February 10, 2011
Brian J. OGrady, Vice President-Nuclear
and Chief Nuclear Officer
Nebraska Public Power
Cooper Nuclear Station
72676 648A Avenue
Brownville, NE 68321
SUBJECT: COOPER NUCLEAR STATION - REQUEST FOR INFORMATION (INSPECTION
REPORT 05000298/2011003) RELATED TO TI 2515/177
Dear Mr. OGrady:
On May 16, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin the on-site portion
of the Gas Accumulation Management in Emergency Core Cooling, Decay Heat Removal, and
Containment Spray Systems Temporary Instruction at your Cooper Nuclear Station. This
inspection will be performed in accordance with NRC Temporary Instruction (TI) 2515/177.
Experience has shown that this inspection is resource intensive for both the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
The documents have been divided into two groups.
- The first group lists information necessary for our initial inspection scoping and in-office
preparation activities. This information should be separated by information request number,
especially if provided electronically (e.g., folder with the information request number). This
information should be available to the inspector no later than March 28, 2011. Any
documents mailed to the inspector should be shipped to his attention at the Region IV
address. Upon review of these documents, the inspectors will select additional
documentation for review upon arrival. By April 15, 2011, the inspector will communicate the
initial selected samples.
- The second group of documents requested is needed to support our onsite inspection
activities. This set of documents should be available to the inspector on May 16, 2011. It is
also requested that corrective action documents and responses to questions developed
during the inspection be provided to the inspector as the documents are generated.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Dave Van Der Kamp of your licensing
organization. If there are any questions about this inspection or the material requested, please
contact the inspector, Greg Pick, at 817-860-8270 or by email at greg.pick@nrc.gov.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
R E GI ON I V
612 EAST LAMAR BLVD, SUITE 400
ARLINGTON, TEXAS 76011-4125
Nebraska Public Power
- 2 -
Cooper Nuclear Station
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
a request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget control number.
In accordance with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of
Practice, a copy of this letter and its enclosure will be available electronically for public
inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)
component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web
site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket: 50-298
License: DPR-46
cc w/enc:
Gene Mace
Nuclear Asset Manager
Nebraska Public Power District
P.O. Box 98
Brownville, NE 68321
John C. McClure, Vice President
and General Counsel
Nebraska Public Power District
P.O. Box 499
Columbus, NE 68601
David Van Der Kamp
Licensing Manager
Nebraska Public Power District
P.O. Box 98
Brownville, NE 68321
Michael J. Linder, Director
Nebraska Department of
Environmental Quality
P.O. Box 98922
Lincoln, NE 68509-8922
Nebraska Public Power
- 3 -
Cooper Nuclear Station
Randy Rohrs, Chairman
Nemaha County Board of Commissioners
Nemaha County Courthouse
1824 N Street, Suite 201
Auburn, NE 68305
Julia Schmitt, Manager
Nebraska Department of Health
and Human Services
Division of Public Health
Nebraska State Office Building, 3rd Fl
Lincoln, NE 68509-5026
Deputy Director for Policy
Missouri Department of Natural Resources
P.O. Box 176
Jefferson City, MO 65102-0176
Director, Missouri State Emergency
Management Agency
P.O. Box 116
Jefferson City, MO 65102-0116
Chief, Radiation and Asbestos
Control Section
Kansas Department of Health
and Environment
Bureau of Air and Radiation
1000 SW Jackson, Suite 310
Topeka, KS 66612-1366
Melanie Rasmussen, State Liaison Officer
Radiation Control Program Director
Bureau of Radiological Health
Iowa Department of Public Health
Lucas State Office Building, 5th Floor
321 East 12th Street
Des Moines, IA 50319
John F. McCann, Director, Licensing
Entergy Nuclear Northeast
Entergy Nuclear Operations, Inc
440 Hamilton Avenue
White Plains, NY 10601-1813
Nebraska Public Power
- 4 -
Cooper Nuclear Station
Keith G. Henke, Planner
Division of Community and Public Health
Office of Emergency Coordination
P.O. Box 570
Jefferson City, MO 65102
Art Zaremba
Director of Nuclear Safety Assurance
Nebraska Public Power District
P.O. Box 98
Brownville, NE 68321
Ronald D. Asche, President
and Chief Executive Officer
Nebraska Public Power District
1414 15th Street
Columbus, NE 68601
Chief, Technological Hazards
Branch
FEMA, Region VII
9221 Ward Parkway
Suite 300
Kansas City, MO 64114-3372
Nebraska Public Power
- 5 -
Cooper Nuclear Station
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Vacant)
Senior Resident Inspector (Jeffrey.Josey@nrc.gov)
Resident Inspector (Michael.Chambers@nrc.gov)
Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)
Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)
CNS Administrative Assistant (Amy.Elam@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Lynnea.Wilkins@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
Inspection Reports/MidCycle and EOC Letters to the following:
ROPreports
Only inspection reports to the following:
OEDO RIV Coordinator (James.Trapp@nrc.gov)
DRS/TSB STA (Dale.Powers@nrc.gov)
R:\\CNS 2011003 RFI-TI77-GAP
ADAMS: No ;Yes
- SUNSI Review Complete
Reviewer Initials: TRF
- Publicly Available
- Non-Sensitive
Non-publicly Available
Sensitive
DRS\\EB2:SRI
EB1:C
G. Pick
T. Farnholtz
/RA/
/RA/
2/10/11
2/10/11
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
- 1 -
Enclosure
MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY
HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION
DOCUMENT REQUEST
The following information should be sent to the Region IV office in hard copy or electronic
format (ims.certrec.com or compact disc, preferred), in care of Greg Pick, to facilitate the
selection of specific items that will be reviewed during the onsite inspection week. The
inspector will select specific items from the information requested below and then request from
your staff additional documents needed during the onsite inspection weeks. Also, we request
that you categorize the documents in your response with the numbered list below. Please
provide requested documentation electronically if possible. If requested documents are large
and only hard copy formats are available, please inform the inspector, and provide subject
documentation during the first day of the onsite inspection. If you have any questions regarding
this information request, please call the inspector as soon as possible.
I. Information Requested By March 28, 2011
1. List of corrective action program documents (with a short description) associated with
Generic Letter (GL) 2008-01, voids in piping, and pressure transients for the previous
3 years.
2. List of changes (with a short description and tracking number) to the final safety
evaluation report (FSAR), technical specifications, technical specification bases, and
technical requirement manual associated with the resolution of GL 2008-01.
3. List of calculations associated with GL 2008-01, including calculations that have been
changed or created in response to GL 2008-01 (with a short description of the
calculation and the change).
4. List (with a short description) of gas intrusion mechanisms that apply to the plant and the
affected system locations (e.g. identify the source, conditions, and expected void
locations).
5. List of the suction piping sections identified as susceptible to gas accumulation (the list
should identify the corresponding system).
6. List of the discharge piping sections identified as susceptible to gas accumulation (the
list should identify the corresponding system).
7. Copies of isometric drawings of the Core Spray A and B, Residual Heat Removal A
and B, and High Pressure Coolant Injection systems (hard-copies are preferred).
8. Copies of piping and instrumentation diagrams (P&IDs) of the Core Spray A and B,
Residual Heat Removal A and B, and High Pressure Coolant Injection systems (hard-
copies are preferred).
9. Copies of program documents and procedures developed to implement the resolution of
- 2 -
Enclosure
10. List of actions that were completed in response to GL 2008-01.
11. Copies of the modification packages for hardware modifications as part of the resolution
of GL 2008-01.
12. Design basis documents of the Core Spray A and B, Residual Heat Removal A and B,
and High Pressure Coolant Injection systems.
13. Design basis documents of keep-full systems of the Core Spray A and B, Residual Heat
Removal A and B, and High Pressure Coolant Injection systems.
14. System walkdown reports associated with the resolution of GL 2008-01.
15. If applicable, provide a list of inaccessible locations where plant walk downs of the Core
Spray A and B, Residual Heat Removal A and B, and High Pressure Coolant Injection
systems have not been completed. Include an explanation of why each area is
considered inaccessible.
16. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the
results of the last two surveillances for the Core Spray A and B, Residual Heat
Removal A and B, and High Pressure Coolant Injection systems.
17. Copies of procedures used for detecting and determining void volumes.
18. Copies of procedures used for filling and venting.
19. Copies of trends of periodic venting results.
20. Copies of the engineering evaluations performed for all identified voids.
21. Basis for the void acceptance criteria (e.g. calculation). If applicable, provide the
justification for any deviation from the void acceptance criteria established by the Office
of Nuclear Reactor Regulation (NRR).
22. Copy of any void transport analyses.
23. Copy of vortexing calculations associated with systems under the scope of GL 2008-01.
24. Copies of self-assessments associated with the implementation of the GL 2008-01
program.
II. Information Requested By May 16, 2011
25. Copies of the selected corrective action program documents.
26. Copies of the selected licensing and design basis document changes.
27. Copies of the selected calculations.
- 3 -
Enclosure
28. Copies of training documents that ensure that personnel are aware of gas-related
concerns.
29. Copies of corrective action program implementing procedures.
30. Electronic copies of the current technical specifications, technical specification bases,
final safety analysis report, and technical report manual.