Letter Sequence Approval |
|---|
TAC:ME6360, Allow 7 Day Completion Time for a TURBINE-DRIVEN AFW Pump Inoperable, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO (Approved, Closed) TAC:ME6361, Allow 7 Day Completion Time for a TURBINE-DRIVEN AFW Pump Inoperable, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO (Approved, Closed) |
|
MONTHYEARML1115301142011-06-0101 June 2011 License Amendment Request 11-04, Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, TS 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources-Operating, TS 3.8.9, Distribution Systems.. Project stage: Request ML1120300652011-07-21021 July 2011 Acceptance Review Email, Request to Revise Technical Specifications Related to Auxiliary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF-340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2 Project stage: Acceptance Review ML1200401172011-12-22022 December 2011 Request for Additional Information E-mail, Revise Technical Specifications Related to Auxiliary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF 340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2 (TAC Nos. ME6360-ME6361) Project stage: RAI ML1200401222011-12-22022 December 2011 Request for Additional Information, Revise Technical Specifications Related to Auxiliary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF 340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2 (TAC Nos. ME6360-ME6361) Project stage: RAI ML1200504882012-01-0505 January 2012 Request for Additional Information, Round 2, Revise Technical Specifications Related to Auxiliary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF 340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2 (TAC ME6360-ME6361) Project stage: RAI ML1200504812012-01-0505 January 2012 Email, Request for Additional Information, Round 2, Revise Technical Specifications Related to Auxiliary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF 340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2 Project stage: RAI DCL-11-059, Response to NRC Request for Additional Information Regarding PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, .2012-02-0606 February 2012 Response to NRC Request for Additional Information Regarding PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, . Project stage: Response to RAI ML1213607062012-05-21021 May 2012 Memo to File, Summary of 5/11/12 Telephone Conference Issues Associated TSTF-412, Rev. 3 and Effect on Staff Review of Request to Revise Technical Specifications Related to Auxiliary Feedwater System (TAC ME6360-ME6361) Project stage: Approval DCL-12-057, Supplement to PG&E Letter DCL-12-017, Response to NRC Request for Additional Information: NRC Question 12012-05-31031 May 2012 Supplement to PG&E Letter DCL-12-017, Response to NRC Request for Additional Information: NRC Question 1 Project stage: Supplement ML1217200982012-06-20020 June 2012 Request for Additional Information Email, Round 3, Revise Technical Specifications Related to Auxiliary Feedwater System to Adopt TSTF-245 Rev. 1, TSTF 340 Rev. 3, TSTF-412 Rev. 3, and TSTF-439 Rev. 2 (TAC ME6360-ME6361) Project stage: RAI DCL-12-076, Response to NRC Second Request for Additional Information Regarding PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification (TS) 3.6.6, Containment Spray and Cooling Systems, Ts2012-08-0606 August 2012 Response to NRC Second Request for Additional Information Regarding PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification (TS) 3.6.6, Containment Spray and Cooling Systems, Ts Project stage: Request DCL-12-107, Supplement to PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification (TS) 3.6.6, Containment Spray and Cooling Systems, TS 3.7.5, Auxiliary Feedwater (AFW) System, TS 3.8.1, Ac...2012-11-0101 November 2012 Supplement to PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification (TS) 3.6.6, Containment Spray and Cooling Systems, TS 3.7.5, Auxiliary Feedwater (AFW) System, TS 3.8.1, Ac... Project stage: Supplement ML12352A0672013-01-31031 January 2013 Issuance of Amendment Nos. 215 and 217, Revise Technical Specifications Related to Auxilary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF-340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2 Project stage: Approval 2012-02-06
[Table View] |
Text
May 21, 2012 MEMORANDUM TO: FILE FROM:
Joseph M. Sebrosky /RA/
Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
DIABLO CANYON POWER PLANT, UNIT NOS. 1 AND 2 -
SUMMARY
OF TELEPHONE CONFERENCE RE: ISSUES ASSOCIATED WITH TECHNICAL SPECIFICATION TASK FORCE TRAVELER 412 AND THE EFFECT ON THE STAFF REVIEW OF A JUNE 1, 2011, LICENSE AMENDMENT REQUEST (TAC NOS. ME6360 AND ME6361)
This memorandum summarizes a telephone discussion on May 11, 2012, between the U.S. Nuclear Regulatory Commission (NRC) staff and Pacific Gas and Electric (PG&E, the licensee). The discussion was in regard to the results of a May 8, 2012, public meeting associated with Technical Specification Task Force (TSTF) change traveler TSTF-412, and the effect the outcome of this meeting would have on the NRC staffs review of a June 1, 2011, license amendment request from PG&E that references this TSTF. Participants in the discussion included PG&E representatives J. Bailey, J. Nelson, M. Richardson, and P. Soenen, and NRC staff Stan Gardocki and Joe Sebrosky.
By "DCL-11-059, Diablo Canyon Units 1 & 2, License Amendment Request 11-04, Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, TS 3.7.5, [[system" contains a listed "[" character as part of the property label and has therefore been classified as invalid. System, TS 3.8.1, AC Sources-Operating, TS 3.8.9, Distribution Sys|letter dated June 1, 2011]] (Agencywide Documents Access and Management System (ADAMS) Accession No. ML111530114), PG&E submitted a license amendment request that proposed changes to several Technical Specifications (TSs) including changes to TS 3.7.5, Auxiliary Feedwater (AFW) System. The license amendment request included changes to be consistent with TSTF-412, Revision 3, Allow 7 Day Completion Time for a Turbine-driven AFW Pump Inoperable.
During a public meeting on May 8, 2012, TSTF-412 was discussed, including the NRC staffs issues associated with the portion of the TSTF traveler associated with a provision for 24-hour completion time for an inoperable motor-driven AFW pump coincident with one inoperable steam supply to the steam-driven AFW pump. The NRC staffs issues are documented in an April 12, 2012, memorandum from Greg Casto to Robert Elliot (ADAMS Accession No. ML111530114).
Because of the issues with TSTF-412 identified during the May 8, 2012, meeting and in the memorandum dated April 12, 2012, PG&E proposed amending the response to question number 1 provided in its "DCL-11-059, Response to NRC Request for Additional Information Regarding PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification 3.6.6, [[system" contains a listed "[" character as part of the property label and has therefore been classified as invalid. and Cooling Systems, .|letter dated February 6, 2012]] (ADAMS Accession No. ML12038A041),
associated with the June 1, 2011, license amendment request. Specifically, the NRC staff had included the following note in question 1:
Note: the licensee can limit the proposed condition, where the inoperable steam supply could only exist on the SG [steam generator] that can be fed by the operable MDAFWP [motor-driven auxiliary feedwater pump].
During the phone call on May 11, 2012, PG&E stated that it would revise its response dated February 6, 2012, to question number 1 to remove the 24-hour limiting condition for operation (LCO) in accordance with the above note and replace it with a 48-hour LCO when the conditions in the above note are met. The NRC staff indicated it would review the revised response when it was provided by PG&E.
Docket Nos. 50-275 and 50-323
ML121360706 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NRR/LPL4/PM NAME JSebrosky JBurkhardt MMarkley JSebrosky DATE 5/21/12 5/16/12 5/21/12 5/21/12