Entergy Nuclear Operations, Inc., Filing of Attached Testimony of Witnesses Nelson F. Azevedo, Alan B. Cox, Jack R. Strosnider, Robert E. Nickell and Mark A. Gray Contention NYS-26-B/RK-TC-1B & Supporting Exhibits
ML12089A289
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/29/2012
From: Bessette P, Sutton K
Entergy Nuclear Operations
To: Lathrop K, Lawrence Mcdade, Richard Wardwell
Atomic Safety and Licensing Board Panel
SECY RAS
Shared Package
ML12089A284 List:
References
RAS 50542, 50-247-LR, ASLBP 07-858-03-LR-BD01, 50-286-LR
Download: ML12089A289 (5)


Text

Morgan, Lewwis & Bockius LLP 1111 Pennsyylvania Avenue, NWW Washington, DC 20004 Tel. 202.7399.3000 Fax: 202.7399.3001 www.morgannlewis.com Kathryn M.M Sutton Partner 202.739.5738 8 ksutton@MorganLewis.com Paul M. Be essette Partner 202.739.5796 6 pbessette@M MorganLewis.comm March 299, 2012 Lawrence G. McDad de, Chairmann Dr. Richaard E. Ward dwell Dr. Kayee D. Lathrop Atomic Safety S and Licensing L Booard U.S. Nucclear Regulattory Commiission Washinggton, DC 205 555-0001 R

Re: Entergrgy Nuclear Operations,, Inc. (Indiaan Point Nucclear Generrating Units 2 and 3), Docket D Nos. 50-247-LR and 50-286-LR ___

Dear Adm ministrative Judges:

Pursuant to 10 C.F.R. §§ 2.1204, 2.3119, 2.323, 2..337, the Atoomic Safety and Licensinng Boards (Board)

( Prrotective Order of September 4, 20009, Schedulinng Order of July J 1, 20100, and subsequeent Order datted Februaryy 16, 2011, Entergy E Nucclear Operatiions, Inc. (EEntergy) is filing thee attached Teestimony of Entergy Wittnesses Nelsson F. Azeveedo, Alan B. Cox, Jack R. R Strosnideer, Robert E.. Nickell, annd Mark A. Gray G Regardding Contentiion NYS-26-B/RK-TC-11B (Metal Faatigue) (Teestimony), and a its suppoorting exhibiits.

Inn accordancee with paragraphs A andd K.2 of the Boards B Septtember 4, 20009, Protectiive Order, coounsel for En ntergy is nottifying the Board B that poortions of thee Testimony quote or referencee exhibits thaat contain Enntergy-Desiggnated Proprrietary Inform mation Ownned by Westinghhouse. The exhibits e thatt contain prooprietary infoormation aree listed below w, including the proprietaary exhibits submitted s byy Entergy annd those propprietary exhiibits submittted by other parties thhat are refereenced in Entergys Testim mony.

  • Exhibit ENT E T000183, Testimony of Entergy E Witnnesses Nelsoon F. Azeveddo, Alan B. Cox, Jaack R. Strosn nider, Roberrt E. Nickell, and Mark A. A Gray (Maar. 29, 2012)).

Administrative Judges March 29, 2012 Page 2

  • Exhibit ENT000196, Westinghouse Level 2 Policy/Procedure NSNP 3.2.6, Design Analysis (Mar. 2011).
  • Exhibit ENT000199, Westinghouse Calculation Note Number CN-PAFM-09-100, Rev.

0, Indian Point Unit 2 Insurge/Outsurge and Environmental Fatigue Evaluations, (June 10, 2010).

  • Exhibit ENT000200, Westinghouse Calculation Note Number CN-PAFM-09-63, Rev 0.

Indian Point Unit 2 Pressurizer Insurge/Outsurge Transient Development (June 18, 2010).

  • Exhibit ENT000201, Westinghouse Calculation Note Number CN-PAFM-08-109, Rev.

0, Indian Point Units 2 and 3: Transfer Function Database Development for Hot Leg Surge Nozzle (June 18, 2010).

  • Exhibit ENT000202, Westinghouse Calculation Note Number CN-PAFM-08-78, Rev. 0, Indian Point Units 2 and 3: Transfer Function Database Development for Hot Leg Charging Nozzle (June 18, 2010).
  • Exhibit ENT000203, Westinghouse Calculation Note Number CN-PAFM-08-116, Rev.

0, Indian Point Units 2 BIT Nozzle Transfer Function Database Development (June 18, 2010).

  • Exhibit ENT000204, Westinghouse, Calculation Note CN-PAFM-08-103, Rev. 0, Indian Point Units 2 and 3: Transfer Function Database Development for Accumulator Nozzles (June 17, 2010).
  • Exhibit ENT000205, Westinghouse Calculation Note Number CN-PAFM-09-105, Rev.

0, Indian Point Unit 3 Insurge/Outsurge and Environmental Fatigue Evaluations (June 22, 2010).

  • Exhibit ENT000206, Westinghouse Calculation Note Number CN-PAFM-09-74, Rev. 0, Indian Point Unit 3 Boron Injection Tank Nozzle Environmental Fatigue Evaluations (June 14, 2010).
  • Exhibit ENT000207, Westinghouse Calculation Note Number CN-PAFM-09-13, Rev. 0, Indian Point Unit 3: BITank Nozzle Transfer Function Database Development (June 18, 2010).
  • Exhibit ENT000211, Westinghouse Memorandum LTR-SSO-03-43, Rev. 1, from NS Systems & Safety Analysis, Design Transient Revisions for Indian Point 2 4.7% Uprate

- Revised Figures (Apr. 25, 2003).

  • Exhibit ENT000212, Westinghouse Memorandum LTR-SCS-03-53, Rev. 0, from NS Systems & Safety Analysis, Design Transient Revisions for Indian Point 3 Stretch Power Uprate Project - Revised Figures (Aug. 21, 2003).
  • Exhibit ENT000213, Westinghouse, Systems Standard Design Criteria 1.3.X, Rev. 0, Nuclear Steam Supply System Auxiliary Equipment Design Transients for All Standard Plants (Sept. 1978).

Administrative Judges March 29, 2012 Page 3

  • Exhibit ENT000217, Westinghouse Owners Group, WCAP-9693, Investigation of Feedwater Line Cracking in Pressurized Water Reactor Plants (June 1980).
  • Exhibit ENT000218, Westinghouse Owners Group, WCAP-12639, Pressurizer Surge Line Thermal Stratification Generic Detailed Analysis Program MUHP-1091 Summary Report (June 1990) (WCAP-12639).
  • Exhibit ENT000219, Westinghouse, WCAP-12937, Structural Evaluation of Indian Point Units 2 and 3 Pressurizer Surge Lines, Considering the Effects of Thermal Stratification (May 1991).
  • Exhibit ENT000227, Westinghouse, WCAP-13588, Operating Strategies for Mitigating Pressurizer Insurge and Outsurge Transients (Mar. 1993).
  • Exhibit ENT000228, Calculation Note RCDA-03-75, Indian Point Unit 3 Stretch Power Uprate Reactor Vessel Structural Evaluation (May 2005).
  • Exhibit ENT000229, Calculation Note RCDA-03-64, Indian Point Unit 2 Stretch Power Uprate Reactor Vessel Evaluation (Feb. 2005).
  • Exhibit RIV000034, Pre-filed Written Testimony of Dr. Joram Hopenfeld Regarding NYS-26-B/RK-TC-1B - Metal Fatigue (Dec. 22, 2011).
  • Exhibit RIV000035, Report of Dr. Joram Hopenfeld in Support of Contention NYS B/RK-TC-1B - Metal Fatigue (Dec. 22, 2011).
  • Exhibit RIV000036, Westinghouse, EnvFat User's Manual Version 1 (May 2009).
  • Exhibit RIV000042, Westinghouse, Calculation Note CN-PAFM-05-114, Rev. 0, DC Cook Charging Nozzle License Renewal Environmental Fatigue Evaluations
  • Exhibit RIV000043, Diablo Canyon Unit 1 Insurge/Outsurge and Environmental Fatigue Evaluations, WCAP-170103-P, Rev. 0 (July 2009).
  • Exhibit RIV000050, WCAP-14950, Westinghouse, Mitigation and Evaluation of Pressurizer Insurge/Outsurge Transients (Feb. 1998).
  • Exhibit RIV000055, Westinghouse, Indian Point Unit 3 Pressurizer Insurge/Outsurge Transient Development, CN-PAFM-09-64 (June 2010).
  • Exhibit RIV000056, System Standard Design Criteria, Nuclear Steam Supply System Design Transients (Jan. 11, 1971).
  • Exhibit NYS000342, Westinghouse, Letter No. LTR-PAFM-03-42, Procedures for Transfer Function Database Creation and Guidelines for the Associated Finite Element Analysis (Mar. 2006).
  • Exhibit NYS00358A-B, Westinghouse, WESTEMS' Users Manual, Ver. 4.5 (Mar.

2007).

  • Exhibit NYS000359, Westinghouse, WCAP 14173, Rev. 2, Global to Local Transformations and Stress Transfer Functions for Pressurizer Surge Line, Pressurizer Lower Head and Pressurizer Spray Line (Aug. 1995).
  • Exhibit NYS000361, Westinghouse, WCAP-17199-P, Rev. 0, Environmental Fatigue Evaluation for Indian Point 2 (June 2010).

Administrative Judges March 29, 2012 Page 4

  • Exhibit NYS000362, Westinghouse, WCAP-17200-P, Rev. 0, Environmental Fatigue Evaluation for Indian Point Unit 3 (June 2010).
  • Exhibit NYS000363, Westinghouse, WCAP-17149-P, Rev. 1, Evaluation of Pressurizer Insurge/Outsurge Transients for Indian Point Unit 2 (July 2010); Westinghouse, WCAP-17162-P, Rev. 1, Evaluation of Pressurizer Insurge/Outsurge Transients for Indian Point Unit 3 (July 2010).
  • Exhibit NYS000364, Westinghouse Calculation Note, CN-PAFM-09-21, Indian Point Units 2 & 3 Charging Nozzles Environmental Fatigue Evaluation (June 18, 2010).
  • Exhibit NYS000365, Westinghouse Calculation Note, CN-PAFM-09-67, Pressurizer Surge Nozzle and Lower Head Transfer Functions for Indian Point Units 2 and 3 (June 18, 2010).
  • Exhibit NYS000366, Westinghouse Calculation Note CN-PAFM-09-77, Indian Point Units 2 & 3 Accumulator Nozzle Environmental Fatigue Evaluation (June 18, 2010).
  • Exhibit NYS000367, Westinghouse Calculation Note, CN-PAFM-09-79, Indian Point Unit 2 Boron Injection Tank Nozzle Environmental Fatigue Evaluations (June 18, 2010).
  • Exhibit NYS000368, Westinghouse Calculation Note, CN-PAFM-09-117, Indian Point Units 2 and 3 Hot Leg Surge Nozzle Environmental Fatigue Evaluations (June 18, 2010).
  • Exhibit NYS00369A-B, Westinghouse, WCAP-12191, Rev. 3, Transient and Fatigue Cycle Monitoring Program Transient History Evaluation Report for Indian Point Unit 2 Addendum 1 (Sept. 2003).

In accordance with paragraphs A and K of the Protective Order, the Testimony and relevant exhibits have been appropriately marked as containing Entergy-designated proprietary information,1 and is being served via the NRCs Electronic Information Exchange upon the 1

See Licensing Board Protective Order at 6 (Sept. 4, 2009) (unpublished) (stating that all pleadings, issuances, testimony, exhibits and correspondence in this proceeding that contain proprietary information shall be treated as confidential, marked in accordance with paragraph A above); see also id. at 2 (stating that a label identifying a document as containing proprietary information shall appear on the first page and on each other page of the document) (emphasis added).

Administrative Judges March 29, 2012 Page 5 Board, its law clerks, the Office of the Secretary, and representatives of Hearing Participants that are authorized to receive such information pursuant to the Protective Order.

Respectfully submitted, Executed in accord with 10 C.F.R. § 2.304(d)

Kathryn M. Sutton, Esq.

Paul M. Bessette, Esq.

Counsel for Entergy Nuclear Operations, Inc.

DB1/ 69385569