NRR E-mail Capture - Acceptance Review for ME6999- Shearon Harris Unit 1, Realistic LBLOCA Methodology (TS 6.9.1.6.2)
ML11272A064
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/29/2011
From: Mozafari B
Division of Operating Reactor Licensing
To: Caves J
Progress Energy Co
References
TAC ME6999
Download: ML11272A064 (2)


Text

1 NRR-PMDAPEm Resource From:

Mozafari, Brenda Sent:

Thursday, September 29, 2011 9:23 AM To:

john.caves@pgnmail.com Cc:

Lingam, Siva; Saba, Farideh

Subject:

Acceptance Review for ME6999-Shearon Harris Unit 1, Realistic LBLOCA Methodology (TS 6.9.1.6.2).

SHEARON HARRIS UNIT 1, LICENSE AMENDMENT REQUEST FOR REVISION TO TECHNICAL SPECIFICATION CORE OPERATING LIMITS REPORT REFERENCES FOR REALISTIC LARGE BREAK LOCA ANALYSIS. dated 08/22/2011.

The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.

[Note: Your justification for omission of a clad ballooning and rupture, and fuel pellet relocation model, while clearly based on extensive study, significant research, and judicial selection of modeling assumptions, remains questionable. We will need to review a significant amount of information, and the review schedule for this request is extremely tight and appears to be need-based. Your support in providing timely responses to our information requests will be crucial to meeting your requested need date].

Sincerely Brenda L. Mozafari Senior Project Manager, NRR/DORL U.S. Nuclear Regulatory Commission 301-415-2020 email: brenda.mozafari@nrc.gov

Hearing Identifier:

NRR_PMDA Email Number:

157 Mail Envelope Properties (Brenda.Mozafari@nrc.gov20110929092200)

Subject:

Acceptance Review for ME6999-Shearon Harris Unit 1, Realistic LBLOCA Methodology (TS 6.9.1.6.2).

Sent Date:

9/29/2011 9:22:38 AM Received Date:

9/29/2011 9:22:00 AM From:

Mozafari, Brenda Created By:

Brenda.Mozafari@nrc.gov Recipients:

"Lingam, Siva" <Siva.Lingam@nrc.gov>

Tracking Status: None "Saba, Farideh" <Farideh.Saba@nrc.gov>

Tracking Status: None "john.caves@pgnmail.com" <john.caves@pgnmail.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2471 9/29/2011 9:22:00 AM Options Priority: