MONTHYEARML1101002912011-01-0505 January 2011 Cooper - License Amendment Request for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves Project stage: Request ML1104202012011-02-11011 February 2011 Acceptance Review Email, License Amendment Request, Revise Technical Specification 3.4.3, Safety/Relief Valves (Srvs) and Safety Valves (Svs), to Reduce Number of Required SRVs for Overpressure Protection Project stage: Acceptance Review ML1114307042011-06-0303 June 2011 Request for Additional Information, License Amendment Request, Revise Technical Specification 3.4.3, Safety/Relief Valves (Srvs) and Safety Valves (Svs), to Reduce Number of Required SRVs for Overpressure Protection Project stage: RAI ML1118100852011-06-30030 June 2011 Notice of Meeting with Nebraska Public Power District to Discuss Cooper'S Request to Revise TS 3.4.3, Safety/Relief Valves (Srvs) and Safety Valves (Svs), to Reduce Number of Required SRVs for Overpressure Protection Project stage: Meeting ML1121401792011-07-11011 July 2011 Licensee Slides from Conference Call with Nebraska Public Power District Project stage: Other ML1121700812011-08-18018 August 2011 7/12/11 - Summary of Teleconference with Nebraska Public Power District to Discuss Cooper'S Request to Revise TS 3.4.3, Safety/Relief Valves (Srvs) and Safety Valves (Svs) at Cooper Nuclear Station Project stage: Meeting NLS2011086, Supplement to License Amendment Request for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves2011-10-0606 October 2011 Supplement to License Amendment Request for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves Project stage: Supplement NLS2011088, Response to Nuclear Regulatory Commission Request for Additional Information for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves2011-10-18018 October 2011 Response to Nuclear Regulatory Commission Request for Additional Information for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves Project stage: Request ML1104808522011-11-0101 November 2011 Request for Withholding Information from Public Disclosure, 2/18/11 Affidavit Executed by J. Harrison, GE Hitachi Nuclear Energy, NEDC-33543P, Revision 0 Project stage: Withholding Request Acceptance ML1136302582012-01-31031 January 2012 Issuance of Amendment No. 240, Revise Technical Specification 3.4.3, Safety/Relief Valves (Srvs) and Safety Valves (Svs), to Reduce Number of Required SRVs for Overpressure Protection Project stage: Approval 2011-02-11
[Table View] |
|
---|
Category:Letter type:NLS
MONTHYEARNLS2024006, Response to Nuclear Regulatory Commission'S Request for Additional Information for Relief Request RC3-022024-01-25025 January 2024 Response to Nuclear Regulatory Commission'S Request for Additional Information for Relief Request RC3-02 NLS2024007, Emergency Plan Implementing Procedure 5.7.1, Revision 732024-01-16016 January 2024 Emergency Plan Implementing Procedure 5.7.1, Revision 73 NLS2024003, 30 Day Report - Unauthorized Disassembly of Liquid Scintillation Detector2024-01-15015 January 2024 30 Day Report - Unauthorized Disassembly of Liquid Scintillation Detector NLS2024004, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20232024-01-10010 January 2024 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2023 NLS2023053, ISFSI, Supplement to Exemption Request from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-30030 November 2023 ISFSI, Supplement to Exemption Request from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NLS2023050, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NLS2023045, Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program2023-11-15015 November 2023 Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program NLS2023051, Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-10-10010 October 2023 Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023049, 10 CFR Part 21 Report Regarding HGA Relays2023-09-0606 September 2023 10 CFR Part 21 Report Regarding HGA Relays NLS2023029, License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks2023-09-0606 September 2023 License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks NLS2023047, Licensee Guarantees of Payment of Deferred Premiums2023-07-26026 July 2023 Licensee Guarantees of Payment of Deferred Premiums NLS2023033, 10 CFR 50.55a Relief Request RC3-022023-06-27027 June 2023 10 CFR 50.55a Relief Request RC3-02 NLS2023039, Preparation and Scheduling of Operator Licensing Examinations2023-06-0101 June 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2023038, Nebraska Public Power District 2022 Financial Report2023-05-22022 May 2023 Nebraska Public Power District 2022 Financial Report NLS2023031, Annual Radiological Environmental Report2023-05-11011 May 2023 Annual Radiological Environmental Report NLS2023017, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023018, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NLS2023030, Annual Radioactive Effluent Release Report2023-04-27027 April 2023 Annual Radioactive Effluent Release Report NLS2023007, Technical Specification Bases Changes2023-04-17017 April 2023 Technical Specification Bases Changes NLS2023027, Annual Report of Individual Exposure Monitoring2023-04-13013 April 2023 Annual Report of Individual Exposure Monitoring NLS2023021, Quality Assurance Program Changes2023-04-10010 April 2023 Quality Assurance Program Changes NLS2023020, Decommissioning Funding2023-03-29029 March 2023 Decommissioning Funding NLS2023019, Property Insurance Coverage2023-03-23023 March 2023 Property Insurance Coverage NLS2023010, Inservice Inspection OAR-1 Owner'S Activity Report for Cooper Nuclear Station2023-02-0909 February 2023 Inservice Inspection OAR-1 Owner'S Activity Report for Cooper Nuclear Station NLS2023005, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20222023-01-19019 January 2023 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2022 NLS2022054, Preparation and Scheduling of Operator Licensing Examinations2023-01-0505 January 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2022055, Emergency Plan, Revision 812023-01-0404 January 2023 Emergency Plan, Revision 81 NLS2022053, CNS-2022-11 Post Exam Submittal2022-11-22022 November 2022 CNS-2022-11 Post Exam Submittal NLS2022050, Notification of Revision to Cooper Nuclear Station Emergency Response Data System Data Point Library2022-11-0909 November 2022 Notification of Revision to Cooper Nuclear Station Emergency Response Data System Data Point Library NLS2022048, Management Change and Correspondence Update2022-11-0101 November 2022 Management Change and Correspondence Update NLS2022047, Core Operating Limits Report, Cycle 33, Revision 02022-10-14014 October 2022 Core Operating Limits Report, Cycle 33, Revision 0 NLS2022042, 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report2022-10-0707 October 2022 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report NLS2022037, Emergency Plan, Revision 80, Summary of 50.54(q) Analyses2022-08-18018 August 2022 Emergency Plan, Revision 80, Summary of 50.54(q) Analyses NLS2022035, Evacuation Time Estimate Report for Cooper Nuclear Station2022-08-16016 August 2022 Evacuation Time Estimate Report for Cooper Nuclear Station NLS2022031, Licensee Guarantees of Payment of Deferred Premiums2022-07-19019 July 2022 Licensee Guarantees of Payment of Deferred Premiums NLS2022005, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-06-16016 June 2022 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements NLS2022025, Nebraska Public Power District Letter (NLS2022010) to U.S. Nuclear Regulatory Commission Dated April 5, 2022, Annual Report of Individual Exposure Monitoring2022-06-0606 June 2022 Nebraska Public Power District Letter (NLS2022010) to U.S. Nuclear Regulatory Commission Dated April 5, 2022, Annual Report of Individual Exposure Monitoring NLS2022016, Annual Radiological Environmental Report2022-05-10010 May 2022 Annual Radiological Environmental Report NLS2022020, Nebraska Public Power District, Cooper Nuclear Station, 2021 Financial Report2022-05-0202 May 2022 Nebraska Public Power District, Cooper Nuclear Station, 2021 Financial Report NLS2022014, Annual Radioactive Effluent Release Report2022-04-27027 April 2022 Annual Radioactive Effluent Release Report NLS2022010, Annual Report of Individual Exposure Monitoring2022-04-0505 April 2022 Annual Report of Individual Exposure Monitoring NLS2022009, Property Insurance Coverage2022-03-23023 March 2022 Property Insurance Coverage NLS2022011, Preparation and Scheduling of Operator Licensing Examinations2022-03-18018 March 2022 Preparation and Scheduling of Operator Licensing Examinations NLS2022004, Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Relief Request RR5-01, Revision 12022-02-0707 February 2022 Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Relief Request RR5-01, Revision 1 NLS2022003, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20212022-01-20020 January 2022 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2021 NLS2021067, ISFSI - Independent Spent Fuel Storage Installation Decommissioning Funding Plan2021-12-16016 December 2021 ISFSI - Independent Spent Fuel Storage Installation Decommissioning Funding Plan NLS2021069, Withdrawal of Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2021-12-15015 December 2021 Withdrawal of Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2021066, Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Alternative Request RI5-02, Revision 32021-12-10010 December 2021 Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Alternative Request RI5-02, Revision 3 NLS2021065, Clarification of Response to Nuclear Regulatory Commission'S Request for Additional Information for Alternative Request RS-012021-12-0606 December 2021 Clarification of Response to Nuclear Regulatory Commission'S Request for Additional Information for Alternative Request RS-01 NLS2021056, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2021-11-16016 November 2021 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements 2024-01-25
[Table view] |
Text
N Nebraska Public Power District Always there when you need us 50.90 NLS2011088 October 18, 2011 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Response to Nuclear Regulatory Commission Request for Additional Information for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves (TAC No. ME5287)
Cooper Nuclear Station, Docket No. 50-298, DPR-46
References:
- 1. Letter from Lynnea E. Wilkins, U. S. Nuclear Regulatory Commission, to Brian J. O'Grady, Nebraska Public Power District, dated June 3, 2011, "Cooper Nuclear Station - Request for Additional Information License Amendment Request for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves (TAC NO. ME5287)"
- 2. Letter from Brian J. O'Grady, Nebraska Public Power District, to the U.S.
Nuclear Regulatory Commission, dated January 5, 2011, "License Amendment Request for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves"
- 3. Letter from Brian J. O'Grady, Nebraska Public Power District, to the U.S.
Nuclear Regulatory Commission, dated October 6, 2011, "Supplement to License Amendment Request for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves"
Dear Sir or Madam:
The purpose of this letter is for Nebraska Public Power District (NPPD) to submit a response to a request for additional information (RAI) from the Nuclear Regulatory Commission (NRC)
(Reference 1). The RAI requested information in support of NRC's review of a license amendment request (LAR) for the Cooper Nuclear Station (CNS) Technical Specifications (TS) to revise TS 3.4.3, "Safety/Relief Valves (SRVs) and Safety Valves (SVs)" to reduce the number of SRVs required to be OPERABLE for over-pressure protection (Reference 2).
Responses to the specific RAI questions were discussed in a public telephone conference on July 12, 2011. Afterwards, the NRC requested these responses be submitted to the public docket, and they are provided here in the Attachment with revisions as discussed. Subsequent to the public COOPER NUCLEAR STATION V 0oI P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 ww-w.nppd .com
NLS2011088 Page 2 of 2 teleconference, NPPD decided to supplement the LAR and request seven of eight rather than five of eight SRVs (Reference 3). No regulatory commitments are made in this submittal.
The information submitted by this response to the RAI does not change the conclusions nor the basis of the no significant hazards consideration evaluation provided with Reference 3.
If you have any questions concerning this matter, please contact David Van Der Kamp, Licensing Manager, at (402) 825-2904.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on (da/a ID I(dafe)
Sincerely, Demetrius L. Willis General Manager of Plant Operations
/em Attachment cc: Regional Administrator w/ attachment USNRC - Region IV Cooper Project Manager w/ attachment USNRC - NRR Project Directorate IV- 1 Senior Resident Inspector w/ attachment USNRC - CNS Nebraska Health and Human Services w/ attachment Department of Regulation and Licensure NPG Distribution w/o attachment CNS Records w/ attachment
NLS2011088 Attachment Page 1 of 3 Attachment Response to Nuclear Regulatory Commission Request for Additional Information for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves (TAC No. ME5287)
Cooper Nuclear Station, Docket No. 50-298, DPR-46 Ouestion #1 Please discuss if all cases were analyzed (i.e., all transients addressed).
Response
As discussed in the public teleconference on July 12, 2011, the Safety Relief Valve (SRV) analysis was performed for the limiting cases of Transients and Special Events, i.e. most bounding. Licensing-Basis for Over-Pressure Protection (OPP) identifies the limiting transient to be Main Steam Isolation Valve (MSIV) fast closure followed by a high neutron flux scram. The limiting special event for OPP is the Anticipated Transient Without Scram (ATWS) with MSIV closure or pressure regulator fails open.
Ouestion #2 Please discuss the number of SR Vs that are neededfor operation as described in the design basis calculations.
Response
Five SRVs are needed for operation. The GE Hitachi Reports provided with Reference 1 are now the Cooper Nuclear Station (CNS) design analysis for the required number of SRVs.
Ouestion #3 Please discuss if these valves have caused a plant shutdown in the past.
Response
No. SRV failures have not caused a plant shutdown.
Ouestion #4 Please discuss the timing and increments related to SR V actuationfor the full range of transients.Please also discuss which five will be the "required"valves or, if the request is for anyfive, justify the basisfor the TS having only four SR Vs availablewhen in the Limiting Conditionfor Operation.
NLS2011088 Attachment Page 2 of 3
Response
Safety Valves (SVs) and SRVs actuate over the full spectrum of transients as follows. SVs spring tension is set at 1240 + 37.2 psig and provides blowdown of approximately 38 to 50 psig, and they relieve > 644,543 lbm/hr each.
Spring lift setpoints for SRVs 71A, 71B and 71G are set at 1100 + 33.0 psig and have capacity > 877,900 lbm/hr each. SRVs 71C, 71E and 71H are set at 1090 +/- 32.7 psig and have capacity > 870,000 lbm/hr each. SRVs 71D and 71F are set at 1080 +/- 32.4 psig and have capacity > 862,100 lbm/hr each.
The request was not for specifically identified SRVs, but for any five OPERABLE. After the July 12, 2011 public teleconference, Nebraska Public Power District (NPPD) decided to supplement the submittal and request seven of eight SRVs required in Technical Specifications (TS) Limiting Condition for Operation (LCO) 3.4.3 to be operable instead of five of eight. This will reserve two SRVs above the five required for OPP and ATWS when operating in a condition of one SRV inoperable as permitted by the LCO action statement.
Ouestion #5 Please discuss if humanfactors will affect the mitigation of an accident and, ifso, if a human factors analysis has been performed.
Response
Human Factors are not affected, because TS LCO 3.4.3 only affects the SRV pilot actuated spring lift function for OPP and ATWS. Manual actions are not required to mitigate OPP or ATWS consequences. No human factors analysis was required.
Ouestion #6 Please discuss if the maintenance rule was taken into consideration. What maintenance issues, if any, contributedto the needfor this request?
Response
Maintenance Rule Functional Failure (MRFF) Evaluations include two SRV functions:
MS-Fl 1, Maintain Reactor Coolant Pressure Boundary, and ADS-PF02, Prevent.
Overpressurization of the Nuclear System (Mechanical Components).
For SRV MRFFs, CNS noted the following. An MRFF does not exist if the SRV can perform its Safety Related Function; the design functions of SRVs are not being changed.
MRFF evaluations are performed for each failure, regardless of how many SRVs are required by TS. Since MR became effective, all SRV as-found bench test failures have
NLS2011088 Attachment Page 3 of 3 been evaluated for MRFF, and the only MRFF CNS has had was in 2003 when SRV 71 G on Main Steam Line 'D' lifted in excess of its Analytical Limit.
No maintenance issues contributed to the need for this request.
Ouestion #7 Please discuss how the reduction in requiredSR Vs affects the heat load in the suppressionpool.
Response
Suppression Pool heat loads for SRV lifts are bounded by the CNS Loss of Coolant Accident analysis values.
Ouestion #8 Please discuss any structuralissues that would be impacted.
Response
The analysis shows that Suppression Pool and Drywell structural components remain capable of coping with SRV lifts in response to the bounding events and transients.
Ouestion #9 For all the above, please discuss the basisfor concluding the change would not increase the probability/consequencesof an accident and not reduce safety margins as described in the Updated Safety Analysis Report.
Response
After the July 12, 2011 public teleconference, NPPD decided to supplement the submittal and request seven of eight SRVs required in TS LCO 3.4.3 to be OPERABLE instead of five of eight. The No Significant Hazards Consideration evaluation was revised and provided in Reference 3. It provides the new basis for concluding the change would not increase the probability/consequences of an accident and not reduce safety margins.
4 ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS© ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS04 Correspondence Number: NLS2011088 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITMENT COMMITTED DATE COMMITMENT NUMBER OR OUTAGE None 4 4.
4 4-
- 4. 1-PROCEDURE 0.42 REVISION 27 PAGE 18 OF 25 [