MONTHYEARML24017A2392024-01-17017 January 2024 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Proposed Valve Testing Frequency Alternative VR-9 ML23226A0742023-08-14014 August 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Remove the Table of Contents from the Technical Specifications ML23180A2322023-06-29029 June 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-276-A, Revision 2 ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23095A3442023-04-0505 April 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Licensing Action Request Regarding Irradiated Fuel Management Plan ML23010A2892023-01-10010 January 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Delay in Issuance of License Amendment Regarding Revising the Methodology Used for Flood Hazard Analysis ML22341A0322022-11-30030 November 2022 10 CFR Part 21 Notification from Curtiss-Wright Nuclear Division for Qualtech Np Supplied Eaton TRM5 Timing Relays ML22241A0362022-08-29029 August 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Adopt TSTF-541, Revision 2 ML22167A1002022-06-16016 June 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Delay in Issuance of License Amendment and Exemptions Regarding Revising the Methodology Used for Flood Hazard Analysis (EPIDs No.L-2021-LLA-0067, L-2021-LLE-0022, L-2021-LLE-0023) ML22136A2122022-05-16016 May 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 ML22089A2452022-03-30030 March 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request VR-12 ML22020A0722022-01-18018 January 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Alternative Requests Regarding VR-10 and VR-11 Inservice Valve Testing ML22020A0702022-01-18018 January 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Proposed Inservice Inspection Alternative IR-063 ML22020A0712022-01-18018 January 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Proposed Alternative VR-12 ML21140A2802021-05-20020 May 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment and Exemptions Regarding Revising the Methodology Used for Flood Hazard Analysis (Epids: L-2021-LLA-0067, L-2021-LLE-0022, L-2021-LLE-0023) ML21110A6852021-04-19019 April 2021 NRR E-mail Capture - Final RAI - Perry - Request to Review the Emergency Plan ML21084A2562021-03-25025 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Adopt TSTF-002, Revision 1 ML21077A0012021-03-17017 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Correction to Acceptance of Relief Requests Regarding VR-3 VR-4, VR-5, VR-6, VR-7, and VR-8 Valve Testing Extensions (Epids: L-2021-LLR-0007 Through L-2021-LLR-0012) ML21070A4042021-03-11011 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant -Acceptance of License Amendment Request to Adopt TSTF-230, Revision 1 ML21063A1922021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-4, Revision 0 ML21063A1912021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-3, Revision 0 ML21063A1932021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-5, Revision 0 ML21063A1952021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-6, Revision 0 ML21063A1982021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-8, Revision 0 ML21063A1962021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-7, Revision 0 ML21063A1342021-03-0404 March 2021 E-Mail Concurrence - SR-2 SE ML21050A1032021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Requests VR-3, Rev. 0 and VR-5, Rev. 0 ML21050A1072021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request VR-7, Rev. 0 ML21050A1112021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Requests VR-4, Rev. 0 and VR-6, Rev. 0 ML21054A1802021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Requests Regarding VR-4, VR-6, and VR-8 Valve Testing Extensions ML21054A1782021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Request Regarding VR-7 Check Valve Testing Extension ML21049A2702021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request SR-2, Rev. 0 (EPID: L-2021-LLR-0005) (2nd Round RAI) ML21054A1742021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Requests Regarding VR-3 and VR-5 Valve Testing Extensions ML21032A3422021-02-0101 February 2021 NRR E-mail Capture - Final RAI - Perry Request for Relief - Proposed Alternative Request SR-2, Rev. 0 ML21027A2032021-01-27027 January 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Request Regarding Snubber Testing Extension ML21021A2602021-01-21021 January 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request Regarding Residual Heat Removal Shutdown Cooling Subsystems ML21011A2732021-01-11011 January 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Review the Emergency Plan ML20325A2782020-11-20020 November 2020 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Part 73 Force-on-Force Exemption ML20289A3562020-10-14014 October 2020 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Revise Technical Specifications Regarding DC Electrical Systems Consistent with TSTF-582 ML20281A3692020-10-0505 October 2020 Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20289A0992020-10-0505 October 2020 NRR E-mail Capture - Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20289A1012020-10-0505 October 2020 NRR E-mail Capture - Final 2nd Round RAI - Perry Request for Relief - Proposed Alternative Request IR-056, Rev. 3 ML20241A0092020-08-27027 August 2020 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Requested Licensing Action, One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic ML20241A0102020-08-27027 August 2020 NRR E-mail Capture - (External_Sender) State Notification of Amendments to Shearon Harris, Unit 1 - Revise TS for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C ML20191A0192020-07-0101 July 2020 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Extension to License Expiration Date by Recapturing Low-Power Testing Time ML20134J0842020-05-13013 May 2020 NRR E-mail Capture - Perry Nuclear Power Plant -Acceptance of License Amendment Request to Revise Technical Specifications Regarding DC Electrical Systems Consistent with TSTF-500, Revision 2 ML20132A0222020-05-0808 May 2020 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Request Regarding Impracticality for Inservice Inspection for Certain Welds ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20127H8692020-05-0606 May 2020 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request IR-054, Rev. 2 ML20111A2802020-04-20020 April 2020 NRR E-mail Capture - Perry Nuclear Power Plant -Acceptance of License Amendment Request to Extend License Expiration Date by Recapturing Low-Power Testing Time 2024-01-17
[Table view] |
Text
Craver, Patti From: Ring, Mark Sent: Thursday, September 01, 2011 10:09 AM To: Gavula, James Cc: Pelton, David; Grobe, Jack
Subject:
RE: Perry Earthquake 1986
- Jim, Thanks for responding, the phone connections were difficult. The reason we were looking for Perry 1986 earthquake info was that an article on the earthquake affecting North Anna came out in conjunction with the NRC sending an AIT. The article stated that only one other time in NRC history has a plant suffered an earthquake that exceeded the design basis and that was Perry in 1986. I didn't remember that the earthquake exceeded the design basis, so we sought more info. Initially we were having difficulty retrieving a copy of the 86 AIT report, so we cast about/called people we thought might have been on the AIT to see what they could remember. Turns out we were eventually able to locate a copy of the report and send it to Mark Franke, the North Anna AIT Team Lead. For Perry, Carl Paperiello was the Team Lead, with you, Jacobson, Danielson, Jones, JJ Harrison, Muffet, and 2 HQS specialists on the team. Jack Grobe was on the AIT team as the then-Perry SRI and Kevin Connaughton as the RI. I told Public Affairs to direct all inquiries to Jack because I was sure he would remember everything. Seriously, according to the AIT report, the quake did in fact exceed the Perry design basis in certain discreet frequencies, but the report essentially dismissed that as insignificant due to the limited severity of the quake. Coincidently, the quake occurred Jan 31, 1986, the day after the SER for the initial license was issued. Normally the license follows the SER directly. However in Perry's case, the initial license was held up until Mar. 17, 1986, due to evaluations associated with the quake. That also complicated the regulatory situation because the plant did not yet have a license, so most of the requirements were not yet in effect. Ifyou are interested, I have a copy of the report. I think we have all the info we need now. Much thanks for your reply.
-Mark From: Gavula, James q 01 Sent: Wednesday, August 3, 1 9:02 PM To: Ring, Mark Cc: Pelton, David
Subject:
Perry Earthquake 1986
- Mark, Sorry about the delay in getting back to you.
Yes, I participated in the response to the Perry seismic event in 1986. I had just started with the NRC and went out with Jim Muffet, and others to perform walk-downs at the plant.
I have vague recollections of the effort. In walking-down the plant I don't remember finding evidence of any damage that we could conclusively attribute to seismic damage. To some extent we were trying to determine if we could discern any piping movements through dents in insulation or scrape marks on piping or equipment, etc. due to spatial interaction between components. I don't remember seeing anything to validate that any significant seismic motion occurred at the site.
There was an issue with the "seismic detectors" which consisted of sets of styluses which would respond to various seismic frequencies that were supposed to leave scratch marks on mirrored plates (or something like that, I never saw them myself). Anyway, when they pulled these out to try to determine the magnitude of the seismic motion, the plates showed traces that would have indicated an "end of the world" type seismic event, 1 I
which obviously didn't happen. The conclusion was that the detector traces resulted from a bad installation or some other construction activities at the plant, and as a result could not be used to determine the magnitude of the ground motion at the site.
I don't remember much else, and don't know if you were looking this type of information or if it was in the least bit helpful.
Let me know if you have any questions.
Jim G.
630-829-9755 2