FOIA/PA-2011-0113 - Resp 2 - Partial
ML11257A288
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 09/06/2011
From: Sealing D
NRC/OIS/IRSD/RFSB
To: Carluccio T
Delaware Riverkeeper Network
References
FOIA/PA-2011-0113
Download: ML11257A288 (21)


Text

NRC FORM 464 Part I U.S. NUCLEAR REGULATORY COMMISSION FOIAIPA RESPONSE NUMBER (4-2011) 2011-01.13 2 RESPONSE TO FREEDOM OF INFORMATION ACT (FOIA) I PRIVACY RESPONSE FINAL PARTIAL ACT (PA) REQUEST TYPE REQUESTER DATE Tracy Carluccio 8 21.11 PART I. -- INFORMATION RELEASED D] No additional agency records subject to the request have been located.

D Requested records are available through another public distribution program. See Comments section.

APPENDICES Agency records subject to the request that are identified in the listed appendices are already available for L.. I public inspection and copying at the NRC Public Document Room.

APPENDICES Agency records subject to the request that are identified in the listed appendices are being made available for 2 D&E Ipublic inspection and copying at the NRC Public Document Room.

E Enclosed is information on how you may obtain access to and the charges for copying records located at the NRC Public Document Room, 11555 Rockville Pike, Rockville, MD 20852-2738.

APPENDICES Agency records subject to the request are enclosed.

DRecords subject to the request that contain information originated by or of interest to another Federal agency have been referred to that agency (see comments section) for a disclosure determination and direct response to you.

W We are continuing to process your request.

D See Comments.

PART L.A -- FEES AMOUNT

  • You will be billed by NRC for the amount listed. F None. Minimum fee threshold not met.

$ D You will receive a refund for the amount listed.

EII Fees waived.

See comments for details PART I.B -- INFORMATION NOT LOCATED OR WITHHELD FROM DISCLOSURE D No agency records subject to the request have been located.

z Certain information in the requested records is being withheld from disclosure pursuant to the exemptions described in and for the reasons stated in Part II.

WThis determination may be appealed within 30 days by writing to the FOIA/PA Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Clearly state on the envelope and in the letter that it is a "FOIA/.PA Appeal."

PART I.C COMMENTS (Use attached Comments continuation page if required)

The incoming FOIA request is located in ADAMS at ML11074A016.

\

I I.

NRC FORM 464 Part II U.S. NUCLEAR REGULATORY COMMISSION FOIAIPA DATE (4-2011)

RESPONSE TO FREEDOM OF INFORMATION 2011-0113 SEP 6 Z211 ACT (FOIA) I PRIVACY ACT (PA) REQUEST PART II.A -- APPLICABLE EXEMPTIONS APPENDICES Records subject to the request that are described in the enclosed Appendices are being withheld in their entirety or in part under the Exemption No.(s) of the PA and/or the FOIA as indicated below (5 U.S.C. 552a and/or 5 U.S.C. 552(b)).

D Exemption 1: The withheld information is properly classified pursuant to Executive Order 12958.

Dl Exemption 2: The withheld information relates solely to the internal personnel rules and practices of NRC.

D Exemption 3: The withheld information is specifically exempted from public disclosure by statute indicated.

D Sections 141-145 of the Atomic Energy Act, which prohibits the disclosure of Restricted Data or Formerly Restricted Data (42 U.S.C.

2161-2165).

D Section 147 of the Atomic Energy Act, which prohibits the disclosure of Unclassified Safeguards Information (42 U.S.C. 2167).

D 41 U.S.C., Section 253b, subsection (m)(1), prohibits the disclosure of contractor proposals in the possession and control of an executive agency to any person under section 552 of Title 5, U.S.C. (the FOIA), except when incorporated into the contract between the agency and the submitter of the proposal.

D Exemption 4: The withheld information is a trade secret or commercial or financial information that is being withheld for the reason(s) indicated.

D The information is considered to be confidential business (proprietary) information.

The information is considered to be proprietary because it concerns a licensee's or applicant's physical protection or material control and accounting program for special nuclear material pursuant to 10 CFR 2.390(d)(1).

FD The information was submitted by a foreign source and received in confidence pursuant to 10 CFR 2.390(d)(2).

D Disclosure will harm an identifiable private or governmental interest.

D Exemption 5: The withheld information consists of interagency or intraagency records that are not available through discovery during litigation.

Applicable privileges:

SDeliberative process: Disclosure of predecisional information would tend to inhibit the open and frank exchange of ideas essential to the deliberative process. Where records are withheld in their entirety, the facts are inextricably intertwined with the predecisional information.

There also are no reasonably segregable factual portions because the release of the facts would permit an indirect inquiry into the predecisional process of the agency.

ED Attorney work-product privilege. (Documents prepared by an attorney in contemplation of litigation)

ED Attorney-client privilege. (Confidential communications between an attorney and his/her client) m] Exemption 6: The withheld information is exempted from public disclosure because its disclosure would result in a clearly unwarranted invasion of personal privacy.

D Exemption 7: The withheld information consists of records compiled for law enforcement purposes and is being withheld for the reason(s) indicated.

(A) Disclosure could reasonably be expected to interfere with an enforcement proceeding (e.g., it would reveal the scope, direction, and focus of enforcement efforts, and thus could possibly allow recipients to take action to shield potential wrong doing or a violation of NRC requirements from investigators).

(C) Disclosure could constitute an unwarranted invasion of personal privacy.

F (D) The information consists of names of individuals and other information the disclosure of which could reasonably be expected to reveal identities of confidential sources.

(E) Disclosure would reveal techniques and procedures for law enforcement investigations or prosecutions, or guidelines that could reasonably be expected to risk circumvention of the law.

(F) Disclosure could reasonably be expected to endanger the life or physical safety of an individual.

D OTHER (Specify)

PART II.B -- DENYING OFFICIALS Pursuant to 10 CFR 9.25(g), 9.25(h), and/or 9.65(b) of the U.S. Nuclear Regulatory Commission regulations, it has been determined that the information withheld is exempt from production or disclosure, and that its production or disclosure is contrary to the public interest. The person responsible for the denial are those officials identified below as denying officials and the FOIA/PA Officer for any denials that may be appealed to the Executive Director for Operations (EDO).

DENYING OFFICIAL TITLE/OFFICE RECORDS DENIED EDO SECYOFIC D] EL DEZ Eric J. Leeds Director, Office of New Reactor Regulations See Appendix E W]

1:1 El 0 E_ E_

Appeal must be made in writing within 30 days of receipt of this response. Appeals should be mailed to the FOIA/Privacy Act Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, for action by the appropriate appellate official(s). You should clearly state on the envelope and letter that it is a "FOIA/PA Appeal."

NRC FORM 464 Part II (4-2011)

FOIA/PA 2011-0113 APPENDIX D RECORDS BEING RELEASED IN THEIR ENTIRETY (If copyrighted identify with *)

NO. DATE DESCRIPTION/(PAGE COUNT)

1. 03/17/08 E-mail from D. Logan, NRR to S. Duda, AECOM, and A.

Stuyvenberg, on FWS Link (1 page)

2. 03/17/08 E-mail from D. Logan, NRR to S. Duda, AECOM, and A.

Stuyvenberg, on FWS Link (1 page)

3. 08/04/08 E-mail from D. Logan, NRR to E. Wexler, NRR, on Event of Potential Public Interest - Salam - Short-Nosed Sturgeon (Protected Species) Found Dead (1 page)
4. 04/14/09 E-mail from D. Logan, NRR to B. Pham, NRR, on Impressive list for Salem (1 page)
5. 06/12/09 E-mail from J. Rikhoff, NRR, to C. Ecceleston, NRR, on Regulatory Audit Plan and Schedule (1 page)
6. 09/09/09 E-mail from D. Logan, NRR, to J. Robinson, NRR et al, on Salem & Hope Creek License Renewal Application Acceptance Review (2 page)
7. 09/15/09 E-mail from B. Pham, NRR, to J. Robinson, NRR et al, on Salem/ Hope Creek SAMA review schedule (2 pages)
8. 09/22/09 E-mail from J. Rikhoff, NRR, to B. Pham, NRR, on Salem &

Hope Creek License Renewal Application Acceptance Review (2 pages)

9. 10/13/09 E-mail from B. Pham, NRR to R. Bulavinetz, NRR on Salem

& Hope Creek CZMA (2 pages)

10. 10/16/09 E-mail from D. Doyle, NRR, to C. Eccleston, NRR, on Prarie Island Example (1 page)
11. 10/16/09 E-mail from B. Pham, NRR, to N. Sheehan, PA, on Acceptance letters for Salem & Hope Creek (2 pages)
12. 10/19/09 E-mail from D. Doyle, NRR, to C. Eccleston, NRR, on Salem Hope Creek (1 page)
13. 10/26/09 E-mail from D. Doyle, NRR, to C. Eccleston, NRR, on Salem-Hope Consultation Addresses (1 page)
14. 10/27/09 E-mail from D. Doyle, NRR, to D. Ashley NRR et al, on Salem-Hope Creek public meeting (1 page)
15. 10/29/09 Email from D. Doyle, NRR to L. Slavitter, MNAP on

FOIA/PA 2011-0113 NO. DATE DESCRIPTION/(PAGE COUNT)

Notification: Salem-Hope Creek License Renewal Scoping Meeting. (1 page)

16. 10/29/09 Email from D. Doyle, NRR to webadmin@ramapoughlenapentation.org on Notification:

Salem-Hope Creek License Renewal Scoping Meeting. (2 pages)

17. 11/02/09 E-mail from D. Doyle, NRR, to C. Eccleston, NRR, on Salem Hope Creek e-mails (1 page)
18. 11/06/09 E-mail from B. Pham, NRR, to R. Ennis, NRR, on Follow-up to phone call (1 page)
19. 11/10/09 E-mail from C. Eccleston, NRR to R. Bulavinetz, NRR, on CEQ Request for Info (2 pages)
20. 11/12/09 E-mail with attachment from D. Doyle, NRR, to L. Yee, NRR, on Tribal distribution list for Salem Hope Creek (5 pages)
21. 11/12/09 E-mail from D. Doyle, NRR, to C. Eccleston, NRR, on Salem Hope Creek SHPO Letter (1 page)
22. 11/18/09 E-mail from D. Doyle, NRR, to C. Cho, NRR, on SHPO Example (2 page)
23. 11/24/09 E-mail from D. Doyle, NRR, to C. Cho, NRR, on Revised Sentence / Salem Hope Creek (1 page)
24. 12/01/09 E-mail with attachment from D. Doyle, NRR, to C. Cho, NRR, on Consulting Letters (3 pages)
25. 12/04/09 E-mail from D. Doyle, NRR, to C. Eccleston, NRR, on Salem-Hope Scoping Slides need to be entered into ADAMS (1 page)
26. 12/08/09 E-mail from D. Doyle, NRR, to C. Cho, NRR, on Salem Hope Creek bio letter - Magnuson-Stevens (1 page)
27. 12/09/09 E-mail from D. Doyle, NRR, to C. Cho, NRR et al, on Salem Hope Creek Biological Letter (3 pages)
28. 12/17/09 E-mail from D. Doyle, NRR to C. Eccelston, NRR et al, on Bio letter plan/Salem Hope Creek (2 page)
29. 12/17/09 E-mail from D. Doyle, NRR to C. Eccleston, NRR, on No CZMA (1 page)

FOIA/PA 2011-0113 NO. DATE DESCRIPTION/(PAGE COUNT)

30. 12/31/09 E-mail from D. Doyle, NRR to C. Cho, NRR, on Final Distribution: Request for List of Protected Species with the Area Under Evaluation for the Salem and Hope Creek Nuclear Generating Stations License Renewal Application Review (1 page)
31. 01/08/10 E-mail from C. Eccleston, NRR, to A. Imboden, NRR, on DEL Program Update: New EO on NEPA Likely (2 pages)
32. 01/29/10 E-mail from B. Pham, NRR to C. Eccleston, NRR et al, on Salem-Hope LR: Site Audit and communications with contractor (2 pages)
33. 02/01/10 E-mail from D. Logan, NRR, to C. Eccleston, NRR et al, on NRC/AECOM Contact List (2 pages)
34. 02/01/10 E-mail from D. Logan, NRR, to C. Eccleston, NRR et al, on Salem/Hope SEIS Meeting (1 page)
35. 02/01/10 Email from B. Pham NRR to d. Doyle, NRR on Working meeting for Salem & HC SEIS. (1 page)
36. 02/02/10 E-mail from D. Doyle, NRR, to D. Ashley, NRR et al, on PSEG to request ESP for Salem-Hope Creek site (1 page)
37. 02/02/10 E-mail from R. Bulavinetz, NRR, to D. Logan, NRR, on Del.

River Dredging proposal (1 page)

38. 02/02/10 E-mail from A. Imoden, NRR, to C. Eccleston, NRR on salem/hope creek team (1 page)
39. 02/03/10 E-mail from D. Logan, NRR to C. Eccleston, NRR, on Salem/Hope SEIS Meeting (1 page)
40. 02/03/10 E-mail from C. Eccleston, NRR to D. Logan, NRR, on Salem/Hope SEIS Meeting (1 page)
41. 02/04/10 E-mail with attachment from C. Eccleston, NRR, to G.

Bacuta, NRR et al, on Information on Salem/Hope Creek License Renewal (3 pages)

42. 02/04/10 E-mail with attachment S. Provenzano, AECOM to J. Rikhoff, NRR, Salem-Hope Creek SEIS (1 page)
43. 02/04/10 E-mail with attachment from J. Rikhoff, NRR, to S.

Provenzano et al, on Salem-Hope Creek SEIS (4 pages)

44. 02/04/10 E-mail from C. Eccleston, NRR, to D. Logan, NRR, on

FOIA/PA 2011-0113 NO. DATE DESCRIPTION/(PAGE COUNT)

Information on Salem/Hope Creek License Renewal (1 page)

45. 02/16/10 E-mail from K. Taylor, AECOM, to S. Klementowicz, NRR, on License Renewal - Salem-Hope Creek Site Visit Needs List (1 page)
46. 02/18/10 E-mail with attachment from C. Eccleston, NRR, to G.

Bacuta, NRR et al, on Site Audit Needs List (4 pages)

47. 02/18/10 E-mail from C. Eccelston, NRR, to G. Bacuta, NRR et al, on Salem/Hope Creek Site Audit (1 page)
48. 02/19/10 E-mail from J. Rihkoff, NRR, to C. Eccleston, nRR et al, on Data Needs List (2) JJR Edits (5 pages)
49. 02/19/10 E-mail from J. Rikhoff, NRR to J. Davis, FSME, on Site Audit Needs list (2 pages)
50. 02/19/10 E-mail from K. Taylor, AECOM, to S. Klementowicz, NRR, on Salem-Hope Creek - Site Audit Needs (2 pages)
51. 02/19/10 E-mail from R. Bulavinetz, NRR, to C. Eccleston, NRR et al on Salem & Hope Creek (1 page)
52. 02/22/10 E-mail with attachments from D. Logan, NRR, to A. Imboden, NRR, on Site Audit Needs List (5 pages)
53. 02/22/10 E-mail with attachment from C. Eccleston, NRR, to G.

Bacuta, NRR, on Salem/Hope Creek Audit Plan & Schedule (7 pages)

54. 02/22/10 E-mail from C. Eccleston, NRR, to D. Logan, NRR, OnSite Audit Needs List (1 page)
55. 02/22/10 E-mail from R. Bulavinetz, NRR, to D. Logan, NRR on NJ Dep reps (1 page)
56. 02/22/10 E-mail from R. Bulavinetz, NRR to D. Logan, NRR on DEP Release: Delaware Deepening (2 pages)
57. 02/22/10 E-mail from R. Bulavinetz, NRR, to D. Logan, NRR on Site Audit Needs List (1 page)
58. 02/23/10 E-mail from D. Logan, NRR, from C. Eccleston, NRR, on Salem/Hope Creek (2 pages)
59. 02/23/10 E-mail from G. Bacuta, NRR from C. Eccleston, NRR, on Salem/Hope Creek Audit Plan & Schedule (1 page)

FOIA/PA 2011-0113 NO. DATE DESCRIPTION/(PAGE COUNT)

60. 02/23/10 E-mail from C. Eccleston, NRR, to G. Bacuta et al, on Correct Version of Site Audit Plan and Schedule (8 pages)
61. 02/23/10 E-mail from D. Logan, NRR, from C. Eccleston, NRR, on Salem/Hope Creek Audit Plan & Schedule (1 page)
62. 02/23/10 E-mail from C. Eccleston, NRR to R: Bulavinetz, NRR, on Salem & Hope Creek (2 pages)
63. 02/23/10 Email from J. Rikhoff, NRR to C. Eccleston, NRR RE:

Salem/Hope Creek Audit Plan & Schedule. (2 pages)

64. 02/24/10 Email from D. Logan, NRR to S. Dillard, NRR FW:

Impressive list for Salem. (1 page)

65. 02/24/10 E-mail from D. Logan, NRR, to S. Duda, AECOM, on Template files for the Ecology Sections (17 pages)
66. 02/24/10 E-mail with attachments from D. Logan, NRR, to S. Duda, AECOM, on Informal Guidance for Writing Ecology Sections (16 pages)
67. 02/24/10 E-mail from D. Logan, NRR, to A. Imboden on Salem/Hope Creek agencies calls (1 page)
68. 02/24/10 E-mail from R. Bulavinetz, NRR to D. Logan, NRR on Salem

& Hope Creek (2 pages)

69. 02/24/10 E-mail with attachment from R. Bulavinetz, NRR to C.

Eccleston, NRR on Site Audit Needs List - Salem & Hope Creek (2 pages)

70. 02/24/10 E-mail from C. Eccleston, NRR, to D. Logan, NRR, on Impressive list for Salem (2 pages)
71. 02/24/10 E-mail from C. Eccleston, NRR to B. Pham, NRR et al, on Salem / Hope Creek agencies calls (2 pages)
72. 02/24/10 E-mail with attachment from C. Eccleston, NRR to D. Logan, NRR, on Consultation letter addresses (2 pages)
73. 02/25/10 E-mail from C. Eccleston, NRR, to D. Beissel, NRR, on Salem / Hope Creek agencies calls (2 pages)
74. 03/01/10 E-mail with attachment from D. Logan, NRR, to S. Duda, AECOM et al, on Mitigation Memo (8 pages)
75. 03/01/10 E-mail from C. Eccleston, to G. Bacuta, NRR, on Mitigation Memo (1 page)

FOIA/PA 2011-0113 NO. DATE DESCRIPTION/(PAGE COUNT)

76. 03/02/10 E-mail from C. Eccleston, NRR, to D. Logan, NRR, on References (1 page)
77. 03/02/10 E-mail from C. Eccleston, NRR, to D. Logan, NRR et al, on ESP Notice of Intent for Salem/Hope.Creek (1 page)
78. 03/02/10 E-mail with attachment from R. Bulavinetz, NRR, to C.

Eccleston, NRR, on Salem and Hope Creek Site visits - T-line and wetlands site visits (4 pages)

79. 03/03/10 E-mail from C. Eccleston, NRR to N. Ranek, Exelon et al, on Salem/Hope Site Audit Plan/Schedule (2 pages)
80. 03/03/10 E-mail with attachment from C. Eccleston, NRR, to G.

Bacuta et al, on Draft Outline of Salem/Hope Creek SEIS (63 pages)

81. 03/03/10 E-mail from with attachment from C. Eccleston, NRR, to G.

Bacuta et al, on Salem/Hope Site Audit Plan/Schedule (11 pages)

82. 03/03/10 E-mail from J. Rikhoff, NRR, to G. Bacuta et al, on Salem/Hope Audit Plan/Schedule (6 pages)
83. 03/03/10 E-mail from C. Eccleston, NRR, to N. Ranek, Exelon Corp, on Salem/Hope Site Audit Plan/Schedule (2 pages)
84. 03/03/10 E-mail from R. Bulavinetz, NRR to C. Eccleston, NRR on Salem/Hope Site Audit Plan/Schedule (1 page)
85. 03/04/10 E-mail from D. Doyle, NRR, to C. Eccleston, NRR, on Salem Hope Creek site access for Doyle, Susco, and Cooper (1 page)
86. 03/12/10 E-mail with attachment from C. Eccleston, NRR, to G.

Bacuta et al, on Salem/Hope Site Audit Information Needs List (5 pages)

87. 03/16/10 E-mail with attachment from C. Eccleston, NRR, to G.

Bacuta et al, on Draft Outline of Alternatives for Salem/Hope SEIS (3 pages)

88. 03/18/10 E-mail with attachment from R. Bulavinetz, NRR, to C.

Eccleston, NRR, on Additional Info request - Salem & Hope Creek (2 pages)

89. 03/19/10 E-mail from D. Logan, NRR, to S. Duda, AECOM, on EPA's Phase I and II regulations for 316(b) (1 page)

FOIA/PA 2011-0113 NO. DATE DESCRIPTION/(PAGE COUNT)

90. 03/30/10 E-mail from S. Duda, AECOM to D. Logan, NRR, RE:

Biological Assessment for Salem and Hope Creek (1 page)

91. 04/07/10 E-mail from C. Eccleston, NRR to D. Logan, NRR, et al, on Draft Outline of alternatives for Salem/Hope SEIS (2 pages)
92. 04/12/10 E-mail from D. Logan, NRR, to S. Duda, AECOM, on Hope Creek/Salem: Wendy Walsh from NJDEP called (1 page)
93. 04/30/10 E-mail from S. Provenzano, AECOM to J. Rikhoff, NRR, RE:

Salem-Hope Creek questions on taxes (2 pages)

94. 05/03/10 E-mail from S. Provenzano, AECOM to J. Rikhoff, NRR, to, on Salem-Hope Creek question on taxes (2 pages)
95. 05/05/10 E-mail from D. Logan, NRR, to C. Eccleston, NRR, on Salem ESP for cumulative effects (1 page)
96. 05/17/10 E-mail from B. Pham, NRR, to C. Eccleston, NRR on Status

- Salem/Hope Creek (1 page)

97. 06/03/10 E-mail from C. Eccleston, NRR, to J. Rikhoff, NRR, re:

Salem - Hope Creek EJ question (3 pages)

98. 06/09/10 E-mail from D. Doyle, NRR, to T. Ghosh, RES, on Response to comment on solar storm risk (3 pages)
99. 06/09/10 E-mail from B. Pham, NRR to C. Eccleston, NRR et al, on Status of Salem/HC SEIS (1 page) 100. 06/18/10 E-mail with attachment from G. Bacuta, NRR to C.

Eccleston, NRR, re: Section S/HC Air impacts Chapter 2 &

4.1 (141 pages) 101. 06/24/10 E-mail with attachment from D. Logan, NRR, to S. Duda, AECOM, on Comments and edits on draft Chapter 2 Aquatic Ecology sections of Hope Creek and Salem dSEIS (5 pages) 102. 06/25/10 E-mail from D. Logan, NRR, to N. Spangler, AECOM, re:

editorial change in literature citations at the end of sentences (1 page) 103. 06/24/10 E-mail from S. Duda, AECOM, to D. Logan, NRR re:

Comments and edits on draft Chapter 2 Aquatic Ecology sections of Hope Creek and Salem dSEIS (1 page) 104. 07/07/10 E-mail from R. Bulavinetz, to C. Eccleston, NRR, on RERB Priority Workloads (1 page)

FOIA/PA 2011-0113 NO. DATE DESCRIPTION/APAGE COUNT) 105. 07/07/10 Email from A. Imboden to B. Balsam on Priorities, (1 page) 106. 07/19/10 E-mail from B. Pham, NRR, to D. Wrona, NRR et al, on SERs and SEISs due to Brian and Melanie (1 page) 107. 07/22/10 E-mail from A. Imboden, NRR to D. Logan, NRR, on Salem and Hope Creek LRA's - Status of aquatic ecology sections (2 pages) 108. 07/27/10 E-mail from C. Eccleston, NRR, to S. Klementowicz, NRR, on Salem/Hope Creek - Chapter 2 (1 page) 109. 07-27-10 E-mail from B. Pham, NRR, to C. Eccleston, NRR, on ACTION: Salem & HC SEIS (1 page) 110. 07/28/10 E-mail from D. Logan, NRR, to S.Spangler, AECOM re:

Salem/HCGS Biological Assessment (2 pages) 111. 07/30/10 E-mail with attachment from D. Logan, NRR, to S. Duda, AECOM, on Salem Hope Creek comments and edits on chapter 4 sections (59 pages) 112. 08/03/10 E-mail from B. Pham,. NRR, to C. Eccelston, NRR, on ACTION: Due for Salem & HC DSEIS (1 page) 113. 08/03/10 E-mail with attachment from R. Bulavinetz, NRR, to C.

Eccleston, NRR, on Salem & Hope Creek Terrest Sections (48 pages) 114. 08/03/10 E-mail from R. Bulavinetz, NRR, to S. Dillard, AECOM on Salem & Hope Creek - Terrest Sections - Phone Call (2 pages) q 115. 08/05/10 E-mail from R. Bulavinetz, NRR, to S. Dillard, AECOM re:

T&E table - Salem/HCGS (2 pages) 116. 08/05/10 E-mail from R. Bulavinetz, NRR, to S. Dillard, AECOM re:

Salem/HCGS (1 page) 117. 08/05/10 E-mail with attachments from S. Klementowicz, NRR, to C.

Eccleston, NRR, re: Salem/Hope Creek Chapter 8 (48 pages) 118. 08/06/10 E-mail from D. Logan, NRR to R. Bulavinetz, NRR, re:

Salem-Chptr 2 (1 page) 119. 08/06/10 E-mail from B. Pham, NRR, to J. Rikhoff, NRR et al, on Salem-HCGS (2 pages)

FOIA/PA 2011-0113 NO. DATE DESCRIPTION/(PAGE COUNT) 120. 08/09/10 E-mail with attachments from C. Eccleston, NRR to J.

Rikhoff, NRR, on Chapter 2,4,& 8 (165 pages) 121. 08/09/10 E-mail from B. Pham, NRR to A. Imboden, NRR et al, on re:

ACTION: Salem & HC SEIS (3 pages) 122. 08/09/10 E-mail from R. Bulavinetz, NRR to S. Dillard, AECOM on Salem & Hope Creek - Chapter 2.2.6 (2 page) 123. 08/09/10 E-mail with attachment from C. Eccleston, NRR, to J.

Rikhoff, NRR, on Updated version of EJ section (11 pages) 124. 08/09/10 E-mail from C. Eccleston, NRR, to J. Rikhoff, NRR, on Chapter 4-V 1_Part 2 (46 pages) 125. 08/09/10 E-mail from J. Rikhoff, NRR to A. Imboden, NRR, on Status of salem/hope creek (1 page) 126. 08/10/10 E-mail from from R. Bulavinetz, NRR to S. Dillard, AECOM re: Salem & Hope Creek - Chapter 2.0, 2.1; 2.1.5 (1 page) 127. 08/10/10 E-mail from B. Pham, NRR to C. Eccleston, NRR, re: Salem

& HC Scoping Summary Report (1 page) 128. 08/11/10 E-mail with attachment from J. Rikhoff, NRR to C. Eccleston, NRR et al, on Salem and Hope Creek Chapter 2 - Technical review of and Land Use and Socioeconomics Sections (J.

Rikhoff Redline Strikeouts) (152 pages) 129. 08/11/10 E-mail from B. Pham, NRR, to B. Hurley et al, on Salem &

HC DSEIS call 8/11/10 (1 page) 130. 08/12/10 E-mail from J. Rikhoff, NRR, to J. Susco, NRR, on Salem/Hope Creek scoping comment response (2 pages) 131. 08/12/10 E-mail with attachment from J. Rikhoff, NRR to C. Eccleston, NRR et al, on Salem and Hope Creek Chapter - Technical review of Land Use, Socioeconomics, and EJ Sections ( C.

Eccleston Redline Strike outs) (46 pages) 132. 08/13/10 E-mail from J. Susco, NRR, to J. Rikhoff, NRR, on Salem/hope Creek scoping comment response (2 page) 133. 08/16/10 E-mail from D. Logan, NRR, to S. Duda, AECOM et al, on Salem - hope creek: mitigation levels (1 page) 134. 08/16/10 E-mail from J. Susco, NRR to D. Logan, NRR et al, re:

FOIA/PA 2011-0113 NO. DATE DESCRIPTION/(PAGE COUNT)

ACTION Salem/Hope Creek scoping comments (1 page) 135. 08/17/10 E-mail from D. Logan, NRR to S. Duda, AECOM et al, re:

QUESTION: salem NJPDES permit status (2 page) 136. 08/17/10 E-mail from D. Logan, NRR to B. Pham, NRR et al, re:

QUESTION: salem NJPDES permit status (2 page) 137. 08/17/10 E-mail from J. Susco, NRR to D. Logan, NRR et al, re:

ACTION Salem/Hope Creek scoping comments (1 page) 138. 08/18/10 E-mail with attachment from C. Eccleston, NRR to W.

Rautzen, NRR, on Salem/Hope Chapter 8 (49 pages) 139. 08/18/10 E-mail with attachment from R. Bulavinetz, NRR to S. Dillard et al, on Cumulative Template - Cooper (5 pages) 140. 08/18/10 E-mail from C. Eccleston, NRR, to D. Logan, NRR, on Chapter 8 Biological Sections (1 page) 141. 08/19/10 E-mail with attachment from D. Logan, NRR, to S. Dillard et al, re: Question: salem NJPEDES permit status (32 pages) 142. 08/19/10 E-mail from C. Eccleston, NRR, to N. Spangler et al, on Health Effects - Chapter 8 (1 page) 143. 08/19/10 E-mail with attachment from R. Bulavinetz, NRR to C.

Eccleston, NRR, on Cumulative Template - Cooper (8 pages) 144. 08/19/10 E-mail from B. Pham, NRR, to N. Spangler, AECOM, Re:

Status for Salem & Hope Creek DSEIS (2 pages) 145. 08/19/10 Email from N. Spangler, AECOM to D. Logan, NRR RE:

Salem-Hope Creek: mitigation levels. (1 page) 146. 08/20/10 E-mail with attachment from R. Bulavinetz, NRR, to C.

Eccleston, NRR, re: Chapter 8 - Biological Sections (48 pages) 147. 08/23/10 E-mail from B. Pham, NRR, to M. Galloway, NRR, on Periods at the End of Sentences (1 page) 148. 08/23/10 E-mail from B. Pham, NRR, to R. Ennis, NRR et al, on John Greenhill response (1 page) 149. 08/25/10 E-mail from B. Pham, NRR to T. Ghosh, RES, on SAMA input for Salem & HC DSEIS (1 page)

FOIA/PA 2011-0113 NO. DATE DESCRIPTION/(PAGE COUNT) 150. 08/25/10 E-mail from B. Pham, NRR, to C. Eccleston, NRR on Status for Salem & Hope Creek DSEIS (2 pages) 151. 08/27/10 E-mail with attachment from A. Imboden, NRR, to A.

Travers, NRR et al, on Salem/Hope Creek afternoon of excellence - Chapter 8 attached (49 pages) 152. 08/27/10 E-mail with attachment from A. Imboden, NRR, to A.

Travers, NRR et al, on Salem/Hope Creek afternoon of excellence - Chapter 4 attached (98 pages) 153. 08/27/10 E-mail with attachment from A. Imboden, NRR, to A.

Travers, NRR et al, on Salem/Hope Creek afternoon of excellence - Chapter 2 attached (146 pages) 154. 08/27/10 E-mail with B. Pham, NRR, to C. Eccleston, NRR, RE: Web Services (1 page) 155. 09/01/10 E-mail with attachment from J. Rikhoff, NRR, to S.

Klementowicz, NRR, on Salem - Hope Creek - EJ -

Radiological Exposure - Steve revision (3 pages) 156. 09/02/10 E-mail from B. Balsam, NRR to R. Bulavinetz, NRR, on Salem/HC Terrestrial Species (1 page) 157. 09/02/10 E-mail from B. Pham, NRR, to A. Imoden, NRR, on Correcting references for Salem & Hope Creek DSEIS (1 page) 158. 09/02/10 E-mail with attachment from D. Logan, NRR, to A. Imboden, NRR et al, on Salem and Hope Creek aquatic ecology sections with comments and edits (285 pages) 159. 09/02/10 E-mail from J. Rikhoff, NRR, to S. Klementowicz, NRR et al, on Salem - Hope Creek - EJ - Radiological Exposure -

Steve revision (1 page) 160. 09/02/10 E-mail from B. Pham, NRR, to S. Sakai, NRR et al, on Salem

& HC environmental review (2 page) 161. 09/03/10 E-mail from A. Imboden, NRR, to K. Folk, NRR, on Salem/Hope Creek Follow-On (1 page) 162. 09/03/10 E-mail with attachment from A. Imboden, NRR, to L. Perkins, NRR, on Salem and Hope Creek aquatic ecology sections with comments and edits (98 pages) 163. 09/03/10 E-mail with attachment from K. Folk, NRR, to L. Perkins, NRR et al, on Redline/Strikeout to Chapters 2, 4, & 8 (297)

FOIA/PA 2011-0113 NO. DATE DESCRIPTION/(PAGE COUNT) pages) 164. 09/08/10 E-mail from B. Pham, NRR, to B. Balsam, NRR et al, on Salem/HC References (1 page) 165. 09/09/10 E-mail from A. Imboden, NRR, to L. Perkins, NRR, on figure Salem/Hope Creek Ch. 2 (1 page) 166. 09/09/10 E-mail from B. Pham, NRR to B. Harris, NRR et al, on Salem

& HC DSEIS (1 page) 167. 09/10/10 E-mail from J. Susco, NRR, to C. Eccleston, NRR, on Information on Reported Hydrazine Spills at Salem (2 pages) 168. 09/14/10 E-mail with attachment from T. Ghosh, RES, to L.

Perkins, NRR et al, on FYI Salem SAMA transmittal (54 pages) 169. 09/16/10 E-mail with attacment from T. Ghosh, NRR, to C. Eccleston, NRR et al, on Reaction Hope Creek SAMA Transmittal Memo (57 pages) 170. 09/17/10 E-mail from D. Harrison, NRR, to T. Ghosh, NRR, on Hope Creek SAMA Transmittal Memo (2 pages) 171. 09/20/10 E-mail with attachment from B. Pham, NRR to L. Perkins, NRR, on Forward Salem/Hope Creek Chapter 5 SAMA input (36 pages) 172. 09/23/10 E-mail with attachment from T. Ghosh, NRR, to L. Perkins, NRR et al, on Salem/Hope Creek Chapter 5 (26 pages) 173. 09/27/10 Email from S. Klementowicz, to B. Pham on Barnwell Low-Level Radioactive Waste Disposal Site. (2 pages) 174. 09/29/10 E-mail with attachment from B. Pham, NRR, to B. Harris, NRR, on Appendices for Salem & HCGS SAMA (103 pages) 175. 10/14/10 E-mail with attachment from B. Pham, NRR, to L. Perkins, NRR et al, on Help with distro list and letter on Salem &

HC (5 page) 176. 10/14/10 E-mail with attachment from D. Doyle, NRR, to L. Perkins, NRR et al, on Salem Hope Creek Mailing (4 pages) 177. 10/14/10 E-mail from M. Wentzel, NRR, to L. Perkins, NRR et al, on Names for Salem Hope Creek EIS (2 pages)

FOIA/PA 2011-0113 NO. DATE DESCRIPTION/(PAGE COUNT) 178. 10/18/10 E-mail from D. Doyle, NRR, to L. Perkins, NRR, on Final pdf versions (1 page) 179. 10/19/10 E-mail from D. Doyle, NRR to L. Perkins, NRR, on Salem/Hope Creek DSEIS (3 pages) 180. 10/20/10 E-mail from D. Doyle, NRR, to L. Perkins, NRR on Salem/Hope Creek DSEIS (3 pages) 181. 10/20/10 E-mail from D. Doyle, NRR, to L. Perkins, NRR on Salem/Hope Creek DSEIS (1 page) 182. 10/20/10 E-mail from D. Doyle, NRR, to L. Perkins, NRR, on Final pdf versions, (2 pages) 183. 10/21/10 E-mail with attachment from D. Doyle, NRR, to L.

Stevenson, ADM et al, on Hope Creek/Salem DSEIS (2 pages) 184. 10/21/10 E-mail from D. Doyle, NRR, to L. Stevenson, ADM, re:

NUREG-1437, Volumes 1 and 2, Supplement 45 (Draft Report for Comment) (1 page) 185. 10/21/10 E-mail from M. Wentzel, NRR, to L. Perkins, NRR, on Help needed on Salem & HC DSEIS (1 page) 186. 10/25/10 E-mail from B. Pham, NRR to D. Logan, NRR et al, on BA and EFH for Salem and HC (2 pages) 187. 11/03/10 E-mail from M. Wentzel, NRR to L. Perkins, NRR, on Travel Logistics for Salem/Hope Creek Meeting Wednesday, Nov 17th (1 page) 188. 11/12/10 E-mail from B. Pham, NRR, to L. Perkins, NRR on Draft Slides for Salem/Hope Creek Public Mtg (2 pages) 189. 11/15/10 E-mail from M. Wentzel, NRR, to S. CuardadoDeJesus, NRR, on Salem/Hope Creek Meeting (1 page) 190. 11/17/10 E-mail from B. Pham, NRR, to B. Holian, NRR et al, on Afternoon DSEIS meeting on Salem & HC (1 page) 191. 12/13/10 E-mail from B. Pham, NRR, to B. Balsam, NRR, on Salem/Hope Creek Biological Assessment (3 pages) 192. 01/05/11 E-mail from D. Doyle, NRR, to L. Perkins, NRR on Salem/Hope Creek DSEIS (1 page)

FOIA/PA 2011-0113 NO. DATE DESCRIPTION/(PAGE COUNT) 193. 01/05/11 E-mail from D. Logan, NRR to L. Perkins, NRR on Salem/Hope Creek Comments (1 page) 194. 01/06/11 E-mail with attachment from B. Pham, NRR, to L. Perkins, NRR on Wording for SEIS (3 pages) 195. 01/06/11 E-mail with attachments from S. Klementowicz, NRR to L.

Perkins, NRR et al, Salem - Hope Creek - response to EPA + NJ comments (4 pages) 196. 01/11/11 E-mail with attachment from M. Wentzel, NRR, to D.

Doyle, NRR, on License Renewal - Salem - Hope Creek

- EPA + NJ comment response (4 pages) 197. 01/11/11 E-mail from D. Doyle, NRR to R. Gallucci, NRR, on Salem/Hope Creek DSEIS Comments (2 pages) 198. 01/11/11 E-mail from D. Doyle, NRR to V. Maresca, NJDPS et al, on Salem and Hope Creek license renewal review (1 page) 199. 01/12/11 E-mail from D. Doyle, NRR to R. Ennis, NRR, on Salem/Hope Creek Susceptibility to Geomagnetic Storms (3 pages) 200. 01/12/11 E-mail from D. Doyle, NRR to B. Harris, NRR et, on Revision to Salem Hope Creek SEIS - chapter 4 (1 page) 201. 01/14/11 E-mail from D. Doyle, NRR, to B. Singal, NRR, on Salem/Hope Creek Susceptibility to Geomagnetic Storms (3 pages) 202. 01/14/11 E-mail from D. Doyle, NRR to L. Perkins, NRR et al, on Salem/Hope Creek environmental review status - Jan 14 (1 page) 203. 01/18/11 E-mail from M. Wentzel, NRR to R. Bulavinetz, NRR, on Salem & Hope Creek Response to comments (1 page) 204. 01/18/11 E-mail with attachment from M. Wentzel, NRR, to R.

Bulavinetz, NRR, on Salem & Hope Creek Response to comments (3 pages) 205. 01/19/11 E-mail with attachment from M. Wentzel, NRR, to L. Perkins, NRR, on Salem/Hope Creek Status (15 pages) 206. 01/20/11 E-mail with attachments from D. Doyle, NRR, to L. Perkins, NRR, on Salem/Hope Creek DSEIS comments - Dan (41 pages)

FOIA/PA 2011-0113 NO. DATE DESCRIPTION/(PAGE COUNT) 207. 01/26/11 E-mail with attachments from D. Doyle, NRR to D. Beissel, NRR et al, on Salem/Hope Creek hydro comments (1 page) 208. 01/28/1 1 Email from D. Doyle, NRR to D. Beissel, NRR RE:

Salem/Hope Creek hydro comments. (2 pages) 209. 02/03/11 E-mail from R. Bulavinetz, NRR, to L. Perkins, NRR on Salem & Hope Creek Response to Comments - Follow-up (2 pages) 210. 02/03/11 E-mail from M. Wentzel, NRR to L. Perkins, NRR, on Salem Hope Creek: Terrestrial Comments (1 page) 211. 02/04/11 E-mail from D. Logan, NRR to B. Pham, NRR, on Five Documents (2 pages) 212. 02/07/11 E-mail from D. Doyle, NRR to L. Perkins, NRR, on NMFS Call (1 page) 213. 02/09/11 E-mail from D. Doyle, NRR to R. Gallucci, NRR, on Salem/Hope DSEIS Comments (5 pages) 214. 02/09/11 E-mail from D. Doyle, NRR to R. Auluck, NRR on Basemat and containment question (2 pages) 215. 02/09/11 E-mail from D. Doyle, NRR to R. Gallucci, NRR, on Salem/

Hope Creek DSEIS Comments (2 pages) 216. 02/09/11 E-mail with attachment from D. Doyle, NRR to B. Lehman, NRR et al, on Salem/Hope Creek DSEIS Comments (4 pages) 217. 02/09/11 E-mail from D. Logan, NRR, to L. Perkins, NRR, on FWS Comments (1 page) 218. 02/09/11 E-mail from D. Doyle, NRR, to R. Dennig, NRR on Basemat and containment question (2 pages) 219. 02/09/11 E-mail from D. Doyle, NRR to D. Beissel, NRR on Salem/Hope Creek hydro comments (2 pages) 220. 02/10/11 E-mail from D. Doyle, NRR, to R. Dennig, NRR et al, on Basemat and containment question (3 pages) 221. 02/10/11 E-mail from D. Doyle, NRR to M. Wentzel, NRR et al, on Basemat and containment question (3 pages) 222. 02/10/11 E-mail from D. Doyle, NRR to L. Perkins, NRR et al, on Basemat and containment question (3 pages)

FOIA/PA 2011-0113 NO. DATE DESCRIPTION/(PAGE COUNT) 223. 02/10/11 E-mail from M. Wentzel, NRR to D. Doyle, NRR et al, on Salem/Hope Creek hydro comments (2 pages) 224. 02/14/11 E-mail from L. Perkins, NRR, to S. Klementowicz, NRR, on Salem/HC Comment (1 page) 225. 02/14/11 E-mail from L. Perkins, NRR, to D. Logan, NRR et al, on Document Related to Aquatic Impacts at Salem/HC (1 page) 226. 02/14/11 E-mail from L. Perkins, NRR to B. Pham, NRR, et al, on Additional info on weakfish from PSEG (1 page) 227. 02/15/11 E-mail with attachment from S. Klementowicz, NRR, to L.

Perkins, NRR, on Salem - Hope Creek - response to comment on tritium (2 pages) 228. 02/16/11 Email from A. Imboden, NRR to D. Logan, NRR RE: BA and EFH for Salem and HC. (55 pages) 229. 03/08/11 E-mail from B. Pham, NRR, to A. Imboden, NRR, on Salem

& HC FSEIS (1 page) 230. 03/11/11 E-mail with attachment from D. Logan, NRR to L. Perkins, NRR, on Hope Creek and Salem Comment Responses for Aquatic Biology (19 pages) 231. 03/25/11 E-mail from D. Doyle, NRR to B. Pham, NRR on Revision for response on page A-35 (1 page) 232. 03/25/11 E-mail from D. Doyle, NRR to B. Pham, NRR on Addition to response on page A-44 (1 page) 233. 04/04/11 E-mail from D. Beissel, NRR, to I. King, Award of Task Order 2 under BPA NRC-DR-03-03-064, (1 page) 234. 04/04/11 E-mail with attachment from D. Beissel, NRR to I. King on SHC - Chapter 8, (5 pages) 235. 04/04/11 E-mail from D. Beissel w/attachment, NRR to I. King on Salem Hope Chapter 8 (Bob Dover's Hydro sections),

(48 pages) 236. 04/04/11 E-mail w/attachment from D. Beissel, NRR to I. King, on Salem/Hope Creek scoping comments (120 pages) 237. 08/18/10 E-mail from B. Pham to C. Eccleston on Status for Salem &

Hope Creek DSEIS 0fO CAkO, Caro[1L, re- Crn A 'A* Le-f C3 ac ý

FOIA/PA 2011-0113 APPENDIX E RECORDS BEING RELEASED IN PART (All records being withheld in part under Exemption 6)

NO. DATE DESCRIPTION/(PAGE COUNT)

1. 01/28/10 E-mail from C. Eccleston, NRR to D. Beissel on NRC/AECOM Contact List, (4 pages)
2. 02/02/10 E-mail from D. Logan, NRR to A. Imboden on AECOM, (1 page)
3. 04/27/10 E-mail from K. Taylor, AECOM to S. Klementowicz on ADAMS ML number, (2 pages)
4. 05/04/10 E-mail from N. spangler, AECOM to S. Dillard on Biological opinion for Salem/Hope Creek, (1 page)
5. 05/21/10 E-mail from K. Taylor, AECOM to S. Klementowicz on Salem/Hope Creek dose evaluations, (1 page)
6. 05/25/10 E-mail from K. Taylor, AECOM to S. Klementowicz on Question on Effluent Report dose, (4 pages)
7. 06/01/10 E-mail from N. Spangler, AECOM to C. Eccleston on Salem Hope Creek Consultation Letters, (1 page)
8. 06/01/10 E-mail from S. Duda, AECOM to D. Logan on Salem/Hope Creek

- conversation with NJDEPE, (1 page)

9. 08/18/10 E-mail from C. Eccleston to W. Rautzen on Salem/Hope Creek Chapter 8, (2 pages)
10. 08/18/10 E-mail from B. Pham to D. Harrison on URGENT: Salem & Hope Creek SAMA review, (1 page)
11. 08/20/10 E-mail from D. Logan to A. Imboden on Executive Decision:

Chapter 8, (3 pages)

12. 09/27/10 E-mail from L. Perkins to B. Hurley, Earthtech on Salem/Hope Creek DSEIS - Chapter 2 (137 pages)
13. 09/29/10 E-mail from B. Pham to R. Dover on Status - Salem/Hope Creek DSEIS, (4 pages)
14. 09/29/10 E-mail from B. Pham to B. Hurley on Status - Salem/Hope Creek DSEIS, (2 pages)

FOIA/PA 2011-0113 NO. DATE DESCRIPTION/(PAGE COUNT)

15. 09/29/10 E-mail from B. Pham to R. Dover on Status - Salem/Hope Creek DSEIS, (1 page)
16. 01/25/11 Email from D. Logan to B. Balsam on Salem/Hope Creek aquatic comments, (15 pages)
17. 02/01/10 E-mail from D. Logan, NRR to C. Eccleston, NRR et al, on Aquatic/terrestrial (Dillard versus Duda) Staff (2 pages)
18. 02/25/10 E-mail from R. Bulavinetz, NRR, to C. Eccleston, NRR on Salem/Hope Site Audit Logistics (2 pages)
19. 03/03/10 E-mail with attachment from C. Eccleston, NRR to G. Bacuta et.

al, on Additional Pre-Draft Sections (30 pages)

20. 03/03/10 E-mail from K. Taylor, AECOM, to S. Klementowicz, NRR, on Comments on draft sections 4.8 and 4.11 (cumulative health) (2 pages)
21. 03/16/10 E-mail from C. Eccleston, NRR, to A. Stuyvenberg, NRR, on Draft Outline of Alternatives for Salem/Hope SEIS (2 pages)
22. 03/22/10 E-mail with attachment from C. Eccleston, NRR, to D. Logan, NRR, on Tentative schedule for Monday's Discussion (6 pages)
23. 03/24/10 E-mail from B. Pham, NRR, to C. Eccleston, NRR, on EIS Sections - Writing Assignments (1 page)
24. 04/05/10 E-mail from K. Taylor, AECOM, to S. Klementowicz, NRR, on Salem-Hope Creek - dSEIS examples for multi-unit sites (1 page)
25. 04/14/10 E-mail with attachment from B. Pham, NRR, to B. Hurley, AECOM, on Scoping response - Once - through (3 pages)
26. 08/03/10 E-mail from K. Taylor, AECOM, to S.' Klementowicz, NRR, on Salem/Hope Creek update (1 page)
27. 08/06/10 E-mail from B. Pham, NRR, to N. Spangler et al, Re: URGENT ACTION regarding Salem & HC DSEIS (2 pages)
28. 08/11/10 E-mail from R. Bulavinetz, NRR, to S. Dillard, AECOM re:

Section 2.2.7 (1 page)

29. 08/16/10 E-mail with attachment from E. Rogers, AECOM to B. Hurley, AECOM, B. Pham, NRR, N. Sprangler, NRR, RE: Chapter 8 edits for Salem & HC (51 pages)

FOIA/PA 2011-0113 NO. DATE DESCRIPTION/(PAGE COUNT)

30. 08/16/10 E-mail from B. Pham, NRR, to B. Hurley et al, RE: Salem/Hope Creek - Chapter 1 (1 page)
31. 08/18/10 E-mail from D. Logan, NRR to A. Imboden NRR, re: Comments for Salem & HC DSEIS (2 pages)
32. 01/26/11 E-mail from D. Doyle, NRR to D. Logan, NRR et al, on Salem/Hope Creek aquatic comments (4 pages)
33. 01/31/11 Email from B. Pham, NRR to L. Perkins, NRR RE. (1 page)