ML112420761
| ML112420761 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 09/20/2011 |
| From: | Thomas Wengert Plant Licensing Branch III |
| To: | Northern States Power Co |
| Wengert T | |
| References | |
| TAC ME6763, TAC ME6764 | |
| Download: ML112420761 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555"()001 September 20, 2011 LICENSEE:
Northern States Power Company - Minnesota (NSPM)
FACILITY:
Prairie Island Nuclear Generating Plant, Units 1 and 2 (PINGP)
SUBJECT:
SUMMARY
OF AUGUST 18, 2011, PRE-APPLICATION MEETING TO DISCUSS THE FUTURE EXTENDED POWER UPRA TE LICENSE AMENDMENT REQUEST (TAC NOS. ME6763 AND ME6764)
On August 18, 2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Northern States Power Company, a Minnesota corporation (NSPM, the licensee), at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss NSPM's future extended power uprate (EPU) license amendment request (LAR) for Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2. A notice for this meeting was issued on August 4, 2011, and is available in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML112150525. The licensee's meeting slides can be found in ADAMS Accession No. ML112280389.
The licensee's presentation to the NRC staff included an overview of the project, including planned major modifications, project status, anticipated licensing action interfaces, the EPU LAR approach, and the licensee's understanding of the NRC's acceptance review expectations.
The NRC staff queried the licensee and provided feedback throughout the presentation.
Regarding Slide 13 of the licensee's presentation, the licensee stated that the Alternative Source Term (AST), Leak-Before-Break (LBB), and Replacement Steam Generator (RSG) submittals will need to be approved by the NRC before the licensee can implement the EPU amendment, and that the analyses supporting the AST, LBB, and RSG submittals are also included in the analyses supporting the EPU.
In response to Slide 14, which states that PINGP is not designed to GDCs (General Design Criteria), the NRC staff remarked that licensees should be aware that the regulations allow the NRC staff to request information consistent with new staff positions and expand the review to related areas, in order to make its regulatory finding and safety determination at the proposed uprate power level.
Members of the public and other stakeholders participated via teleconference. Public Meeting Feedback forms were not received. A list of attendees is included as an enclosure.
- 2 Please direct any inquiries to me at 301-415-4037, orthomas.wengert@nrc.gov.
Thomas J. Wengert, Senior Project Manager Plant licensing Branch 111-1 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306
Enclosure:
list of Attendees cc w/encl: Distribution via listserv
LIST OF ATTENDEES AUGUST 18, 2011, PRE-APPLICATION MEETING WITH NORTHERN STATES POWER COMPANY - MINNESOTA PRAIRIE ISLAND NUCLEAR GENERATING PLANT FUTURE LICENSE AMENDMENT REQUEST FOR EXTENDED POWER UPRA TE NAME ORGANIZATION J. Molden Xcel Energy S. McCall Xcel Energy G. Eckholt Xcel Energy T. Verbout Xcel Energy T. Wengert NRC/NRR/DORL R. Pascarelli NRC/NRRIDORL D. Duvigneaud NRC/NRR/DRA T. Lupoid NRC/NRRIDCI K. Scales NRC/NRRIDE R. Stattel NRC/NRR/DE T. Mossman NRC/NRR/DE C. Basavaraju NRC/NRR/DE P. Lain NRC/NRR/DRA R. Lobel NRC/NRR/DSS D. Harrison NRC/NRR/DRA J. Patel NRC/NRR/DRA S. Garry NRC/NRR/DIRS R. Mathew NRC/NRR/DE A. Ulses NRC/NRR/DSS K. Martin NRC/NRRIDIRS T. Alexion NRC/NRR/DPR G. Waig*
NRC/NRRIDIRS H. Westra*
Prairie Island Indian Community L. Gundersen*
Exelon (representing)
K. Borton*
Exelon
- Participated via teleconference ACRONYMS NRC U.S. Nuclear Regulatory Commission NRR Office of Nuclear Reactor Regulation DCI Division of Component Integrity DE Division of Engineering DIRS Division of Inspection and Regional Support DORL Division of Operating Reactor Licensing DRA Division of Risk Assessment DSS Division of Safety Systems DPR Division of Policy and Rulemaking Enclosure
- 2 Please direct any inquiries to me at 301-415-4037, or thomas.wengert@nrc.gov.
Docket Nos. 50-282 and 50-306
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL3-1 R/F RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl3-1 Resource RidsNrrPMPrairie Island Resource RidsNrrLABTully Resource RidsOgcRp Resource PLain, NRR DHarrison, NRR AUlses, NRR IRAJ Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsRgn3MailCenter Resource CSteger, NRR DMerzke, EDO Region III DDuvigneaud, NRR KScales, NRR GWaig, NRR RStattel, NRR TLupold, NRR TMossman, NRR RMathew, NRR CBasavaraju, NRR RLobel, NRR TAlexion, NRR JPatel, NRR SGarry, NRR KMartin. NRR ADAMS Accession Nos.: PKG: ML112430252 Meeting Notice: ML112150525 Meetlng Summary: ML 112 20761 Srd I es: ML112280389 4
OFFICE NRR/DORULPL3-1/PM NRR/DORULPL3-1/LA NRR/DORULPL3-1/BC NAME TWengert BTuily RPascarelli DATE 09/20111 09/20/11 09120111 OFFICIAL RECORD COpy