Letter Sequence RAI |
|---|
TAC:ME6360, Allow 7 Day Completion Time for a TURBINE-DRIVEN AFW Pump Inoperable, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO (Approved, Closed) TAC:ME6361, Allow 7 Day Completion Time for a TURBINE-DRIVEN AFW Pump Inoperable, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO (Approved, Closed) |
|
MONTHYEARML1115301142011-06-0101 June 2011 License Amendment Request 11-04, Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, TS 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources-Operating, TS 3.8.9, Distribution Systems.. Project stage: Request ML1120300652011-07-21021 July 2011 Acceptance Review Email, Request to Revise Technical Specifications Related to Auxiliary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF-340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2 Project stage: Acceptance Review ML1200401172011-12-22022 December 2011 Request for Additional Information E-mail, Revise Technical Specifications Related to Auxiliary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF 340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2 (TAC Nos. ME6360-ME6361) Project stage: RAI ML1200401222011-12-22022 December 2011 Request for Additional Information, Revise Technical Specifications Related to Auxiliary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF 340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2 (TAC Nos. ME6360-ME6361) Project stage: RAI ML1200504882012-01-0505 January 2012 Request for Additional Information, Round 2, Revise Technical Specifications Related to Auxiliary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF 340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2 (TAC ME6360-ME6361) Project stage: RAI ML1200504812012-01-0505 January 2012 Email, Request for Additional Information, Round 2, Revise Technical Specifications Related to Auxiliary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF 340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2 Project stage: RAI DCL-11-059, Response to NRC Request for Additional Information Regarding PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, .2012-02-0606 February 2012 Response to NRC Request for Additional Information Regarding PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, . Project stage: Response to RAI ML1213607062012-05-21021 May 2012 Memo to File, Summary of 5/11/12 Telephone Conference Issues Associated TSTF-412, Rev. 3 and Effect on Staff Review of Request to Revise Technical Specifications Related to Auxiliary Feedwater System (TAC ME6360-ME6361) Project stage: Approval DCL-12-057, Supplement to PG&E Letter DCL-12-017, Response to NRC Request for Additional Information: NRC Question 12012-05-31031 May 2012 Supplement to PG&E Letter DCL-12-017, Response to NRC Request for Additional Information: NRC Question 1 Project stage: Supplement ML1217200982012-06-20020 June 2012 Request for Additional Information Email, Round 3, Revise Technical Specifications Related to Auxiliary Feedwater System to Adopt TSTF-245 Rev. 1, TSTF 340 Rev. 3, TSTF-412 Rev. 3, and TSTF-439 Rev. 2 (TAC ME6360-ME6361) Project stage: RAI DCL-12-076, Response to NRC Second Request for Additional Information Regarding PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification (TS) 3.6.6, Containment Spray and Cooling Systems, Ts2012-08-0606 August 2012 Response to NRC Second Request for Additional Information Regarding PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification (TS) 3.6.6, Containment Spray and Cooling Systems, Ts Project stage: Request DCL-12-107, Supplement to PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification (TS) 3.6.6, Containment Spray and Cooling Systems, TS 3.7.5, Auxiliary Feedwater (AFW) System, TS 3.8.1, Ac...2012-11-0101 November 2012 Supplement to PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification (TS) 3.6.6, Containment Spray and Cooling Systems, TS 3.7.5, Auxiliary Feedwater (AFW) System, TS 3.8.1, Ac... Project stage: Supplement ML12352A0672013-01-31031 January 2013 Issuance of Amendment Nos. 215 and 217, Revise Technical Specifications Related to Auxilary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF-340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2 Project stage: Approval 2012-02-06
[Table View] |
Email, Request for Additional Information, Round 2, Revise Technical Specifications Related to Auxiliary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF 340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2| ML120050481 |
| Person / Time |
|---|
| Site: |
Diablo Canyon  |
|---|
| Issue date: |
01/05/2012 |
|---|
| From: |
Steven Lynch Plant Licensing Branch IV |
|---|
| To: |
Soenen P Pacific Gas & Electric Co |
|---|
| Lynch, S T, NRR/DORL/LPL4, 301-415-1524 |
| Shared Package |
|---|
| ML120050473 |
List: |
|---|
| References |
|---|
| TAC ME6360, TAC ME6361 |
| Download: ML120050481 (1) |
|
Text
From:
Lynch, Steven Sent:
Thursday, January 05, 2012 3:41 PM To:
Soenen, Philippe R Cc:
Lent, Susan; Burkhardt, Janet; Wang, Alan
Subject:
RAIs for DCPP Changes to Aux Feedwater Technical Specifications Based Upon TSTF 245, 340, 412 and 439 (TAC Nos. ME6360 and ME6361)
Attachments:
RAIs for Diablo Canyon Changes to Aux Feedwater Tec Specs.docx
- Philippe, By "DCL-11-059, Diablo Canyon Units 1 & 2, License Amendment Request 11-04, Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, TS 3.7.5, [[system" contains a listed "[" character as part of the property label and has therefore been classified as invalid. System, TS 3.8.1, AC Sources-Operating, TS 3.8.9, Distribution Sys|letter dated June 1, 2011]] (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML11530114), Pacific Gas and Electric Company (PG&E) submitted PG&E Letter DCL 059, License Amendment Request 11-04, Revision to Technical Specification (TS) 3.6.6, Containment Spray and Cooling Systems, TS 3.7.5, Auxiliary Feedwater (AFW) System, TS 3.8.1, AC Sources -
Operating, TS 3.8.9, Distribution Systems - Operating, and TS Example 1.3-3.
PG&E submitted a request for revision to Technical Specifications (TS) 3.7.5, Auxiliary Feedwater (AFW)
System, 3.6.6, Containment Spray and Cooling Systems, 3.8.1, AC Sources - Operating, 3.8.9, Distribution Systems - Operating, and Example 1.3-3 to clarify the operability of an AFW train during alternate alignments; establish conditions, required actions, and completion times when one steam supply to the turbine driven AFW pump is inoperable concurrent with an inoperable motor driven AFW (MDAFW) train; remove second completion times from TSs; and provide specific actions to be taken when automatic control of the MDAFW level control valves is not functional. These changes are consistent with the guidance provided in Technical Specification Task Force (TSTF) Travelers TSTF-245, Revision 1, AFW Train Operable when in Service, TSTF-340, Revision 3, Allow 7 day completion Time for a Turbine-driven AFW Pump Inoperable, TSTF-412, Revision 3, Provide Actions for One Steam Supply to Turbine Driven AFW/EFW Pump Inoperable, and TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time From Discovery of Failure to Meet an LCO.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the information provided in your application and determined that additional information is required in order to complete its review. This request for additional information (RAI), found as an attachment to this e-mail, was discussed with you on December 15, 2011. In a follow-up call on January 5, 2012, it was agreed that a response to this RAI would be provided within 30 days of the date of this message. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1524 or via e-mail at Steven.Lynch@nrc.gov. The NRC staff has determined that no security-related or proprietary information is contained herein.
- Regards, Steve Lynch General Engineer Office of Nuclear Reactor Regulation Division of Operating Reactor Licensing, Plant Licensing Branch 4 Office: O-12F08 MS: O-12D20 Phone: 301-415-1524