Apr.
21, 2011 Page 1
of 2
MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2011-21499 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#:
0363 Address: NUCSA2 Phone#:
254-3194 TRANSMITTAL INFORMATION:
TO:
GERLACH*ROSE M 04/21/2011 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THEDOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION:
"REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRM2 TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 04/11/2011 ADD MANUAL TABLE OF CONTENTS DATE: 04/20/2011 CATEGORY:
DOCUMENTS TYPE:
TRM2
Apr.
21, 2011 Page 2
of 2
ID:
TEXT 3.2.1 ADD:
REV: 9 REMOVE:
REV:8 CATEGORY:
ID:
TEXT REMOVE:
DOCUMENTS TYPE: TRM2 LOES REV:67 ADD:
REV:
68 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL
- USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES M4ANUJAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:
0 Procedure Name TEXT LOES
Title:
LIST OF EF]
4/20/2011 Rev 68 FECTIVE SECTIONS Issue Date 04/20/2011 Change ID Change Number TEXT TOC
Title:
19 01/13/2011 TABLE OF CONTENTS TEXT 1.1 0
11/19/2002
Title:
USE AND APPLICATION DEFINITIONS TEXT 2.1 1
02/04/2005
Title:
PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 10 01/13/2011
Title:
PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 4
05/23/2008
Title:
APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO)
APPLICABILITY TEXT 3.1.1 1
11/09/2007
Title:
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)
INSTRUMENTATION TEXT 3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT 3.1.3 4
Title:
REACTIVITY CONTROL SYSTEMS TEXT 3.1.4 0
Title:
REACTIVITY CONTROL SYSTEMS CHECK VALVE TEXT 3.2.1 9
Title:
CORE OPERATING LIMITS CORE 05/14/2009 CONTROL ROD BLOCK INSTRUMENTATION 11/19/2002 CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND 04/20/2011 OPERATING LIMITS REPORT (COLR)
LDCN 4712 Page 1 of 15 Report Date: 04/20/11 Page 1 of 15 Report Date: 04/20/11
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0
11/19/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3
03/31/2011
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2
11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 6
07/09/2010
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0
11/19/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 3
01/13/2011
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1
11/09/2007
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1
10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3
05/14/2009
Title:
INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1
12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1
10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 0
04/16/2009
Title:
WATER MONITORING INSTRUMENTATION Page 2 of 15 Report Date: 04/20/11 Page 2 of
.15 Report Date: 04/20/11
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1
Title:
REACTOR TEXT 3.4.2
Title:
REACTOR TEXT 3.4.3
Title:
REACTOR TEXT 3.4.4
Title:
REACTOR TEXT 3.4.5
Title:
REACTOR TEXT 3.4.6
Title:
REACTOR TEXT 3.5.1 1
04/26/2006 COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY 1
04/16/2009 COOLANT SYSTEM STRUCTURAL INTEGRITY 1
11/09/2007 COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS) 2 05/14/2009 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 1
04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 0
07/20/2010 RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION 1
02/04/2005
Title:
ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1
11/09/2007
Title:
ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0
11/19/2002
Title:
ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0
11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0
11/19/2002
Title:
CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0
11/19/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page~
of i~.
Report Date: 04/20/11 Page 3 of 15 Report Date: 04/20/11
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.6.4 0
11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1
Title:
PLANT TEXT 3.7.2
Title:
PLANT TEXT 3.7.3.1
Title:
PLANT TEXT 3.7.3.2
Title:
PLANT TEXT 3.7.3.3
Title:
PLANT TEXT 3.7.3.4
Title:
PLANT TEXT 3.7.3.5
Title:
PLANT TEXT 3.7.3.6
Title:
PLANT 0
11/19/2002 SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW)
SHUTDOWN 0
11/19/2002 SYSTEMS ULTIMATE HEAT SINK (UHS)
AND GROUND WATER LEVEL 2
04/16/2009 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 3
04/16/2009 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 3
04/16/2009 SYSTEMS C02 SYSTEMS 2
SYSTEMS HALON SYSTEMS
,04/16/2009 SYSTEMS SYSTEMS TEXT 3.7.3.7
Title:
PLANT SYSTEMS TEXT 3.7.3.8
Title:
PLANT SYSTEMS TEXT 3.7.4
Title:
PLANT SYSTEMS 2
04/16/2009 FIRE HOSE STATIONS 2
04/16/2009 YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES
- 1.
04/26/2006 FIRE RATED ASSEMBLIES 9
09/21/2010 FIRE DETECTION INSTRUMENTATION 1
04/26/2006 SOLID RADWASTE SYSTEM Page 4 of
.15 Report Date: 04/20/11 ep Da e:
0 /20 11
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.1
Title:
PLANT TEXT 3.7.5.2
Title:
PLANT TEXT 3.7.5.3
Title:
PLANT TEXT 3.7.6
Title:
PLANT 0
11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0
11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 1
04/26/2006 SYSTEMS LIQUID HOLDUP TANKS 2
06/27/2008 SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2
09/05/2.008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 7
12/03/2010
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1
08/28/2006
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11
Title:
PLANT SYSTEMS 1
10/02/2009 TEXT 3.8.1 2
02/04/2005
Title:
ELECTRICAL POWER PRIMARY CONTAIINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2
11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT 3.8.2.2 2
12/14/2004
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD, PROTECTION -
AUTOMATIC Page 5 of
.15 Rýýort Date: 04/20/11
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.3
Title:
ELECTRICAL TEXT 3.8.4
Title:
ELECTRICAL TEXT 3.8.5
Title:
ELECTRICAL TEXT 3.8.6
Title:
ELECTRICAL TEXT 3.8.7 1
04/05/2010 POWER DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES 1
02/04/2005 POWER 24 VDC ELECTRICAL SUBSYSTEM 0
11/19/2002 POWER DEGRADED VOLTAGE PROTECTION 0
11/19/2002 POWER EMERGENCY SWITCHGEAR ROOM COOLING 2
10/22/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1
04/26/2006
Title:
MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1
04/09/2007
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2
06/15/2010
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.11.1.1 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION Page 6 of 15ý',
ReportDate:, 04/20/11
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.2
Title:
RADIOACTIVE TEXT 3.11.1.3
Title:
RADIOACTIVE TEXT 3.11.1.4
Title:
RADIOACTIVE TEXT 3.11.1.5
Title:
RADIOACTIVE TEXT 3.11.2.1
Title:
RADIOACTIVE TEXT 3.11.2.2
Title:
RADIOACTIVE TEXT 3.11.2.3
Title:
RADIOACTIVE FORM TEXT 3.11.2.4
Title:
RADIOACTIVE TEXT 3.11.2.5
Title:
RADIOACTIVE TEXT 3.11.2.6
Title:
RADIOACTIVE TEXT 3.11.3
Title:
RADIOACTIVE TEXT 3.11.4.1
Title:
RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1
04/26/2006 LIQUID EFFLUENTS DOSE 1
04/26/2006 LIQUID WASTE TREATMENT SYSTEM 1
12/14/2004 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 2
05/02/2007 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION 3
04/26/2006 DOSE RATE 1
04/26/2006 DOSE -
NOBLE GASES 1
04/26/2006 DOSE -
11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM EFFLUENTS EFFLUENTS 3
11/14/2006 VENTILATION EXHAUST 4
09/16/2009 RADIOACTIVE GASEOUS 1
04/26/2006 TOTAL DOSE 3
04/26/2006 MONITORING PROGRAM TREATMENT SYSTEM EFFLUENT MONITORING INSTRUMENTATION EFFLUENTS EFFLUENTS Page 7.
of 15 Report Date: 04/20/11 Page 7 of
.15 Report Date: 04/20/11
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.4.2 2
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0
11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4
04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT 4.1
Title:
TEXT 4.2
Title:
TEXT 4.3
Title:
TEXT 4.4
Title:
TEXT 4.5
Title:
TEXT 4.6
Title:
TEXT 4.7
Title:
0 09/27/2003 ADMINISTRATIVE CONTROLS ORGANIZATION ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE 0
09/27/2003 CONTROLS REPORTABLE EVENT ACTION 0
09/27/2003 CONTROLS SAFETY LIMIT VIOLATION 1
12/18/2008 CONTROLS PROCEDURES & PROGRAMS 0
09/27/2003 CONTROLS REPORTING REQUIREMENTS 0
09/27/2003 CONTROLS RADIATION PROTECTION PROGRAM 0
09/27/2003 ADMINISTRATIVE CONTROLS TRAINING 0
PageS of ~5 Report Date: 04/20/11 Page 8 of 15' Report Date: 04/20/11
SSES MANUJAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.0 4
0.5/23/2008
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO)
APPLICABILITY TEXT B3.1.1 1
11/09/2007
Title:
REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)
INSTRUMENTATION TEXT B3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT B3.1.3 3
04/10/2007
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0
11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1
Title:
INSTRUMENTATION TEXT B3.3.2
Title:
INSTRUMENTATION TEXT B3.3.3
Title:
INSTRUMENTATION TEXT B3.3.4
Title:
INSTRUMENTATION TEXT B3.3.5
Title:
INSTRUMENTATION TEXT B3.3.6
Title:
INSTRUMENTATION 0
11/19/2002 BASES RADIATION MONITORING INSTRUMENTATION 2
03/31/2011 BASES SEISMIC MONITORING INSTRUMENTATION 2
11/09/2007 BASES METEOROLOGICAL.MONITORING INSTRUMENTATION 4
07/09/2010 BASES TRM POST ACCIDENT MONITORING (PAM)
INSTRUMENTATION 2
11/09/2007 BASES THIS PAGE INTENTIONALLY LEFT BLANK 4
01/13/2011 BASES TRM ISOLATION ACTUATION INSTRUMENTATION Pages of 15 Report Date: 04/20/11 Page.2 of 15 Report Date: 04/20/11
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.7 1
11/09/2007
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1
10/22/2003
Title:
INSTRUMENTATION BASES TRM RPS INSTRUMENTATION TEXT B3.3.9 3
05/14/2009
Title:
INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 2
08/09/2010
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1
10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0
04/16/2009
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.1
Title:
REACTOR COOLANT TEXT B3.4.2
Title:
REACTOR COOLANT TEXT B3.4.3
Title:
11/19/2002 SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY 1
04/16/2009 SYSTEM BASES STRUCTURAL INTEGRITY 1
11/09/2007 SYSTEM BASES HIGH/LOW PRESSURE INTERFACE.LEAKAGE MONITOR 0
11/19/2002 SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 0
11/19/2002 SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.4.4
Title:
REACTOR TEXT B3.4.5
Title:
REACTOR COOLANT COOLANT TEXT B3.4.6 0
07/20/2010
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION.
Page 10 of 15 Report Date: 04/20/11
SSES MANUJAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.1 0
11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1
11/09/2007
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1
11/09/2007
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0
11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0
11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 1
04/19/2007
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1
12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1
Title:
PLANT TEXT B3.7.2
Title:
PLANT TEXT B3.7.3.1
Title:
PLANT TEXT B3.7.3.2
Title:
PLANT TEXT B3.7.3.3
Title:
PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0
11/19/2002 EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN) 0 11/19/2002 ULTIMATE HEAT SINK (UHS)
GROUND WATER LEVEL 3
06/15/2010 FIRE SUPPRESSION WATER SUPPLY SYSTEM 2
04/26/2006 SPRAY AND SPRINKLER SYSTEMS 0
11/19/2002 C02 SYSTEMS Page.11 of 15 Report Date: 04/20/11 Page 11 of 15 Report Date: 04/20/11
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.4
Title:
PLANT TEXT B3.7.3.5
Title:
PLANT TEXT B3.7.3.6
Title:
PLANT TEXT B3.7.3.7
Title:
PLANT TEXT B3.7.3.8
Title:
PLANT TEXT B3.7.4
Title:
PLANT TEXT B3.7.5.1
Title:
PLANT TEXT B3.7.5.2
Title:
PLANT TEXT B3.7.5.3
Title:
PLANT TEXT B3.7.6
Title:
PLANT TEXT B3.7.7
Title:
PLANT SYSTEMS BASES SYSTEMS BASES 1
04/26/2006 HALON SYSTEMS 1
04/26/2006 FIRE HOSE STATIONS 1
04/26/2006 YARD FIRE HYDRANTS AND SYSTEMS BASES HYDRANT HOSE HOUSES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0
11/19/2002 FIRE RATED ASSEMBLIES 1
01/12/2004 FIRE DETECTION INSTRUMENTATION 0
11/19/2002 SOLID RADWASTE SYSTEM 0
11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0
11/19/2002 MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 0
11/19/2002 LIQUID HOLDUP TANKS 2
06/27/2008 ESSW PUMPHOUSE VENTILATION 2
01/31/2008 SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 3
Title:
PLANT SYSTEMS BASES SNUBBERS 06/21/2007 Pagell ofI~
Report Date: 04/20/11 Page 12
.-of -.15 Report Date: 04/20/11
SSES MANTJAt1 Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.9 1
12/14/2004
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11
Title:
STRUCTURAL TEXT B3.8.1
Title:
ELECTRICAL PROTECTIVE TEXT B3.8.2.1
Title:
ELECTRICAL CONTINUOUS TEXT B3.8.2.2
Title:
ELECTRICAL AUTOMATIC TEXT B3.8.3
Title:
ELECTRICAL TEXT B3.8.4
Title:
ELECTRICAL TEXT B3.8.5
Title:
ELECTRICAL TEXT B3.8.6
Title:
ELECTRICAL TEXT B3.8.7 2
04/14/2010 INTEGRITY 2
03/10/2010 POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 0
11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD 1
09/17/2004 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD 0
11/19/2002 POWER BASES DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES 0
11/19/2002 POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM 0
11/19/2002 POWER BASES DEGRADED VOLTAGE PROTECTION 1
02/04/2005 POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING 1
06/15/2009 PROTECTION -
PROTECTION -
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME Page 11 of 15 Report Date: 04/20/11 Page 13 of
.15 Report Date: 04/20/11
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0
11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1
04/10/2007
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0
11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.11.1.1
Title:
RADIOACTIVE TEXT B3.11.1.2
Title:
RADIOACTIVE TEXT B3.11.1.3
Title:
RADIOACTIVE TEXT B3.11.1.4
Title:
RADIOACTIVE TEXT B3.11.1.5
Title:
RADIOACTIVE 0
11/19/2002 BASES-LIQUID EFFLUENTS CONCENTRATION EFFLUENTS 0
11/19/2002 EFFLUENTS BASES LIQUID EFFLUENTS DOSE 0
11/19/2002 EFFLUENTS BASES.LIQUID WASTE TREATMENT SYSTEM 0
11/19/2002 EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 0
11/19/2002 EFFLUENTS BASES RADIOACTIVE.LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.2
Title:
RADIOACTIVE EFFLUENTS 1
12/14/2004 BASES DOSE RATE 0
11/19/2002 BASES DOSE -
NOBLE GASES Page.JA.
of 15 Report Date: 04/20/11 Page 14
.of 15 Report Date: 04/20/11
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.3
Title:
RADIOACTIVE EFFLUENTS PARTICULATES FORM TEXT B3.11.2.4
Title:
RADIOACTIVE EFFLUENTS 0
11/19/2002 BASES DOSE -
11/19/2002 BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 4
11/14/2006
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6
Title:
RADIOACTIVE EFFLUENTS INSTRUMENTATION 1
01/27/2004 BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING TEXT B3.11.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1
Title:
RADIOACTIVE EFFLUENTS 3
07/09/2010 BASES-MONITORING PROGRAM TEXT B3.11.4..2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1
10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2
Title:
LOADS CONTROL PROGRAM TEXT B3.12.3
Title:
LOADS CONTROL PROGRAM 1
12/03/2010 BASES HEAVY LOADS REQUIREMENTS 0
11/19/2002 BASES LIGHT LOADS REQUIREMENTS Page ~
of 15 Report Date: 04/20/11 Page 15 of
.15 Report Date: 04/20/11
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 68 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC 1.0 2.0 3.0 3.1 TABLE OF CONTENTS USE AND APPLICATION Page TRM / 1.0-1 Page TRM / 1.0-2 Page TRM / 1.0-3 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Page TRM / 2.0-6 Page TRM / 2.0-7 Pages TRM / 2.0-8 and TRM / 2.0-9 Page TRM / 2.0-10 Page TRM / 2.0-11 Page TRM / 2.0-12 Pages TRM / 2.0-13 and TRM / 2.0-14 Page TRM / 2.0-15 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 Page TRM / 3.0-3 Page TRM / 3.0-4 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 Pages TRM / 3.1-2 through TRM / 3.1-5 Page TRM / 3.1-6 Page TRM / 3.1-7 Page TRM / 3.1-8 Pages TRM / 3.1-9 and TRM / 3.1-9a Page TRM / 3.1-10 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 Pages TRM / 3.2-2 through TRM / 3.2-54 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Pages TRM / 3.3-4 and TRM / 3.3-5 Page TRM / 3.3-6 Page TRM 3.3-7 Page 3.3-8 01/07/2011 08/31/1998 10/04/2002 08/31/1998 08/31/1998 01/28/2005 06/25/2002 04/12/1999 04/15/2009 05/15/2008 01/07/2011 02/02/2010 11/15/2004 04/15/2009 11/15/2004 11/15/2005 04/14/2008 03/15/2002 11/30/2005 10/31/2007 08/31/1998 03/27/2007 04/15/2009 03/27/2007 02/18/1999 02/18/1999 08/31/1998 04/12/2011 07/16/1999 10/31/2007 03/10/2011 10/31/2007 08/31/1998 3.2 3.3 SUSQUEHANNA - UNIT 2 TRM /LOES-1 EFFECTIVE DATE 04/12/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 68 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.4 Pages TRM / 3.3-9 and TRM / 3.3-9a Page TRM / 3.3-10 Pages TRM / 3.3-11 and TRM / 3.3-11 a Page TRM / 3.3-12 Page TRM / 3.3-13 Page TRM / 3.3-14 Pages TRM / 3.3-15 and TRM / 3.3-16 Page TRM / 3.3-17 Page TRM / 3.3-18 Pages TRM / 3.3-19 and TRM / 3.3-20 Page TRM / 3.3-21 Page TRM / 3.3-21a Pages TRM /3.3-21b through TRM / 3.3-21d Page TRM / 3.3-22 Pages TRM / 3.3-23 and TRM / 3.3-24 Page TRM / 3.3-25 Pages TRM / 3.3-26 and TRM / 3.3-27 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages TRM / 3.4-6 through TRM / 3.4-8 Page 3.4-9 Page 3.4-10 Page 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 Page TRM / 3.4-14 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM / 3.6-9 06/30/2010 10/31/2007 06/30/2010 03/30/2001 01/07/2011 12/14/1998 01/07/2011 06/14/2002 10/31/2007 10/22/2003 04/15/2009 11/15/2004 03/27/2007 12/03/2004 05/16/2003 10/22/2003 04/07/2009 03/31/2006 10/23/1998 04/01/2009 08/31/1998 10/31/2007 08/31/1998 04/17/2009 03/31/2006 07/15/2010 01/28/2005 08/31/1998 10/31/2007 08/31/1998 08/31/1998 01/07/2002 08/31/1998 12/31/2002 3.5 3.6 SUSQUEHANNA
- UNIT 2 TRM / LOES-2 EFFECTIVE DATE 04/12/2011 SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 04/12/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 68 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Page TRM / 3.7-4 Page TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Pages TRM / 3.7-9 and TRM / 3.7-10 Page TRM / 3.7-11 Page TRM / 3.7-12 Page TRM / 3.7-13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Page TRM / 3.7-23 Page TRM / 3.7-24 Pages TRM / 3.7-25 and TRM / 3.7-26 Page TRM / 3.7-27 Page TRM / 3.7-28 Page TRM / 3.7-29 Page TRM / 3.7-30 Page TRM / 3.7-31 Page TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM / 3.7-36 Pages 3.7-37 through 3.7-38 Page TRM / 3.7-39 Page TRM / 3.7-40 Page TRM / 3.7-40a Page TRM / 3.7-41 Page TRM / 3.7-42 Pages TRM / 3.7-43 through TRM / 3.7-45 Page TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 Page TRM / 3.7-54 Page TRM / 3.7-55 Page TRM / 3.7-56 07/29/1999 08/31/1998 03/31/2006 04/07/2009 08/02/1999 04/07/2009 01/21/2000 08/02/1999 04/07/2009 08/09/2005 08/02/1999 04/07/2009 08/02/1999 04/07/2009 08/02/1999 04/07/2009 03/31/2006 08/02/1999 10/31/2007 11/29/2006 01/13/2010 11/30/2005 11/16/2001 09/16/2010 10/05/2002 03/31/2006 02/01/1999 08/31/1998 03/31/2006 02/14/2005 06/20/2008 09/04/2008 08/31/1998 10/05/2006 06/07/2007 11/29/2010 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/01/2009 09/25/2009 04/01/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 04/12/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 68 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 and TRM / 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Page TRM / 3.8-13 Page TRM / 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 Page TRM / 3.8-26 Page TRM / 3.8-27 Page TRM / 3.8-28 Page TRM / 3.8-29 04/02/2002 01/28/2005 01/31/2005 04/02/2002 10/31/2007 08/10/2004 12/03/2004 03/25/2010 08/31/1998 01/28/2005 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 08/31/1998 05/28/2009 11/29/2006 05/28/2009 10/20/2009 08/31/1998 03/31/2006 08/30/1998 03/27/2007 06/10/2010 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 3.10 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 through 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages 3.11-7 through 3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page TRM / 3.11-13 Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/03/2004 08/31/1998 04/12/2007 12/03/1004 09/01/1998 03/31/2006 SUSQUEHANNA
- UNIT 2 TRM / LOES-4 EFFECTIVE DATE 04/12/2011 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 04/12/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 68 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3.11-20 and TRM /3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page TRM / 3.11-25 Pages TRM / 3.11-26 and TRM / 3.11-27 Page TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM 3.11-30 through TRM / 3.11-32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 Page TRM / 4.0-4 Pages TRM / 4.0-5 through TRM / 4.0-8 08/31/1998 08/15/2005 03/31/2006 04/02/2002 11/14/2006 05/13/2005 04/12/2007 01/21/2004 09/08/2009 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 03/31/2006 08/31/1998 03/31/2006 02/05/1999 03/14/2008 02/05/1999 08/31/1998 12/11/2008 08/31/1998 3.12 4.0 SUSQUEHANNA-UNIT 2 TRM / LOES-5 EFFECTIVE DATE 04/12/2011 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 04/12/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 68 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 Page TRM / B 3.0-4 Page TRM / B 3.0-5 Page TRM / B 3.0-6 Page TRM / B 3.0-7 Pages TRM / B 3.0-8 through TRM / B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 and TRM / B 3.0-14 Page TRM / B 3.0-15 B 3.1 B 3.2 B 3.3 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 Pages TRM / B 3.1-2 and TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM /B 3.3-1 Page TRM / B 3.3-2 Page TRM / B-3.3-2a Pages TRM / B 3.3-3 and TRM / B 3.3-3a Page TRM / B 3.3-4 Page TRM / B 3.3-5 Page TRM / B 3.3-6 Page TRM / B 3.3-7 Page TRM / B 3.3-8 Page TRM / B 3.3-9 Pages TRM / B 3.3-10 through TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 through TRM I B 3.3-17 Pages TRM / B 3.3-18 and TRM / B 3.3-19 Pages TRM / B 3.3-19a and TRM / B 3.3-19b Page TRM / B 3.3-19c Pages TRM / B 3.3-19d and TRM / B 3.3-19e Pages TRM / B 3.3-20 and TRM / B 3.3-21 Page TRM / B 3.3-22 Page TRM / B 3.3-23 Pages TRM / B 3.3-24 and TRM / B 3.3-25 08/31/1998 01/10/2007 04/14/2008 08/31/1998 04/12/2007 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 10/31/2007 08/31/1998 03/27/2007 02/18/1999 08/31/1,998 04/07/2000 03/10/2011 10/31/2007 10/31/2007 06/30/2010 05/30/2006 06/30/2010 10/31/2007 06/30/2010 10/31/2007 01/07/2011 06/25/2002 10/31/2007 06/14/2002 10/22/2003 03/27/2007 03/27/2007 04/17/2009 03/27/2007 08/03/2010 10/22/2003 05/16/2003 04/07/2009 SUSQUEHANNA-UNIT 2 TRM / LOES-6 EFFECTIVE DATE 04/12/2011 SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 04/12/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 68 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title B 3.4 B 3.5 B 3.6 REACTOR COOLANT SYSTEM BASES Page TRM / B 3.4-1 Pages TRM / B 3.4-2 and TRM / B3.4-3 Pages TRM / B 3.4-4 and TRM / B 3.4-4a Page TRM / B 3.4-5 Page B 3.4-6 Page TRM / B 3.4-7 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 Pages TRM / B 3.5-3 and TRM / B 3.5-3a Page B 3.5-4 Page TRM / B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages TRM / B 3.6-7 through TRM / B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Page TRM / B 3.7-3 Page TRM / B 3.7-3a Page TRM / B 3.7-4 Page TRM / B 3.7-5 Pages TRM / B 3.7-6 and TRM / B 3.7-6a Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 Pages TRM / B 3.7-10a through TRM / B 3.7-11a Pages TRM / B 3.7-12 through TRM / B 3.7-14 Pages TRM / B 3.7-14a and TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM / B 3.7-21 Page TRM / B 3.7-21a Pages TRM / B 3.7-22 and TRM / B 3.7-23 Pages TRM / B 3.7-24 through TRM / B 3.7-29 Effective Date 08/31/1998 04/01/2009 10/31/2007 10/15/1999 08/31/1998 07/15/2010 08/31/1998 10/31/2007 08/31/1998 10/31/2007 07/26/2001 02/01/1999 08/31/1998 03/29/2007 04/04/2007 12/03/2004 12/31/2002 08/31/1998 06/10/2010 12/27/2007 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 01/09/2004 02/01/1999 08/31/1998 02/14/2005 06/20/2008 01/30/2008 10/05/2006 B 3.7 SUSQUEHANNA
- UNIT 2 TRM / LOES-7 EFFECTIVE DATE 04/12/2011 SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 04/12/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 68 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / B 3.7-30 Pages TRM / B 3.7-30a and TRM / B 3.7-30b Page TRM / B 3.7-32 Page TRM / B 3.7-33 Page TRM / B 3.7-34 Page TRM / B 3.7-35 Pages TRM / B 3.7-36 and TRM / B 3.7-37 Page TRM / B 3.7-38 Page TRM / B 3.7-39 Page TRM / B 3.7-40 B 3.8 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM / B 3.8-2 Page TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM / B 3.8-17 Pages TRM / B 3.8-18 through TRM / B 3.8-20 Pages TRM / B 3.8-21 through TRM / B 3.8-24 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM / B 3.10-2 and TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-11a Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a 06/07/2007 10/05/2006 03/09/2001 04/15/2003 12/03/2004 07/05/2000 04/01/2009 09/25/2009 04/01/2009 04/08/2010 04/02/2002 01/28/2005 03/01/2010 04/02/2002 04/02/2002 04/02/2002 08/10/2004 08/31/1998 04/02/2002 01/28/2005 11/29/2006 05/28/2009 08/31/1998 10/23/1998 08/31/1998 03/27/2007 08/23/1999 08/31/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/31/1998 04/02/2002 04/02/2002 SUSQUEHANNA-UNIT 2 TRM / LOES-8 EFFECTIVE DATE 04/12/2011 SUSQUEHANNA - UNIT 2 TRM / LOES-8 EFFECTIVE DATE 04/12/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 68 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / B 3.11-21 Pages TRM / B 3.11-22 and TRM / B 3.11-23 Page TRM / B 3.11-23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-27 Pages TRM / B 3.11-28 and TRM / B 3.11-29 Page TRM / B 3.11-30 Pages TRM / B 3.11-31 and TRM / B 3.11-32 Page TRM / B 3.11-33 Pages TRM / B 3.11-34 and TRM / B 3.11-35 Page TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 Page TRM / B 3.12-2 Page TRM / B 3.12-3 TRM2 text LOES.doc 4113/2011 05/13/2005 11/14/2006 05/13/2005 01/21/2004 08/31/1998 11/30/2005 06/30/2010 08/31/1998 06/30/2010 08/31/1998 02/12/1999 09/19/2007 11/29/2010 02/05/1999 SUSQUEHANNA - UNIT 2 TRM / LOES-9 EFFECTIVE DATE 04/12/2011
Core Operating Limits Report (COLR)
PPL Rev. 9 3.2.1 3.2 Core Operating Limits Report (COLR) 3.2.1 Core Operating Limits Report (COLR)
TRO 3.2.1 The Core Operating Limits specified in the attached COLR shall be met.
APPLICABILITY:
Specified in the referenced Technical Specifications.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Core Operating Limits not A. 1 Perform action(s)
Specified in referenced met.
described in referenced Technical Technical Specification.
Specifications.
TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY NOTE............
N/A No associated Surveillances. Surveillances are implemented in the applicable Technical Specifications.
SUSQUEHANNA - UNIT 2 TRM / 3.2-1 EFFECTIVE DATE 08/31/1998
PPL Rev. 9 Susquehanna Unit 2 Cycle PL-NF-11-001 Rev. 0 Page 1 of 53 SES 16 CORE OPERATING LIMITS REPORT Nuclear Fuels Engineering APRIL 2011
'Ij ppIll IN$
- 4.
P.
SUSQUEHANNA UNIT 2 TRM/3.2-2 EFFECTIVE DATE 4/12/2011
PPL Rev. 9 PL-NF-11-001 Rev. 0 Page 2 of 53 CORE OPERATING LIMITS REPORT REVISION DESCRIPTION INDEX Rev.
Affected I
No.
Sections Description/Purpose of Revision 0
ALL Initial issuance of this COLR is in support of Unit 2 Cycle 16 operation.
.6.
FORM NFP-QA-008-2, Rev. 1 SUSQUEHANNA UNIT 2 TRM/3.2-3 EFFECTIVE DATE 4/12/2011
PPL Rev. 9 PL-NF-11-001 Rev. 0 Page 3 of 53 SUSQUEHANNA STEAM ELECTRIC STATION Unit 2 Cycle 16 CORE OPERATING LIMITS REPORT Table of Contents 1.0 INT RO D U CT IO N....................................................................................................
4 2.0 D E FIN IT IO N S.............................................................................................................
5 3.0 SHUTDOWN MARGIN...........................................................................................
6 4.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)...................
7 5.0 MINIMUM CRITICAL POWER RATIO (MCPR)......................................................
9 6.0 LINEAR HEAT GENERATION RATE (LHGR).........................................................
24 7.0 ROD BLOCK MONITOR (RBM) SETPOINTS AND OPERABILITY REQ U IR EM ENTS...................................................................................................
32 8.0 RECIRCULATION LOOPS - SINGLE LOOP OPERATION....................................
34 9.0 POW ER / FLOW MAP............................................................................................
49 10.0 O PRM SETPO INTS..............................................................................................
51 11.0 R E FE R EN C E S.............................................................................................................
52 SUSQUEHANNA UNIT 2 TRM/ 3.,2-4 EFFECTIVE DATE 4/12/2011
PPL Rev. 9 PL-NF-1 1-001 Rev. 0 Page 4 of 53
1.0 INTRODUCTION
This CORE OPERATING LIMITS REPORT for Susquehanna Unit 2 Cycle 16 is prepared in accordance with the requirements of Susquehanna Unit 2, Technical Specification 5.6.5. As required by Technical Specifications 5.6.5, core shutdown margin, the core operating limits, RBM setpoints, and OPRM setpoints presented herein were developed using NRC-approved methods and are established such that all applicable limits of the plant safety analysis are met.
SUSQUEHANNA UNIT 2 TRM/3.2-5 EFFECTIVE DATE 4/12/2011
PPL Rev. 9 PL-NF-11-001 Rev. 0 Page 5 of 53 2.0 DEFINITIONS Terms used in this COLR but not defined in Section 1.0 of the Technical Specifications or Section 1.1 of the Technical Requirements Manual are provided below.
2.1 The AVERAGE PLANAR EXPOSURE at a specified height shall be equal to the total energy produced per unit length at the specified height divided by the total initial weight of uranium per unit length at that height.
2.2 The PELLET EXPOSURE shall be equal to the total energy produced per unit length of fuel rod at the specified height divided by the total initial weight of uranium per unit length of that rod at that height.
2.3 FDLRX is the ratio of the maximum LHGR calculated by the core monitoring system for each fuel bundle divided by the LHGR limit for the applicable fuel bundle type.
2.4 LHGRFACr is a multiplier applied to the LHGR limit when operating at less than 108 Mlbm/hr core flow. The LHGRFACf multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from core flows less than 108 Mlbm/hr.
2.5 LHGRFACp is a multiplier applied to the LHGR limit when operating at less than RATED THERMAL POWER. The LHGRFACp multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from partial power conditions.
2.6 MFLCPR is the ratio of the applicable MCPR operating limit for the applicable fuel bundle type divided by the MCPR calculated by the core monitoring system for each fuel bundle.
2.7 MAPRAT is the ratio of the maximum APLHGR calculated by the core monitoring system for each fuel bundle divided by the APLGHR limit for the applicable fuel bundle type.
2.8 OPRM is the Oscillation Power Range Monitor. The Oscillation Power Range Monitor (OPRM) will reliably detect and suppress anticipated stability related power oscillations while providing a high degree of confidence that the MCPR safety limit is not violated.
2.9 Np is the OPRM setpoint for the number of consecutive confirmations of oscillation half-cycles that will be considered evidence of a stability related power oscillation.
2.10 Sp is the OPRM trip setpoint for the peak to average OPRM signal.
2.11 Fp is the core flow, in Mlbm / hr, below which the OPRM RPS trip is activated.
SUSQUEHANNA UNIT 2 TRM/3.2-6 EFFECTIVE DATE 4/12/2011
PPL Rev. 9 PL-NF-11-001 Rev. 0 Page 6 of 53 3.0 SHUTDOWN MARGIN 3.1 Technical Specification Reference Technical Specification 3.1.1 3.2 Description The SHUTDOWN MARGIN shall be equal to or greater than:
a) 0.38% Ak/k with the highest worth rod analytically determined OR b) 0.28% Ak/k with the highest worth rod determined by test Since core reactivity will vary during the cycle as a function of fuel depletion and poison burnup, Beginning of Cycle (BOC) SHUTDOWN MARGIN (SDM) tests must also account for changes in core reactivity during the cycle. Therefore, the SDM measured at BOC must be equal to or greater than the applicable requirement from either 3.2.a or 3.2.b plus an adder, "R". The adder, "R", is the difference between the calculated value of maximum core reactivity (that is, minimum SDM) during the operating cycle and the calculated BOC core reactivity. If the value of "R" is zero (that is, BOC is the most reactive point in the cycle) no correction to the BOC measured value is required.
The SHUTDOWN MARGIN limits provided in 3.2a and 3.2b are applicable in MODES 1, 2, 3, 4, and 5. This includes core shuffling.
SUSQUEHANNA UNIT 2 TRM/3.2-7 EFFECTIVE DATE 4/12/2011
PPL Rev. 9 PL-NF-11-001 Rev. 0 Page 7 of 53 4.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) 4.1 Technical Specification Reference Technical Specification 3.2.1 4.2 Description The APLHGRs for ATRIUMTM-1 0 fuel shall not exceed the limit shown in Figure 4.2-1.
The APLHGR limits in Figure 4.2-1 are valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable in Two Loop operation. The APLHGR limits for Single Loop operation are provided in Section 8.0.
SUSQUEHANNA UNIT 2 TRM/3. 2-8 EFFECTIVE DATE 4/12/2011
_-4 (A3 16.0 14.0 12.0 r
o.2 10.0 t"
X38.
6.0 0
SSES UNIT 2 CYCLE 16 1
1 1
I~~.
I
..... J.........
l ~~~
I I
l e
v e
I L
.1
'=
'='
.'h, z
I REFERENCETS3 l....
I I
I I
I I
I I
I I
I I
I I
I l
o Il I
I I
I I
I l
l i
i
- I I
Ii I
I I
I I
I i
I I
i I
I I
i S
I I
i e
o I
i
=
I I
I I I I
I I
I I
S o
I i
o o
e I
a I
I i
I i
I S
eI I I e I I
i I I
I n
I I
I I
e i
I I.
I e
I I
nI I
l u
I l
ii o
I l
S I
l..
I l
I i
i I
i i
i..
i I i i
i i
iI.
I i
i i
I I
i I i i
i i
I i i
I I
I i
170 C-,
m C=)
-4ý
-U I-(D (a
- k CD '
0 GO, 0
4.0 I
0 10000 20000 30000 40000 50000 60000
.70000 Average Planar Exposure (MWDIMTU)
AVERAGE PLANAR LINEAR HEAT GENERATION RATE LIMIT VERSUS AVERAGE PLANAR EXPOSURE TWO LOOP OPERATION ATRIUMm-10 FUEL FIGURE 4.2-1
PPL Rev. 9 PL-NF-11-001 Rev. 0 Page 9 of 53 5.0 MINIMUM CRITICAL POWER RATIO (MCPR) 5.1 Technical Specification Reference Technical Specification 3.2.2, 3.3.4.1, 3.7.6, and 3.7.8 5.2 Description The MCPR limit is specified as a function of core power, core flow, average scram insertion time per Section 5.3 and plant equipment operability status. The MCPR limits for all fuel types (ATRIUMTM-10) shall be the greater of the Flow-Dependent or the Power-Dependent MCPR, depending on the applicable equipment operability status.
a)
Main Turbine Bypass / EOC-RPT / Backup Pressure Regulator Operable Figure 5.2-1: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-2: Power-Dependent MCPR value determined from BOC to EOC b)
Main Turbine Bypass Inoperable Figure 5.2-3: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-4: Power-Dependent MCPR value determined from BOC to EOC c)
EOC-RPT Inoperable Figure 5.2-5: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-6: Power-Dependent MCPR value determined from BOC to EOC d)
Backup Pressure Regulator Inoperable Figure 5.2-7: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-8: Power Dependent MCPR value determined from BOC to EOC The MCPR limits in Figures 5.2-1 through 5.2-8 are valid for Two Loop operation.
The MCPR limits for Single Loop operation are provided in Section 8.0.
SUSQUEHANNA UNIT 2 TRM/3.2-10 EFFECTIVE DATE 4/12/2011
PPL Rev. 9 PL-NF-1 1-001 Rev. 0 Page 10 of 53 5.3 Average Scram Time Fraction If the average measured scram times are greater than the Realistic Scram times listed in Table 5.3-1 then the MCPR operating limits corresponding to the Maximum Allowable Average Scram Insertion Time must be implemented.
Determining MCPR operating limits based on interpolation between scram insertion times is not permitted. The evaluation of scram insertion time data, as it relates to the attached table should be performed per Reactor Engineering procedures.
SUSQUEHANNA UNIT 2 TRM/3.2-11 EFFECTIVE DATE 4/12/2011
PPL Rev. 9 PL-NF-11-001 Rev. 0 Page 11 of 53 Main Turbine Bypass / EOC-RPT I Backup Pressure Regulator Operable SUSQUEHANNA UNIT 2 TRM/3.2-12 EFFECTIVE DATE 4/12/2011
S VI)
Nc) 2.2 2.1 2.0 1.9 co
- to
.9 1.8
-1 1.7 1.6 SSES UNIT 2 CYCLE 16 I
I....
LEGEND CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 USED IN DETERMINING MFLCPR I60
_1 B
REFERENCE:
T.S.
.-U I-"
5D co m
~11
-n rn C-)
-1
.1
-4 m
N) 1.5 1.4 1.3 1.2 30 40 50 60 70 80 90 100 110 Total Core Flow (MLBIHR)
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS I EOC-RPT I BACKUPPRESSURE REGULATOR OPERABLE TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-1
-U Co CD 0
-h (7'
(D 0
,I-z 60
Cl) rl SSES UNIT 2 CYCLE 16 3.6 3.4 3.2 3.0
-H c~)
I.
2.8 E
2.6
,, 2.4 0
EL 2.2 2.0 (D
(0 m
-TI P1A
-H CD 3')
1.8 1.6 1.4 1.2 20 30 40 50 60 70 80 90 100 Core Power (% RATED)
MCPR OPERATING LIMIT VERSUS CORE POWER MAIN TURBINE BYPASS I EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-2 (D
CA) 0.
-4, W,
C3~
PPL Rev. 9 PL-NF-11-001 Rev. 0
.Page 14 of 53 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT 2 TRM/3.2-15 EFFECTIVE DATE 4/12/2011
Nl) 2.2 2.1 2.0 1.9
.-J
" 1.7 0
.1.6 1.5 SSES UNIT 2 CYCLE 16 tI I
I I
LEGEND
-CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERT-ION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS-VALVES ARE
_INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 USED IN DETERMINING MFLCPR A
B
REFERENCE:
T.S. 3.7.6 and
_ 1 I'-
.D P1-n m
C-)
H II 1.4 1.3 1.2 30 40 50 60 70 80 90 100 110 Total Core Flow (MLBIHR)
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS INOPERABLE TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-3 u X
- 0)
(
(m <
CD 0
h7 c,)
r-z-n 60
mJmL m mmlmmlmm
- mL J,*
m
=
- bb5h1S UNIT C CYGLE 16 Lo 3.6 23.7 I
I I
i I
-D">
ILEGEND 3.44]
23-3-25 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM S
3.2 INSERTION TIME 21
- 326, 3.04 CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 3.0 CURVE C: CORE POWER < 26% AND CORE FLOW < 50 MLBMIHR 2.8
-1"n2.6 II!I
_.0 SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS VALVES ARE
-o S2.4 INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 r-
.2.2 (0
26.01,2.05 USED IN DETERMINING MFLCPR 2.0 1.8
'A*
180, 1.1501 1.6 B
100, too:
1.4
REFERENCE:
T.S. 3.7.6 and 3.2.21 1.2 20 30 40 50 60 70 80 90 100 Core Power (% RATED) i-n0
-n MCPR OPERATING LIMIT VERSUS CORE POWER MAIN TURBINE BYPASS INOPERABLE TWO LOOP OPERATION (BOC to EOC) 0 FIGURE 5.2-4
PPL Rev. 9 PL-NF-11-001 Rev. 0 Page 17 of 53 EOC-RPT Inoperable SUSQUEHANNA UNIT 2 TRM/3.2-18 EFFECTIVE DATE 4/12/2011
C=
(Ai SSES UNIT 2 CYCLE 16 2.2 2.1 2.0 1.9
- 4.
4 4-I
- 1 EGEND JRVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME JRVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 4
4 4.-I::
I I
I I
SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 r
-40 I-,
- 1.8
" 1.7 0.
p1.6 rn
-n
~-rirn C-)
A m
c::j Am 4~.
I.
1.5 1.4 1.3 1.2 USED IN DETERMINING MFLCPR B
REFERENCE:
T.S. 3.3.4.1 and 3.2.2 108,1.22 co 30 40 50 60 70 80 90 100 110
. Total Core Flow (MLBIHR)
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW EOC-RPT INOPERABLE TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-5 OD 0
CD 0
,-u z
00
m T-D, 3.6 3.4 3.2 3.0 N,
N) 2.8 E.
--2.6 S2.4 C0 0
IL 2.2 2.0 SSES UNIT 2 CYCLE 16 LEGEND CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM
_INSERTION TIME C
6CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME CURVE C: CORE POWER <26% AND CORE FLOW <50 MLBMIHR SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 USED IN DETERMINING MFLCPR
[26.0 1,2.01I REFRENE:_.S 3.3. 4944.61ad200,
REFERENCE:
T.S. 3.3.4. 1 and 3.2.2110 14
-U r-CD 5o rr-n 711 C-)
m N)
N) 1.8 1.6 1.4 1.2 20 30 40 s0 60 70 80 90 100 Core Power (% RATED)
MCPR OPERATING LIMIT VERSUS CORE POWER EOC-RPT INOPERABLE TWO LOOP OPERATION (BOC to EOC)
FIGURE 5.2-6
-u 0
-h
-u,-
z
,-n
,-S
PPL Rev. 9 PL-NF-11-001 Rev. 0 Page 20 of 53 Backup Pressure Regulator Inoperable SUSQUEHANNA UNIT 2 TRM/3.2-21 EFFECTIVE DATE 4/12/2011
0 CA CA m
-H NJ SSES UNIT 2 CYCLE 16 2.2 2.1 2.0 1.9 Y
T I
I I
- 4.
4.
EGEND JRVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME JRVE B: REALISTIC AVERAGE SCRAM INSERTION TIME
- 4.
- 4.
- 4.
J~..
Im 1~
- 4.
- 4.
I SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 I
NJ NJ E1.8
.I-02 1.7 0
?1.6 l
m m
ý-4 m
m 1.5 1.4 1.3 1.2 USED IN DETERMINING MFLCPR A..
REFEREN E: T.S. 3.7.,8 and 3.2.*
2 "0
-o r-E CD 30 40 50 60 70 80 90 100 110 Total Core Flow (MLBIHR)
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW BACKUP PRESSURE REGULATOR INOPERABLE TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-7 (D
0 ft, CA W,
- u u a r 0 -
6
V)
N)
SSES UNIT 2 CYCLE 16 3.6 3.4 3.2 3.0 C.,
2.8 E
-2.6 S2.4 0.
0 CL 2.2 2.0
-u I-U (D
(0 m
C-)
m N) 1.8 1.6 1.4 1.2 20 30 40 50 60 70 80 Core Power (% RATED)
MCPR OPERATING LIMIT VERSUS CORE POWER BACKUP PRESSURE REGULATOR INOPERABLE TWO LOOP OPERATION (BOC to EOC)
FIGURE 5.2-8 90 100 S(D Z~
0-r (TI 0
co)
PPL Rev. 9 PL-NF-11-001 Rev. 0 Page 23 of 53 Table 5.3-1 Average Scram Time Fraction Table For Use With Scram Time Dependent MCPR Operating Limits Control Rod Average Scram Time to Position (seconds)
Position 45 0.470 0.520 39 0.630 0.860 25 1.500 1.910 5
2.700 3.440 Average Scram Realistic Maximum Insertion Time Allowable SUSQUEHANNA UNIT 2 TRM/3.2-24 EFFECTIVE DATE 4/12/2011
PPL Rev. 9 PL-NF-11-001 Rev. 0 Page 24 of 53 6.0 LINEAR HEAT GENERATION RATE (LHGR) 6.1 Technical Specification Reference Technical Specification 3.2.3 and 3.7.6 6.2 Description The maximum LHGR for ATRIUMTM-10 fuel shall not exceed the LHGR limit determined from Figure 6.2-1. The LHGR limit in Figure 6.2-1 is valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
To protect against both fuel centerline melting and cladding strain during anticipated system transients initiated from reduced power and flow conditions, power and flow dependent LHGR limit multipliers are provided. The following figures are applicable to EOC-RPT Operable and Inoperable and Backup Pressure Regulator Operable and Inoperable:
a)
Main Turbine Bypass Operable Figure 6.2-2: Flow-Dependent LHGR Limit Multiplier Figure 6.2-3: Power-Dependent LHGR Limit Multiplier b)
Main Turbine Bypass Inoperable Figure 6.2-4: Flow-Dependent LHGR Limit Multiplier Figure 6.2-5: Power-Dependent LHGR Limit Multiplier The LGHR limit and LHGR limit multipliers in Figures 6.2-1 through 6.2-5 are valid for both Two Loop and Single Loop operation.
SUSQUEHANNA UNIT 2 TRM/3.2-25 EFFECTIVE DATE 4/12/2011
- 1.
SSES UNIT 2 CYCLE 16 S.....................1 i
a
- a.
.a Zr.........................
a...
I I S
s a
a g
14.0"---
- 11900 3 4~-~-
REFERENCE:
T.S. 3.2.3 T-1UEDINETERMINING FDLRX:-
CI 1.0o-I-
6.0I I
I I
I I
I IIS 4
~ S I
I I 4 I I~~~I a-I I..................
-o C ~
120.....................................................................................................S i-i-i S...............-
4-4.0 0
10000 20000 30000 40000 50000 60000 70000 80000 Pellet Exposure (MWDIMTU)w LINEAR HEAT GENERATION RATE LIMIT VERSUS PELLET EXPOSURE cn-.
ATRIUMTM-10 FUEL f
FIGURE 6.2-ll C
PPL Rev. 9 PL-NF-11-001 Rev. 0 Page 26 of 53 Main Turbine Bypass Operable SUSQUEHANNA UNIT 2 TRM/3.2-27 EFFECTIVE DATE 4/12/2011
1.10 1.00
-II 0.90-1.2 0.80 0.70-
-I r
co V
CL S
o 0.60 0
U-SSES UNIT 2 CYCLE 16
..II i
i I
.o.-
7~~
SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2
........... *........... L..... *............
REFERENCE:
T.S. 3.2.3 and 3.7.6 USED I
I I
I DETERMINIG I
I -
I
.i.
I I
I I
O I
I I
I I
I I
I I
I I
III.
S l
I i
I I
I I
I I
I C
I I
r-.
(0 m
0.50-m 0.40-rn-m CD) 0.40-,
0.30 N) 3'
.. )
0 40 50 60 70 80 90 100 110 Total Core Flow (MLBIhr)
Ca <
a1 "
Z FLOW DEPENDENT LHGR LIMIT MULTIPLIER 071 MAIN TURBINE BYPASS OPERABLE 0
ATRIUMT'-10 FUEL C 2 FIGURE 6.2-2
(A 11 SSES UNIT 2 CYCLE 16 1.10 C
A B
CURVE Ez
.6
- 1.
0 CUV B: COR
,OE:
26% AN OEFO.55 LM 1
0.0 -
CURVE A....SE.
VE.--.......
0.90--------------------
0.80 T...........
I i
~
(9
-u S.
SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES D
ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 Sa I
REFERENCE:
T.S. 3.2.3 and 3.7.6 m
USED IN DETERMINING FDLRX m 0.80 23, 0.44 I.....
q.....
.m- ----
,t 41 -----
4 ---
0.40.,--
0.70 I -- -
I 23,0390 0.30I II I
20 30 40 50 60 70 80T 90 100 N)
~Core Power (% RATED)
WC POWER DEPENDENT LHGR LIMIT MULTIPLIER C)-
MAIN TURBINE BYPASS OPERABLE 0
ATRIUMO-10 FUEL 0
FIGURE 6.2-3
PPL Rev. 9 PL-NF-11-001 Rev. 0 Page 29 of 53 Main Turbine Bypass Inoperable SUSQUEHANNAUNIT 2 TRM/3.2-30 EFFECTIVE DATE 4/12/2011
SSES UNIT 2 CYCLE 16 I
I C,.)
0.70-------------------------SFT NLSSASM HTTOO OEBPS
.*1
.0 0.....
0.*
I I
i I
i i0l S
D...
z III III Z
I I
I I
I I
I I
I I
I I
i I
0 0
I
- 4..
- -4.
00...
0
.7 a.....
a.....
SAFETY ANALYSES A
THAT TWO.
OR.
MOR.
BY IA-S I
i i
S
,i I
i i
MANTRBN VYASVS AEINOPERABLE PESR3761O3.62 I......
A 0
L.
L.
i -
RE 3
aFU FIGURE.6...
5 I --------.....
m OA I.... I I
I 4:z 0.30I I
I i
I 30 40 so 60 70 80 90 10 110 A~
CD Toa Cor Flo (MB/R m
I m
MAI TUBN BYAS INOPEABLE-
.... i iiii~i~iiii~ii
~CA ATRIU~m-1 FUE
- ~ ~
~
~
~
~~
FGR 6...2-................4
ESSES UNIT 2 CYCLE 16 XD1.10 1.00-
-CURVE A: BASE CURVE.2-E 94.4 6v 0.94
- CCi, i
ii I
a i
, l i
l
- CURVE B: CORE POWERS5 26% AND CORE FLOW5 560 MLBM/HR
~
LEGEND..
0.90 - -
....... 1 0 a
0........0.-----------------------------------A-----------------------------.... *;
SAEYAAYE SUETA WRMR BYAS VAVE 2
.00 ARERINOPERABLE PERVS 3..AO
.7..2
.0 R F R C
- --.2.3-ad 3.7.6 aA--
INODEERMNI PEG SR 3.7.6.1 O F.LRX a
aa
- a.
I a
0.40 e
.0 i
a.
m T.....
T......*......i......i......I......i.......
a-
- 0.30 23,
,~4-
-- -- 4.... -- -- -- --
.- I.....
CDD I0.30 POWER DEPENDENT LHGR LIMIT MULTIPLIER 0 ~
MAIN TURBINE BYPASS INOPERABLE ATRIUMM.0 FUEL uC FIGURE 6.2-6
PPL Rev. 9 PL-NF-11-001 Rev. 0 Page 32 of 53 7.0 ROD BLOCK MONITOR (RBM) SETPOINTS AND OPERABILITY REQUIREMENTS 7.1 Technical Specification Reference Technical Specification 3.3.2.1 7.2 Description The RBM Allowable Value and Trip Setpoints for, a)
Low Power Range Setpoint, b)
Intermediate Power Range Setpoint, c)
High Power Range Setpoint, e)
Low Power Range - Upscale, f)
Intermediate Power Range - Upscale, and g)
High Power Range - Upscale shall be established as specified in Table 7.2-1. The RBM setpoints are valid for Two Loop and Single Loop Operation, Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
The RBM system design objective is to block erroneous control rod withdrawal initiated by the operator before fuel design limits are violated. If the full withdrawal of any control rod would not violate a fuel design limit, then the RBM system is not required to be operable. Table 7.2-2 provides RBM system operability requirements to ensure that fuel design limits are not violated.
SUSQUEHANNA UNIT 2 TRM/3.2-33 EFFECTIVE DATE 4/12/2011
PPL Rev. 9 PL-NF-11-001 Rev. 0 Page 33 of 53 Table 7.2-1 RBM Setpoints Function Allowable Nominal Trip Function Value(l)
Setpoint Low Power Range Setpoint 28.0 24.9 Intermediate Power Range Setpoint 63.0 61.0 High Power Range Setpoint 83.0 81.0 Low Power Range - Upscale 123.4 123.0 Intermediate Power Range - Upscale 117.4 117.0 High Power Range - Upscale 109.6 109.2 (1) Power setpoint function (Low, Intermediate, and High Power Range Setpoints) determined in percent of rated thermal power. Upscale trip setpoint function (Low, Intermediate, and High Power Range - Upscale) determined in percent of reference level.
Table 7.2-2 RBM System Operability Requirements Thermal Power MCPR (2-3)
(% of Rated)
> 28 and < 90
< 1.80
> 90 and < 95
< 1.47
> 95
< 1.53 (2)
Applicable to Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
(3)
Applicable to both Two Loop and Single Loop Operation.
SUSQUEHANNA UNIT 2 TRM/3.2-34 EFFECTIVE DATE 4/12/2011
PPL Rev. 9 PL-NF-11-001 Rev. 0 Page 34 of 53 8.0 RECIRCULATION LOOPS - SINGLE LOOP OPERATION 8.1 Technical Specification Reference Technical Specification 3.2,1, 3.2.2, 3.2.3, 3.3.4.1, 3.4.1, 3.7.6, and 3.7.8 8.2 Description APLHGR The APLHGR limit for ATRIUMTM-1 0 fuel shall be equal to the APLHGR Limit from Figure 8.2-1.
The APLHGR limits in Figure 8.2-1 are valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable in Single Loop operation.
Minimum Critical Power Ratio Limit The MCPR limit is specified as a function of core power, core flow, and plant equipment operability status. The MCPR limits for all fuel types (ATRIUMTM-10) shall be the greater of the Flow-Dependent or the Power-Dependent MCPR, depending on the applicable equipment operability status.
a)
Main Turbine Bypass / EOC-RPT / Backup Pressure Regulator Operable Figure 8.2-2: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-3: Power-Dependent MCPR value determined from BOC to EOC b)
Main Turbine Bypass Inoperable Figure 8.2-4: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-5: Power-Dependent MCPR value determined from BOC to EOC c)
EOC-RPT Inoperable Figure 8.2-6: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-7: Power-Dependent MCPR value determined from BOC to EOC d)
Backup Pressure Regulator Inoperable Figure 8.2-8: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-9: Power-Dependent MCPR value determined from BOC to EOC SUSQUEHANNA UNIT 2 TRM/3.2-35 EFFECTIVE DATE 4/12/2011
PPL Rev. 9 PL-NF-11-001 Rev. 0 Page 35 of 53 The MCPR limits in Figures 8.2-2 through 8.2-9 are valid only for Single Loop operation.
Linear Heat Generation Rate Limit The LHGR limits for Single Loop Operation are defined in Section 6.0.
RBM Setpoints and Operability Requirements The RBM setpoints and operability requirements for Single Loop Operation are defined in Section 7.0.
SUSQUEHANNA UNIT 2 TRM/3.2-36 EFFECTIVE DATE 4/12/2011
1SSES UNIT 2 CYCLE 16 I
a-a 1.0
- 12.
14.0.....................
lD.........
RE ER NC T..--
3--*---.4 n.
2........
I a
a a
a I
= a a
a.........
I L
U$EDIN DETERM'IINING MAPRAT i
a
,i a
E......
a a
a a
a a
120 F
L I
a
-Ti C) a I...
a a
a I
l i
aa a
a a
S S
a a
ai aI i a
m
)
r a
oo a
aI
-6005.61 100-.
a..........a aa a
a a
a a
.a a
4.0.
0.0 10000.0 20000.0 30000.0 40000.0 50000.0 60000.0 70000.0 Average Planar Exposure (MWDIMTU) tD 0 17 AVERAGE PLANAR LINEAR HEAT GENERATION RATE LIMIT VERSUS w
AVERAGE PLANAR EXPOSURE SINGLE LOOP OPERATION ATRIUM -10 FUEL C
FIGURE 8.2-1
PPL Rev. 9 PL-NF-1 1-001 Rev. 0 Page 37 of 53 Main Turbine Bypass / EOC-RPT I Backup Pressure Regulator Operable SUSQUEHANNA UNIT 2 TRMI3.2-38 EFFECTIVE DATE 4/12/20il
0 V),
XD H
4.0 3.8 3.6 3.4 3.2 N)
E 3.0
=2.8 o 2.6 2.
S2.4 SSES UNIT 2 CYCLE 16 I
I I
I LEGEND CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME i
i I
I I
SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 USED IN DETERMINING MFLCPR REERENCE: T.S. 3.4.1 and 3.2.21 f-(0 m
m N-,
NJ 2.2 2.0 1.8 1.6 1.4 30 40 50 60.
70 80 90 100 110 Total Core Flow (MLBIHR)
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS I EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-2 (0<
CD -
Z 0
-h6
V) m r\\3 SSES UNIT 2 CYCLE 16 4.6 4.4 4.2 4.0 3.8 3.6
' LEGEND I_ CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM 23,4.07 INSERTION TIME
.___CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME CURVE C: CORE POWER *26% AND CORE FLOW _50 MLBM/HR SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 USED IN DETERMINING MFLCPR 26.0_,_2.53_
-H CD 3.2
.E m 3.2
.5 3.0 0~
C.,S2.8 I1.
- 2.6
- 0 5
(0 mm
-nm C-,)
-H m
N.)
I-2.4 2.2 2.0 1.8 1.6 1.4
.9 I 40, 2.'1
'II~E-I 9
1
.9
'9
,vI JAI 4
~...A-'
~
- 4.
I 4
.9 I
!60, 1.99 [
-IH.99 I
REFERENCE:
T.S. 3.4.1 and 3.2.21 1
1 1_
__I I
20 30 40 50 60 70 80 90 100 Core Power (% RATED)
MCPR OPERATING LIMIT VERSUS CORE POWER MAIN TURBINE BYPASS I EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-3 CD 0
CA~
W, (0
,I-z
-. l 0
0
PPL Rev. 9 PL-NF-11-001 Rev. 0 Page 40 of 53 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT 2 TRM/3.2-41 EFFECTIVE DATE 4/12/2011
U)
.CD c1
-H 4.6 4A 4.2 4.0 3.8 3.6 CX)
= 3.4
- 34
-I 3.2 3.0 0*
2.8 S2.6 SSES UNIT 2 CYCLE 16 ILEGEND CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 USED IN DETERMINING MFLCPR
REFERENCE:
T.S. 3.4.1, 3.7.6, and 3.2.2 I --
<D C.o m
I-n C-)
P1 P1i CD 2.4 2.2 2.0 1.8 1.6 1.4 30 40 50 60 70 80 90 100 110 Total Core Flow (MLB/HR?
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS INOPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-4 CD (0
CA~
u, X
(D 0
-0,I-z-I3 0
AAImlA
- ll IIlmlul A
ARIAN Nulml
- A
- 5b51t*5 UNI I Z t;YL;Lih I3f
.4.6
-L LEGEND 4.4 z_
CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME 26,4.10 CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME NJ 470CURVE C: CORE POWER < 26% AND CORE FLOW < 50 MLBMIHR 4
- 3.8 2 6,3.8 1 3.6 SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS SVALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 3.4" r -
0" 3.2 USED IN DETERMINING MFLCPR a..
(0o 3.0 2.8 1
126.01,2.58 2.4 C-)--i
~
m 2.2 1 100, 2.06 C
REFERENCE:
T.S. 3.4.1, 3.7.6, and 3.2.2 A
B -
2.0 20 30 40 50 60 70 80 90 100 Core Power (% RATED)
(<'
MCPR OPERATING LIMIT VERSUS CORE POWER o_-p MAIN TURBINE BYPASS INOPERABLE 0
SINGLE LOOP OPERATION (BOC to EOC)
E 0
FIGURE 8.2-5 W
PPL Rev. 9 PL-NF-11-001 Rev. 0 Page 43 of 53 EOC-RPT Inoperable SUSQUEHANNA UNIT 2 TRM/3.2-44 EFFECTIVE DATE 4/12/2011
(A 4.6 4.4 4.2 4.0 3.8 3.6 H-cn
'& 3.4
.E 0m 3.2 3.0 a.
0 S2.8 2.6 SSES UNIT 2 CYCLE 16
_LEGEND CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 USED IN DETERMINING MFLCPR
"-30, 2.02-
_"-'--,_A B
108,1.55
REFERENCE:
T.S. 3.4.1, 3.3.4.1, and 3.2.2
-u
-U I-Cr, (0
m-n
-n m
c:)
4I.
2.4 2.2 2.0 1.8 1.6 1.4 30 40 50 60 70 80 90 100 110 Total Core Flow (MLBIHR)
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW EOC-RPT INOPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-6 0
- 0 0 z-0n 6
CD
(A (A'
SSES UNIT 2 CYCLE 16 4.6 4.4 4.2 4.0 3.8 3.6 X) 3.4 E
m 3.2 3.0
- 0. 2.8 2.6
- 2.6 LEGEND 23,4.071 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME
-23CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME CURVE C: CORE POWER < 26% AND CORE FLOW *50 MLBMIHR SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 USED IN DETERMINING MFLCPR 40, 2.1
-u m
m m
CD) m C:)
ND CD 2.4 2.2 2.0 1.8 1.6 1.4
- 4.
~
- 4.
4.
wýj
- 4.
4
~
4
- 4.
1*
100,1.99
- 4.
4 4
i A
B
- 4.
4 4
- 4.
- 4.
- 4.
1~
- 4.
4 4
- 4.
-1*
1~
[ýFERENCE: T.S. 3.4.1, 3.3.4.1, andl 3.2.2~j~t 20 30 40 50 60 70 80 90 100 Core Power (% RATED)
MCPR OPERATING LIMIT VERSUS CORE POWER EOC-RPT INOPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-7 0h
- 0
-u,-
-n 6
0
PPL Rev. 9 PL-NF-11-001 Rev. 0 Page 46 of 53 Backup Pressure Regulator Inoperable SUSQUEHANNAUNIT 2 TRMI3.2-47 EFFECTIVE DATE 4/12/2011
V)
NO SSES UNIT 2 CYCLE 16 4.6 4.4 4.2 4.0 3.8 3.6 I
I I
I t1 t-I' 2=4LP
- 4.
4 URVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME URVE B: REALISTIC AVERAGE SCRAM INSERTION TIME
- 4.
.4
.1.-
I.
I SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2
-Hi
- 0 3.4
.E a, 3.2 S3.0 0W 2.8 CL 0p*2.6 I
USED IN DETERMINING MFLCPR 30, 2!.02
-u
- o CD (0
rn
-n
-,m C-,)
m FH m
N)
ND 2.4 2.2 2.0 1.8 1.6 I
4~
I I
I
__ 1 A "
I- --
B A.
REFERENCE:
T.S. 3.4.1, 3.7.8, and 3.2.2 J.
4
- 4.
1 1
I I
1.4 3(
J.
1 A.
1 1
I) 40 50 60 70 80 Total Core Flow (MLB/HR) 90 100 110 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW BACKUP PRESSURE REGULATOR INOPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-8
-u (D
0-ft co 7 0-1 0C0
Go')
m NJ SSES UNIT 2 CYCLE 16 4.6 4.4 4.2 4.0 3.8 3.6 t-0 m
N-)
3A 3.2 3.0 E
-*2.8 2.6 0 2.4 02.2 2.0 1.8 1.6 1.4
-13
'-u X-0o 20 30 40 50 60 70 80 Core Power (% RATED)
MCPR OPERATING LIMIT VERSUS CORE POWER BACKUP PRESSURE REGULATOR INOPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-9 90 100 cc 00 0
C.0 0 -
PPL Rev. 9 PL-NF-1 1-001 Rev. 0 Page 49 of 53 9.0 POWER I FLOW MAP 9.1 Technical Specification Reference Technical Specification 3.3.1.1 9.2 Description Monitor reactor conditions to maintain THERMAL POWER I core flow outside of Stability Regions I and II of the Power/ Flow map, Figure 9.1.
If the OPRM Instrumentation is OPERABLE per TS 3.3.1.1, Region I of the Power / Flow map is considered an immediate exit region.
If the OPRM Instrumentation is inoperable per TS 3.3.1.1, Region I of the Power
/ Flow map is considered an immediate scram region.
Region II of the Power / Flow map is considered an immediate exit region regardless of the operability of the OPRM Instrumentation.
SUSQUEHANNA UNIT 2 TRM/3.2-50 EFFECTIVE DATE 4/12/2011
PPL Rev. 9 PL-NF-1 1-001 Rev. 0 Page 50 of 53 120 110 100 -
90 80
Purpose:
Initial IDate:I i
f f l
l l
t l
l
- t.
.l STABILITY REGION I IF OPRM INOPERABLE IMMEDIATE SCRAM JAW ON-278402 IF OPRM OPERABLE IMMEDIATE EXIT lAW ON-278-"02 U
-- L M MEIAIELY EXrT lAW ON-278-002 I-- + I L 4. 1 -1 I I I I
- T Ti 1r114
- r r 1A LI II I
it I
Trp etFn RESTWICTEO REGION (As defined In AItaclhment 6 to NDAP-QA-0338)
IF ABOVE MELLLA BOUNDARY.
IMM=DIATLy EXIT lAW ON-278-002 JI 120 110 0oo 1
-o%
90 lod Line 80%
TI I r,;
Lii 31-0 0L E-(D 70 60 50 40 30 20 in I I I-11
'j *_
._.l
./
L.
t i l l t i l l t i l l I "i--I--I-I-t
-- I-I--
. 1---
- -1--
I41 44I 44I I I I 4I 4444: 1 1
1 4
4 4114jt_
I---I--
I 4 4-4 4-I I-I 4 I ii 4 I ~I I i-m--
i-mT--v r t-t
_t_
.44. _._.4 4444
-41 4 I r --
J 1 1 OfX
- 4,/lII Ji.
I I
- i-1÷-- -I-4 I
-I. *-I I1 J
i4I-
& 4-4-I I
_I4 4 -4 -1 Ro i
Li 9in
-r1 4-4
"-4
,, Rod Line 70
-60 I
.=r
- L
.J -I-L I J J l-r T i
I I ~
I L.4.4. 4.
-- LI 4.4 --
II-1 I
I 4e_
-i1 1r 7
- L I.
..4..
Rod,--
L n
--Ti7 Rod Line 50 Ti Twoump Ili i
i t
i4 rT1 I
i<
L Iff
.II II
£4 4..
I I
4 I I..
I i
I1 l
"II JJ.
J.2...
l
.I I L I I
I I
I I~.
J I
I ii I-._
I I
I I I J_
L I I I
I NaturalCirculation, I I, II*T C reFlo.
40 (f
ILine
<7*5%Pup peed -For---2T0-0--T-T IT-
- I-I r' T "-I ip -rT -i--r 1-1 T 1 C--*
T 1 rl ~
~~
~ ~
j L
I j
I,
- L 11 j-
- L 11 j-Ii i I IIInI]IIIlIl T,-,
T-
"r 1-=-
I T -I--F T 1-1----
T i
-- "rT 1-1-i--
T 1 rT 7
.1
- %J-1 L I~ J_ l
.L J
_j_ L.
.JJ_1.
L.L J..
__ L.L.1.J-L
-. _J.J-L 1.1
.J _L_J-
.Z A pp I
I I I
I i I I I
I I I
I I I I
I I
'I,
I I
I 1 11o t
I I I I
l I I I
I I
I 1
i ll1!
I I
I [ I I
I
] I.
I I1 I
I 3V l I:
I
_1 L I J J-Seed
_L nl
-I I
L I I I I
I I
I I
I I
I I l I
1Ul lllu F -
i i I I 1
1 1
[ I i I I I I /
i I I I I 1 11 1 1 1 1 1 1 1 1 1 1 1i 1
-Lii L 180% Speed.
T I i I
I
/F F T I
-1f F~JF i
I-
-1 1 1 1 1 1 1 1 r
3 1 -
T F
3 1 -
T F
I_/J I L/--*
jj
_L I
_I _L jj__L~j L
jJ__Ljj_
_L!. !
0 10 20 30 40 so 60 70 80 90 100 110 Total Core Flow (Mlbmihr)
(for SLO <75% Pump Speed Use Form GO-200-009-2)
,0 Figure 9.1 SSES Unit 2 Cycle 16 Power I Flow Map SUSQUEHANNA UNIT 2 TRM/3.2-51 EFFECTIVE DATE 4/12/2011
PPL Rev. 9 PL-NF-11-001 Rev. 0 Page 51 of 53 10.0 OPRM SETPOINTS 10.1 Technical Specification Reference Technical Specification 3.3.1.1 10.2 Description Setpoints for the OPRM Instrumentation are established that will reliably detect and suppress anticipated stability related power oscillations while providing a high degree of confidence that the MCPR Safety limit is not violated. The setpoints are described in Section 2.0 and are listed below:
Sp
=
1.12 Np 16 F=,
60 MIbm / hr SUSQUEHANNA UNIT 2 TRM/3.2-52 EFFECTIVE DATE 4/12/2011
PPL Rev. 9 PL-NF-11-001 Rev. 0 Page 52 of 53
11.0 REFERENCES
11.1 The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
- 1. XN-NF-81-58(P)(A), Revision 2 and Supplements 1 and 2, "RODEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model," Exxon Nuclear Company, March 1984.
- 2. EMF-2361 (P)(A), Revision 0, "EXEM BWR-2000 ECCS Evaluation Model,"
Framatome ANP, May 2001.
- 3. EMF-2292(P)(A), Revision 0, "ATRIUM*-10: Appendix K Spray Heat Transfer Coefficients,' Siemens Power Corporation, September 2000.
- 4. XN-NF-84-105(P)(A), Volume 1 and Volume 1 Supplements 1 and 2, "XCOBRA-T: A Computer Code for BWR Transient Thermal-Hydraulic Core Analysis," Exxon Nuclear Company, February 1987.
- 5. XN-NF-80-19(P)(A), Volume 1 and Supplements 1 and 2, "Exxon Nuclear Methodology for Boiling Water Reactors: Neutronic Methods for Design and Analysis," Exxon Nuclear Company, March 1983.
- 6. XN-NF-80-19(P)(A), Volumes 2, 2A, 2B, and 2C "Exxon Nuclear Methodology for Boiling Water Reactors: EXEM BWR ECCS Evaluation Model," Exxon Nuclear Company, September 1982.
- 7. XN-NF-80-19(P)(A), Volume 3 Revision 2 "Exxon Nuclear Methodology for Boiling Water Reactors Thermex: Thermal Limits Methodology Summary Description," Exxon Nuclear Company, January 1987.
- 8. XN-NF-80-19(P)(A), Volume 4, Revision 1, "Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads," Exxon Nuclear Company, June 1986.
- 9. XN-NF-85-67(P)(A), Revision 1, "Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel," Exxon Nuclear Company, Inc.,
September 1986.
- 10. ANF-524(P)(A), Revision 2 and Supplements 1 and 2, "Advanced Nuclear Fuels Corporation Critical Power Methodology for Boiling Water Reactors,"
November 1990.
- 11. NE-092-001A, Revision 1, "Licensing Topical Report for Power Uprate With Increased Core Flow," Pennsylvania Power & Light Company, December 1992 and NRC SER (November 30, 1993).
SUSQUEHANNA UNIT 2 TRM/3.2-53 EFFECTIVE DATE 4/12/2011
PPL Rev. 9 PL-NF-11-001 Rev. 0 Page 53 of 53
- 12. ANF-89-98(P)(A) Revision 1 and Supplement 1, "Generic Mechanical Design Critera for BWR Fuel Designs," Advanced Nuclear Fuels Corporation, May 1995.
- 13. EMF-2209(P)(A), Revision 3, "SPCB Critical Power Correlation," AREVA NP, September 2009.
i4. EMF-85-74(P)(A), Revision 0, Supplement 1 (P)(A) and Supplement 2(P)(A),
"RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model,"
Siemens Power Corporation, February 1998.
- 15. EMF-2158(P)(A), Revision 0, "Siemens Power Corporation Methodology for Boiling Water Reactors: Evaluation and Validation of CASMO-4/Microburn-B2," Siemens Power Corporation, October 1999.
- 16. EMF-CC-074(P)(A), Volume 4, Revision 0, "BWR Stability Analysis -
Assessment of STAIF with Input from MICROBURN-B2," Siemens Power Corporation, August 2000.
- 17. NEDO-32465-A, "BWROG Reactor Core Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications," August 1996.
- 18. ANF-913(P)(A), Volume 1 Revision 1 and Volume 1 Supplements 2, 3, and 4, "COTRANSA2: A Computer Program for Boiling Water Reactor Transient Analyses," Advanced Nuclear Fuels Corporation, August 1990.
- 19. ANF-1 358(P)(A), Revision 3, "The Loss of Feedwater Heating Transient in Boiling Water Reactors," Framatome ANP, September 2005.
SUSQUEHANNA UNIT 2 TRM/3.2-54 EFFECTIVE DATE 4/12/2011