unit 1 & 2, Request for License Amendment Regarding Measurement Uncertainty Recapture (MUR) Power Uprate Project stage: Request ML1117900382011-06-23023 June 2011 Steam Generator Tube Rupture Analysis Report, Attachment 5a to Braidwood Station, Units 1 & 2, Byron Station, Unit 1 & 2, Request for License Amendment Regarding Measurement Uncertainty Recapture (MUR) Power Uprate Project stage: Request RS-11-099, Request for License Amendment Regarding Measurement Uncertainty Recapture (MUR) Power Uprate2011-06-23023 June 2011 Request for License Amendment Regarding Measurement Uncertainty Recapture (MUR) Power Uprate Project stage: Request ML11224A0832011-08-0303 August 2011 NRR E-mail Capture - Draft - Supplemental Information Request Braidwood and Byron MUR LAR (ME6587-ME6590) Project stage: Draft Approval ML1121505632011-08-22022 August 2011 Supplemental Information Needed for Acceptance of Licensing Action Measurement Uncertainty Recapture Power Uprate Project stage: Acceptance Review ML11266A0022011-09-19019 September 2011 NRR E-mail Capture - Draft RAI Braidwood/Byron - Measurement Uncertainty Recapture LAR Project stage: Draft RAI ML1122315742011-09-19019 September 2011 Acceptance Review of License Amendment Request (LAR) Measurement Uncertainty Recapture (MUR) Power Uprate Project stage: Acceptance Review ML11262A1612011-10-12012 October 2011 Request for Addtional Information Measurement Uncertainty Power Uprate Request Project stage: Other RS-11-169, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2011-11-0101 November 2011 Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request ML1129305492011-11-0303 November 2011 Request for Withholding Information from Public Disclosure Affidavit CAW-11-03 Project stage: Withholding Request Acceptance ML1129203422011-11-0303 November 2011 Request for Withholding Information from Public Disclosure Affidavit CAW-11-3137 Project stage: Withholding Request Acceptance ML1130104032011-11-28028 November 2011 Request for Additional Information 2 Measurement Uncertainty Power Uprate Request Project stage: RAI ML1202609362012-02-14014 February 2012 Request for Additional Information Measurement Uncertainty Recapture Power Uprate Request Project stage: RAI ML1202701462012-02-14014 February 2012 Request for Additional Information Measurement Uncertainty Recapture Power Uprate Request Project stage: RAI ML1205302582012-02-24024 February 2012 Request for Additional Information Measurement Uncertainty Recapture Power Uprate Request Project stage: RAI ML12068A3822012-03-0808 March 2012 E-MAIL - MUR LAR 1 Response Date Project stage: Approval ML12068A2942012-03-0808 March 2012 Request for Additional Information Regarding Reactor Systems MUR Review (TACs ME6587, ME6588, ME6589, and ME6590) Project stage: RAI ML1205904602012-03-0909 March 2012 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML12089A4902012-03-29029 March 2012 E-MAIL - Draft Balance of Plant Request for Additional Information for MUR Review Project stage: Draft RAI ML12121A6942012-05-10010 May 2012 Request for Additional Information Related to License Application for Measurement Uncertainty Recapture Uprate Project stage: RAI RS-12-081, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2012-05-16016 May 2012 Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request ML12157A0632012-06-13013 June 2012 Request for Additional Information Related to Measurement Uncertainty Recapture Uprate Project stage: RAI ML12233A6012012-08-27027 August 2012 Request for Additional Information, Measurement Uncertainty Recapture Power Uprate Request Project stage: RAI RS-12-144, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2012-09-13013 September 2012 Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request ML12216A0002012-09-27027 September 2012 Request for Additional Information Related to Measurement Uncertainty Uprate Project stage: RAI ML12271A3082012-12-0606 December 2012 Request for Additional Information and Suspension of Review of License Amendment Request for Power Uprate Project stage: RAI RS-13-227, Response to NRC HELB Audit Request for Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2013-09-0505 September 2013 Response to NRC HELB Audit Request for Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request RS-13-261, Supplemental Response to NRC HELB Audit Request for Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2013-10-24024 October 2013 Supplemental Response to NRC HELB Audit Request for Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Supplement RS-13-267, Supplemental Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2013-11-13013 November 2013 Supplemental Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Supplement 2012-02-14
[Table View] |
Text
From: Mozafari, Brenda Sent: Thursday, March 29, 2012 3:25 PM To: Leslie.Holden@exeloncorp.com; timothy.byam@exeloncorp.com; Lisa.Simpson@exeloncorp.com; David.Gullott@exeloncorp.com
Subject:
DRAFT BALANCE OF PLANT REQUEST FOR ADDITIONAL INFORMATION FOR MUR REVIEW
((TAC NOS. ME6587,ME6588, ME6589 AND ME6590)
- Leslie, Pursuant to 10 CFR 50.90, by letter to the Nuclear Regulatory Commission (NRC) dated June 23, 2011, the Exelon Generation Company, LLC (the licensee), submitted a license amendment request (LAR) for the Byron Station Units 1 and 2 and Braidwood Station Units 1 and 2. The proposed measurement uncertainty recapture power uprate would increase the current licensed thermal power at Byron Station Units 1 and 2 and Braidwood Station Units 1 and 2, by approximately 1.63 percent. The NRC staff has identified additional information (shown below) that is needed to complete the technical review.
After you have had time to consider your response, we can schedule a call to provide any clarifications and discuss your planned response. I will provide the question formally after our discussion, however we would expect the question to be responded to by letter within 30 days of this email (by April 27, 2012). Please let me know when you are ready for a telecon for clarification and discussion of the path forward.
- Thanks, Brenda L. Mozafari Senior Project Manager, NRR/DORL U.S. Nuclear Regulatory Commission 301-415-2020 email: brenda.mozafari@nrc.gov BRAIDWOOD STATION, UNIT NOS. 1 & 2, AND BYRON STATION, UNIT NOS 1 & 2 REQUEST FOR FOLLOW-UP ADDITIONAL INFORMATION REGARDING MEASUREMENT UNCERTAINTY RECAPTURE (MUR) POWER UPRATE TAC NOS.
ME6587, ME6588, ME6589, ME6590 BALANCE OF PLANT BRANCH - RAI - 6 Section 3.6.1.1 of the Braidwood and Byron Updated Final Safety Analysis Report (UFSAR),
Design Basis, contains the criteria related to the classification of high energy and moderate energy fluid systems at Braidwood and Byron. Further, Section 3.6.1.1.1 of the Braidwood and Byron UFSAR, Definitions, defines a high energy fluid system at these facilities as one where either or both of the following requirements are met: maximum operating temperature exceeds 200 °F or maximum operating pressure exceeds 275 psig. Additionally, Section 3.6.1.1.1 of the Braidwood and Byron UFSAR defines a moderate energy fluid system as those systems which are either in operation or maintained pressurized (above atmospheric pressure) during normal
plant conditions and meet the following requirements: maximum operating temperature is 200
°F or less and maximum operating pressure is 275 psig or less. However,Section VII.6.B of to the Braidwood and Byron measurement uncertainty recapture (MUR) power uprate submittal states:
High-energy pipe breaks are analyzed for piping for which the maximum operating pressure exceeds 275 psig and the maximum operating temperature equals or exceeds 200 deg F. High-energy pipe cracks are postulated in piping for which either the operating pressure exceeds 275 psig or the operating temperature equals or exceeds 200 deg F.
a) Address the apparent discrepancy between the MUR power uprate license amendment request submittal and the UFSAR criteria related to the classification of high and moderate energy systems at Braidwood and Byron.
b) Confirm that the evaluations performed to support the implementation of the MUR power uprate at Braidwood and Byron appropriately considered the criteria stipulated in the UFSAR related to high and moderate energy fluid system classification and high energy line break and moderate energy line crack postulation.
Brenda L. Mozafari Senior Project Manager, NRR/DORL U.S. Nuclear Regulatory Commission 301-415-2020 email: brenda.mozafari@nrc.gov