Letter Sequence RAI |
---|
TAC:ME6010, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B (Approved, Closed) TAC:ME6011, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B (Approved, Closed) TAC:ME6012, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B (Approved, Closed) |
|
MONTHYEARRA-10-065, Response to Draft Request for Additional Information License Amendment Request Regarding Relocation of Selected Technical Specification Surveillance Frequencies to a Licensee Controlled Document2010-08-31031 August 2010 Response to Draft Request for Additional Information License Amendment Request Regarding Relocation of Selected Technical Specification Surveillance Frequencies to a Licensee Controlled Document Project stage: Draft Request ML11103A0532011-03-31031 March 2011 License Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program Project stage: Request ML1113101402011-05-11011 May 2011 Acceptance Review Email, Adoption of Technical Specification Task Force (TSTF)-425, Rev. 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b Project stage: Acceptance Review ML1118809542011-07-0707 July 2011 Request for Additional Information, Adoption of TSTF-425, Rev. 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b (TAC ME6010-ME6012) Project stage: RAI ML1118809482011-07-0707 July 2011 E-mail, Request for Additional Information, Adoption of TSTF-425, Rev. 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b (TAC ME6010-ME6012) Project stage: RAI ML11235A5152011-08-12012 August 2011 Response to Request for Additional Information (RAI) on License Amendment Request to Relocate Surveillance Frequencies to a Licensee-Controlled Program Project stage: Response to RAI ML1126202932011-12-15015 December 2011 Issuance of Amendment Nos. 188, 188, and 188, Adoption of TSTF-425, Rev. 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b Project stage: Approval 2011-03-31
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML24297A6212024-10-22022 October 2024 Request for Additional Information Relief Request (RR) No. 72: Re-Submittal of RR-39/ASME Code X1 IWC-3420, IWA-3300 ML24257A1012024-09-11011 September 2024 Request for Additional Information License Renewal Commitment for AMP of Alloy 600 Components ML24143A1112024-05-20020 May 2024 Draft 2nd Round Request for RAIs Concerning LAR to Modify LCO for TS 3.5.2, LCO for TS 3.6.5, and Surveillance Requirements 3.5.1.2 and 3.5.2.2 for TS 3.5.1 and TS 3.5.2 ML24123A2002024-05-0101 May 2024 (E-Mail) Draft 2nd Round Request for Additional Information Concerning License Amendment Request to Modify Limiting Condition for Operation (LCO) for Technical Specification (TS) 3.5.2, LCO for TS 3.6.5, 3.5.1.2 and 3.5.2.2 for TS 3.5.1, a ML24114A2812024-04-19019 April 2024 Request for Additional Information (RAI-10150-R1) ML24011A1002024-01-10010 January 2024 March 2024 Emergency Preparedness Program Inspection - Request for Information ML23334A1612023-11-30030 November 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - RAIs Associated with License Renewal Commitment for Pressurizer Surge Line Welds Inspection Program to Manage Environmentally Assisted Fatigue ML23334A0072023-11-29029 November 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for LAR That Revises TSs 3.5.1, SITs - Operating; 3.5.2, SIT Shutdown; 3.6.5, Containment Air Temperature; and SRs for TS 3.5.1, SITs Operating ML23298A1232023-10-25025 October 2023 NRR E-mail Capture - Palo Verde, Unit 1 - RAIs for Relief Request 70, Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle ML23031A3392023-01-31031 January 2023 In-service Inspection Request for Information ML23013A0632023-01-13013 January 2023 NRR E-mail Capture - Palo Verde Unit 1 -Request for Additional Information - U1R23 Inspection Summary Report for Steam Generator Tubing ML22348A1672022-12-14014 December 2022 March 2023 Emergency Preparedness Exercise Inspection - Request for Information ML22339A2372022-12-0505 December 2022 NRR E-mail Capture - Palo Verde Unit 1 – Request for Additional Information - U1R23 Inspection Summary Report for Steam Generator Tubing ML22272A3252022-09-29029 September 2022 Licensed Operator Positive Fitness-For-Duty Test Request for Additional Information ML22209A1752022-07-28028 July 2022 Inservice Inspection Request for Information ML22187A2632022-07-0606 July 2022 Notification of Inspection (NRC IR 05000528/2022004, 05000529/2022004 and 05000530/2022004) and Request for Information ML22067A2292022-03-0202 March 2022 Inservice Inspection Inspection PWR Request for Information ML22055A5842022-02-24024 February 2022 NRR E-mail Capture - Palo Verde, Unit 3 - Final RAIs for 22nd Refueling Outage (Spring 2021) Steam Generator Tube Inservice Inspection Report ML22035A3302022-02-10010 February 2022 Requests for Confirmation of Information for Exemption to Delete Diverse Auxiliary Feedwater Actuation System Based on Risk-Informed Process for Evaluations ML22025A4012022-01-0303 January 2022 March 2022 Emergency Preparedness Program Inspection - Request for Information ML21245A2222021-09-0101 September 2021 Request for Information ML21200A2392021-07-20020 July 2021 Docs Request AC - AA August 2021 ML21154A0082021-05-26026 May 2021 NRR E-mail Capture - Palo Verde 1, 2 and 3 - Official RAIs for LAR Associated with Permanent Extension of Containment ILRT Frequency to 15 Years (Type a) and CIV Leak Rate Test Frequency to 75 Months (Type C) ML21064A2372021-03-0303 March 2021 ISI Request for Information Rls ML21042B9692021-02-18018 February 2021 Notification of NRC Design Bases Assurance Inspection and Initial Request for Information ML21043A1462021-02-11011 February 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAI for an Order Associated with Indirect License Transfer from Public Service Company of New Mexico to Avangrid, Inc ML21023A0212021-01-13013 January 2021 PVNGS PI&R Request for Information RA ML21011A1972021-01-12012 January 2021 Unit 2, and Unit 3 - Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000528/2021012, 05000529/2021012 and 05000530/2021012) and Request for Information ML20227A0992020-08-14014 August 2020 Licensed Operator Positive Fitness-For-Duty Test Request for Additional Information ML20118D1362020-04-28028 April 2020 Licensed Operator Positive Fitness-For-Duty Test Request for Additional Information ML20049A0992020-02-14014 February 2020 Notification of Cyber Security Inspection (NRC Inspection Report 05000528/2020401; 05000529/2020401; and 05000530/2020401) and Request for Information ML20049A0252020-02-12012 February 2020 NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 1 - Official RAIs for License Amendment Request Associated with Changes to Emergency Plan Staffing Requirements ML20021A3172020-01-21021 January 2020 NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 1 - Official RAIs for Relief Request 64, Impractical Examinations for the Third 10-Year ISI Interval ML19317D0782019-11-13013 November 2019 NRR E-mail Capture - Palo Verde 1 - Requests for Additional Information on Unit 1 21st Refueling Outage Steam Generator Tube Inspection Report ML19234A3202019-08-29029 August 2019 Redacted - Request for Additional Information for Amendment and Exemption Request to Support the Implementation of Framatome High Thermal Performance Fuel (EPID L-2018-LLA-0194; EPID L-2018-LLE-0010) ML19155A1842019-05-30030 May 2019 NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 3 - Mvib Official RAIs for RR-63, Impractical Examinations for the Third 10-Year ISI Interval ML19095A6552019-04-0404 April 2019 NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 3 - Mphb Official RAIs for RR-63, Impractical Examinations for the Third 10-Year ISI Interval ML19044A7342019-02-13013 February 2019 NRR E-mail Capture - Palo Verde1, 2, and 3 - Official Requests for Additional Information for RR 62, Third and Fourth 10-Year ISI Intervals, Proposed Alternative - Pressurizer Heat Sleeve Repairs ML19008A3612019-01-0808 January 2019 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for LAR Associated with Response Time Testing of Pressure Transmitters ML18341A0252018-12-0303 December 2018 Notification of NRC Design Bases Assurance Inspection (Teams)(05000528/2019011, 05000529/2019011, and 05000530/2019011) and Initial Request for Information ML18271A0392018-10-0202 October 2018 Non Proprietary - Supplemental Information Needed for Acceptance of Requested License Amendments and Exemptions Implementation of Framatome High Thermal Performance Fuel (Epids L-2018-LLA-0194 and L-2018-LLE-0010) ML18221A5102018-08-23023 August 2018 Request for Additional Information License Amendment Request to Adopt Risk-Informed Completion Times (CAC Nos. MF6576, MF6577, and MF6578; EPID: L-2015-LLA-0001) ML18229A3132018-08-17017 August 2018 NRR E-mail Capture - Request for Additional Information Relief Request 58: Impractical Examinations for the Third 10-Year Inservice Inspection Interval Arizona Public Service Company Palo Verde Nuclear Generation Station, Unit 2 - Second Se ML18227A8672018-08-15015 August 2018 NRR E-mail Capture - Request for Additional Information Relief Request 58: Impractical Examinations for the Third 10-Year Inservice Inspection Interval Arizona Public Service Company Palo Verde Nuclear Generation Station, Unit 2 ML18124A0112018-05-0303 May 2018 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official Eeob RAIs for TSTF-505 (4b) LAR (CAC Nos. MF6576, MF6577, and MF6578; EPID L-2015-LLA-0001) ML18099A0072018-04-0606 April 2018 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for 10 CFR 50.69 LAR (CAC Nos. MF9971, MF9972, and MF9973; EPID L-2017-LLA-0276) ML18094B1122018-04-0404 April 2018 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Final RAIs for TSTF-505 (Initiative 4b) LAR (CAC Nos. MF6576, MF6577, and MF6578: EPID L-2015-LLA-0001) ML18066A7032018-03-0707 March 2018 Notification of Nrc Design Bases Assurance Inspection (Programs) 05000528/2018011, 05000529/2018011, and 05000530/2018011 Initial Request for Information ML17248A0162017-08-31031 August 2017 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Final RAI for RRs PRR-03, PRR-04 and PRR-05, Pump Testing ML17107A0052017-04-14014 April 2017 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Ngf LAR and Exemption RAIs (CAC Nos. MF8076 to MF8081) 2024-09-11
[Table view] |
Text
DRAFT REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST TO ADOPT TECHNICAL SPECIFICATIONS TASK FORCE TRAVELLER TSTF-425, REVISION 3, TO RELOCATE SPECIFIC SURVEILLANCE FREQUENCIES TO A LICENSEE CONTROLLED PROGRAM PALO VERDE NUCLEAR GENERATING STATION (PVNGS) UNITS 1, 2, AND 3 DOCKET NO. 50-528, 50-529, AND 50-530 ARIZONA PUBLIC SERVICE COMPANY By letter dated March 31, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11103A053) Arizona Public Service Company (the licensee),
submitted a license amendment request (LAR) to relocate certain surveillance frequencies to a licensee-controlled program (the Surveillance Frequency Control Program, SFCP) in accordance with Technical Specification Task Force (TSTF) Traveler 425, Relocate Surveillance Frequencies to Licensee Control-- RITSTF (Risk Informed Technical Specification Task Force) Initiative 5b, Revision (Agencywide Documents Access and Management System (ADAMS) Accession No. ML090850642).
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the information provided by the licensee and determined that the following additional information is needed to complete the review:
- 1. In Section 6 of Attachment 2 to the submittal it is stated that PVNGS will follow the Nuclear Energy Institute (NEI) 04-10 guidance to assess the fire and seismic risk associated with Surveillance Test Interval (STI) changes. However, the statement does not include other external events (e.g., high winds, external floods, transportation, nearby facility accidents) in the statement. Please clarify if Palo Verde Nuclear Generating Station (PVNGS) intends to follow NEI 04-10 guidance to assess risk associated with these types of other external events as well. If not, what methodology would be used?
- 2. The scope of risk assessments may need to include shutdown, using NEI 04-10 guidance for STI changes. What shutdown risk method would be used for the analyses?
- 3. As noted in the submittal, identifying plant changes that have been incorporated at the site, but are not yet in the PRA model and justifying why the changes do not impact the PRA results used to support the amendment request is one aspect of the technical adequacy of the PVNGS PRA model used to support risk-informed applications. Please discuss PVNGSs approach to assessing plant changes not yet incorporated into the PRA model for this application.
Enclosure
- 4. The peer review found that the Category II requirement for SY-A4, given in Table 2, RG 1.200 Category II Supporting Requirements Not Met Evaluation, was not met since walkdowns and interviews either were not conducted or not documented. It is not clear that walkdowns have been performed to confirm that the systems analysis correctly reflects the as-built, as-operated plant. As a specific example, the peer review observation in Table 1, Open CEOG Internal Event PRA Peer Review F&Os, for SY-03, sub-element SY-3, discusses observations from a walkdown performed for the Auxiliary Feedwater System, for which no specific evaluation is provided. More generally, the evaluation for the SY-A4 peer review finding does not explicitly mention that walkdowns were performed.
Please clarify if walkdowns have been conducted but not yet documented. If this is not the case, please provide justification as to why walkdowns are not necessary for this application or how the intent of the Supporting Requirement is met for this application.
Also, specifically, please evaluate the importance of the peer review observations for SY-03, sub-element SY-3 for this application.
- 5. The peer review also noted for SY-C1 in Table 2 that system studies have not been updated for several revisions of the model. The PVNGS evaluation of the peer review finding for SY-C1 Category II requirement apparently does not rely on the documentation of theses system studies. While this is a documentation-related finding, it is not clear what impact out-of-date system studies have on the PRA model. Please assess the impact of the out-of-date system studies on the PRA model.
- 6. Do the failure probabilities of structures, systems, and components that are in standby mode for extended periods, as modeled in the PVNGS PRA, include a standby time-related contribution and a cyclic demand-related contribution? Please describe how you address the standby time-related contribution for extended surveillances.