Request for Information (Inspection Report 05000298/2011003) Related to Ti 2515/177
ML110410707
Person / Time
Site: Cooper Entergy icon.png
Issue date: 02/10/2011
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: O'Grady B
Nebraska Public Power District (NPPD)
References
IR-11-003, TI 2515/177
Download: ML110410707 (8)


See also: IR 05000298/2011003

Text

February 10, 2011

Brian J. OGrady, Vice President-Nuclear

and Chief Nuclear Officer

Nebraska Public Power

Cooper Nuclear Station

72676 648A Avenue

Brownville, NE 68321

SUBJECT: COOPER NUCLEAR STATION - REQUEST FOR INFORMATION (INSPECTION

REPORT 05000298/2011003) RELATED TO TI 2515/177

Dear Mr. OGrady:

On May 16, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin the on-site portion

of the Gas Accumulation Management in Emergency Core Cooling, Decay Heat Removal, and

Containment Spray Systems Temporary Instruction at your Cooper Nuclear Station. This

inspection will be performed in accordance with NRC Temporary Instruction (TI) 2515/177.

Experience has shown that this inspection is resource intensive for both the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

The documents have been divided into two groups.

  • The first group lists information necessary for our initial inspection scoping and in-office

preparation activities. This information should be separated by information request number,

especially if provided electronically (e.g., folder with the information request number). This

information should be available to the inspector no later than March 28, 2011. Any

documents mailed to the inspector should be shipped to his attention at the Region IV

address. Upon review of these documents, the inspectors will select additional

documentation for review upon arrival. By April 15, 2011, the inspector will communicate the

initial selected samples.

  • The second group of documents requested is needed to support our onsite inspection

activities. This set of documents should be available to the inspector on May 16, 2011. It is

also requested that corrective action documents and responses to questions developed

during the inspection be provided to the inspector as the documents are generated.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Dave Van Der Kamp of your licensing

organization. If there are any questions about this inspection or the material requested, please

contact the inspector, Greg Pick, at 817-860-8270 or by email at greg.pick@nrc.gov.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

R E GI ON I V

612 EAST LAMAR BLVD, SUITE 400

ARLINGTON, TEXAS 76011-4125

Nebraska Public Power

- 2 -

Cooper Nuclear Station

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget control number.

In accordance with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of

Practice, a copy of this letter and its enclosure will be available electronically for public

inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)

component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web

site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-298

License: DPR-46

cc w/enc:

Gene Mace

Nuclear Asset Manager

Nebraska Public Power District

P.O. Box 98

Brownville, NE 68321

John C. McClure, Vice President

and General Counsel

Nebraska Public Power District

P.O. Box 499

Columbus, NE 68601

David Van Der Kamp

Licensing Manager

Nebraska Public Power District

P.O. Box 98

Brownville, NE 68321

Michael J. Linder, Director

Nebraska Department of

Environmental Quality

P.O. Box 98922

Lincoln, NE 68509-8922

Nebraska Public Power

- 3 -

Cooper Nuclear Station

Randy Rohrs, Chairman

Nemaha County Board of Commissioners

Nemaha County Courthouse

1824 N Street, Suite 201

Auburn, NE 68305

Julia Schmitt, Manager

Nebraska Department of Health

and Human Services

Division of Public Health

Nebraska State Office Building, 3rd Fl

Lincoln, NE 68509-5026

Deputy Director for Policy

Missouri Department of Natural Resources

P.O. Box 176

Jefferson City, MO 65102-0176

Director, Missouri State Emergency

Management Agency

P.O. Box 116

Jefferson City, MO 65102-0116

Chief, Radiation and Asbestos

Control Section

Kansas Department of Health

and Environment

Bureau of Air and Radiation

1000 SW Jackson, Suite 310

Topeka, KS 66612-1366

Melanie Rasmussen, State Liaison Officer

Radiation Control Program Director

Bureau of Radiological Health

Iowa Department of Public Health

Lucas State Office Building, 5th Floor

321 East 12th Street

Des Moines, IA 50319

John F. McCann, Director, Licensing

Entergy Nuclear Northeast

Entergy Nuclear Operations, Inc

440 Hamilton Avenue

White Plains, NY 10601-1813

Nebraska Public Power

- 4 -

Cooper Nuclear Station

Keith G. Henke, Planner

Division of Community and Public Health

Office of Emergency Coordination

P.O. Box 570

Jefferson City, MO 65102

Art Zaremba

Director of Nuclear Safety Assurance

Nebraska Public Power District

P.O. Box 98

Brownville, NE 68321

Ronald D. Asche, President

and Chief Executive Officer

Nebraska Public Power District

1414 15th Street

Columbus, NE 68601

Chief, Technological Hazards

Branch

FEMA, Region VII

9221 Ward Parkway

Suite 300

Kansas City, MO 64114-3372

Nebraska Public Power

- 5 -

Cooper Nuclear Station

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Vacant)

Senior Resident Inspector (Jeffrey.Josey@nrc.gov)

Resident Inspector (Michael.Chambers@nrc.gov)

Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)

Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)

Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)

CNS Administrative Assistant (Amy.Elam@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Lynnea.Wilkins@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

Inspection Reports/MidCycle and EOC Letters to the following:

ROPreports

Only inspection reports to the following:

OEDO RIV Coordinator (James.Trapp@nrc.gov)

DRS/TSB STA (Dale.Powers@nrc.gov)

R:\\CNS 2011003 RFI-TI77-GAP

ADAMS ML

ADAMS: No ;Yes

SUNSI Review Complete

Reviewer Initials: TRF

Publicly Available
Non-Sensitive

Non-publicly Available

Sensitive

DRS\\EB2:SRI

EB1:C

G. Pick

T. Farnholtz

/RA/

/RA/

2/10/11

2/10/11

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

- 1 -

Enclosure

MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY

HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION

DOCUMENT REQUEST

The following information should be sent to the Region IV office in hard copy or electronic

format (ims.certrec.com or compact disc, preferred), in care of Greg Pick, to facilitate the

selection of specific items that will be reviewed during the onsite inspection week. The

inspector will select specific items from the information requested below and then request from

your staff additional documents needed during the onsite inspection weeks. Also, we request

that you categorize the documents in your response with the numbered list below. Please

provide requested documentation electronically if possible. If requested documents are large

and only hard copy formats are available, please inform the inspector, and provide subject

documentation during the first day of the onsite inspection. If you have any questions regarding

this information request, please call the inspector as soon as possible.

I. Information Requested By March 28, 2011

1. List of corrective action program documents (with a short description) associated with

Generic Letter (GL) 2008-01, voids in piping, and pressure transients for the previous

3 years.

2. List of changes (with a short description and tracking number) to the final safety

evaluation report (FSAR), technical specifications, technical specification bases, and

technical requirement manual associated with the resolution of GL 2008-01.

3. List of calculations associated with GL 2008-01, including calculations that have been

changed or created in response to GL 2008-01 (with a short description of the

calculation and the change).

4. List (with a short description) of gas intrusion mechanisms that apply to the plant and the

affected system locations (e.g. identify the source, conditions, and expected void

locations).

5. List of the suction piping sections identified as susceptible to gas accumulation (the list

should identify the corresponding system).

6. List of the discharge piping sections identified as susceptible to gas accumulation (the

list should identify the corresponding system).

7. Copies of isometric drawings of the Core Spray A and B, Residual Heat Removal A

and B, and High Pressure Coolant Injection systems (hard-copies are preferred).

8. Copies of piping and instrumentation diagrams (P&IDs) of the Core Spray A and B,

Residual Heat Removal A and B, and High Pressure Coolant Injection systems (hard-

copies are preferred).

9. Copies of program documents and procedures developed to implement the resolution of

GL 2008-01.

- 2 -

Enclosure

10. List of actions that were completed in response to GL 2008-01.

11. Copies of the modification packages for hardware modifications as part of the resolution

of GL 2008-01.

12. Design basis documents of the Core Spray A and B, Residual Heat Removal A and B,

and High Pressure Coolant Injection systems.

13. Design basis documents of keep-full systems of the Core Spray A and B, Residual Heat

Removal A and B, and High Pressure Coolant Injection systems.

14. System walkdown reports associated with the resolution of GL 2008-01.

15. If applicable, provide a list of inaccessible locations where plant walk downs of the Core

Spray A and B, Residual Heat Removal A and B, and High Pressure Coolant Injection

systems have not been completed. Include an explanation of why each area is

considered inaccessible.

16. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the

results of the last two surveillances for the Core Spray A and B, Residual Heat

Removal A and B, and High Pressure Coolant Injection systems.

17. Copies of procedures used for detecting and determining void volumes.

18. Copies of procedures used for filling and venting.

19. Copies of trends of periodic venting results.

20. Copies of the engineering evaluations performed for all identified voids.

21. Basis for the void acceptance criteria (e.g. calculation). If applicable, provide the

justification for any deviation from the void acceptance criteria established by the Office

of Nuclear Reactor Regulation (NRR).

22. Copy of any void transport analyses.

23. Copy of vortexing calculations associated with systems under the scope of GL 2008-01.

24. Copies of self-assessments associated with the implementation of the GL 2008-01

program.

II. Information Requested By May 16, 2011

25. Copies of the selected corrective action program documents.

26. Copies of the selected licensing and design basis document changes.

27. Copies of the selected calculations.

- 3 -

Enclosure

28. Copies of training documents that ensure that personnel are aware of gas-related

concerns.

29. Copies of corrective action program implementing procedures.

30. Electronic copies of the current technical specifications, technical specification bases,

final safety analysis report, and technical report manual.