2010 BYRON STATION INITIAL EXAMINATION MISCELLANEOUS CORRESPONDENCE

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLlNlOlS 605324352 September 23, 201 0 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555

SUBJECT:

OPERATOR LICENSING EXAM I NATION APPROVAL

Dear Mr. Pacilio:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Byron Station.

The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Ms. Elizabeth Bogue, Training Director, Byron Station. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, Supplement 1, of NUREG-I 021, Operator Licensing Examination Standards for Power Reactors, during the week of October 4, 2010.

The NRC staff will administer the operating tests during the weeks of September 27 and October 4,201 0. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-I021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-I 021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9707.

Please contact your Chief Examiner, Mr. Michael Bielby, at 630-829-9762, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.qov/readinq-rm/adams.html.

Sincerely, HiFonori Petirson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Distribution via ListServ

I In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.uov/readinu-rm/adams.html.

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Distribution via ListServ DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-2 Resource RidsNrrPMByron Resource RidsNrrDirslrib Resource Steven Reynolds Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPlll DRSlll Patricia Buckley Tammy Tomczak John McHale DOCUMENT NAME: BYR 09-10 DRS OL EXAM APPROVAL.DOCX Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICIAL RECORD COPY

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 2443 WARRENVILLE ROAD, SUITE 2 10 LISLE, llllNOlS 60532-4352 April 6,2010 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555

SUBJECT:

BYRON STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION

Dear Mr. Pardee:

In a telephone conversation on February 12,2010, between Mr. R. Peterson, Initial License Exam Lead, and Mr. M. Bielby, Chief Examiner, arrangements were made for the administration of licensing examinations at the Byron Station, Units 1 and 2, during the weeks of September 27 and October 4, 2010. In addition, the NRC will make an examination validation visit to your facility the week of September 6,2010.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by July 5, 2010. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by August 6,2010. Pursuant to Title IO, Section 55.40(b)(3), of the Code of Federal Regulations (IO CFR 55..40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

I To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OM6 approval number 31 50-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

. 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (31 50-001 8), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OM6 control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at httD://www.nrc.aov/readina-rmladams. html (the Public Electronic Reading Room Thank you for your cooperation in this matter. Mr. R. Peterson has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. M. Bielby at 630-829-9762, or me at 630-829-9707.

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Distribution via ListServ

I To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 31 50-0090), medical certifications (OMB approval number 31 50-0024),

and waiver requests (if any) (OMB approval number 31 50-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAlPrivacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-001 8), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room Thank you for your cooperation in this matter. Mr. R. Peterson has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. M. Bielby at 630-829-9762, or me at 630-829-9707.

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-454; 50455 License Nos. NPF-37; NPF-66 cc: Distribution via ListServ DISTRIBUTION See next page DOCUMENT NAME: G:\\DRS\\WORK IN PROGRESS\\BYR 03-1 0 DRS OL RE EXAM CONFIRMATION.DOC To receive a copy of this document, indicate in the concurrence box "C" = Copy without attachlencl "E" = Copy with attachlencl OFFICE RIII:DRS RII I:DRS Id NAME MBielby:co WG?

H P e k r s o n A DATE 03/>k/10 OFFICIAL RECORD COPY i

Letter to Mr. Charles G. Pardee from Mr. Hironori Peterson dated April 6, 2010.

SUBJECT:

BYRON STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-2 Resource RidsNrrPMByron Resource RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPlll DRSlll Patricia Buckley Tammy Tomczak John McHale

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I l l 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 I)

      • +?

February 19,2010 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION Ill EXELON STATIONS

Dear Mr. Pardee:

In a letter dated August 13, 2009 (RS-09-log), your staff responded to Regulatory Issue Summary (RIS) 2009-1 I, and requested we schedule initial license operator examinations for the Exelon Nuclear Plants. In a separate letter dated March 19, 2009 (U-603882),

Clinton Power Station requested an examination be administered in October or November 201 0 that was not included in your RIS response letter. That examination has been added to your examination schedule. In a separate letter dated November 18, 2009 (U-603924),

Clinton Power Station requested we not schedule the examination requested in December 201 1 per your letter, but retain an August 201 1 examination scheduled from your response to the 2008 RIS for examination scheduling. In a separate letter dated January 6, 201 0 (Byron 2010-0003), Byron Station requested we change the dates of their examinations proposed for 201 1, 201 2, and 201 3 to other dates. We were unable to accommodate the April 2013 examination requested for Quad Cities Nuclear Power Station. It is currently listed as To Be Determined as we are currently negotiating a mutually acceptable examination date with Quad Cities training department personnel. This letter confirms scheduling of the requested examinations at the Region 111 Exelon power plants and incorporates the changes requested by Clinton Power Station and Byron Station. We have tentatively scheduled the requested examinations to occur as follows:

On-site validation of the examinations is tentatively scheduled to occur approximately three weeks before each scheduled examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the affected stations training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

L

We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. If an examination anticipates greater than nine anticipated applicants for the examination, the examination is scheduled for two weeks.

Otherwise, the examination is scheduled for one week. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule.

Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations.

A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief

'examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.qov/readinwrm/adams. html (the Public Electronic Reading Room).

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Docket No. 50-461 License No. NPF-62 Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc:

Distribution via ListServ

OFFICE RIII:DRS 1

RIII:DRS I

RIII:DRS I

I NAME JKweiser:co DMcNeil HPeterson DATE 01/25/10 02/17/10 0211 911 0 We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. If an examination anticipates greater than nine anticipated applicants for the examination, the examination is scheduled for two weeks.

Otherwise, the examination is scheduled for one week. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule.

Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations.

A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at httD://www.nrc.novlreadinn-rmladams.htm1 (the Public Electronic Reading Room).

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Docket No. 50-461 License No. NPF-62 Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc:

Distribution via ListServ DISTRIBUTION:

See next page

Letter to Mr. Charles G. Pardee from Mr. Hironori Peterson, dated February 19, 2010.

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION Ill EXELON STATIONS DISTRIBUTION:

RidsNrrDorlLpl3-2 Resource Susan Bagley RidsNrrPMBraidwood Resource RidsNrrPMByron Resource RidsNrrPMClinton Resource RidsNrrPMDresden Resource RidsNrrPMLaSalle RidsNrrPMQuad Cities RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPlll DRSlll Carole Ariano Linda Linn Patricia Buckley Tammy Tomczak

1 t

a t -

Exe la na Nuclear Exelon Nuclear www.exeloncorp.com 4300 Winfield Road Warrenville, IL 60555 RS-09-109 August 13,2009 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 yv& o/ 0 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289

August 13,2009 U. S. Nuclear Regulatory Commission Page 2

Subject:

Response to NRC Regulatory Issue Summary 2009-1 1 "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2009-1 1, "Preparation and Scheduling of Operator Licensing Examinations," dated July 16, 2009 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 201 0 through 201 3, and the number of candidates requiring Generic Fundamentals Examinations (GFEs) for calendar years 2010 and 201 1. Attachments 1 through 10 provide responses to RIS 2009-1 1 for the Exelon Generation Company, LLC (EGC) plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

In calendar year 2010, eight candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 6. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on for LGS. Attachment 8 for PBAPS references Attachment 6 where appropriate.

There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819.

@/-

Je L. Hansen Manker - Licensing and Regulatory Affairs - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1

NRC FORM 536

(?O-rnO81 U.S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 I

NRC Docket Nos. STN 50-456 and STN 50-457 APPROVED BY OM6 NO. 3150-0131 EXPIRES: 101311201 Estimated burden per res onse to comply with this voluntary informatic collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. ?his information collection IS used to plan budge and rasourcos for operator examinatmns. Send comments r ardln burdi estlmate to the Records and FOIA/Prlvacy Services Branch?

F&), U.

Nuclear R ulaloty Commission, Washington, DC 20555400 or b intern e-mail to iyoccllects@nrc. ov. and to the Desk Officer. Office of In/ormatlc and Regulatory Affairs, NE&-10202. (3150-0131), Office of Management ai Budget, Washington, DC 20503.

If a means used to impose an informatic collection does not display a currently valid OM6 control number. the NRC m, not conduct or s onsor. and a person is not required to respond to, 11 information collectkn.

111 cy 2011 -

A. PROPOSED EXAMINATION PREPARATION SCHEDULE I

1 I

f cy 2012 cy 2013 1

PROPOSEDNUMBER I 7

I cy 2012 -

0 5

cy 2013 -

2 I

o ESTIMATED NUMBER OF LICENSEE-PREPARED I

EXAMINATIONS 0

2 1

I 07/11/2011 1

04/08/2013 N/A I

o ESTIMATED NUMBER OF NRC-PREPARED I

EXAMINATIONS PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES O

I CY 2010 CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER 21 0

0 0

0 0

0 19 O

I 0

IB. INITIAL OPERATOR LICENSE EXAMINATIONS I PROPOSEDNUMBER I CY2010 -

0 I

NUMBEROFREACTOR OPERATORS I

0 I

NUMBER OF SENIOR REACTOR I

OPERATORS - INSTANT 0

I NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE I

t I

I NUMBER OF SENIOR REACTOR OPERATORS - LIMITED I

0 PROPOSED DATES PRIMARY DATE l2 I

O I

12 N/A I 03/24/2013 I

06/20/2011 ALTERNATE DATE EXAMINATION (GFE) SCHEDULE

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/20 Estimated burden per res onse to comply with this voluntary informatl (IC-MOBt collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. this information wllection is used to plan budgi and resources for operator examinations. Send camments re ardin burd edlmate to the Records and FOlAIPrivacy Services Branch /f-5 143). U Nuclear R ulatory Commission, Washington, DC 20555-000 or b interi e-mail to i?ocollectp@nrc.

ov, and to the Desk Officer, Office of lnknstl and Regulatory Affairs. NE&-10202. (3150-0131). Omce of Management a Budget, Washington, DC 20503.

If a means used to impose an informatl colledlon does not display a currently valid OMB control number. the NRC PT not conduct or s onsor. and a person is not required to respond to. t information coIIectpOn.

OPERATOR LICENSING EXAMINATION DATA I

FACILITY NRC REGION Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 I

NRC Docket Nos. STN 50-454 and STN 50-455 cy 2010 cy 2011 cy 2012 PROPOSED NUMBER ESTIMATED NUMBER OF EXAMINATIONS LICENSEE-PREPARED 1

1 1

111 cy 2013 -

1

[A. PROPOSED EXAMINATION PREPARATION SCHEDULE cy 201 1 -

cy 2010 -

PROPOSED NUMBER cy 2013 -

cy 2012 -

I o

ESTIMATED NUMBER OF NRC-PREPARED I

EXAMINATIONS I

8 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 1

NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE O

I 6

6 6

1 0

0 O

I PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES 0

CY 2010 CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER 0

6 0

0 0

6 0

0

6. INITIAL OPERATOR LICENSE EXAMINATIONS I

NUMBER OF REACTOR OPERATORS 8

l O

I O

I I

6 I

I NUMBER OF SENIOR REACTOR OPERATORS -LIMITED I

0 I

0 I

0 0

I I

I PROPOSED DATES I PRIMARY DATE I

09/24/2012 1

09/23/2013 I

09/26/2011 I

09/27/2010 I

I I

I

2. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PRINTED ON RECYCLED PAPER NRC FORM 536 (10-2006)

Response to RIS 2009-1 1 B. INITIAL OPERATOR LICENSE EXAMINATIONS CY201 3 -

CY2012 -

CY2011 -

CY2010 -

PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR 8

6 0

6 0

4 0

4 OPERATORS - INSTANT 0

2 0

2 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0

0 0

0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSEDDATES 10/25/2010 12/05/2011 N/A OW19/2013 PRIMARY DATE ALTERNATE DATE 11/01/2010 12/11/2011 N/A oBnBcLo13 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2010 CY 2011 JUNE SEPTEMBER OECEMBER MARCH JUNE SEPTEMBER DECEMBER NUMBER MARCH ESTIMATED CANDIDATES NUMBER OF 0

0 9

0 0

0 0

0 PANTED ON RECYCLED PAPER NaCFORMW (bzo8)

Page 1 of 1 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS OPERATOR LICENSING EXAMINATION DATA CY2013 -

CY2012 -

CY 201 1 -

CY2010 -

1 1

0 1

F-mUTV Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 I

l o

l o

l o

l o

ESTIMATED NUMBER OF NRCPREPAREO I

EXAMINATIONS Page 1 of 1 Response to RIS 2009-1 1 NRC FORM 536 US. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO 31500131 EXPIRES 10/31/2011 Estimated burden per res onse to comply wlth this voluntary information (102008) collectcon request. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> This information mllect~on IS used to plan budgets and resourcas for operator examinations Send comments re ardln burden estimate to the Records and FOINPnvscy Services Branch f-5 F&). U S Nuclear R ulatoty Cornmisson, Washlngton. DC 20555-000 orb Internet e-mail to i?ocoliects@nrc ov and to the Desk Officer Oflice of lnkrmatlon and Regulatory AflaiN, NE88-iO202, (31504131), OMce of Management and Budget Washington DC 20503 If a means used to impose an informallon collect& does not display a currently valid OM6 wnlrol number, he NRC may not conduct or sponsor, and a person is not requlred to respond to. the informatton collection OPERATOR LICENSING EXAMINATION DATA FACILITY NRC REGION Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE 111 c y 2010 c y 201 1 c y 2012 c y 2013 PROPOSED NUMBER ESTIMATED NUMBER OF EXAMINATIONS ESTIMATED NUMBER OF EXAMINATIONS 1

LICENSEE-PREPARED 1

1 1

NRC-PREPARED 0

0 0

0 I

8. INITIAL OPERATOR LICENSE EXAMINATIONS c y 2010 c y 201 1 c y 2012 c y 2013 PROPOSED NUMBER 2

3 3

3 NUMBEROFREACTOR OPERATORS NUMBER OF SENIOR REACTOR 6

9 9

9 OPERATORS - INSTANT 1

1 1

1 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0

0 0

0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSEDDATES PRIMARY OAT 03/08/2010 03/07/2011 03/05/2012 03/04/20 13 ALTERNATE DATE 04/05/2010 04/04/2011 04/02/2012 04/01/2013 I

C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED CANDIDATES NUMBER OF 0

0 0

12 0

0 0

12 PRIMED ON RECYCLED PAPER NRC FORM 536 (10-2W8)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION

( 10-2006)

OPERATOR LICENSING EXAMINATION DATA LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 I

NRC Docket Nos. STN 50-373 and STN 50-374 APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10131120' Estimated burden per res onse to comply with this volunlaty inlorrnali collection rfquesl: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. h i s infomallon collection is used to plan budgi and resources for operator examinations. Sand comments r ardin burd estlmate to Ihe Records and FOINPrlvacy Services Branch? 5 Fh). U Nuclear Re ulalory Commission Washington DC 20555-0004 br b interr e-mail to m?ocollects@nrc. MI. k d lo the D&k Olfcer. Omce'of inirmati and Regulalo Affairs NE&-10202. (3150-0131). Office of Management a Budget. Wsshmglon. DC 20503. If a means used lo impose an informati collection does not display a currently valkl OMB control number, the NRC m not conduct or sponsor. and a person is not required lo respond to. 11 information collection.

Ill I

~

cy 2011 -

(A. PROPOSED EXAMINATION PREPARATION SCHEDULE ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS I PROPOSEDNUMBER I CY2o1o -

~

~~~~

1 0

1 0

0 0

0 0

PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSEDDATES PRIMARY DATE ALTERNATE DATE cy 2010 cy 201 1 cy 2012 cy 2013 3

0 6

0 I1 0

8 0

0 0

2 0

0 0

0 0

09/14/2010 N/A 09/24/2012 N/A 09/21/2010 N/A 10/01/2012 N/A le. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES CY 2010 CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER 0

0 0

0 0

14 0

0

Response to RIS 2009-1 1 PROPOSED NUMBER ESTIMATED NUMBER OF UCENSEE-PREPARU)

ESTIMATED NUMBER OF NRCPREPERED EXAMINATION6 u(AwNATIoN8 Page I of 2 cy 2010 cy 2011 cy 2012 cy 2013 1

0 1

0 0

0 0

OPERATOR LICENSING EXAMINATION DATA PROPOSED NUMBER NUMBER OF RE4CTOR OPERATORS NUMBEROF SWKHl REACTOR OPERAlOfts - INSTAM NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR

-TORS

- LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE IA PROPOSED EXAMINATION PREPARATION SCHEDULE cy 2013 6

0 11 0 -

cy 2012 -

cy 2010 cy 2011 7

0 5

0 5

0 2

0 0

0 0

0

-~

~

~

10/04/2010 N/A 10/01/2012 N/A 10/1(VzOl@

N/A 09/24/2012 N/A PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES

16. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2010 CY 2011 JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER MARCH 0

0 0

0 0

16 0

0

Response to RIS 2009-1 1

~-

A. PROPOSED EXAMINATION PREPARATION SCHEDULE cy 2010 cy 2011 cy 2012 cy 2013 PROPOSED NUMBER ESTIMATED NUMBER OF EXAMINATIONS ESTIMATED NUMBER OF EXAMINATIONS LICENSEE-PREPARED 1

0 0

0 NRC-PREPARED 0

0 0

0

6. INITIAL OPERATOR LICENSE EXAMINATIONS cy 2012 cy 2013 0

0 0

0 cy 2010 cy 2011 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 0

0 0

0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0

0 0

0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 8

0 0

0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSEDDATES PRIMARY DATE 0611 412010 N/A N/A N/A r

ALTERNATE DATE 06/07/2010 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE)

SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED CANDIDATES NRC FORM 536 (102WB)

NUMBER OF 0

0 0

0 0

0 0

0 PRIMED ON RECYCLED PAPER Attach men t 6 Page 2 of 2 NRC FORM 536 (10-2008)

I US. NUCLEAR REGULATORY COMMISSION APPROVE0 BY OM8 NO 31504131

~

EXPIRES %311%

Estimated burden par res onse to comply with this voluntary informati I

coilactm reauesl 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. ?his information collection IS used lo Dlan budal OPERATOR LICENSING EXAMINATION DATA and resources for operator examinations. Send comments re aidin buid estimale to the Records and FOINPrivacy Servlces Branch e - 5 d 3 ). U Nuclear R e uialory Commission, Washington, DC 20555-000, or b inlerr a-mall to in!owllects@nrc.

ov. and to the Desk OMcer. Office of InLrrnatl and Regulalov Affairs, NE&-10202. (3150-0131). Office of Management a Budget. Washington, OC 20503. If a means used to impose an informati wiiectlon does not display a currently valid OM6 control number, the NRC m not conduct or sponsor. and a person is not required to respond to, I information miledon.

FACILITY Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 I

NRC Docket Nos. 50352 and 50-353 NRC REGION I

Response to RIS 2009-1 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVE0 BY OM8 NO 31504131 EXPIRES 10131120 (1o.zooa)

Estlmated burden per res onse to comply with this voluntary informatl collection request. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> $his information wllection is used to plan budgc and resources lor operator examinations Send comments re ardin burd estimate to the Records and FOINPrivacy Services Branch It-5 F&). U Nuclear Re ulatory Commlsslon, Washingtw DC 20555000 orb interr

+mad to infowllects@nrc ov, and to the Desk Officer, Office 01 lnkrmati end Regulalo Affairs, NE8B-10202. (3150-0131), Office of Management a Budget Washrglon DC 20503 If a means used to impose an Informeti collectihn does not display a currently valld OMB conlrol number, the NRC m not conduct or s onsor. and a person Is no1 required lo respond to, t information coIIectLn OPERATOR LlCENSlN G EXAMINATION DATA FACILITY NRC REQION Page 1 of 1 PROPOSED NUMBER LICENSEE-PREPARED ESTIMATED NUMBER OF EXAMINATIONS c y 2010 c y 2011 c y 2012 c y 2013 1

1 1

0 Oyster Creek Nuclear Generating Station I

Renewed Facility Operating License No. DPR-16 PROPOSED NUMBER NUMBEROFREACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE I I c y 2011 c y 2012 c y 2013 c y 2010 6

6 6

0 7

7 8

0 2

1 2

0 0

0 0

0 0511 7/2010 07/11/2011 05/28/2012 N/A 05i24i2OIO 07/18/2011 06l04i2012 N/A 1 NRC Docket No. 50-219 I

CY 2010 MARCH JUNE SEPTEMBER DECEMBER 13 0

0 0

CY 2011 MARCH JUNE SEPTEMBER DECEMBER 14 0

0 0

I o

ESTIMATED NUMBER OF NRC-PREPARED I

EXAMINATIONS CY 2010 MARCH JUNE SEPTEMBER DECEMBER 13 0

0 0

I 0

CY 2011 MARCH JUNE SEPTEMBER DECEMBER 14 0

0 0

I 0

0

16. INITIAL OPERATOR LICENSE EXAMINATIONS

~

~-

~

~

, PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER I

ESTIMATED NUMBER OF I C ANOIOATES

~

PROPOSED 1

NUMBER ESTIMATED NUMBER OF C ANOIOATES PRINTED ON RECYCLED PAPER NRC FORM 538 (10-2008)

Response to RIS 2009-1 I PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (10-2006)

I cy 2010 cy 2011 cy 2012 cy 2013 0

1 0

1 OPERATOR LICE NS ING EXAMINATION DATA PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES P RlMARY DATE ALTERNATE DATE F A ~ L I T Y Peach Bottom Atom Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 I

NRC Docket Nos. 50-277 and 50-278 cy 2010 cy 2011 cy 2012 c y 2013 0

6 0

8 0

8 0

10 0

3 0

2 0

0 0

01/31/2011 N/A 02/ 1 11201 3 03/21/2011 N/A 02/04/2013 Page 1 of 1 PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES APPROVED BY OMB: NO. 31504131 EXPl RES: 1013 1 /20 1

CY 2010 CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER 0

0 0

0 0

0 18 0

Esllmated burden per res onse 10 comply with this voluntary informatic coilection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> this information collection is used to plan budge and resources for operator examinalions Send comment!, r ardin burdc eslimale to Ihe Records and FOINPrlvacy Services Branch?-5 F&i),

U Nuclear Re ulatory Commtsson Washington. DC 20555-000, orb intern e-mail lo in?ocollectsQnrc ov. hnd lo [he Desk Officer Office of Inkrmatlc and Regulalo Affairs NE&-10202, (31500131), Omce of Management ac Budget. Washmplon, DC 20503 If a means used lo impose an lnformebc mllectlon does not display a currently valid OMB conbol number. the NRC mi not conduct or sponsor. and a person is not requlred lo respond lo. It mformalion collec3on NRC REGION I'

I (A. PROPOSED EXAMINATION PREPARATION SCHEDULE I

ESTIMATED NUMBER OF NRC-PREPARED I

EXAMINATIONS I

0 O

I 0

NRC FORM 536 (10-2008)

U.S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 I

N R C Docket Nos. 50-254 and 50-265 APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/201 Esllmaled burden per res onse to comply with this voluntary informatic collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ?his information collectlon is used to plan budge and resources for operator examinalions. Send comments re ardin burdc estimate to the Records and FOlNPrivacy Services Branch It-5 Ff33). U.

Nuclear Re ulatory Commission Washington DC 20555600 or b intern e-mail lo tnfocoIlects@nrc ov end to (he Desk Officer, O h

of tnkrmatic and Regulatory Affaln, NEbB~10202. (3150-0131). Offee of Management ai Budget, Washington, DC 20503.

If a means used lo impose an lnfmatk collection does not display a currently valid OMS control number. the NRC m, not conduct or sponsor, and a person ie not required to respond to, tt informatlon collection.

PROPOSED NUMBER ESTIMATED NUMBER OF EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS LICENSEE-PREPARED le. INITIAL OPERATOR LICENSE EXAMINATIONS c y 2010 c y 2011 c y 2012 c y 2013 0

1 I

1 0

0 0

0 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSEDDATES PRIMARY DATE ALTERNATE DATE c y 2010 c y 201 1 c y 2012 c y 2013 0

6 4

3 0

11 10 10 0

0 1

1 0

0 0

0 N/A 05/30/2011 03/12/2012 0411 51201 3 N/A 06/13/2011 03/26/2012 04/29/2013 PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES CY 2010 CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER 0

0 0

14 0

0 0

0

Response to RIS 2009-1 1 (Icblo08)

~

~

A. PROPOSED EXAMINATION PREPARATION SCHEDULE cy 2010 cy 2011 cy 2012 cy 2013 PROPOSED NUMBER I

OPERATOR LICENSING EXAMINATION DATA ESTIMATED NUMBER OF LICENSEEPREPARED EXAMINATIONS ESTIMATED NUMBER OF NRCPREPARED EXAMINATIONS 0 Page 1 of 1 I

I 0

I 0

0 0

0 lApwtOMD BY OMB: NO. 31604131 EXPIRES: 10131m

~

6. INITIAL OPERATOR LICENSE EXAMINATIONS cy 2012 CY m13 1

10 0

9 1

10 0

8 cy 2010 cy 2011 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0

1 0

1 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0

0 0

0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 01/21/2010 09/12/2011 N/A 09/09/2013 Oll28/2010 09/19/2011 N/A 0911 a2013 ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEOULE CY 2012 CY 2010 PROPOSED,

--_I-NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED CANDIDATES NUMBER of 21 0

0 0

18 0

0 0

NRC FORM w (ioaoos)

AIlNTEOCftRECY#LOPAPER Esthnaled burden per n s ons.

IO cornpry wifh Ihls voluntary informau c m ~ ~ m q u a s t i how. Rh hhmatbn w8-n b u d

to p l ~,

end reaoum~ for oprakw emllultknr. Send cwnmb r bud railmala to the Recorda and FOIAJPI~WC~

Setviws Branch 6 F 3) U Wud.ar R ulatory Combdon. Wuhington, DC 2-x' him wnd lo I%coHwts@nm.

and (0 lhe Dsak OMcrr Ofka d t&matJ end R"gubg 8udg.r wa ngtm c 20503 i f a m o u u u u d t o m p o u a X 2 cdkcth door not dbplay s c&Uy vald OMB wnbd nmkr ltrr NRC m not condun3 or s nwc. and a perron is not requhed to riapond to. U bkmUtfand&.

N E E 1 0202, (3150-0131). OI& d Mul Three Mile Island Nuclear Station, Unit 1 FncWfy Operadng Llcense no. DPR-SO I

NRC Docket No. 50-289 I I

October 7, 2008 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville IL 60555

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION Ill EXELON STATIONS

Dear Mr. Pardee:

In a letter dated July 22, 2008, (RS-08-092) your staff responded to Regulatory Issue Summary 2008-1 6 and requested we schedule initial license operator examinations for the Exelon Nuclear Plants. In a separate letter dated July 11, 2008, (KKM-08-001) the Quad Cities Nuclear Power Station Training Manager requested a change to the start date of the Stations 2009 examination. This letter confirms scheduling of the requested examinations at the Region Ill power plants and the change requested for the Quad Cities Nuclear Power Station 2009 examination. We have tentatively scheduled the requested examinations to occur as follows:

On-site validation of the examinations is tentatively scheduled to occur approximately three weeks before each scheduled examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the affected stations training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. Because the examinations have greater than nine anticipated applicants, each examination is scheduled for two weeks. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations.

A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.nov/readinq-rm/adams.html.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 cc:

Site Vice President - Braidwood Station Plant Manager - Braidwood Station Regulatory Assurance Manager - Braidwood Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission Site Training Director - Braidwood Station

OFFICE NAME DATE A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.

RIII:DRS I

RIII:DRS I

RIII:DRS I

I JKweiser:co DMcNeil HPeterson 10/02/08 10/02/08 10/07/08 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at httrx//www.nrc.ctov/readina-rm/adams.html.

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 cc:

Site Vice President - Braidwood Station Plant Manager - Braidwood Station Regulatory Assurance Manager - Braidwood Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission Site Training Director - Braidwood Station See Attached Distributions

Docket Nos. 50-454; 50455 License Nos. NPF-37; NPF-66 cc:

Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station P. Schmidt, State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission Site Training Director - Byron Station

6. Quigley, Byron Station Docket No. 50-461 License No. NPF-62 cc:

Site Vice President - Clinton Power Station Plant Manager - Clinton Power Station Regulatory Assurance Manager - Clinton Power Station Manager Licensing - Clinton, Dresden and Quad Cities Site Training Director - Clinton Power Station Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc:

Site Vice President - Dresden Nuclear Power Station Plant Manager - Dresden Nuclear Power Station Regulatory Assurance Manager - Dresden Nuclear Power Station Site Training Director - Dresden Nuclear Power Station Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 cc:

Site Vice President - LaSalle County Station Plant Manager - LaSalle County Station Regulatory Assurance Manager - LaSalle County Station Site Training Director - LaSalle County Station Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc:

Site Vice President - Quad Cities Nuclear Power Station Plant Manager - Quad Cities Nuclear Power Station Regulatory Assurance Manager -

Vice President - Law and Regulatory Affairs D. Tubbs, Manager of Nuclear Associate General Counsel M. Rasmusson, State Liaison Officer, State of Iowa Chief Radiological Emergency Preparedness Section, Site Training Director - Quad Cities Nuclear Power Station Quad Cities Nuclear Power Station Dept. of Homeland Security

Letter to Charles G. Pardee from Hironori Peterson dated October 7, 2008

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION Ill EXELON STATIONS DISTRIBUTION:

Russell Gibbs Tamara Bloomer Meghan Thorpe-Kavanaugh Joel Wiebe Stephen Sands Christopher Gratton RidsNrrDirslrib Resource Mark Satorius Kenneth OBrien Jared Heck Roland Lickus Carole Ariano Linda Linn Patricia Buckley DRPlll DRSlll Patricia Buckley Tammy Tomczak

From:

Carmen Olteanu Sent:

To:

Tuesday, October 21,2008 11 2 2 AM Russell Gibbs; Tamara Bloomer; Meghan Thorpe-Kavanaugh; Joel Wiebe; Stephen Sands; Christopher Gratton; RidsNrrDirslrib Resource; Mark Satorius; Kenneth OBrien; Jared Heck; Carole Ariano; Linda Linn; Patricia Buckley; DRPIII; DRSIII; Patricia Buckley; Tammy Tomczak Exelon Letter Re Confirmation of Initial Exam

Subject:

Attachments:

Exelon 100708 DRS OL.doc The subject document has been completed and has been submitted to DPC to be declared in ADAMS. A Word copy of the document has been attached and the document has been assigned Accession

  1. ML082880559.

' AmerGen.

An Exelon Company Ameri;en Energy Company, LLC 4300 Wvfield Road Warrenville. \\ L 60555 www exeloncorp tom RS-08-092 July 22, 2008 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25.,

NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Nuclear Exelon Grncration 4300 Winficld Road WarrenviIIc. IL 60555 Oyster Creek Nuclear Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219 i

Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278

July 22, 2008 U. S. Nuclear Regulatory Commission Page 2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289

Subject:

Response to NRC Regulatory Issue Summary 2008-1 6, Preparation and Scheduling of Operator Licensing Examinations

Reference:

NRC Regulatory Issue Summary 2008-1 6, Preparation and Scheduling of Operator Licensing Examinations, dated June 27, 2008 The referenced Regulatory Issue Summary requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2009 through 2012, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2009 and 201 0.

Attachments 1 through 10 provide responses for the Exelon Generation Company, LLC and AmerGen Energy Company, LLC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

In calendar year 2009, six candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 8. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on for PBAPS. Attachment 6 for LGS references Attachment 8 where appropriate.

There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-281 9.

Respectfully, I

Respectfully, Darin M. Benyak I

Darin M. Benyak

July 22, 2008 U. S. Nuclear Regulatory Commission Page 3 - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1

~-

Response to RIS 2008-16 Page 1 of 1

.APPROVED BY OMB: NO. 31H~11131 EXPlRM lW3lCOlH NRC FORM 536 I1.S NUCLEAR REGLLATORY COMMISSION

(#-Tuos)

I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 C Y U CY2011 C Y W ESTIMATED NUMBER OF EXAMINATIONS ESTIMATED NUMBER OF EXAM IN ATIONS LICENSEE-PREPARED 1

0 1

0 NRC-PREPARED 0

0 0

0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY=

CY 2010 C Y W CY 2012 1

0 7

0 12 0

12 0

1 0

2 0

0 0

0 0

NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT NUMBER OFSENIOR REACIDR OPERATORS-UPGR,WE NUMBER OFSENIOR REACTOR OPERATORS-LIM lTEiD I

PROPOSED DATES PRIMARY DATE 1010512009 NIA 6/2012011 NIA ALTERNATE DATE 1011 9/2009 N/A 7/11 /2011 NIA OPERATOR LICENSING EXAMINATION DATA PROPOSED NUMBER CY 2009 MARCH I JUNE SEPTEMBER FACILITY I NRC REGION 0

Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 21 0

0 0

Ill ESTIMATED VUMBER OF XNDIDATES 1

DECEMBER MARCH JUNE I SEFTEMBER 1 DECEMBER

Response to RIS 2008-16 PROPOSED NUMBER CY 2009 CY=

ESTTMATED NUMBER OF EXAMINATIONS ESTLMATED NUMBER OF EXAMINATIONS LICENSEE-PREPARED 0

1 NRC-PREPARED 0

0 US NUCLEAR REGULATORY COMMISSION C Y U CY 2012 1

1 0

0 OPERATOR LICENSING EXAMINATION DATA PROPOSED NUMBER CY=

CY=

0 9

0 8

0 1

0 0

NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRlMARY DATE N/A 9/27/2010 ALTERNATE DATE NIA 10/04/2010 Page 1 of 1 1

CY 2011 CY=

0 7

12 6

1 2

0 0

9/1 a201 1 9/10/2012 9/26/2011 9/24/2012 APPROVED BY OME: NO. 3150 0131 EXPIRES: I)W311211 CY 2009 MARCH JUNE SEPTEMBER DECEMBER 0

17 0

0 FACILITY Byron Station, Units 1 and 2 CY 2010 MARCH JUNE SEPTEMBER DECEMBER 0

12 0

0 I

Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED YUMBER OF

ANDDATES

Response to RIS 2008-16 I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 C Y U CY 2011 C Y W ESTIMATED NUMBER OF EXAM INATIONS ESTIMATED NUMBER OF EXAM IN ATlONS LICENSEE-PREPARED 1

0 1

0 NRC-PREPARED 0

0 0

0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2009 C Y W CY 2011 CY=

6 0

6 0

6 0

3 0

2 0

3 0

0 0

0 0

NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMTfED PROPOSED DATES PRIMARY DATE 8/24/2009 N/A 8/22/2011 N/A ALTERNATE DATE 8/17/2009 N/A 8/29/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEF'EMBER DECEMBER ESTIMATED CANDIDATES NUMBER OF 0

0 0

0 0

9 0

0 Page 1 of 1 APPROVED RY OMR NO. 31560131 EXPIRES: OWJINIX NRC FORM 536 US ZlUCLMR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA FACILITY Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 NRC REGION Ill

Response to RIS 2008-16 APPROVED BY OM6:NO. 3 1 5 0 0 1 ~ 1 EXPIRES ~ u l ~ 1 1 2 ~ X l H Page 1 of 1 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS NRC FORM 536 ln-rosl l1.S NUCLEAR RECIIIATORY COUMlSlON CY 2009 C Y W CY 2011 CY 2012 1

1 1

1 0

0 0

0 OPERATOR LICENSING EXAMINATION DATA PROPOGED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-MSTANT NUMBER OFSENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIM m D PROPOSED DATES PRlMARY DATE ALTERNATE DATE CY 2009 CY 2010 CY 2011 CY=

6 4

4 4

4 10 8

8 0

1 1

1 0

0 0

0 3/09/2009 3/08/20 1 0 3/07/2011 3/05/2012 4/06/2009 4/05/2010 4/04/2011 4/02/2012 FACILITY ROPOSED NUMBER STMATED JUMBEROF ANDIDATES Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 CY 2009 CY 2010 JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER MARCH 0

12 0

0 0

14 0

0 I NRC REGION 111

Response to RIS 2008-16 CY=

CY2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDLDATES 0

12 0

0 0

0 0

0 PROPOSED NUMBER C Y U ESTIMATED NUMBER OF EXAMINATIONS ESTMATED NUMBER OF EXAMINATIONS LICENSEE-PREPARED 0

NRC-PREPARED 0

Page 1 of 1 CY2010 C Y U CY=

1 0

1 0

0 0

NRC FORM 536 (U-UIUS)

U S NUCLEAR REGULATORY COMYlSSlON PROPOSED NUMBER NUMBER OF REACMR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE OPERATOR LICENSING EXAMINATION DATA CY=

CY2010 CY=

C Y U 0

4 0

4 0

8 0

8 0

2 0

2 0

0 0

0 N/A 9/14/2010 N/A 9/1 a201 2 N/A 9/21 /2010 N/A 9/25/20 1 2 EXPIRES: ow3 i/mn APPROVED BY OMB: NO. 3lSU-tlI31 FACILITY LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 I NRC REGION Ill

~

PROPOSED NUMBER ESTIMATED NUMBER OF EXAMINATIONS ESTMATED NUMBER OF NRC-PREPARED EXAMINATIONS LICENSEE-PREPARED Response to RIS 2008-16 Page 1 of 1 CY=

CY=

CY2011 CY 2012 1

0 1

0 0

0 0

Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 PROPOSED NUMBER NUMBER OFREACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT NUMBER OFSENIOR REACTOR OPERATORS-UPGR ADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRlMARY DATE ALTERNATE DATE I

CY 2009 C Y W CY 201 1 CY 2012 0

6 0

4 0

10 0

6 0

2 0

3 0

0 0

1 0/04/20 1 0 tWA 10/08/2012 1 0/18/20 1 0 N/A 10/15/2012

?ROPOSED NUMBER ESTIMATED VUMBER OF ANDDATES CY 2009 CY 2010 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEFIEMBER DECEMBER 0

16 0

0 0

0 0

0

Response to RIS 2008-16 APPROVED BY Oh18: NO. 315041\\3\\

EXPIRES: iM31i2fW Page 1 of 1 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED w(AM IN ATIONS ESTIMATED NUMBER OF NRC-PREP ARED EXAMNATIONS U S YllCLEAR RECbLATORY COMMISSION CY 2009 CY=

CY=

CY 2012 1

1 1

0 0

0 0

0 OPERATOR LICENSING EXAMINATION DATA PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIM ITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE CY 2009 CY 201Q CY2011 C Y U 6

6 6

0 10 8

10 0

0 2

2 0

0 0

0 0

5/04/2009 511 71201 0 511 61201 1 N/A 511 1 12009 5/24/2010 5/23/2011 N/A FACILITY PROPOSED NUMBER ESTIMATED VUMBEROF

'ANDDATES Oyster Creek Nuclear Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219

~

CY 2009 c u m MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER 0

0 16 0

0 0

0 14 NRC REGION I

Response to RIS 2008-16 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Page 1 of 1

~~

~~

CY-CY=

PROPOSED JUNE SEPTEMBER DECEMBER MARCH JUNE SEPlZMBER DECEMBER NUMBER MARCH 0

0 16 0

0 0

0 0

ESTIMATED NUMBER OF CANDIDATES N R C FO'ORII 536 I#-LI)(H)

L I S NUCLEAR REGULATORY COWMISSION I APPROVED BY OMB: NO. 31SO-01.31 EXPIRES. lUUw\\I/?IKw OPERATOR LICENSING EXAMINATION DATA PROPOSED NUMBER FACILITY CY 2009 CY 2010 CY2011 CY 2012 ESTIMATED NUMBER OF LICENSEEPREPARED EXAM IN ATlONS Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 1 and 1 LSRO 1

0 1

I ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0

0 0

0 PROPOSED NUMBER CY=

C Y W C Y W C Y W 2

NUMBER OF REACTOR OPERATORS 6

0 6

NUMBER OF SENIOR REACTOR OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 9

10 0

10 1

2 0

2 6

0 0

0 12/03/2012 2/07/2009 12/06/2010 N/A 8/03/2009 - LSRO ALTERNATE DATE 12/14/2009 12/13/2010 N/A 12/10/2012 8/10/2009 - LSRO

Response to RIS 2008-16 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEEPREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMlNATlONS Page 1 of 1 CY 2009 CY 2010 CY 2011 CY=

1 0

1 1

0 0

0 0

NRC FORM 536 In-ZIM)

U S NUCLEAR RECljLATORY COMMISSION

~

I 10 OPERATOR LICENSING EXAMINATION DATA ALTERNATE DATE FACILITY 12/07/2009 N/A 6/1 2/2011 3/26/2012 APPROVED BY OMB. NO. 3150-0131 EXPIRES: l1wT) 1/?001

'ROPOSED NUMBER BTlMATED WMBEROF ANDLDATES Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 CY 2009 CY 2010 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER 0

0 16 0

0 0

14 0

PROPOSED NUMBER I

CY=

NUMBER OF REACTOR OPERATORS l

6 I

NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 10 0

4 1

NUMBER OF SWlOR REACTOR OPERATORS-UPGRADE 0

I o

I NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 1

I I

1 0

0 PROPOSED DATES PRIMARY DATE I 11/30/2009 I N/A 1

5/29/2011 I 3/12/2012 I

. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE

Response to RIS 2008-16 PROPOSED NUMBER ESTlMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMMATlONS 0 Page 1 of 1 CY C Y W CY 201 1 CY=

1 0

1 0

0 0

0 0

NRC FORM 536 IH.W5)

U S NUCLEAR REGULATORY COMMISSION PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACI'OR OPERATORS-INST ANT NUMBER OF SENIOR REACI'OR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMm PROPOSED DATES PRIMARY DATE ALTERNATE DATE OPERATOR LICENSING EXAMINATION DATA CY 2009 CY-CY 201 1 CY 2012 8

0 8

0 6

0 7

0 0

0 2

0 0

0 0

0 5/25/2009 N/A 5/30/2011 N/A 6/0 1 /ZOO9 N/A 6/06/2011 N/A FACILITY

'ROPOSED NUMBER ESTIMATED JUMBER OF ANDDATES Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289 CY=

CY 2010 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER 0

0 0

0 15 0

0 0

EXPIRES OW3II3NN APPROVED BY WB. NO.

3150.0131 I

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 2 10 LISLE, ILLINOIS 60532-4352 April 16, 2008 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville IL 60555

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: BYRON STATION

Dear Mr. Pardee:

In a letter dated February 23,2008 (BYRON 2008-0018), a request was made that we change the date for a scheduled initial license operator examination for the Byron Station. This letter confirms the requested examination date change for the Byron Station. The letter requested we reschedule the examination scheduled for June 20, 2010, to September 6, 2010, with an alternate date of October 18, 2010. We regret that we are unable to provide the examination on the primary date requested because of heavy examination schedules at other facilities.

However, in a telephone conversation bebeen Mr. D. McNeil of my staff and Mr. G. Smith, Initial License Training Supervisor, Byron Station, on March 11, 2008, a mutually acceptable examination date of September 27,2010, was agreed upon.

On-site validation of the examinations is tentatively scheduled to occur during the week of September 6, 2010. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the Byron Stations training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the proposed written examination and operating test.

The examination will be scheduled for 2 weeks as a class size of more than ten candidates is anticipated. Please inform us if the number of candidates declines below ten as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover a need to change the date of this examination.

A supplementary letter will be sent to the Byron Stations training department approximately 120 days prior to the initial examination. The letter will provide the station with the chief examiners name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.aov/readina-rm/adams.html.

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc:

Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron, and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency J. Klinger, State Liaison Officer, State of Illinois P. Schmidt, State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.qov/reading-rm/adams.html.

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc:

Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron, and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency J. Klinger, State Liaison Officer, State of Illinois P. Schmidt, State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission

6. Quigley, Byron Station DOCUMENT NAME: G:\\DRS\\Work in Progress\\BYR 04-08 DRS OL Confirrnation.doc Publicly Available Non-Publicly Available 0 Sensitive 0 Non-Sensitive OFFICIAL RECORD COPY

Letter to Charles G. Pardee from Hironori Peterson dated April 16, 2008.

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: BYRON STATION DISTRIBUTION:

RAG 1 TEB MMT RidsNrrDirslrib MAS KGO JKH3 RML2 SRI Byron CAAl DRPlll DRSlll PLBl TXN

February 23,2008 LTR:

BYRON 2008- 0018 File:

1.10.0101 Mr. Dell McNeil Operations Branch - Region III US. Nuclear Regulatory Commission 2443 Warrenville Road Sulk 210 Lisle, IL 60532-4352 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket nos. !STN 5045eimd STN 50-455

Subject:

Change to Byron Station Operator Ucensing Examination 2010 Dates Mr. McNeil:

In conversation with Mr. Gregg Srnfth, Senior Operations Training Instructor at Byron Station, a request has been made to reschedule the current 2010 Primary and Alternate Byron Station Initial Operator License Examination dates.

fer Response to IUS 2007-17 NRC Form 536 subrnltted in Exelon Generation letter 6-07-116 dated August 13, 2007, the current Ptimary and Alternate dates listed below were provided.

Proposed revised dates are also shown below.

Current Primary Cumnt Alternate Proposed Primary Proposed Alternate Dates Date Dates Dates June 20,2010 June 27, 2010 September 6,2010 October 18,2010 September 13,2010 October 25,2010 Please confirm these revisions by contacting Mr. Gregg Smith at 815-406-2386.

Sincerely, Site Vlce President Byron Station

I AmerG Exelam Nuclear www.exeloncorp.com An Exelon Company ArnerCen Energy Company, LLC 4300 Winfield Road Warrenville. IL 60555

~

~~

Exelon Generation 4300 Winfield Road Warrenville, IL 60555 RS 1 16 August 13,2007 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 C$.%f

.,J Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-373 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278

August 13,2007 U. S. Nuclear Regulatory Commission Page 2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No.-50-289

Subject:

Response to NRC Regulatory Issue Summary 2007-17 Preparation and Scheduling of Operator Licensing Examinations

Reference:

NRC Regulatory Issue Summary 2007-1 7, Preparation and Scheduling of Operator Licensing Examinations, dated July 12, 2007 The referenced Regulatory Issue Summary (RE) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates to be tested in operator licensing examinations and the Generic Fundamentals Examinations (GFEs) for calendar years 2008 through 201 1. Attachments 1 through 10 provide responses to RIS 2007-17 for the Exelon Generation Company, LLC (EGC) and AmerGen Energy Company, LLC (AmerGen) plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

In calendar year 2009, 6 candidates are expected to take the dual site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 8. The schedule for the indicated examination is as follows: the written examination and part of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on Attachment 8 for PBAPS. Attachment 6 for LGS references Attachment 8 where necessary.

The operator licensing examination information for each facility is provided on a separate NRC Form 536. There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Michelle Yun at (630) 657-2818.

Respectfully, Darin M. Benyak I

Director - Licensing and Regulatory Affairs

August 13,2007 U. S. Nuclear Regulatory Commission Page 3 - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1

~~

Response to RIS 2007-17 PROPOSED NUMBER ESTIMATED NUMBER OF UCENSEECPREP ARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS U S NUCLWR REGULATORY COMMLSSION CY 2008 CY201Q C Y U 0

1 0

1 0

0 0

0 OPERATOR LICENSING EXAMINATION DATA PROPOSED NUMBER NUMBER OFREACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT NUMBER OF SENIOR REACrOR OPERATORS-UPGR ADE NUMBER OFSENIOR REACIOR OPERATORS-LMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE FACILITY Braidwood Station, Units 1 and 2 CY=

CY=

CY2010 CY2011 0

1 0

6 0

13 0

12 0

1 0

2 0

0 0

0 1 0/5/09 4/4/2011 1011 9/09 511 6/2011 Page 1 of 1 PROPOSED NUMBER NUMBER OF ESTIMATED ZANDIDATES CY=

CY a MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER 0

14 0

0 0

0 0

18

Response to RIS 2007-17 Page 1 of 1 PROPOSED NUMBER CY ESTIMATED NUMBER OF EXAMINATIONS ESTIMATED NUMBER OF EXAMINATIONS LICENSEE-PREPARED 0

NRC-PREPARED 1

YRC FORM 536 U S NUCLEAR REGULATORY COMMISSION wzm)

CY 2009 C Y U CY2011 0

1 1

0 0

0 OPERATOR LICENSING EXAMINATION DATA PROPOSED NUMBER CY 2008 CY 2009 a

0 5

0 1

0 0

0 NUMBER OF W O ' O R OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT NUMBER OF SENIOR REACIOR OPERATORS-UPGRADE NUMBER OF SENlOR RFiACTY)R OPERATORS-LlMm PROPOSED DATES PRIMARY DATE 511 912008 ALTERNATEDATE 5/26/2008 FACILITY CY 2010 CY 2011 a

5 6

7 1

0 0

0 6/20/2010 8/7/2011 06/27/2010 ai1 41201 1 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES Ill CY 2008 CY 2009 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER 0

0" 0

0 14 0

0 0

Response to RIS 2007-17 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS NRC FORM 536 lii-ZM)5I 1;S NUCLEAR RE(XJLATORY C'OMhtlSSlON CY=

CY 2009 CY2010 CY 2011 0

1 0

1 0

0 0

0 OPERATOR LICENSING EXAMINATION DATA PROPOSED NUMBER NUMBER OF RF.AWR OPERATORS NUMBER OFSENIOR REACTOR OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENfoR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE FACILITY Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 CY 2008 CY 2009 CY 201.0 C Y U 0

6 0

6 0

3 0

3 0

3 0

3 0

0 0

0 8/24/2009 8/22/2011 811 712009 8/29/2011 Page 1 of 1 PROPOSED NOMBER NUMBER OF ESTIMATED XNDIDATES infi~rml~in cirl Wtaln.

CY-CY 2009 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEFTEMBER DECEMBER 0

9 0

0 0

0 0

0 NRC REGION 111

Response to RIS 2007-1 7 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 Page 1 of 1 111 NRC FORM S36 (b2mlW)5l US NUCLEAR REGULATORY COLIMISSION PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMlN ATIONS OPERATOR LICENSING EXAMINATION DATA CY a CY CY 2010 CY 2011 1

1 1

1 0

0 0

0 FACILITY PROPOSED NUMBER NUMBER OF REACTQR OPERAMRS NUMBER OFSENIOR REACTOR OPERATORS-INSTANT NUMBER OFSENIOR REACTOR OPERATORS-UPGRADE NUMBER OFSENIOR R E A m R OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE APPROVED BY OMB: NO. 315u-llI31 EXPIRES: fW3II?IXl CY=

CY 2009 CY 2010 CY=

5 5

4 4

7 5

10 8

0 0

1 0

0 0

0 0

3/3/2008 3/9/2009 2/8/2010 3/7/2011 4/7/2008 4/6/2009 3/8/2010 4/4/2011 WOPOSED NUMBER ESTIMATED VUMBER OF

ANDDATES CY 2008 CY 2009 JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER MARCH 0

0 12 0

0 0

14 0

Response to RIS 2007-1 7 PROPOSED NUMBER CY 2008 ESTIMATED NUMBER OF EXAMINATIONS ESTMATED NUMBER OF EXAMIN ATlONS LICENSEE-PREPARED 1

NRC-PREPARED 0

Page 1 of 1 CY 2009

~ 2 0 1 0 CY 2011 0

1 0

0 0

0 NRC FORM 536 L1.S NUCLEAR REGULATORY COMMISSION (n.#w)s)

PROWED NUMBER NUMBER OFREACTOR OPERATORS NUMBER OFSENIOR REACTOR OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE OPERATOR LICENSING EXAMINATION DATA CY 2008 CY 2099 C Y U CY 2011 4

0 4

0 6

0 8

0 0

0 2

0 0

0 0

0 8/18/2008 9/14/2010 8/25/2008 9/2 1 /2010 APPROVED BY OMB: NO. 3IJU-0131 EXPIRES: IM113M PROPOSED NUMBER NUMBER OF ESTIMATED CANDIDATES LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 CY?J&g CY 2009 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SE"EMBER DECEMBER 0

0 0

0 0

12 0

0 NRC REGION 111

Response to RIS 2007-17 0.S NUCLEAR REGULATORY COMMISSION NRC FORM 5%

IkZlllS)

OPERATOR LICENSING EXAMINATION DATA Page 1 of 1 APPROVED BY OMB: NO. 31J0-0131 Estimated burden pr wpme tu mmply with this voluntary inti)rm;ltiin collectwn rqicu: I hiur. This informaturn cvlleclbn IS urrd lo,plon budgets and rewurces lor opentor examinui)ns. Send commens re wrdm burden wimdtc 10 Ihe Reeiirds;md FOIAPriwy Serviccr Brunch b-5 I%).

U S Nuckar Keftpi'il): P,mrnisnu)n. Warhmglim DC 21)5SS-IXUI. or by irnema e-mail to m mi)lk&l~@nrc

'iiv and IO Ihe Dcrk Officer Office of I n l i n l b n aid Regulatory Affair% N E S B :, ~ I ~ ~ ~ ~ I ~ ~, I ~ I,,, O ~ ' ~

o<vamge%n Budget. Washinyon. DC 20Si13. Ifa mew ugd hi impow an inii)rmauin u)lbcli)n doe% MII display I cumntly valid OMB contn)l numkr. lhe NRC may MII coduu iirsponwr, and J pcwn is not required ti) respnd IO. he inliirmatkin c~,lk'Iw)n.

ExPfu~.omlm PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 CY=

CY 2009 CY2010 CY 2011 0

1 0

1 0

0 0

I PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-NSTANT NUMBER OF SENIOR REACIY)R OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LlMTI%D PROPOSED DATES PRIMARY DATE ALTERNATE DATE CY 2008 CY 2009 CYm CY 2011 3

0 9

0 11 0

9 0

2 0

1 0

0 0

0 (r

10/20/2008 10/04/2010 N/A 10/27/2008 10/18/2010 N/A PROPOSED NUMBER NUMBER OF ESTIMATED EANDIDATES CY 2008 CY 2009 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SE"EMBER DECEMBER 0

0 0

0 0

18 0

0

Response to RIS 2007-1 7 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEEPREPARED EXAMINATIONS ESTIMATED NUMBEROF NRC-PREPARED EXAMINATIONS Page 1 of 1 CY 2008 CY=

CY 2010 CY=

1 1

1 1

0 0

0 0

NRC FORM 536 I(CZMJ5)

U.S NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACIQR OPERATORS-LNSTANT NUMBER OFSENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LlMPTU)

PROPOSED DATES PRIMARY DATE ALTERNATE DATE Oyster Creek Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219 CY=

CY-CY2010 CY2011 5

6 6

4 9

10 10 10 0

0 0

2 0

0 0

0 4/7/2008 611 5/2009 6/14/2010 3/14/2011 411 4/2008 6/22/2009 6/21 /2010 3/21/2011 APPROVED BY OMB. NO 31sn-oi31 EXPIRTS. OUU311?l1 PROPOSED NUMBER ESTIMATED CANDIDATES NUMBEROF NRC REGION I

CY 2008 mQQ9 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER 16 0

0 0

16 0

0 16

Response to RIS 2007-1 7 ESTIMATED NUMBER OF NRC-PREPARED Page 1 of 1 APPROVED BY OMB: NO.

1150-0131 EXPIRE%W3I/XNNI 1 I

0 0

0 0

OPERATOR LICENSING EXAMINATION DATA 4

NUMBER OF REACKlR OPERATORS FACILITY 0

4 0

Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 0

NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES I

6 0

0 I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PRIMARY DATE PROPOSED NUMBER 12/7/2009 12/8/2008 12/6/2010 7/27/2009 - LSRO I

1 I 1 and1 LSRO ALTERNATE DATE I

I I

I ESTIMATED NUMBER OF I

I I

1 LICENSEE-PREPARED EXAMINATIONS la1 512008 la1 4/2009 12/1 3/2010 PROPOSED NUMBER EXAMINATIONS I

I I

I B. INITIAL OPERATOR LICENSE EXAMINATIONS CY=

CY 2009 MARCH I JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER I

I I

I I

ESTlMATED NUMBER OF XVDIDATES PROPOSED NUMBER 1

CY=

1 CY=

I CY2010 0

0 7

0 0

0 14 0

I NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 9

I 10 1

1 2

1 2

NUMBER OF SENIOR REACIDR OPERATORS-UPGRADE

~

2 r- 0 1 I

I I

I I

I I

I I

I I

I I

I I

I

Response to RIS 2007-1 7 PROPOSED NUMBER CY@@

CY 2009 LICENSEE-PREPARED 0

1 NRC-PREPARED 0

0 ESTIMATED NUMBER OF EXAMPIATIONS ESTIMATED NUMBER OF EXAMIN ATlONS Page 1 of 1 CY 2010 CY 2011 1

0 0

0 U.S NUCLEAR REGULATORY COMMISSION PROPOSED NUMBER OPERATOR LICENSING EXAMINATION DATA CY 2008 CY=

CY 2010 CY 2011 APPROVEDBY OMB: NO 31Y)-O131 EXPIRE!? OIVSIIYXI I

0 FACILITY 0

0 NUMBER OFSWIOR WCT'OR OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 11 8

0 1

1 0

I NRC REGION 111 I

I 10/23/2009 I 10/25/2010 I

PROPOSED NUMBER NUMBER OF ESTIMATED CANDIDATES CY=

CY 2pes!

MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER 0

16 0

0 0

15 0

0 NUMBER OF REACTOR OPERATORS I

NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0

0 0

I I

1 I

I I

I I

I PROPOSED DATES I

PRIMARY DATE I 10/16/2009 I 10/18/2010 I ALTERNATE DATE

~

C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I

Response to RIS 2007-17 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEEPREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 Page 1 of 1 CY 2008 CY gggj CY 2010 C Y U 0

1 0

1 0

0 0

0 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289 PROPOSED NUMBER CY 2008 CY 2009 0

10 NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR 0

6 OPERATORS-INSTANT 0

1 0

0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRMARY DATE 5/25/2009 ALTERNATE DATE 6/1 /2OO9 I

CY 2010 CY=

0 8

0 a

0 1

0 0

5/30/2011 6/6/2011 PROPOSED NUMBER ESTIMATED NUMBEROF CANDIDATES

~

~

~

~

~~

CY 2008 c u m MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER 16 0

0 0

0 0

0 0