Letter Sequence Draft RAI |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement
|
MONTHYEARML1106200892011-03-0202 March 2011 Response to NRC Verification Inspection Report; 05000456/2011009; 05000457/2011009 Project stage: Request ML1117900402011-04-12012 April 2011 Westinghouse Electric Company Affidavit Supporting Withholding, Attachment 6 to Braidwood Station, Units 1 & 2, Byron Station, Unit 1 & 2, Request for License Amendment Regarding Measurement Uncertainty Recapture (Mur) Power Uprate Project stage: Request ML1117900432011-05-0909 May 2011 Affidavit from Cameron International Corporation Supporting Withholding of Attachments 8a Through 8d Project stage: Request ML1117900422011-06-21021 June 2011 Mur Technical Evaluation, (Non-Proprietary Version), Attachment 7 to Braidwood Station, Units 1 & 2, Byron Station, Unit 1 & 2, Request for License Amendment Regarding Measurement Uncertainty Recapture (Mur) Power Uprate Project stage: Request RS-11-099, Request for License Amendment Regarding Measurement Uncertainty Recapture (Mur) Power Uprate2011-06-23023 June 2011 Request for License Amendment Regarding Measurement Uncertainty Recapture (Mur) Power Uprate Project stage: Request ML1117900382011-06-23023 June 2011 Steam Generator Tube Rupture Analysis Report, Attachment 5a to Braidwood Station, Units 1 & 2, Byron Station, Unit 1 & 2, Request for License Amendment Regarding Measurement Uncertainty Recapture (Mur) Power Uprate Project stage: Request ML11224A0832011-08-0303 August 2011 NRR E-mail Capture - Draft - Supplemental Information Request Braidwood and Byron Mur LAR (ME6587-ME6590) Project stage: Draft Other ML1121505632011-08-22022 August 2011 Supplemental Information Needed for Acceptance of Licensing Action Measurement Uncertainty Recapture Power Uprate Project stage: Acceptance Review ML1122315742011-09-19019 September 2011 Acceptance Review of License Amendment Request (LAR) Measurement Uncertainty Recapture (Mur) Power Uprate Project stage: Acceptance Review ML11266A0022011-09-19019 September 2011 NRR E-mail Capture - Draft RAI Braidwood/Byron - Measurement Uncertainty Recapture LAR Project stage: Draft RAI ML11262A1612011-10-12012 October 2011 Request for Addtional Information Measurement Uncertainty Power Uprate Request Project stage: Other RS-11-169, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2011-11-0101 November 2011 Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request ML1129203422011-11-0303 November 2011 Request for Withholding Information from Public Disclosure Affidavit CAW-11-3137 Project stage: Withholding Request Acceptance ML1129305492011-11-0303 November 2011 Request for Withholding Information from Public Disclosure Affidavit CAW-11-03 Project stage: Withholding Request Acceptance ML1130104032011-11-28028 November 2011 Request for Additional Information #2 Measurement Uncertainty Power Uprate Request Project stage: RAI ML1202701462012-02-14014 February 2012 Request for Additional Information Measurement Uncertainty Recapture Power Uprate Request Project stage: RAI ML1202609362012-02-14014 February 2012 Request for Additional Information Measurement Uncertainty Recapture Power Uprate Request Project stage: RAI ML1205302582012-02-24024 February 2012 Request for Additional Information Measurement Uncertainty Recapture Power Uprate Request Project stage: RAI ML12068A3822012-03-0808 March 2012 E-MAIL - Mur LAR #1 Response Date Project stage: Other ML12068A2942012-03-0808 March 2012 Request for Additional Information Regarding Reactor Systems Mur Review (TACs ME6587, ME6588, ME6589, and ME6590) Project stage: RAI ML1205904602012-03-0909 March 2012 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML12089A4902012-03-29029 March 2012 E-MAIL - Draft Balance of Plant Request for Additional Information for Mur Review Project stage: Draft RAI ML12121A6942012-05-10010 May 2012 Braidwood Units 1 and 2 - Request for Additional Information Related to License Application for Measurement Uncertainty Recapture Uprate Project stage: RAI RS-12-081, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2012-05-16016 May 2012 Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request ML12157A0632012-06-13013 June 2012 Request for Additional Information Related to Measurement Uncertainty Recapture Uprate Project stage: RAI ML12233A6012012-08-27027 August 2012 Request for Additional Information, Measurement Uncertainty Recapture Power Uprate Request Project stage: RAI RS-12-144, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2012-09-13013 September 2012 Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request ML12216A0002012-09-27027 September 2012 Request for Additional Information Related to Measurement Uncertainty Uprate Project stage: RAI ML12271A3082012-12-0606 December 2012 Request for Additional Information and Suspension of Review of License Amendment Request for Power Uprate Project stage: RAI RS-13-227, Response to NRC HELB Audit Request for Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2013-09-0505 September 2013 Response to NRC HELB Audit Request for Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request RS-13-261, Supplemental Response to NRC HELB Audit Request for Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2013-10-24024 October 2013 Supplemental Response to NRC HELB Audit Request for Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Supplement RS-13-267, Supplemental Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2013-11-13013 November 2013 Supplemental Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Supplement 2012-02-14
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference ML23317A2012023-11-22022 November 2023 (External_Sender) Supplement - Byron Security Rule Exemption Request ISFSI Docket No. Reference ML23321A2012023-11-17017 November 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23305A2992023-11-0101 November 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 2, Relief Request I4R-24 ML23304A0222023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Braidwood 1 & 2 - Exemption from Security Rule (L-2023-LLE-0030) ML23304A0202023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Byron 1 & 2 - Exemption from Security Rule (L-2023-LLE-0027) ML23272A0602023-09-29029 September 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 1, Relief Request I4R-25 ML23187A0092023-07-0606 July 2023 NRR E-mail Capture - NRC Acceptance Review of Byron and Braidwood Request to Adopt TSTF-370 ML23103A4692023-04-12012 April 2023 NRR E-mail Capture - NRC Acceptance Review of Braidwood Request for Amendment to Revise TS 3.7.9 ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML23115A2412023-01-20020 January 2023 NRR E-mail Capture - Preliminary RAIs Related to L-2022-LLA-0131 - Byron, Unit 2, Reinsertion of an Accident Tolerant Fuel Lead Test Assembly ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22284A1022022-10-0606 October 2022 NRR E-mail Capture - NRC Acceptance Review for Byron, Unit 2, License Amendment Request (LAR) to Reinsert an Accident Tolerant Fuel (ATF) Lead Test Assembly (LTA) (L-2022-LLA-0131) NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22189A0602022-07-0707 July 2022 NRR E-mail Capture - Draft RAI for Byron/Braidwood TSTF-501 ML22136A2722022-05-16016 May 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron Adoption of TSTF-501 ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22116A0242022-04-25025 April 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, and Ginna Request to Adopt TSTF-246 ML22105A0722022-04-15015 April 2022 NRR E-mail Capture - Braidwood/Byron Verbal Authorization for Proposed Alternative I4R-15/I4R-21 ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22091A0842022-02-24024 February 2022 NRR E-mail Capture - Braidwood and Byron - Withdrawal of Draft RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML23089A0152022-01-0505 January 2022 NRR E-mail Capture - NRC Acceptance Review of Byron - Proposed Alternative for Examinations of Categories B-B, B-D, and C-A SG Welds and Nozzles ML23089A0172022-01-0505 January 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood - Proposed Alternative for Examinations of Categories B-B, B-D, and C-A SG Welds and Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21272A1492021-09-29029 September 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron - Proposed Alternative for Examinations of Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0172021-09-0303 September 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood - License Amendment to Revise Technical Specification 3.7.9, Ultimate Heat Sink ML21252A0042021-08-26026 August 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood/Byron/Clinton - Adoption of TSTF-273, Safety Function Determination Program Clarifications ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21203A3112021-07-21021 July 2021 NRR E-mail Capture - Final Byron Permanently Defueled Technical Specifications (PDTS) - Second Round RAI ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21189A1612021-07-0808 July 2021 NRR E-mail Capture - Second Round Request for Additional Information - Byron Permanently Defueled Technical Specification Amendment ML21154A0162021-06-0202 June 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood - Proposed Alternative for Exam of Pzr Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Shell Welds ML21154A0172021-06-0202 June 2021 NRR E-mail Capture - Acceptance Review of Byron - Proposed Alternative for Exam of Pzr Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Shell Welds ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21123A2442021-05-0303 May 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood/Byron/Ginna - Application to Address the Issues Identified in Westinghouse Documents NSAL-09-5 and NSAL-15-1 (L-2021-LLA-0066) ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21081A0972021-03-19019 March 2021 Acceptance Review for Byron Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis-External Events (EPID L-2021-JLD-0004) (E-mail) 2023-09-29
[Table view] |
Text
From: Mozafari, Brenda Sent: Thursday, March 29, 2012 3:25 PM To: Leslie.Holden@exeloncorp.com; timothy.byam@exeloncorp.com; Lisa.Simpson@exeloncorp.com; David.Gullott@exeloncorp.com
Subject:
DRAFT BALANCE OF PLANT REQUEST FOR ADDITIONAL INFORMATION FOR MUR REVIEW
((TAC NOS. ME6587,ME6588, ME6589 AND ME6590)
- Leslie, Pursuant to 10 CFR 50.90, by letter to the Nuclear Regulatory Commission (NRC) dated June 23, 2011, the Exelon Generation Company, LLC (the licensee), submitted a license amendment request (LAR) for the Byron Station Units 1 and 2 and Braidwood Station Units 1 and 2. The proposed measurement uncertainty recapture power uprate would increase the current licensed thermal power at Byron Station Units 1 and 2 and Braidwood Station Units 1 and 2, by approximately 1.63 percent. The NRC staff has identified additional information (shown below) that is needed to complete the technical review.
After you have had time to consider your response, we can schedule a call to provide any clarifications and discuss your planned response. I will provide the question formally after our discussion, however we would expect the question to be responded to by letter within 30 days of this email (by April 27, 2012). Please let me know when you are ready for a telecon for clarification and discussion of the path forward.
- Thanks, Brenda L. Mozafari Senior Project Manager, NRR/DORL U.S. Nuclear Regulatory Commission 301-415-2020 email: brenda.mozafari@nrc.gov BRAIDWOOD STATION, UNIT NOS. 1 & 2, AND BYRON STATION, UNIT NOS 1 & 2 REQUEST FOR FOLLOW-UP ADDITIONAL INFORMATION REGARDING MEASUREMENT UNCERTAINTY RECAPTURE (MUR) POWER UPRATE TAC NOS.
ME6587, ME6588, ME6589, ME6590 BALANCE OF PLANT BRANCH - RAI - 6 Section 3.6.1.1 of the Braidwood and Byron Updated Final Safety Analysis Report (UFSAR),
Design Basis, contains the criteria related to the classification of high energy and moderate energy fluid systems at Braidwood and Byron. Further, Section 3.6.1.1.1 of the Braidwood and Byron UFSAR, Definitions, defines a high energy fluid system at these facilities as one where either or both of the following requirements are met: maximum operating temperature exceeds 200 °F or maximum operating pressure exceeds 275 psig. Additionally, Section 3.6.1.1.1 of the Braidwood and Byron UFSAR defines a moderate energy fluid system as those systems which are either in operation or maintained pressurized (above atmospheric pressure) during normal
plant conditions and meet the following requirements: maximum operating temperature is 200
°F or less and maximum operating pressure is 275 psig or less. However,Section VII.6.B of to the Braidwood and Byron measurement uncertainty recapture (MUR) power uprate submittal states:
High-energy pipe breaks are analyzed for piping for which the maximum operating pressure exceeds 275 psig and the maximum operating temperature equals or exceeds 200 deg F. High-energy pipe cracks are postulated in piping for which either the operating pressure exceeds 275 psig or the operating temperature equals or exceeds 200 deg F.
a) Address the apparent discrepancy between the MUR power uprate license amendment request submittal and the UFSAR criteria related to the classification of high and moderate energy systems at Braidwood and Byron.
b) Confirm that the evaluations performed to support the implementation of the MUR power uprate at Braidwood and Byron appropriately considered the criteria stipulated in the UFSAR related to high and moderate energy fluid system classification and high energy line break and moderate energy line crack postulation.
Brenda L. Mozafari Senior Project Manager, NRR/DORL U.S. Nuclear Regulatory Commission 301-415-2020 email: brenda.mozafari@nrc.gov