Final Safety Analysis Report, Amendment 106
ML11266A136
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 09/15/2011
From: Stinson D
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML11266A136 (28)


Text

Attachment 1 to be withheld from Public Disclosure Under 10 CFR 2.390. When separated from this Enclosure, this letter is decontrolled.

Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 September 15, 2011 10 CFR 50.4(b)(6) 10 CFR 50.34(b) 10 CFR 2.390(d)(1)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 Docket No. 50-391

Subject:

WATTS BAR NUCLEAR PLANT (WBN) - UNIT 2 - FINAL SAFETY ANALYSIS REPORT (FSAR), AMENDMENT 106

References:

1. TVA letter to NRC dated August 12, 2011, "Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report (FSAR), Amendment 105"
2. TVA letter to NRC dated December 10, 2010, "Watts Bar Nuclear Plant (WBN) Unit 2 - Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information" This letter transmits WBN Unit 2 FSAR Amendment 106 (A106), which reflects changes made since the issuance of Amendment 105 on August 12, 2011 (Reference 1). contains a summary listing of FSAR sections and corresponding Unit 2 change package numbers associated with the A106 FSAR changes.

FSAR A106 is contained on the enclosed Optical Storage Media (OSM #1) (Attachment 1).

The FSAR contains security-related information identified by the designation "Security-Related Information - Withhold Under 10 CFR 2.390." TVA hereby requests this information be withheld from public disclosure in accordance with the provisions of 10 CFR 2.390. A redacted version of the FSAR is contained on OSM #2 (Attachment 2),

which is suitable for public disclosure. contains a listing of the FSAR pages that have been redacted. Enclosure 3 lists the files and file sizes on the security-related OSM (OSM #1), and Enclosure 4 lists the files and file sizes on the publicly available OSM (OSM #2).

U.S. Nuclear Regulatory Commission Page 2 September 15, 2011 In addition, one of the A106 changes involves additions to Sections 9.2.1.3 and 9.2.2.4.

These additions stem from a recent calculation revision resulting in revised values for the component cooling and essential raw cooling water system individual loads. Although only total required flow values were placed into Al 06, the values for the individual system loads were previously provided in Enclosures 3 and 5 of Reference 2 in response to a NRC request for additional information. Revised Enclosures 3 and 5 of Reference 2 are being provided by separate correspondence.

There are no new commitments made in this letter. This amendment closes Supplemental Safety Evaluation Reports (SSERs) 22/23, Item No. 91 (See Enclosure 1, Item 7). This letter does not close any "Generic Communications." If you have any questions, please contact Gordon Arent at (423) 365-2004.

I declare under the penalty of perjury that the foregoing is true and correct. Executed on the 15th day of September, 2011.

Respectfully, David Stinson Watts Bar Unit 2 Vice President

Enclosures:

1. WBN Unit 2 FSAR Al 06, "Summary Listing of Al 06 FSAR Changes"
2. WBN Unit 2 FSAR A106, "Summary of Redacted Pages"
3. WBN Unit 2 FSAR A106, "List of files and file sizes on the security-related OSM (OSM #1)"
4. WBN Unit 2 FSAR Al 06, "List of files and file sizes on the publicly available OSM (OSM #2)"

Attachments:

1. OSM #1: WBN Unit 2 FSAR Amendment 106 - Security-Related Information - Withhold Under 10 CFR 2.390
2. OSM #2: WBN Unit 2 FSAR Amendment 106 - Publicly Available Version cc: See Page 3

U.S. Nuclear Regulatory Commission Page 3 September 15, 2011 cc (Enclosures):

U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381

ENCLOSUREI WBN Unit 2 FSAR A106 "Summary Listing of A106 FSAR Changes" Change Item No.

Change Area Change Description Package Number

1. On Pages 2.3-13 (A105), insert the following sentence between the first and second sentences of the first paragraph of Section 2.3.3.3 entitled, "Onsite Data Summaries of Parameters for Dispersion Meteorology:"

"Tables 2.3-68 through 2.3-74 provide similar data for the time period of 1986 to 2005."

2. On page 2.3-17 (A105), define the term "D/Qs" by inserting the words "Relative Deposition" in front of the term in the first sentence of the first paragraph under Section 2.3.5, "Long-Term (Routine) Diffusion
1.

Section 2.3 Estimates."

2-106-09

3. On Page 2.3-17 (Al05), insert the letter "a" after Table 2.3-75, add the letter "s" onto the word "contain" and insert "Table 2.3-75b contains,"

between "and" and "D/Q's" in the third paragraph under Section 2.3.5, "Long-Term (Routine)

Diffusion Estimates."

4.- For Table 2.3-75a on page 2.3-111 (Al 05), delete "and D/Q's" from the title.

5. For Table 2.3-75b on page 2.3-112 (Al05), delete "X/Q's and" from the title.

El-I

ENCLOSUREI WBN Unit 2 FSAR A106 "Summary Listing of A106 FSAR Changes" Change Item No.

Change Area Change Description Package Number

1. On page 4.2-19, replace the last paragraph of Section 4.2.1.3.5,,"Evaluation of the Reactor Core for a Limiting LOCA Load Accumulator Line Break," with the following paragraph:

"The fuel assembly grid impact forces were also obtained from the reactor core time history response.

The maximum impact force occurred at the peripheral fuel assembly location adjacent to the baffle wall. The grid impact forces were rapidly attenuated for fuel assembly positions inward from the peripheral fuel.

Only the periphery (outer) portion of the core experience significant grid impact forces. A calculation of the maximum LOCA and seismic grid impact forces, combined using the square root sum of the squares method (in accordance with NUREG 0800, Section 4.2, Appendix A), demonstrated that the maximum value is greater than the allowable grid strength for the RFA -2 assembly with IFMs in peripheral core locations. An analysis of the effects of this grid deformation has shown the core geometry will remain coolable."

2. Add paragraph near the end of Section 15.3.1.3, Reactor Coolant System Pipe Break Results, which addresses the lower radial key stiffness value to read as follows:

"An evaluation has been performed to determine the impact of change in the lower radial key stiffness value and concluded that the fuel assemblies on the core periphery are the only assemblies to experience grid deformation for Watts Bar Unit 2. An SBLOCA assessment has concluded that core coolable geometry is maintained if grid deformation remains in peripheral assembly locations. Therefore, it is further concluded that coolable core geometry is maintained for Watts Bar Unit 2 for cores of 17x17 RFA-2 fuel following a SBLOCA."

2.

Section 4.2.1.3.5 Section 15.3.1.3 2-106-05 E1-2

ENCLOSURE 1 WBN Unit 2 FSAR A106 "Summary Listing of A106 FSAR Changes" Change Item No.

Change Area Change Description Package Number

1. For Table 7.1-1 (page 3 of 11) (Al 05), delete reference to Note 17 in the second line item from the top.
2. For Table 7.1-1 (page 3 of 11) (Al 05), delete reference to Note 18 in the eighth line item from the top.
3. For Table 7.1-1 (page 10 of 11) (A105), delete Note
3.

Table 7.1

17.

2-106-08 Section 7.2

4. For Table 7.1-1 (pages 10-11 of 11) (A105), delete Note 17.
5. For Table 7.1-1 (page 11 of 11) (Al 05), delete Note 18.
6. For Section 7.2 on page 7.2-5 (A105), change P to P" and P' to P in the list of defined terms at the top of page.

E1-3

ENCLOSURE1 WBN Unit 2 FSAR A106 "Summary Listing of A106 FSAR Changes" Change Item No.

Change Area Change Description Package Number

1. For Section 8.2.1, "Description," on Page 8.2-1 (Al 05),

in the next to last line of first paragraph, change "to" to "which can".

2. For Section 8.2.1, "Description," on Page 8.2-1 (Al 05),

in the second line of the second paragraph, insert "and maintenance" between the words, "alternate" and power."

3. For Section 8.2.1, "Description," on Page 8.2-1 (A105),

insert the following between the first and second sentence of the fifth paragraph:

"Additionally, studies have also been made that show one transmission line and transformer A, or one Section transmission line and transformer B are capable of 8.2.1 starting and running the minimum required safety-8.2.1.3 related loads for one train in each unit."

4.

8.2.1.5 2-106-07 8.2.1.6

4. For Section 8.2.1.3, "Arrangement of the Start Boards, 8.2.1.8 Unit Boards, Common Boards, and Reactor Coolant 8.2.2 Pump (RCP) Boards," on Page 8.2-5 (A105), insert the following between of the partial paragraph at the top of page and the first full paragraph at the top of the page:

"From four of the 6.9kV unit boards located in the turbine building, maintenance feeder cables are routed to the 6.9kV shutdown boards located in the auxiliary building where they connect to the supply breakers.

These feeder cables are routed in divisional raceway to maintain separation between the two offsite power sources."

5. For Section 8.2.1.5, "Switchyard Control and Relaying," on Page 8.2-5 (A105), insert the word, "normal," between the words, "its," and "provision."

E1-4

ENCLOSUREI WBN Unit 2 FSAR A106 "Summary Listing of A106 FSAR Changes" Change Item No.

Change Area Change Description Package Number

6. For Section 8.2.1.5, "Switchyard Control and Relaying," on Page 8.2-5 (A105), insert the following after the first paragraph of the section.

"The CSST maintenance configurations can be aligned to provide either two immediate access circuits or one immediate and one delayed access circuit in accordance with Regulatory Guide 1.32, position C.1.a, requirements for acceptable designs."

7. On Page 8.2-7 (Al 05), insert the following sentence after the third paragraph of Item 5:

"Automatic transfers are not provided for CSST maintenance alignments."

8. For Section 8.2.1.6, On Page 8.2-9 (A105), insert the word "and" between "D" and "Start" of the heading as Secio shown below,"6.9kV Common Switchgear C and D 8.2.1

.8.2.1.3 and Start Board A and B."

8.2.1.5 2-106-07 (cont.)

8.2.1.5

9. For Section 8.2.1.6, on Page 8.2-9 (A105), replace the 8.2.1.6 verbiage starting with Item (3) at the bottom of the 8.2.2 page and continue onto page 8.2-10 through Item (4) and stopping with the replacement of the sentence beginning with "Line-up," with the following replacement verbiage:

"The secondaries of common station service transforms A and B feed into the 6.9kV start boards A and B. The start boards can be aligned to the 6.9kV shutdown boards through the unit boards as follows:

3. Common station service transformer A:

This transformer provides offsite power, from the secondary Y winding through circuit breaker 1512, for normal power to 6.9kV common board A and alternate power to 6.9kV unit boards 1A, 1C, 2A and 2C. When CSST D is not available this transformer can be aligned manually to provide power to the train B 6.9kV shutdown boards. Normal (offsite) power from the transformer secondary Y winding can be aligned to E1-5

ENCLOSUREI WBN Unit 2 FSAR A106 "Summary Listing of A106 FSAR Changes" Change Item No.

Change Area Change Description Package Number 6.9kV shutdown board 1 B-B via 6.9kV start board A through circuit breaker 1512 to 6.9kV unit board 1C through circuit breakers 1524 and 1722 and to 6.9kV shutdown board 1B-B through circuit breaker 1726.

Similarly, normal (offsite) power from transformer secondary Y winding can be aligned to 6.9kV shutdown board 2B-B via 6.9kV start board A through circuit breaker 1512 to 6.9kV unit board 2C through circuit breakers 1534 and 1822 and to 6.9kV shutdown board 2B-B through circuit breaker 1826.

These circuits are identified as P separation designation.

4. Common station service transformer B:

This transformer provides offsite power, from the secondary Y winding through circuit breaker 1612, for normal power to 6.9kV common board B and alternate Section power to 6.9kV unit boards 1 B, 1D, 2B and 2D. When 8.2.1 CSST C is not available this transformer can be

4.

8.2.1.3 aligned manually to provide power to the train A 6.9kV (cont.)

8.2.1.5 shutdown boards. Normal (offsite) power from the 2-106-07 8.2.1.6 transformer secondary Y winding can be aligned to 8.2.1.8 6.9kV shutdown board 1A-A via 6.9kV start board B 8.2.2 through circuit breaker 1612 to 6.9kV unit board 1B through circuit breakers 1622 and 1714 and to 6.9kV shutdown board 1A-A through circuit breaker 1718.

Similarly, normal (offsite) power from transformer secondary Y winding can be aligned to 6.9kV shutdown board 2A-A via 6.9kV start board B through circuit breaker 1612 to 6.9kV unit board 2B through circuit breakers 1632 and 1814 and to 6.9kV shutdown board 2B-B through circuit breaker 1818.

These circuits are identified as R separation designation.

The provisions made for independence of offsite sources are limited such that CSST A and B cannot be credited simultaneously for supply of 6.9kV class 1 E power. Additionally, CSST A and B only have the capacity to supply one train of 6.9kV shutdown boards for each unit."

E1-6

ENCLOSUREI WBN Unit 2 FSAR A106 "Summary Listing of A106 FSAR Changes" Change Item No.

Change Area Change Description Package Number

10. For Section 8.2.1.6, on Page 8.2-11 (Al 05), replace verbiage contained under subsections entitled, "6.9kV Start Boards A & B, Unit Boards and Common Boards Control Power," "6.9kV Start Board Breaker Control - Bkr 1512 (N), Bkr 1612 (N)," and "6.9kv Unit Board 1 B, 1 C, 2B, 2C breaker control (maintenance feeder path)," with the following verbiage:

"6.9kV Start Boards A & B, Unit Boards and Common Boards Control Power The normal control power for circuit breakers used to supply offsite power from CSST A and B to the 6.9kV shutdown boards is arranged to provide physically and electrically independent supplies.

The normal and alternate control power feeds to the 250VDC control buses for 6.9kV Start Boards A and B, Unit Boards 1B, 1C, 2B, 2C and Common Board A and B are supplied from 250VDC Turbine Distribution Section Boards 1 and 2. The normal power feeder cables for 8.2.1 6.9kV Start Board control bus A are routed separately 8.2.1.3 from those for control bus B. The normal power

4.

8.2.1.5 feeder cables for the 6.9kV Common Board A control 2-106-07 (cont.)

8.2.1.6 bus are routed separately from those for 6.9kV 8.2.1.8 Common Board B. The normal power feeder cables 8.2.2 for the 6.9kV Unit Board 1 B control bus are routed separately from those for 6.9kV Unit Board lC. The normal power feeder cables for the 6.9kV Unit Board 2B control bus are routed separately from those for 6.9kV Unit Board 2C.

Control cables associated with CSST A normal alignments are designated as P and control cables associated with CSST B normal alignments are designated as R for separation identification.

6.9kV Start Board Breaker Control:

The breaker control cables for 6.9kV Start Bus A normal feeder breaker 1512 are routed separately from those for 6.9kV Start Bus B normal feeder breaker 1612. Control cables associated with breaker 1512 are designated as P and control cables associated with breaker 1612 are designated as R for separation identification. 6.9kV start bus alternate feeder breakers 1614 and 1514 are not credited for supply of offsite power.

E11-7

ENCLOSURE1 WBN Unit 2 FSAR A106 "Summary Listing of A106 FSAR Changes" Change Item No.

Change Area Change Description Package Number 6.9kV Unit Board 1 B, 1 C, 2B, 2C Breaker Control:

The breaker control cables for circuit breakers 1714, 1622 (NO) and 1114 (NC) at 6.9kV Unit Board 1 B are routed separately from those for breakers 1722, 1524 (NO) and 1122 (NC) at 6.9kV Unit Board lC.

Similarly, the breakers control cables for circuit breakers 1814, 1632 (NO) and 1214 (NC) at 6.9kV Unit Board 2B are routed separately from those for breakers 1822, 1534 (NO) and 1222 (NC) at 6.9kV Unit Board 2C. Control cables associated with breakers 1114, 1214, 1622, 1632, 1714 and 1814 are designated as R and control cables associated with breakers 1122, 1222, 1524, 1534, 1722 and 1822 are designated as P for separation identification."

11. On Page 8.2-16 (A105), delete the paragraph that begins with "CSST A or B..."
12. For Section 8.2.1.8, "Conformance with Standards)

Functional Measures," on Page 8.2-17 (A105), insert the following between the second and third full Section paragraphs of this section:

8.2.1

4.

8.2.1.3 "CSST A or B (but not both simultaneously) may be (cont.)

8.2.1.5 used as an immediate or delayed source replacement 2-106-07 8.2.1.6 for CSSTs D or C, respectively, through the 6.9kV 8.2.1.8 shutdown board maintenance supply breakers.

8.2.2 CSST A and B each have sufficient FA rated capacity to maintain adequate voltage for one train of shutdown boards for each unit while supplying required BOP loads for a design basis accident in one unit and safe shutdown of the other unit. When used as a delayed source, the affected shutdown board maintenance feeders are supplied from the USSTs through the Unit Boards and are automatically transferred to CSST A or B in the event of a unit trip.

Use of CSST A or B as an offsite source requires that CSST A and B both be available and that the associated power and control feeders be in their normal positions to ensure independence. Feeders for CSST A are independent of those for CSST C and feeders for CSST B are independent of those for CSST D. Supply of Class 1 E power by CSST A or B requires manual breaker operations to align the CSST source to the applicable shutdown board maintenance feeders."

13. On Page 8.2-11 (Al 05), in the fourth line of the fifth full paragraph, insert "or maintenance" between the words. "alternate" and "feeder."

E1-8

ENCLOSUREI WBN Unit 2 FSAR A106 "Summary Listing of A106 FSAR Changes" Change Item No.

Change Area Change Description Package Number

14. On Page 8.2-19 (A105), replace the word "to" with the word "from" in the second line of the fourth full paragraph.
15. On Page 8.2-19 (A105), insert the following after the word, "network" at the end of the first sentence of the fourth full paragraph:

"under normal plant alignments and either two immediate access circuits or one immediate access circuit and one delayed access circuit under maintenance alignments."

16. On Page 8.2-19 (A105), replace the sentence in the sixth full paragraph that begins with "CSSTs A and B have been retrofitted..." with the following sentence:

"Additionally CSST A or B may supply power to 6.9kV shutdown boards during maintenance of CSST D or Secio C respectively in any operating mode."

8.2.1

4.

8.2.1.3

17. On Page 8.2-19 (A105), replace the seventh and (cont.)

8.2.1.6 eighth full paragraphs with the following:

2-106-07 8.2.1.6 8.2.1.8 "Power continuity to the 6.9kV shutdown boards is 8.2.2 normally provided from common station service transformers C and D. To provide a stable voltage these transformers have automatic load tap changers on each secondary which adjust voltage based on the normally connected shutdown boards.

During maintenance of common station service transformer C or D, power continuity to the normally connected train of 6.9kV shutdown boards is provided by the boards' maintenance feeds which connect to unit boards with access to common station service transformers B or A respectively. Use of transformers A and B is restricted such that they are not simultaneously credited as an independent source of offsite power for the Class 1 E power system.

Common station service transformers A and B have automatic load tap changers on the primary winding which adjust voltage based on the normally connected start board.

E1-9

ENCLOSUREI WBN Unit 2 FSAR A106 "Summary Listing of A106 FSAR Changes" Change Item No.

Change Area Change Description Package Number The automatic load tap changers for all common Section station service transformers are normally controlled in 8.2.1 the automatic mode with the capability for manual 4

8.2.1.3 adjustment from the main control room."

(cont.)

8.2.1.5 2-106-07 8.2.1.6

18. For Section 8.2.2, on Page 8.2-20 (A105), replace the 8.2.1.8 term, "CSSTs C and D," with "its associated CSSTs,"

8.2.2 in the first line of the first paragraph of the section.

On Page 8.3-17 (A105), revise the cases entitled, "Cold Dead Load Pickup @950 F," and "Hot Dead Load Pickup

5.

8.3.1.1

@95' F," to read "Cold Engine Motor Start Capability, 2-106-01 First Three Minutes (kW)" and "Hot Engine Motor Start Capability, Fully Turbo-Charged (kW)," respectively.

Revise the sixth sentence in the paragraph under the

6.

Section 9.1.4.2.2 subtitle "Reactor Vessel Stud Tensioner," to remove the 2-106-02 words "in series."

1. Revise FSAR Section 9.2.1.3 to insert the following words on FSAR page 9.2-6 as shown below:

"ERCW is a versatile system capable of providing sufficient flow and heat removal for a variety of conditions in each unit. As examples, a) during normal operations, the ERCW system can supply the highest flow demand of one unit in startup and the other in hot shutdown with a flow requirement of approximately 26,400 gpm and Section 9.2.1.3 remove the highest heat removal demand of one

7.

unit in hot shutdown and the other unit in cold 2-106-04 shutdown with a heat load of approximately 235,000 kBTU/hr.

b) under design basis accident conditions with offsite power available, the ERCW system can supply the highest flow demand of one unit in startup and the other in LOCA Recirculation with a flow requirement of approximately 32,900 gpm and remove the highest heat removal demand of one unit in cold shutdown and the other unit in LOCA Recirculation with a heat load of approximately 469,000 kBTU/hr.

El-10

ENCLOSUREI WBN Unit 2 FSAR A106 "Summary Listing of A106 FSAR Changes" Change Item No.

Change Area Change Description Package Number c) under design basis accident conditions with a LOOP coupled with a Loss of Train A, Train B of the ERCW system can supply the highest flow demand of one unit in either cold shutdown or refueling (equally demanding) and the other in LOCA Recirculation with a flow requirement of approximately 21,300 gpm and remove the highest heat removal demand of one unit in cold shutdown and the other unit in LOCA Recirculation with a heat load of approximately 305,000 kBTU/hr.

d) under design basis accident conditions with a LOOP coupled with a Loss of Train B, Train A of the ERCW system can supply the highest flow demand of one unit in cold shutdown and the other in LOCA Recirculation with a flow requirement of approximately 21,400 gpm and remove the highest heat removal demand of one unit in cold shutdown and the other unit in LOCA Recirculation with a heat load of approximately 309,000 kBTU/hr."

7.

Section 9.2.1.3

2. Revise FSAR Section 9.2.2.4 to insert the following 2-106-04 (cont.)

Section 9.2.2.4 words on FSAR page 9.2-6 as shown below:

"CCS is a versatile system capable of providing sufficient flow and heat removal for a variety of conditions in each unit. As examples, a) during normal operations, the CCS system can supply the highest flow demand of both units in startup with a flow requirement of approximately 24,200 gpm and remove the highest heat removal demand of one unit in hot shutdown and the other unit in cold shutdown with a heat load of approximately 188,000 kBTU/hr.

b) under design basis accident conditions with-offsite power available, the CCS system can supply the highest flow demand of one unit in startup and the other in LOCA Recirculation with a flow requirement of approximately 22,900 gpm and remove the highest heat removal demand of one unit in cold shutdown and the other unit in LOCA Recirculation with a heat load of approximately 150,000 kBTU/hr.

El-11

ENCLOSURE1 WBN Unit 2 FSAR A106 "Summary Listing of A106 FSAR Changes" Change Item No.

Change Area Change Description Package Number c) under design basis accident conditions with a LOOP coupled with a Loss of Train A, Train B of the CCS system can supply the highest flow demand of one unit in either cold shutdown or initial refueling (equally demanding) and the other in LOCA Recirculation with a flow requirement of approximately 10,200 gpm and remove the highest heat removal demand of one unit in cold shutdown and the other unit in LOCA Recirculation with a heat load of approximately

7.

Section 9.2.1.3 129,000 kBTU/hr.

2-106-04 (cont.)

Section 9.2.2.4 d) under design basis accident conditions with a LOOP coupled with a Loss of Train B, Train A of the CCS system can supply the highest flow demand of one unit in either cold shutdown or initial refueling (equally demanding) and the other in LOCA Recirculation with a flow requirement of approximately 15,800 gpm and remove the highest heat removal demand of one unit in cold shutdown and the other unit in LOCA Recirculation with a heat load of approximately 149,000 kBTU/hr."

FSAR Section 9.2.1.6 entitled "Corrosion, Organic Fouling, and Environmental Qualification System Description" is revised to add the following paragraph:

"The water used in the Essential Raw Cooling Water (ERCW), High Pressure Fire Protection (HPFP) and Raw Cooling Water (RCW) system is chemically treated. The chemical treatment program injects chemicals to the ERCW, RCW, and HPFP raw water

8.

Section 9.2.1.6 systems at the Intake Pumping Station pits, such that 2-106-03 any pump taking suction from these pits, will introduce the chemicals into the system. This treatment includes oxidizing biocide,-non-oxidizing biocide, phosphate, and zinc. The phosphate is used to sequester iron from existing corrosion products, the zinc is used to passivate the carbon steel surfaces, and the oxidizing and non-oxidizing biocide will control slime, clams, and microbiological induced corrosion."

E1-12

ENCLOSUREI WBN Unit 2 FSAR A106 "Summary Listing of A106 FSAR Changes" Change Item No.

Change Area Change Description Package Number

1. Revise the "Function" for Item 12 on FSAR Table 9.3-7, Sheet 8 of 44, by replacing the word "control" with the word "content."
2. Revise the "Effect on System" for Item 21 on FSAR Table 9.3-7, Sheet 14 of 44, by inserting the words "open, check" after the word "stuck."
3. Revise the "Method of Failure Detection" for Item 35 on FSAR Table 9.3-7, Sheet 19 of 44, by inserting valve number "-391" as shown on the attached FSAR markup. Also add "Cooling Water Failure" to the "Failure Mode" for Item 35 and include the "Potential Cause," "Method of Failure Detection," "Effect on System" and "Effect on Plant" for this failure.
4. Revise the "Function" for Item 41 on FSAR Table 9.3-7, Sheet 22 of 44, by inserting the word "inlet" after the word "regulate."
9.

Table 9.3-7

5. Revise the "Method of Failure Detection" and "Effect 2-106-06 on Plant" for Item 47 on FSAR Table 9.3-7, Sheet 27 of 44, by changing PI-32-105 to PT-32-105, changing the Dryer No. from 2 to 1 and deleting the word "if."
6. Revise the "Effect on System" for Item 48 on FSAR Table 9.3-7, Sheet 28 of 44, by changing the identification of the compressor from "SCAS" to "ACAS."
7. Revise the "Method of Failure Detection" for Item 50 on FSAR Table 9.3-7, Sheet 30 of 44, by changing the Dryer No. from 2 to 1.
8. Revise the "Effect on System" and "Remarks" for Item 67 on FSAR Table 9.3-7, Sheet 37 of 44, by replacing the words "backup. Manual" with "backup by manual" and by deleting the word "of' as shown on the attached FSAR markup.

El-13

ENCLOSUREI WBN Unit 2 FSAR A106 "Summary Listing of A106 FSAR Changes" Change Item No.

Change Area Change Description Package Number

9.

Revise the "Component Identification" and "Method of Failure Detection" for Item 73 on FSAR Table 9.3-7, Sheet 40 of 44, by changing "2-FCV-32-333" to "2 333" and "2-HS68340D" to "2-HS-68-340D."

10. Revise the "Method of Failure Detection" and "Effect on Plant" for Item 79 on FSAR Table 9.3-7, Sheet 43
9.

Table 9.3-7 of 44, by replacing the words "function not effected; 2-106-06 however, spray" with the word "valve" and changing "2-PCV-68-340B" to "2-PCV-68-340D."

11. Revise the "Method of Failure Detection," "Effect on System" and "Effect on Plant" for Item 80 on FSAR Table 9.3-7, Sheet 44 of 44.

E1-14

ENCLOSURE2 WBN Unit 2 FSAR A106 "Summary of Redacted Pages" Chapter Page(S)

Section No.

Figure No.

Basis For Redaction I

1 1.2-15 1.2 1.2-1 Security Related, 10CFR2.390(d)(1) 1 1.2-16 1.2 1.2-2 Security Related, 10CFR2.390(d)(1) 1 1.2-17 1.2 1.2-3 Security Related, 10CFR2.390(d)(1) 1 1.2-18 1.2 1.2-4 Security Related, 10CFR2.390(d)(1) 1 1.2-19 1.2 1.2-5 Security Related, 10CFR2.390(d)(1) 1 1.2-20 1.2 1.2-6 Security Related, 10CFR2.390(d)(1) 1 1.2-21 1.2 1.2-7 Security Related, 10CFR2.390(d)(1) 1 1.2-22 1.2 1.2-8 Security Related, 10CFR2.390(d)(1) 1 1.2-23 1.2 1.2-9 Security Related, 10CFR2.390(d)(1) 1 1.2-24 1.2 1.2-10 Security Related, 10CFR2.390(d)(1) 1 1.2-25 1.2 1.2-11 Security Related, 10CFR2.390(d)(1) 1 1.2-26 1.2 1.2-12 Security Related, 10CFR2.390(d)(1) 1 1.2-27 1.2 1.2-13 Security Related, 10CFR2.390(d)(1) 1 1.2-28 1.2 1.2-14 Security Related, 10CFR2.390(d)(1) 1 1.2-29 1.2 1.2-15 Security Related, 10CFR2.390(d)(1) 2 2.2-7 2.2 2.2-1 Security Related, 10CFR2.390(d)(1) 2 2.2-8 2.2 2.2-2 Security Related, 10CFR2.390(d)(1) 2 2.4-89 2.4 2.4-2 Security Related, 10CFR2.390(d)(1) 2 2.4-159 2.4 2.4-24 Security Related, 10CFR2.390(d)(1) 2 2.4-162 2.4 2.4-27 Security Related, 10CFR2.390(d)(1) 2 2.4-163 2.4 2.4-28 Security Related, 10CFR2.390(d)(1) 2 2.4-168 2.4 2.4-40a Security Related, 100FR2.390(d)(1) 2 2.4-16 2.4 Sheet 1 Security Related, 10CFR2.390(d)(1) 2 2.4-171 2.4 2.4-40b Security Related, 10CFR2.390(d)(1) 2 2.4-172 2.4 2.4-40c Security Related, 10CFR2.390(d)(1) 2 2.4-173 2.4 2.4-40d Security Related, 10CFR2.390(d)(1)

~~~~~Sheet 1 2

2.4-178 2.4 Sheet 1 Security Related, 10CFR2.390(d)(1) 2 2.4-181 2.4 2.4-40g Security Related, 10CFR2.390(d)(1)

Sheet 1 2

2.4-206 2.4 2.4-76 Security Related, 10CFR2.390(d)(1) 2 2.4-209 2.4 2.4-79 Security Related, 10CFR2.390(d)(1) 2 2.4-212 2.4 2.4-82 Security Related, 10CFR2.390(d)(1) 2 2.4-213 2.4 2.4-83 Security Related, 10CFR2.390(d)(1) 2 2.4-218 2.4 2.4-88 Security Related, 10CFR2.390(d)(1) 2 2.4-219 2.4 2.4-89 Security Related, 10CFR2.390(d)(1) 2 2.4-220 2.4 2.4-90 Security Related, 10CFR2.390(d)(1) 2 2.5-471 2.5 2.5-185 Security Related, 10CFR2.390(d)(1) 2 2.5-472 2.5 2.5-185a Security Related, 10CFR2.390(d)(1) 2 2.5-513 2.5 2.5-225 Security Related, 10CFR2.390(d)(1) 2 2.5-514 2.5 2.5-226 Security Related, 10CFR2.390(d)(1) 2 2.5-515 2.5 2.5-226a Security Related, 10CFR2.390(d)(1) 2 2.5-575 2.5 2.5-273 Security Related, 10CFR2.390(d)(1) 2 2.5-690 2.5 2.5-358 Security Related, 10CFR2.390(d)(1)

E2-1

ENCLOSURE2 WBN Unit 2 FSAR A106 "Summary of Redacted Pages" IChapter Page(S)

Section No.

Figure No.

Basis For Redaction I

2 2.5-934 2.5 2.5-592 Security Related, 10CFR2.390(d)(1) 3 3.5-53 3.5 3.5-3 Security Related, 10CFR2.390(d)(1) 3 3.5-54 3.5 3.5-4 Security Related, 10CFR2.390(d)(1) 3 3.6-73 3.6 3.6-21 Security Related, 10CFR2.390(d)(1) 3 3.6-74 3.6 3.6-22 Security Related, 10CFR2.390(d)(1) 3 3.6-75 3.6 3.6-23 Security Related, 10CFR2.390(d)(1) 3 3.6-76 3.6 3.6-24 Security Related, 10CFR2.390(d)(1) 3 3.7-217 3.7 3.7-39 Security Related, 10CFR2.390(d)(1) 3 3.7-218 3.7 3.7-40 Security Related, 10CFR2.390(d)(1) 3 3.7-219 3.7 3.7-41 Security Related, 10CFR2.390(d)(1) 3 3.7-222 3.7 3.7-44 Security Related, 10CFR2.390(d)(1) 3 3.8.3-60 3.8.3 3.8.3-6 Security Related, 10CFR2.390(d)(1) 3 3.8.3-61 3.8.3 3.8.3-7 Security Related, 10CFR2.390(d)(1) 3 3.8.4-94 3.8.4 3.8.4-2 Security Related, 10CFR2.390(d)(1) 3 3.8.4-95 3.8.4 3.8.4-3 Security Related, 10CFR2.390(d)(1) 3 3.8.4-96 3.8.4 3.8.4-4 Security Related, 10CFR2.390(d)(1) 3 3.8.4-97 3.8.4 3.8.4-5 Security Related, 10CFR2.390(d)(1) 3 3.8.4-98 3.8.4 3.8.4-6 Security Related, 10CFR2.390(d)(1) 3 3.8.4-101 3.8.4 3.8.4-9 Security Related, 10CFR2.390(d)(1) 3 3.8.4-109 3.8.4 3.8.4-17 Security Related, 10CFR2.390(d)(1) 3 3.8.4-110 3.8.4 3.8.4-18 Security Related, 10CFR2.390(d)(1) 3 3.8.4-111 3.8.4 3.8.4-19 Security Related, 10CFR2.390(d)(1) 3 3.8.4-112 3.8.4 3.8.4-20 Security Related, 10CFR2.390(d)(1) 3 3.8.4-116 3.8.4 3.8.4-24 Security Related, 10CFR2.390(d)(1) 3 3.8.4-120 3.8.4 3.8.4-28 Security Related, 10CFR2.390(d)(1) 3 3.8.4-127 3.8.4 3.8.4-35 Security Related, 10CFR2.390(d)(1) 3 3.8.4-128 3.8.4 3.8.4-36 Security Related, 10CFR2.390(d)(1) 3 3.8.4-129 3.8.4 3.8.4-36a Security Related, 10CFR2.390(d)(1) 3 3.8.4-132 3.8.4 3.8.4-37 Security Related, 10CFR2.390(d)(1) 3 3.8.4-149 3.8.4 3.8.4-50 Security Related, 10CFR2.390(d)(1) 3 3.8.4-150 3.8.4 3.8.4-51 Security Related, 10CFR2.390(d)(1) 3 3.8.6-19 3.8.6 3.8.6-7 Security Related, 10CFR2.390(d)(1) 6 6.2.2-24 6.2.2 6.2.2-4 Security Related, 10CFR2.390(d)(1) 6 6.2.3-76 6.2.3 6.2.3-4 Security Related, 10CFR2.390(d)(1) 6 6.2.3-77 6.2.3 6.2.3-5 Security Related, 10CFR2.390(d)(1) 6 6.2.3-78 6.2.3 6.2.3-6 Security Related, 10CFR2.390(d)(1) 6 6.2.3-79 6.2.3 6.2.3-7 Security Related, 10CFR2.390(d)(1) 6 6.2.3-80 6.2.3 6.2.3-8 Security Related, 10CFR2.390(d)(1) 6 6.2.3-81 6.2.3 6.2.3-9 Security Related, 10CFR2.390(d)(1) 6 6.2.3-82 6.2.3 6.2.3-10 Security Related, 10CFR2.390(d)(1) 6 6.2.3-92 6.2.3 6.2.3-18 Security Related, 10CFR2.390(d)(1) 6 6.2.3-93 6.2.3 6.2.3-19 Security Related, 10CFR2.390(d)(1) 8 8.1-21 8.1 8.1-1 Security Related, 10CFR2.390(d)(1) 8 8.2-15 8.2 Text only Security Related, 10CFR2.390(d)(1) 8 8.2-30 8.2 8.2-3 Security Related, 10CFR2.390(d)(1)

E2-2

ENCLOSURE2 WBN Unit 2 FSAR A106 "Summary of Redacted Pages" IChapter _

Page(S)

Section No.

Figure No.

Basis For Redaction I

8 8.2-31 8.2 8.2-4 Security Related, 10CFR2.390(d)(1) 8 8.2-44 8.2 8.2-11 Security Related, 10CFR2.390(d)(1) 8 8.3-97 8.3 8.3-1 Security Related, 10CFR2.390(d)(1) 8 8.3-99 8.3 8.3-2 Security Related, 10CFR2.390(d)(1) 8 8.3-100 8.3 8.3-3 Security Related, 10CFR2.390(d)(1) 8 8.3-102 8.3 8.3-4b Security Related, 10CFR2.390(d)(1) 8 8.3-205 8.3 8.3-46 Security Related, 10CFR2.390(d)(1) 8 8.3-218 8.3 8.3-59 Security Related, 10CFR2.390(d)(1) 9 9.2-211 9.2 9.2-40 Security Related, 10CFR2.390(d)(1) 9 9.4-276 9.4 9.4-21 Security Related, 10CFR2.390(d)(1) 9 9.4-280 9.4 9.4-22c Security Related, 10CFR2.390(d)(1) 9 9.4-281 9.4 9.4-23 Security Related, 10CFR2.390(d)(1) 9 9.4-282 9.4 9.4-24 Security Related, 10CFR2.390(d)(1) 12 12.3-39 12.3 12.3-1 Security Related, 10CFR2.390(d)(1) 12 12.3-40 12.3 12.3-2 Security Related, 10CFR2.390(d)(1) 12 12.3-41 12.3 12.3-3 Security Related, 10CFR2.390(d)(1) 12 12.3-42 12.3 12.3-4 Security Related, 10CFR2.390(d)(1) 12 12.3-43 12.3 12.3-5 Security Related, 10CFR2.390(d)(1) 12 12.3-44 12.3 12.3-6 Security Related, 10CFR2.390(d)(1) 12 12.3-45 12.3 12.3-7 Security Related, 10CFR2.390(d)(1) 12 12.3-46 12.3 12.3-8 Security Related, 10CFR2.390(d)(1) 12 12.3-47 12.3 12.3-9 Security Related, 10CFR2.390(d)(1) 12 12.3-48 12.3 12.3-10 Security Related, 10CFR2.390(d)(1) 12 12.3-49 12.3 12.3-11 Security Related, 10CFR2.390(d)(1) 12 12.3-50 12.3 12.3-12 Security Related, 10CFR2.390(d)(1) 12 12.3-51 12.3 12.3-13 Security Related, 10CFR2.390(d)(1) 12 12.3-52 12.3 12.3-14 Security Related, 10CFR2.390(d)(1) 12 12.3-53 12.3 12.3-15 Security Related, 10CFR2.390(d)(1) 12 12.3-54 12.3 12.3-16 Security Related, 10CFR2.390(d)(1) 12 12.3-55 12.3 12.3-17 Security Related, 10CFR2.390(d)(1) 12 12.4-7 12.4 12.4-1 Security Related, 10CFR2.390(d)(1)

E2-3

ENCLOSURE3 WBN Unit 2 FSAR A106 "List Of Files And File Sizes On The Security-Related OSM (OSM #1)"

E3-1

ENCLOSURE 3 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 106 - List of Files on Security-Related OSM File Name File Size - Bytes TVA_WBN-2_FSARFiles 001 TVA WBFSAR TOC.pdf 371,367 002_TVA WB FSAR LRP.pdf 85,233 003_TVA WB FSAR Section_l.pdf 4,643,776 004_TVA WB FSAR Section 2 A.pdf 10,467,268 005 TVA WB FSAR Section 2 B Part 1 of 2.pdf 44,606,416 005 TVA WB FSAR Section 2 B Part 2 of 2.pdf 49,572,150 006 TVA WB FSAR Section 2 C.pdf 2,107,326 007_TVA WB FSAR Section 2 D.pdf 31,323,879 008_TVA WB FSAR Section 2 E.pdf 47,312,479 009 TVA WBFSARSection 3 A.pdf 2,623,168 010 TVA WB FSAR Section 3_B,.pdf 7,063,096 01 ITVA WB FSARSection_3_C.pdf 30,016,106 012_TVAWBFSAR Section 3 D.pdf 11,764,556 013 TVA WB FSARSection 4.pdf 12,554,946 014_TVAWBFSAR Section-5.pdf 9,921,700 015_TVAWBFSAR Section 6 A.pdf 26,047,715 016_TVA WB FSAR Section_6_B.pdf 8,063,345 017_TVA WB FSAR Section_7.pdf 14,020,663 018 TVA WB FSAR Section 8.pdf 29,729,038 019 TVA WB FSAR Section 9 A.pdf 24,538,388 020_TVAWBFSAR Section 9 B.pdf 16,485,379 021 TVA WB FSAR Section 10. pdf 14,163,281 022_TVA WB FSAR Section_ 1.pdf 3,964,879 023 TVA WB FSAR Section 12.pdf 5,993,776 024-TVA WB FSAR Section 13.pdf 3,239,951 025_TVA,_WB FSAR Section_ 14.pdf 1,169,887 Page 1 of 3

ENCLOSURE 3 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 106 - List of Files on Security-Related OSM File Name File Size - Bytes 026 TVA WB FSAR Section 15.pdf 46,593,712 027 TVA WB FSAR Section_ 16.pdf 148,050 028 TVA WB FSAR Section 17.pdf 144,934 Total 458,736,464 TVA_WBN-2_OversizedFSARFigures 001 TVA WB FSAR Figure 2.5 3.pdf 1,757,743 002 TVA WB FSAR Figure 2.5 11.pdf 1,689,538 003 TVA WB FSAR Figure 2.5 71.pdf 2,263,087 004 TVAWBFSAR Figure 2.5 222.pdf 909,429 005 TVA WB FSAR Figure 2.5 281_1.pdf 2,155,627 006 TVA WB FSAR Figure 2.5 281_2.pdf 2,117,562 007 TVA WBFSAR Figure 2.5 549 1.pdf 3,600,807 008 TVA WBFSAR Figure 2.5 549 2.pdf 3,989,180 009 TVA WB FSAR Figure 2.5 549_3.pdf 2,863,719 010_TVAWBFSAR Figure 2.5 549 4.pdf 2,809,599 011 TVA WBFSARFigure 2.5 550.pdf 1,803,985 012 TVA WB FSAR Figure 2.5 551.pdf 1,996,869 013_TVAWBFSARFigure 2.5 554_1.pdf 3,081,060 014-TVAWBFSARFigure 2.5 554_2.pdf 1,996,707 015_=_TVAWBFSARFigure 2.5 555.pdf 1,993,312 016_TVAWBFSARFigure_2.5 556.pdf 2,998,087 017 TVA WB FSAR Figure 2.5 571 1.pdf 844,484 018 TVA WB FSAR Figure 2.5 571_2.pdf 3,128,329 019_TVAWBFSAR Figure 2.5 571_3.pdf 3,284,555 020 TVA WBFSAR Figure 2.5 571 4.pdf 2,142,316 021_TVA WB FSARFigure 2.5 572.pdf 2,196,945 Page 2 of 3

ENCLOSURE 3 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 106 - List of Files on Security-Related OSM File Name File Size - Bytes 022 TVA WBFSAR Figure 2.5 573.pdf 2,013,286 023_TVA WBFSAR Figure 2.5 576 1.pdf 3,238,525 024_TVAWBFSAR Figure 2.5 576 2.pdf 2,151,750 025_TVAWBFSARFigure 2.5 577.pdf 2,207,622 026_TVAWBFSAR Figure 2.5 578.pdf 2,080,032 027 TVA WBFSAR Figure 2.5 579.pdf 2,308,985 028_TVAWBFSAR Figure 2.5 583.pdf 2,487,346 029_TVAWBFSAR Figure 2.5 588.pdf 2,528,515 030 TVA WB FSAR Figure 2.5 589.pdf 2,480,438 031_TVA WBFSAR Figure 2.5 594.pdf 13,054,127 032 TVA WB FSAR Figure 2.5 595.pdf 2,323,267 033_TVA WB FSAR Figure 2.5 596.pdf 5,732,107 034 TVA WB FSAR Figure 2.5 597.pdf 1,287,336 035 TVA WB FSAR Figure 2.5 602.pdf 5,549,537 036 TVA WB FSAR Figure 2.5 603.pdf 4,830,835 037 TVA WB FSAR Figure 2.5 604.pdf 6,392,279 038 TVA WB FSAR Figure 2.5 605.pdf 20,823,108 Total 131,112,035 TVA_WBN-2_OversizedFSARTable 001 TVA WB FSAR Table 6.2.4-1.pdf 1,215,565 Total 1,215,565 Page 3 of 3

ENCLOSURE4 WBN Unit 2 FSAR A106 "List Of Files And File Sizes On The Publicly Available OSM (OSM #2)"

E4-1

ENCLOSURE 4 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 106 List of Files on Publicly Available OSM File Name File Size - Bytes TVA_WBN-2_FSARFiles 001 TVA WB FSARTOC.pdf 371,367 002_TVAWBFSARLRP.pdf 85,233 003_ TVA WB FSAR Section, 1.pdf 837,201 004 TVA WB FSAR Section_2_A.pdf 10,130,725 005 TVA WB FSAR Section 2 B Part 1_of_2.pdf 34,358,971 005 TVA WB FSAR Section 2 B Part 2 of_2.pdf 43,314,029 006 TVA WB FSAR Section 2_C.pdf 2,107,326 007 TVA WB FSAR Section 2_D.pdf 31,323,879 008 TVA WB FSAR Section_2_.pdf 45,933,102 009 TVA WB FSAR Section 3 A.pdf 2,331,747 010 TVA WB FSAR Section_3_B.pdf 5,661,334 011 TVA WB FSAR Section_3_C.pdf 25,183,703 012 TVA WB FSAR Section_3_D.pdf 11,495,874 013 TVA WB FSAR Section 4.pdf 12,554,946 014 TVA WB FSAR Section 5.pdf 9,921,700 015 TVA WB FSAR Section 6 A.pdf 23,167,226 016_TVAWBFSARSection 6_B.pdf 8,063,345 017 TVA WB FSAR Section 7.pdf 14,020,663 018_ TVA WB FSAR Section 8.pdf 26,768,644 019 TVA WB FSAR Section_9_A.pdf 24,277,271 020 TVA WB FSAR Section 9_B.pdf 15,270,857 021 TVA WB FSAR Section _10.pdf 14,163,281 022 TVA WB FSAR SectionI 1.pdf 3,964,879 023. TVA WB FSAR Section 12.pdf 1,725,763 024 TVA WB FSAR Section 13.pdf 3,239,951 025_TVA WB FSAR Section_ 14.pdf 1,169,887 Note: Byte amounts in italics are redacted files.

Page 1 of 3

ENCLOSURE 4 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 106 List of Files on Publicly Available OSM File Name File Size - Bytes 026 TVA WB FSAR Section 15.pdf 46,593,712 027 TVA WB FSAR Section 16.pdf 148,050 028 TVA WB FSAR Section_ 17.pdf 144,934 Total 418,329,600 TVA_WBN-2_OversizedFSARFigures 001 TVAWBFSAR Figure 2.5 3.pdf 1,757,743 002_TVAWBFSAR Figure 2.5 11.pdf 1,689,538 003 TVAWBFSAR Figure 2.5 71.pdf 2,263,087 004 TVA WB FSAR Figure 2.5 222.pdf 909,429 005_TVAWBFSAR Figure 2.5 281_1.pdf 2,155,627 006 TVAWBFSAR Figure 2.5 281_2.pdf 2,117,562 007_TVAWBFSAR Figure 2.5 549 1.pdf 3,600,807 008_TVA WB FSAR Figure 2.5 549 2.pdf 3,989,180 009_TVAWBFSAR Figure 2.5 549 3.pdf 2,863,719 010_TVA WB FSAR Figure 2.5 549 4.pdf 2,809,599 011 TVA WBFSAR Figure 2.5 550.pdf 1,803,985 012_TVA WB FSAR Figure 2.5 551.pdf 1,996,869 013_TVAWB FSAR Figure 2.5 554 1.pdf 3,081,060 014_TVAWBFSAR Figure 2.5 554_2.pdf 1,996,707 015 TVA WBFSAR Figure 2.5 555.pdf 1,993,312 016_TVA WB FSAR Figure 2.5 556.pdf 2,998,087 017_TVAWBFSARFigure 2.5 571_1.pdf 844,484 018 TVA WB FSAR Figure 2.5 571_2.pdf 3,128,329 019 TVAWBFSAR Figure 2.5 571 3.pdf 3,284,555 020_TVAWBFSAR Figure 2.5 571 4.pdf 2,142,316 021_TVAWBFSAR Figure 2.5 572.pdf 2,196,945 Note: Byte amounts in italics are redacted files.

Page 2 of 3

ENCLOSURE 4 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 106 List of Files on Publicly Available OSM File Name File Size - Bytes 022 TVA WB FSAR Figure 2.5 573.pdf 2,013,286 023 TVA WB FSAR Figure 2.5 576_1.pdf 3,238,525 024 TVA WB FSAR Figure 2.5 576_2.pdf 2,151,750 025 TVA WB FSAR Figure 2.5 577.pdf 2,207,622 026_TVA WB FSAR Figure 2.5 578.pdf 2,080,032 027_TVAWBFSAR Figure 2.5 579.pdf 2,308,985 028_TVA WB FSAR Figure 2.5 583.pdf 2,487,346 029_TVA WB FSAR Figure 2.5 588.pdf 2,528,515 030 TVA WB FSAR Figure 2.5 589.pdf 2,480,438 031 TVA WB FSARFigure 2.5 594.pdf 13,054,127 032 TVA WB FSAR Figure 2.5 595.pdf 2,323,267 033 TVAWBFSAR Figure 2.5 596.pdf 5,732,107 034 TVA WB FSAR Figure 2.5 597.pdf 1,287,336 035 TVA WBFSAR Figure 2.5 602.pdf 5,549,537 036_TVAWBFSARFigure 2.5 603.pdf 4,830,835 037 TVAWBFSAR Figure 2.5 604.pdf 6,392,279 038 TVA WB FSAR Figure 2.5 605.pdf 20,823,108 Total 131,112,035 TVA_WBN-2_OversizedFSARTable 001 TVA WB FSAR Table 6.2.4-1.pdf 1,215,565 Total 1,215,565 Note: Byte amounts in italics are redacted files.

Page 3 of 3