Request for Return of Document Submitted to Nuclear Regulatory Commission Document Control Desk
ML111290472
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/02/2011
From: Peter Bamford
Plant Licensing Branch 1
To: Atherholt D
Exelon Nuclear
Bamford, Peter J., NRR/DORL 415-2833
References
Download: ML111290472 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 2, 2011 Mr. David Atherholt Manager - Site Regulatory Affairs Exelon Nuclear Three Mile Island Nuclear Station P. O. Box 480 Middletown, PA 17057

SUBJECT:

THREE MILE ISLAND NUCLEAR STATION, UNIT 1 REQUEST FOR RETURN OF DOCUMENT SUBMITTED TO NUCLEAR REGULATORY COMMISSION DOCUMENT CONTROL DESK

Dear Mr. Atherholt:

By transmittal dated December 6,2010, the Records Management Department of Three Mile Island Nuclear Station, Unit 1 (TMI-1), submitted a copy of the Exelon Generation Company, LLC, (Exelon) Quality Assurance Topical Report (QATR), NO-AA-10, Revision 85, to the U.S.

Nuclear Regulatory Commission (NRC) Document Control Desk (DCD). The DCD identified a page numbering discrepancy in Appendix A of the submittal, prior to processing the QATR into the NRC's Agencywide Documents Access and Management System (ADAMS). By letter dated May 4,2011 (ADAMS Accession No. ML11126A312), after verbal discussions of the discrepancy between the NRC staff and Exelon, Exelon determined that the QATR submittal dated December 6,2010, was not required by regulation and requested its return. Specifically, Exelon determined that a fleet QATR, applicable to TMI-1, is submitted separately, in accordance with the requirements of Title 10 of the Code ofFederal Regulations Paragraph 50.54(a)(3).

Enclosed please find the requested document. Based on your withdrawal request, the version of the QATR submitted December 6,2010, has not been entered into ADAMS. The NRC understands that the QATR discrepancy has been entered into your corrective action program under issue report number 1201371.

Please contact me at 301-415-2833, if you have any questions.

S;;;I~

Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289

Enclosure:

As stated cc wlo encls: Distribution via Listserv

ML11126A312), after verbal discussions of the discrepancy between the NRC staff and Exelon, Exelon determined that the QA TR submittal dated December 6, 2010, was not required by regulation and requested its return. Specifically, Exelon determined that a fleet QA TR, applicable to TMI-1, is submitted separately, in accordance with the requirements of Title 10 of the Code of Federal Regulations Paragraph 50.54(a)(3).

Enclosed please find the requested document. Based on your withdrawal request, the version of the QATR submitted December 6,2010, has not been entered into ADAMS. The NRC understands that the QA TR discrepancy has been entered into your corrective action program under issue report number 1201371.

Please contact me at 301-415-2833, if you have any questions.

Sincerely,

/ra/

Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289

Enclosure:

As stated cc wlo encls: Distribution via Listserv DISTRIBUTION:

RidsNrrPMThreeMilelsland Resource PUBLIC LPLI-2 RIF RidsAcrsAcnw_MailCTR Resource RidsNrrLAABaxter Resource RidsOgcRp Resource RidsRgn1 MailCenter Resource RidsNrrDorlLpl1-2 Resouce ADAMS Accession Number' ML111290472 II OFFICE LPL1-2/PM I

LPL1-2/LA II NAME PBamford I

ABaxter w/comment DATE 05/24/2011 I 05/25/2011 LPLI-2/BC HChernoff 06/02/2011