MONTHYEARML1007405732008-10-17017 October 2008 Redacted- License Renewal Application of the University of Wisconsin Nuclear Reactor; License R-74, Docket 20-156 Project stage: Other ML0929905182009-11-13013 November 2009 University of Wisconsin, Request for Additional Information (Financial Qualification) License Renewal Project stage: RAI ML1010504252010-05-0303 May 2010 University of Wisconsin, Request for Additional Information Regarding Renewal of Facility Operating License Project stage: RAI ML1005002722010-06-0404 June 2010 University of Wisconsin, Transmittal Letter Federal Register Notice Determination of Acceptability and Sufficiency for Docketing and Opportunity for Hearing Regarding the Application for the Renewal of Facility Operating License No. R-74 Project stage: Other ML1005006572010-06-14014 June 2010 FRN: General Notice, Determination of Acceptability and Sufficiency for Docketing and Opportunity for Hearing Regarding the Application for the Renewal of Facility Operating License No. R-74 Project stage: Other ML1016901372010-06-16016 June 2010 University of Wisconsin-Madison Nuclear Reactor Laboratory Response to Request for Additional Information for License Renewal to Facility License No. R-74 Project stage: Response to RAI ML1016900832010-06-16016 June 2010 University of Wisconsin Nuclear Reactor Laboratory Response to Request for Additional Information for License Renewal Facility License No. R-74, TAC No. ME1585 (Final Qualification RAI) Project stage: Response to RAI ML1021100512010-07-0808 July 2010 University of Wisconsin - Madison, Response to Request for Clarification for License Renewal to Facility License No. R-74 Project stage: Request ML1023202092010-08-11011 August 2010 Response to Request for Clarification for License Renewal to Facility License No. R-74 University of Wisconsin Nuclear Reactor Project stage: Request ML1022402282010-09-10010 September 2010 University of Wisconsin-Transmittal Letter to Licensee Environmental Assessment Regarding Renewal of Facility Operating License No. R-74 for the University of Wisconsin Nuclear Reactor Project stage: Other ML1022401922010-09-10010 September 2010 FRN: General Notice, University of Wisconsin, Environmental Assessment and Finding of No Significant Impact Regarding License Renewal Project stage: Other ML1032201492010-11-18018 November 2010 University of Wisconsin - Request for Additional Information Regarding the License Renewal for the University of Wisconsin Nuclear Reactor Project stage: RAI ML1033000402010-11-22022 November 2010 Response to Request for Additional Information for License Renewal to Facility License No. R-74 University of Wisconsin Nuclear Reactor Project stage: Response to RAI ML1103403102011-01-28028 January 2011 University of Wisconsin Nuclear Reactor - Submission of Revised Proposed Technical Specifications for License Renewal to Facility License Project stage: Other ML1104105342011-02-0808 February 2011 University of Wisconsin, Madison, Submission of Revised Dose Estimates for License Renewal Project stage: Other NRC-2010-0203, Federal Register Notice: General Notice, University of Wisconsin, Notice of Issuance of Renewed Facility Operating License No. R-742011-03-25025 March 2011 Federal Register Notice: General Notice, University of Wisconsin, Notice of Issuance of Renewed Facility Operating License No. R-74 Project stage: Approval ML1023701262011-03-25025 March 2011 University of Wisconsin - Appendix a to Renewed Facility Operating License No. R-74, Technical Specifications and Bases for the University of Wisconsin Nuclear Reactor Project stage: Other ML1023701402011-03-25025 March 2011 University of Wisconsin- Facility Operating License Renewal Safety Evaluation Report Project stage: Approval ML1023708652011-03-25025 March 2011 Federal Register Notice: General Notice, University of Wisconsin, Notice of Issuance of Renewed Facility Operating License No. R-74 Project stage: Approval 2010-06-16
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000156/20232012023-08-0101 August 2023 University of Wisconsin - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000156/2023201 - Cover Letter and Enclosure IR 05000156/20222022022-12-28028 December 2022 University of Wisconsin - U. S. Nuclear Regulatory Commission Security Inspection Report No. 05000156-2022202 Cover Letter ML22340A0052022-11-30030 November 2022 Univ of Wisconsin - Madison, Submittal of 2021 - 2022 Annual Report ML22292A2982022-11-28028 November 2022 University of Wisconsin Research Reactor, Closure of Confirmatory Action Letter No. NRR-03-002 on the Site-Specific Compensatory Measures Implementation Plan ML22224A0852022-08-0808 August 2022 University of Wisconsin - Madison, Physical Security Protection Plan Cover Page & CAL No. NRR-03-002; Confirmatory Action Letter - Site Specific Compensatory Measures Implementation Plan, Request to Change Commitment ML22200A0422022-07-13013 July 2022 University of Wisconsin-Madison - Change to Physical Security Protection Plan in Accordance with 10 CFR 50.54(p) (2) IR 05000156/20222012022-06-0101 June 2022 University of Wisconsin - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000156/2022201 ML22138A1872022-05-12012 May 2022 Univ. of Wisconsin - Madison, Technical Specification 6. 7. 2 (2) (a) Change in Operating Organization ML22062A7662022-04-20020 April 2022 the University of Wisconsin - Issuance of Amendment No. 18 to Facility License No. R-74 to Revise the Organizational Structure in the Technical Specifications for the University of Wisconsin Nuclear Reactor ML22046A0592022-02-24024 February 2022 Examination Confirmation Letter No. 50-156/OL-22-01, University of Wisconsin- Madison ML21253A2452021-09-23023 September 2021 University of Wisconsin - Change of Facility Project Manager ML21251A4862021-09-0202 September 2021 Univ. of Wisconsin, Madison - Annual Operating Report Fiscal Year 2020-2021 IR 05000156/20212012021-06-0303 June 2021 Univesity of Wisconsin - U.S. NRC Routine Inspection Report 05000156/2021201 ML21103A2532021-04-13013 April 2021 Examination Confirmation Letter No.50-156/OL-21-01, University of Wisconsin - Madison IR 05000156/20202022020-11-16016 November 2020 University of Wisconsin - U.S. Nuclear Regulatory Commission Routine Inspection Report 05000156/2020202 ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20276A1192020-09-25025 September 2020 Univ. of Wisconsin, Madison - Transmittal of 2019-2020 Annual Report ML20253A3162020-09-22022 September 2020 Examination Report No. 50-156/OL-20-01, University of Wisconsin-Madison ML20192A1112020-07-10010 July 2020 Univ of Wisconsin-Madison - License Amendment Request Regarding Administrative Controls Proposed Changes to Technical Specifications IR 05000156/20202012020-05-20020 May 2020 University of Wisconsin - U.S. Nuclear Regulatory Commission Security Inspection Report No. 050000156/2020-201 - Non-OUOSRI (Cover Ltr) ML19351C7472019-12-0606 December 2019 Univ. of Wisconsin - Madison - Transmittal of 2018-2019 Annual Report ML19190A0912019-07-0202 July 2019 University of Wisconsin-Madison - Technical Specification 6.7.2 (2)(a): Change in Operating Organization IR 05000156/20192012019-04-24024 April 2019 University of Wisconsin - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-156/2019-201 ML18365A3502019-01-0808 January 2019 University of Wisconsin - Change of Facility Project Manager ML18200A0652018-07-16016 July 2018 Transmittal of 2017-2018 Annual Report for the University of Wisconsin Nuclear Reactor Laboratory ML18179A1692018-06-25025 June 2018 University of Wisconsin-Madison - 10 CFR 50.74, Notification of Change in Operator or Senior Operator Status ML18178A3882018-06-22022 June 2018 Examination Report No. 50-156/OL-18-01, University of Wisconsin-Madison ML18086B3102018-03-27027 March 2018 Examination Confirmation Letter 50-156/OL-8-01, Wisconsin ML17202D0782017-07-17017 July 2017 University of Wisconsin Nuclear Reactor Laboratory: 2016-2017 Annual Report IR 05000156/20172012017-06-0505 June 2017 University of Wisconsin - Nuclear Regulatory Commission Routine Inspection Report 05000156/2017201 ML17104A0982017-04-19019 April 2017 Non-Power Reactor Closeout of Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools University of Wisconsin Docket No. 50-156 (CAC No. A11010) ML16286A2352016-10-0505 October 2016 Univ. of Wisconsin - Madison, Response to NRC Generic Letter 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools ML16209A4732016-08-11011 August 2016 University Of Wisconsin - U.S. Nuclear Regulatory Commission Routine Inspection Report 05000156/2016202 ML16217A4602016-07-29029 July 2016 University of Wisconsin, Submittal of Annual Operating Report 2015-2016 Fiscal Year ML16138A3072016-05-23023 May 2016 IR 05000156/2016-201 - May 2-5, 2016 - University Of Wisconsin - Nuclear Regulatory Commission Security Inspection Report ML16096A1552016-04-0707 April 2016 Examination Notification Letter No. 50-156/OL-16-01,University of Wisconsin ML15218A0302015-07-31031 July 2015 University of Wisconsin, Madison - Transmittal of the 2014-2015 Annual Operating Report IR 05000156/20152012015-06-24024 June 2015 IR 05000156/2015201 - 06/08/15 - 06/11/15, University of Wisconsin- NRC Routine Inspection ML14290A4862015-06-0303 June 2015 Y020140127 - Withdrawal of Order EA-05-007, Order Imposing Additional Security Measures ML15055A5962015-02-20020 February 2015 Technical Specification 6.7.2(2)(a), Change in Operating Organization ML14204A0752014-07-18018 July 2014 Transmittal of 2013-2014 Annual Report for University of Wisconsin Nuclear Reactor Laboratory IR 05000156/20142012014-06-19019 June 2014 IR 05000156-14-201 on May 19-22, 2014, at the University of Wisconsin - NRC Routine Inspection Report No. 50-156/2014-201 ML14139A5592014-05-27027 May 2014 University of Wisconsin - Change of Facility Project Manager ML13294A0242013-10-17017 October 2013 University of Wisconsin Nuclear Reactor Violation of Technical Specification 6.1.3(i) (a) and Technical Specification 6.6.2(1) 14 Day Follow Up Special Report to Event Notification Report Number 49409 in Accordance with Technical Specificat IR 05000156/20132012013-08-27027 August 2013 IR 05000156-13-201 on August 5-8, 2013 at the University of Wisconsin - NRC Routine Inspection Report ML13226A0702013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13225A4962013-08-0909 August 2013 Transmittal of 2012-2013 Annual Report for University of Wisconsin Nuclear Reactor Lab ML12229A5152012-08-14014 August 2012 10 CFR 50.74; Notification of Change in Operator or Senior Operator Status IR 05000156/20122022012-08-0909 August 2012 IR 05000156-12-202 on July 9-12, 2012 at the University of Wisconsin - Transmittal Letter for NRC Security-Related Inspection Report No. 50-156/2012-202 IR 05000156/20122012012-08-0909 August 2012 IR 05000156-12-201 on July 9-12, 2012 at the University of Wisconsin - NRC Routine Inspection Report No. 50-156/2012-201 2023-08-01
[Table view] |
Text
W Nuclear Reactor Laboratory UWNR University of Wisconsin-Madison 1513 University Avenue, Room 1215 ME, Madison, WI 53706-1687, Tel: (608) 262-3392, FAX: (608) 262-8590 email: reactor@engr.wisc.edu, http://reactor.engr.wisc.edu February 8, 2011 RSC 1078 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Docket 50-156, License R-74 Submission of Revised Dose Estimates for License Renewal to Facility License No. R-74, University Of Wisconsin Nuclear Reactor TAC No. ME1585
Dear Sirs:
On April 10, 2009, the University of Wisconsin Nuclear Reactor (UWNR) submitted revised dose estimates for the conversion from high enriched uranium (HEU) fuel to low enriched uranium (LEU) fuel in response to the Commission's request for additional information, specifically RAI #43, dated February 26, 2009.
Following telephone communications with Commission staff on February 3, 2011 it was agreed to provide revised dose estimates for all analyzed accident scenarios, including those not addressed in RAI #43. For completeness, a comprehensive summary of all revised doses have been compiled below.
The dose calculations reflect the LEU 30/20 core design as well as methodologies of calculation in the LEU Conversion Analysis Safety Analysis Report (LEU SAR) as supplemented by letter dated April 10, 2009. The results reported in the LEU SAR were updated to use more appropriate fission product release fractions. The LEU SAR calculated the release fraction based on the maximum centerline temperature, but .a more accurate approach is to use an effective release fraction calculated by volume integrating the release fraction equation across the fuel temperature distribution, both axial and radial. This is appropriate since the release fraction measurements were made Page 1 of 4
I..-.
- on small isothermal fuel samples (General Atomics, "The U-ZrH, Alloy: Its Properties and Use in TRIGA Fuels," GA E-117-833, February 1980, page 5-5). The revised release fractions are 7.825E-5 BOL, 7.630E-5 MOL, and 6.125E-5 EOL, approximately 10%
of the values listed in chapter 13 of the LEU SAR.
The table numbering represents the original numbering in the LEU SAR.
Table 13.1.6 MHA Total Occupational Dose during 5 minute evacuation External Dose Thyroid Dose TEDE (mrem) (mrem) (mrem)
Previous HEU SAR 10 N/A N/A Revised HEU Analysis 20.3 2,110 83.7 LEU BOL Analysis 36.1 3,730 148 LEU MOL Analysis 34.6 3,670 145 LEU EOL Analysis 27.4 2,960 116 Table 13.1.8 MHA Building Occupant Dosesfor Ground Release External Dose Thyroid Dose TEDE (mrem) (mrem) (nrem)
Previous HEU SAR N/A N/A N/A Revised HEU Analysis 1.26 131 5.18 LEU BOL Analysis 2.24 231 9.16 LEU MOL Analysis 2.14 227 8.95 LEU EOL Analysis 1.70 183 7.20 Table 13.1.9 MHA Dose to Outside Building External Dose Thyroid Dose TEDE (mrem) (nrem) (nrem)
Previous HEU SAR 0.153) 1,019 30.7 Revised HEU Analysis 1.35 141 5.58.
LEU BOL Analysis 2.41 249 9.86 LEU MOL Analysis 2.31 245 9.64 LEU EOL Analysis 1.83 198 7.75 Page 2 of 4
Table 13. 1.11 Near"MHA with Pool Intact OccupationalDose during 5 minute evacuation External Dose Thyroid Dose TEDE (mrem) (mrem) (mrem)
Previous HEU SAR N/A 18,900 N/A Revised HEU Analysis 7.32 211 13.7 LEU BOL Analysis 13.1 373 24.2 LEU MOL Analysis 12.4 367 23.4 LEU EOL Analysis 9.69 296 18.6 Table 13. 1.12 Near MHA with Pool Intact Building Occupant Dosesfor Ground Release External Dose Thyroid Dose TEDE (mtrero) (rem) (mrem)
Previous HEU SAR N/A N/A N/A Revised HEU Analysis 0.453 13.1 0.845 LEU BOL Analysis 0.808 23.1 1.50 LEU MOL Analysis 0.768 22.7 1.45 LEU EOL Analysis 0.600 18.3 1.15 Table 13.1.13 Near MHAl With Pool Intact Dose to Outside Building External Dose Thyroid Dose TEDE (mrem) (mrem) (mrem)
Previous HEU SAR 0.084 102 3.14 Revised HEU Analysis 0.488 14.1 0.911 LEU BOL Analysis 0.870 24.9 1.62 LEU MOL Analysis 0.827 24.5 1.56 LEU EOL Analysis 0.646 19.8 1.24 Table 13.1.15 ANear AMHA IVAh Ventilation Intact: Dose to Outside Building External Dose Thyroid Dose TEDE (mrem) (mrem) (mrem)
Previous HEU SAR N/A N/A N/A Revised HEU Analysis 0.0049 0.506 0.0200 LEU BOL Analysis 0.0087 0.893 0.0354 LEU MOL Analysis 0.0083 0.879 0.0347 LEU EOL Analysis 0.0066 0.710 0.0279 Page 3 of 4
Table 13.1.16 Near AHA With Pool and Ventilation hInact: Dose to Outside Building External Dose Thyroid Dose TEDE (mrem) (mrem) (mrem)
Previous HEU SAR 0.006 10.0 0.306 Revised HEU Analysis 0.0018 0.0506 0.0033 LEU BOL Analysis 0.0031 0.0893 0.0058 LEU MOL Analysis 0.0030 0.0879 0.0056 LEU EOL Analysis 0.00232 0.0710 0.0045 I certify under penalty of perjury that the foregoing is true and correct.
,ly, Executed on: c J
Robert J. Agasie Reactor Director Page 4 of 4