Confirmation of Requested Initial Operator License Examinations for Watts Bar Nuclear Plant
ML120300592
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 01/27/2012
From: Joel Munday
Division of Reactor Safety II
To: James Shea
Tennessee Valley Authority
References
Download: ML120300592 (5)


Text

I UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 27, 2012 Mr. Joseph W. Shea Manager, Corp. Nuclear Licensing Programs Tennessee Valley Authority 1101 Market Street, LP 4B-C Chattanooga, TN 37402-2801

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR WATTS BAR NUCLEAR PLANT

Dear Mr. Shea:

In a letter dated July 8, 2011, your staff responded to Regulatory Issue Summary 2011-04 and requested we schedule initial license operator examinations for the Watts Bar Nuclear Plant.

Based on your letter and following discussions with your staff, we have scheduled the requested examinations as follows:

2012 2013 Plant / Station Date Applicants Date Applicants Watts Bar 11/26* 16 6/3 16

  • Changed from your original requested date On-site validation of the examinations is typically scheduled to occur approximately three weeks before each examination. If you have a need to change the dates of your scheduled exam(s) from that (those) listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.

We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks.

If the number of applicants is reduced to less than ten (10) for any examination, please inform us as this will impact the examination schedule.

TVA 2 A supplementary letter will be sent to each stations training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner=s name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates. If you have any questions concerning this information, please contact Mr. Malcolm Widmann, Chief, Operations Branch I, at 404-997-4550 or Mr. Mark Franke, Chief, Operations Branch II at 404-997-4436.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC=s public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Joel T. Munday, Director Division of Reactor Safety Docket Nos.: 50-391 License Nos.: CPPR-92 cc: (See page 3)

_ML120300592________________________ G SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRS RII:DRS SIGNATURE NAME M Bates MWidmann M.Franke J Munday DATE 1/ /2012 1/ /2012 1/ /2012 1/ /2012 1/ /2012 1/ /2012 1/ /2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO TVA 3 cc: Senior Resident Inspector D. E. Grissette U.S. Nuclear Regulatory Commission Site Vice President Watts Bar Nuclear Plant Watts Bar Nuclear Plant 1260 Nuclear Plant Road Tennessee Valley Authority Spring City, TN 37381-2000 Electronic Mail Distribution Ann Harris G. A. Boerschig 341 Swing Loop Plant Manager Rockwood, TN 37854 Watts Bar Nuclear Plant, MOB 2R-WBN Tennessee Valley Authority Tennessee Valley Authority Electronic Mail Distribution ATTN: Mr. William Thompson Training Manager D. K. Guinn Watts Bar Nuclear Plant Manager, Licensing P. O. Box 200 Watts Bar Nuclear Plant, ADM 1L-WBN Spring City, TN 37381 Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381 E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority Electronic Mail Distribution Gordon P. Arent New Generation Licensing Manager Watts Bar Nuclear Plant, EQB 1B-WBN Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381 County Mayor P.O. Box 156 Decatur, TN 37322 County Executive 375 Church Street Suite 215 Dayton, TN 37321 Tennessee Department of Environment &

Conservation Division of Radiological Health 401 Church Street Nashville, TN 37243

TVA 4 Letter to Joseph W. Shea from Joel T. Munday dated January27, 2012.

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR WATTS BAR NUCLEAR PLANT Distribution:

C. Evans L. Douglas OEMAIL V. McCree L. Wert J. Munday H. Christensen M. Widmann M. Franke K. Schaaf J. Vincent J. Kirby S. Shaeffer R. Haag J. McHale RIDSNRRDIRSIRIB Resource Document Control Desk - Licensing RIDSNRRDIRS PUBLIC RidsNrrPMWattsBar1 Resource RidsNrrPMWattsBar2 Resource