Closeout of Generic Letter 2008-01 Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
ML11172A062
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/27/2011
From: Jason Paige
Plant Licensing Branch II
To: Nazar M
Florida Power & Light Co
Paige J
References
TAC MD7889, TAC MD7890, GL-08-001
Download: ML11172A062 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 27, 2011 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420

SUBJECT:

TURKEY POINT UNITS 3 AND 4 - CLOSEOUT OF GENERIC LETTER 2008-01 "MANAGING GAS ACCUMULATION IN EMERGENCY CORE COOLING.

DECAY HEAT REMOVAL. AND CONTAINMENT SPRAY SYSTEMS" (TAC NOS. MD7889 AND MD7890)

Dear Mr. Nazar:

On January 11. 2008, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling. Decay Heat Removal, and Containment Spray Systems" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072910759). The stated purpose of GL 2008-01 was (a) to request addressees to submit information to demonstrate that the subject systems are in compliance with the current licensing and design bases and applicable regulatory requirements, and that suitable design, operational, and testing control measures are in place for maintaining this compliance; and, (b) to collect the requested information to determine if additional regulatory action is required.

GL 2008-01 requested that licensees provide the following information within 9 months of the date of the G L:

(a)

A description of the results of evaluations that were performed pursuant to requested actions specified in the GL. This description should provide sufficient information to demonstrate that you are or will be in compliance with the quality assurance criteria in Sections III, V, XI, XVI, and XVII of Appendix B to 10 CFR [Title 10. Code of Federal Regulation] Part 50 and the licensing basis and operating license as those requirements apply to the subject systems; (b)

A description of all corrective actions, including plant, programmatic, procedure, and licensing basis modifications that you determined were necessary to assure compliance with these regulations; and, (c)

A statement regarding which corrective actions were completed, the schedule for completing the remaining corrective actions, and the basis for that schedule.

In your letters dated October 14,2008, August 6,2009, March 2,2010, and February 7,2011, you provided information in response to the GL. The NRC staff has reviewed the submitted information and has concluded that the licensee has acceptably addressed each request.

M. Nazar

- 2 Consequently, your GL response is considered closed and no further information or action is requested of you with the exception of any commitments you have made with respect to the GL responses. The NRC staff expects that the associated commitments will be entered into the licensee's tracking system, and controlled consistent with the Nuclear Energy Institute (NEI) document NEI99-04, "Guidelines for Managing NRC Commitment Changes." The NRC staff is continuing to engage with stakeholders regarding the creation of durable guidance for Gas Management which may require additional actions by the licensee beyond the scope of GL 2008-01. In addition, the NRC's Region II staff may decide to perform (and would contact you to schedule) an inspection using Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC GL 2008-01)" (ADAMS Accession No. ML082950666). The TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01 and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured.

If you have any questions regarding this letter, please feel free to contact me at 301-415-5888.

Jason C. Paige, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251 cc: Distribution via Listserv

M. Nazar

- 2 Consequently, your GL response is considered closed and no further information or action is requested of you with the exception of any commitments you have made with respect to the GL responses. The NRC staff expects that the associated commitments will be entered into the licensee's tracking system, and controlled consistent with the Nuclear Energy Institute (NEI) document NEI 99-04, "Guidelines for Managing NRC Commitment Changes." The NRC staff is continuing to engage with stakeholders regarding the creation of durable guidance for Gas Management which may require additional actions by the licensee beyond the scope of GL 2008-01. In addition, the NRC's Region II staff may decide to perform (and would contact you to schedule) an inspection using Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC GL 2008-01)" (ADAMS Accession No. ML082950666). The TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01 and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured.

If you have any questions regarding this letter, please feel free to contact me at 301-415-5888.

Sincerely, IRA!

Jason C. Paige, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251 cc: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL2-2 RtF RidsNrrDorlLpl2-2 RidsNrrDssSrxb RidsNrrLABClayton RidsNrrPMTurkeyPoint RidsOgcRp RidsNrrDorlDpr RidsRgn2MailCenter RidsAcrsAcnwMailCenter ADAMS Accession No. ML11172A062

  • Bv memo OFFICE LPL2-2/PM LPL2-2/LA SRXB/BC*

LPL2-2BC LPL2-2/PM NAME JPaige BClayton TUlses DBroaddus JPaige (SLingam for)

DATE 06/27/11 06/27/11 05/10/11 06/27/11 06/27/11 OFFICIAL AGENCY RECORD