Category:Letter
MONTHYEARML24304B0512024-10-30030 October 2024 Cycle 26 Core Operating Limits Report IR 05000498/20244022024-10-23023 October 2024 Security Baseline Inspection Report 05000498/2024402 and 05000499/2024402 05000499/LER-2024-003, Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function2024-10-22022 October 2024 Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function ML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24290A1162024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan ML24255A0322024-09-30030 September 2024 The Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators IR 05000498/20243012024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test 05000499/LER-2024-001, Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators 05000498/LER-2024-003, Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump2024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump 05000498/LER-2024-002-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function 05000498/LER-2023-003-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24137A0882024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment 05000498/LER-2023-004-01, Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water2024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 05000498/LER-2024-001, Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update ML24081A3972024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NOC-AE-240040, Nuclear Liability Certificates of Insurance2024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) IR 05000498/20240132024-02-27027 February 2024 Design Basis Assurance Inspection (Programs) Commercial Grade Dedication IR 05000498/2024013 and 05000499/2024013 ML24022A2252024-02-20020 February 2024 Issuance of Amendment Nos. 227 and 212 to Authorize the Revision of the Alternative Source Term Dose Calculation ML24050A0082024-02-19019 February 2024 Evidence of Financial Protection 2024-09-30
[Table view] Category:Drawing
MONTHYEARML22140A0582022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Controlled Drawings, Part 2 of 4 (Redacted) ML22140A0622022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Controlled Drawings, Part 3 of 4 ML22140A0752022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Controlled Drawings, Part 4 of 4 (Redacted) ML22140A0742022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Controlled Drawings, Part 1 of 4 ML20133J9442020-04-29029 April 2020 Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 4 of 4) (Redacted) ML20133J9412020-04-29029 April 2020 Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 1 of 4) ML20133J9432020-04-29029 April 2020 Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 3 of 4) ML20133J9422020-04-29029 April 2020 Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 2 of 4) (Redacted) ML18130A0482018-04-30030 April 2018 Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 19, Controlled Drawing, Part 3 ML18130A0462018-04-30030 April 2018 Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 19, Controlled Drawing, Part 1 ML18130A0472018-04-30030 April 2018 Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 19, Controlled Drawing, Part 2 ML16207A6462016-04-28028 April 2016 Revision 18 to Updated Safety Analysis Report, Section 1.2, Figure 1.2-1 Through Figure 1.2-4 ML16207A6442016-04-28028 April 2016 Revision 18 to Updated Safety Analysis Report, Section 1.1, Figure 1.1-1 Through Figure 1.1-3 ML13070A2132013-03-29029 March 2013 3/5/13 Summary of Preapplication Meeting Via Conference Call with STP Nuclear Operating Company to Discuss License Amendment Request for Fire Protection Program to Credit Additional Operator Actions for South Texas, Units 1 and 2 ML11318A1332011-11-0303 November 2011 Drawing No. LR-STP-CV-5R179F05008#2, Rev. 16, Piping an Instrumentation Diagram Chemical and Volume System Birs Sub System. ML11318A1302011-11-0303 November 2011 Drawing No. LR-STP-CT-5S199F00020#1, Rev. 1, Piping and Instrumentation Diagram Condensate Storage ML11318A1532011-11-0303 November 2011 Drawing No. LR-STP-FC-5R219F05029#1, Revision 1, Piping & Instrumentation Diagram Spent Fuel Pool Cooling & Cleanup System. ML11318A1522011-11-0303 November 2011 Drawing No. LR-STP-EW-5R289F05038#2-1, Revision 1, Piping & Instrumentation Diagram Essential Cooling Water System Train 2A ML11318A1312011-11-0303 November 2011 Drawing No. LR-STP-CT-5S199F00020#2, Rev. 1, Piping and Instrumentation Diagram Condensate Storage ML11318A1322011-11-0303 November 2011 Drawing LR-STP-CV-5R179F05008#1, Rev. 1, Piping and Instrumentation Diagram Chemical and Volume Control System Btrs Sub System ML11318A1492011-11-0303 November 2011 Drawing No. LR-STP-ED-7Q069F90016#1, Revision 1, Piping & Instrumentation Diagram Radioactive Vent and Drain System Mab Floor Drains El. 41'-0 and Above. ML11318A1482011-11-0303 November 2011 Drawing No. LR-STP-ED-5Q069F90011#2, Revision 1, Piping & Instrumentation Diagram Radioactive Vent and Drain System Fuel Handling Building Gravity Drains. ML11318A1472011-11-0303 November 2011 Drawing No. LR-STP-ED-5Q069F90011#1, Revision 1, Piping & Instrumentation Diagram Radioactive Vent and Drain System Fuel Handling Building Gravity Drains. ML11318A1382011-11-0303 November 2011 Drawing LR-DTP-DG-5Q159F22546 #1, Rev. 21, Piping & Instrumentation Diagram Standby Diesel Starting Air. ML11318A1462011-11-0303 November 2011 Drawing LR-STP-ED-5Q069F05030 #2, Rev. 17, Piping & Instrumentation Diagram Radioactive Vent & Drain System Sump Pumps. ML11318A1452011-11-0303 November 2011 Drawing LR-STP-ED-5Q069F05030 #1, Rev. 18, Piping & Instrumentation Diagram Radioactive Vent & Drain System Sump Pumps. ML11318A1442011-11-0303 November 2011 Drawing LR-STP-DW-5S199F05034 #2, Rev. 14, Piping & Instrument Diagram Demineralized Water Distribution System Rcb Fhb, and Mead. ML11318A1432011-11-0303 November 2011 Drawing LR-DTP-DW-5S199F05034 #1, Rev. 15, Piping & Instrumentation Diagram Demineralized Water Distribution System Rcb. Fhb and Meab. ML11318A1352011-11-0303 November 2011 Drawing No. LR-STP-CV-5R179F05009, Rev. 22, Piping and Instrumentation Diagram Chemical and Volume Control System. ML11318A1422011-11-0303 November 2011 Drawing LR-STP-DR-6Q069F20005 #2, Rev. 25, Piping and Instrument Diagram Non-Radioactive Drains Mech. and Elec. Aux. Bldg. and Turbine Gen. Bldg. ML11318A1362011-11-0303 November 2011 Drawing LR-STP-CV-5R179F05009 #2, Rev. 21, Piping and Instrumentation Diagram Chemical and Volume Control System. ML11318A1402011-11-0303 November 2011 Drawing LR-STP-CV-159F00045 #1, Rev. 32, Piping & Instrumentation Diagram Standby Diesel Generator Fuel Oil Storage & Transfer System. ML11318A1392011-11-0303 November 2011 Drawing LR-STP-DG-5Q159F22546 #2, Rev. 15, Piping & Instrumentation Diagram Standby Diesel Starting Air. ML11318A1692011-11-0303 November 2011 Drawing No. LR-STP-RM-5R279F05033#1, Rev. 1, Piping & Instrumentation Diagram Reactor Makeup Water System. NOC-AE-11002749, Drawing No. LR-STP-SB-7S209F200032, Rev. 0, Piping and Instrumentation Diagram Steam Generator Blowdown System2011-11-0303 November 2011 Drawing No. LR-STP-SB-7S209F20003#2, Rev. 0, Piping and Instrumentation Diagram Steam Generator Blowdown System ML11318A1822011-11-0303 November 2011 Drawing No. 1218E40, Fuel Transfer System Hydraulic Power Unit Outline ML11318A1812011-11-0303 November 2011 Drawing No. LR-STP-WS-6R329F05048#2, Rev. 1, Piping and Instrumentation Diagram Solid Waste Processing System ML11318A1792011-11-0303 November 2011 Drawing No. LR-STP-WL-7R309F90021#2, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System ML11318A1782011-11-0303 November 2011 Drawing No. LR-STP-WL-7R309F90021#1, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System ML11318A1762011-11-0303 November 2011 Drawing No. LR-STP-WL-7R309F05024#2, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System ML11318A1752011-11-0303 November 2011 Drawing No. LR-STP-WL-7R309F05024#1, Rev. 1, Piping an Instrumentation Diagram Liquid Waste Processing System ML11318A1742011-11-0303 November 2011 Drawing No. LR-STP-WL-5R309F05027#2, Rev. 1, Piping & Instrumentation Diagram Auxiliary Steam and Condensate Return System (Lwps) ML11318A1732011-11-0303 November 2011 Drawing No. LR-STP-WL-5R309F05027#1, Rev. 1, Piping & Instrumentation Diagram Auxiliary Steam and Condensate Return System (Lwps) ML11318A1722011-11-0303 November 2011 Drawing No. LR-STP-WL-5R309F05022#2, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System. ML11318A1712011-11-0303 November 2011 Drawing No. LR-STP-WL-5R309F05022#1, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System. ML11318A1572011-11-0303 November 2011 Drawing No. LR-STP-IA-8Q119F00048#1-2, Rev. 1, Piping and Instrumentation Diagram Instrument Air Dryers 11, 12 & 13. ML11318A1682011-11-0303 November 2011 Drawing No. LR-STP-RC-5R149F05004#2, Rev. 1, Piping and Instrumentation Diagram Acs Pressurizer Relief Tank. ML11318A1672011-11-0303 November 2011 Drawing No. LR-STP-RC-5R149F05004#1, Rev. 1, Piping and Instrumentation Diagram RCS Pressurizer Relief Tank. ML11318A1662011-11-0303 November 2011 Drawing No. LR-STP-PS-9Z329Z00047#2, Rev. 1, Piping and Instrument Diagram Primary Sampling System. ML11318A1642011-11-0303 November 2011 Drawing No. LR-STP-PS-5Z329Z00045#2, Rev. 1, Piping & Instrumentation Diagram Primary Sampling System. 2022-04-28
[Table view] |
Text
\-t.Il-R REGU UNITED STATES
~
- j~~~p. ...,
l.qrO~.< (>
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 I- , 0
<I) , l:
~~ ~
~'?
, ",,""
0....
February 9, 2011
Javier Loera Tribal Historic and Preservation Officer (THPO)
Ysleta del Sur Pueblo 119 S. Old Pueblo Rd.
P.O. Box 17579 EIPaso, Texas 79917
SUBJECT:
REQUEST FOR COMMENTS CONCERNING THE SOUTH TEXAS PROJECT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW
Dear Javier Loera:
The U.S. Nuclear Regulatory Commission (NRC) is seeking input for its environmental review of an application from South Texas Project Nuclear Operating Company (STPNOC) for the renewal of the operating license for the South Texas Project (STP), Units 1 and 2, located in Matagorda, Texas. STP is in close proximity to lands that may be of interest to the Ysleta del Sur Pueblo. As described below, the NRC process includes an opportunity for public and inter governmental participation in the environmental review. We want to ensure that you are aware of our efforts and, pursuant to Section 51.28(b) of Title 10 of the Code of Federal Regulations (10 CFR), the NRC invites the Ysleta del Sur Pueblo to provide input to the scoping process relating to the NRC's environmental review of the application. In addition, as outlined in 36 CFR 800.8, the NRC plans to coordinate compliance with Section 106 of the National Historic Preservation Act of 1966 through the requirements of the National Environmental Policy Act of 1969 Under NRC regulations, the original operating license for a nuclear power plant is issued for up to 40 years. The license may be renewed for up to an additional 20 years if NRC requirements are met. The current operating license for STP, Units 1 and 2, will expire on August 20,2027, and December 15, 2028, respectively. STPNOC submitted its application for renewal of the STP, Units 1 and 2, operating licenses by letter dated October 25, 2010.
The NRC is gathering information for a STP, Units 1 and 2, site-specific supplement to its "Generic Environmental Impact Statement for License Renewal of Nuclear Plants" (GElS),
NUREG-1437. The supplement will contain the results of the review of the environmental impacts on the area surrounding the STP, Units 1 and 2, site that are related to terrestrial ecology, aquatic ecology, hydrology, cultural resources, and socioeconomic issues (among others) and will contain a recommendation regarding the environmental acceptability of the license renewal action. Provided for your information is the STP, Units 1 and 2, Site Layout (Enclosure 1) and Transmission Line Map (Enclosure 2).
J. Loera -2 The NRC will hold two public scoping meetings for the South Texas Project license renewal site-specific supplement to the GElS on March 2, 2011, at the Bay City Civic Center, Main Hall, Room 100,201 Seventh Street, Bay City, TX 77414. There will be two sessions to accommodate interested parties. The first session will convene at 1:30 p.m. and will continue until 3:30 p.m., as necessary. The second session will convene at 7:00 p.m., with a repeat of the overview portions of the meeting, and will continue until 9:00 p.m., as necessary.
Additionally, the NRC staff will host informal discussions one hour before the start of each session. To be considered, comments must be provided either at the transcribed public meetings or in writing. No formal comments on the proposed scope of the supplement to the GElS will be accepted during informal discussions.
The license renewal application is publicly available at the NRC Public Document Room (PDR),
located at One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, or from the NRC's Agencywide Documents Access and Management System (ADAMS). The ADAMS Public Electronic Reading Room is accessible at http://www.nrc.gov/reading-rm/adams/web-based.html. The accession number for the license renewal application is ML103010256. Persons who do not have access to ADAMS, or who encounter problems in accessing the documents located in ADAMS, should contact the NRC's Public Document Room reference staff by telephone at 1-800-397-4209, or 301-415-4737, or by e-mail at pdr.resource@nrc.gov.
The STP, Units 1 and 2, license renewal application is also available on the Internet at http://www.nrc.gov/reactors/operatingllicensing/renewallapplications/south-texas-project.html.
In addition, the Bay City Public Library, located at 1100 7th Street, Bay City, TX 77414, has agreed to make the application available for public inspection.
The GElS, which assesses the scope and impact of environmental effects that would be associated with license renewal at any nuclear power plant site, can also be found on the NRC's website or at the NRC's PDR.
Please submit any comments that the Ysleta del Sur Pueblo may have to offer on the scope of the environmental review by April 1, 2011. Written comments should be submitted by mail to the Chief, Rules, Announcements, and Directives Branch, Division of Administrative Services, Mail Stop TWB-05-B01M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
Electronic comments may be submitted to the NRC at http://www.regulations.gov referencing documents filed under Docket ID NRC-2010-0375. At the conclusion of the scoping process, the NRC staff will prepare a summary of the significant issues identified and the conclusions reached, and provide you a copy.
The NRC will issue the draft supplemental environmental impact statement (SEIS) for public comment (anticipated publication in 2012), and will hold another set of public meetings in the site vicinity to solicit comments on the draft. A copy of the draft SEIS will be sent to you for your review and comment. After consideration of public comments received on the draft, the NRC will prepare a final SEIS.
J. Loera -3 The issuance of the final SEIS for STP, Units 1 and 2, is planned for 2012. If you need additional information regarding the environmental review process, please contact Tam Tran, Environmental Project Manager, at 301-415-3617 or bye-mail at Tam.Tran@nrc.gov.
Sincerely, Bo M. Pham, Branch Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499
Enclosures:
As stated cc w/encls.: Distribution via Listserv
SITE LAYOUT
\ ';)
11~
<>
r'""!ltJ Ii!lwrart 1,"1.(-K.. . ,
r-- '~~1
- 1........... N It>gend f:;)Exclusion A.rea Boundary
'C"'"" Ior'
"" lexas
~J'J
--,~ "'+"""
'I
.
. '"
CSitt> Boundary
- I - Railroad
"\ Ic os 'I s
IMI~
LocalHoad Urban Arn STP Units. 1 and 2 Water License Renewal Environmental Report Figure 2.1-3: STP SUe Boundary ENCLOSURE 1
TRANSMISSION LINE MAP
'~
\2G'~, ,,~-\)( "".
\ (
-. ",....'....
".L'"J
'~-
....
--~
., /'
1
"",-:... "'..~
.,
" -
frlu.1;-f!;'-':':1 ""
.........\'.-'f:r
... - " " ,
.
1:
./
' ....
.~;t\+
,
,
,..."
, ..../
~/
M~MU\1>]l / ....-" Gililf Q f ,We"J'~Q r
./
/"
" - , . - - -.......
1". _' /
/'
~.
r-,
",+L tJ Legmd "'---....
!
o~rtm.llt{)fl>fl'_' ~. ~ Texas)
IJ S For..l SeotC& . ". .
n SOOU'lTGlIUIProJIleI
_Primary Road
-ll'lInlmI38ton Corrtdor
... SUllIilatlOll 1""" BU~B" or una Managemlll1t
~.~ 1-I.:S' 0
3 U.S, FIIIIII and WlldllfalBrvtea Bure.u or indIan AlTa1ra
, J '
I D 10
~~
- us:
M... I D OOUMy Soundary IIf!!I NatOflaI Pan S8f'IIIIC, I water STP Units 1 and 2 Ul!)3lIArfa License Renewal Environmental Report Figure 3,1-2: Trl.lIlsmission Corridors ENCLOSURE 2
J. Loera - 3 The issuance of the final SEIS for STP, Units 1 and 2, is planned for 2012. If you need additional information regarding the environmental review process, please contact Tam Tran, Environmental Project Manager, at 301-415-3617 or bye-mail at Tam.Tran@nrc.gov.
Sincerely, IRA!
Bo M. Pham, Branch Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499
Enclosures:
As stated cc w/encls.: Distribution via Listserv DISTRIBUTION:
See next page A.. _ ....... _ . - - - - - - . - - - . - - _ .... _ - - * * '" .~z::J' ..... _ . - - - - - - - - , _ . . . . ...,--_ .. - -----.-
OFFICE LA:DLR PM: DLR/RPB1 BC:DLR/RERB BC:DLR/RPB1 NAME SFigueroa TTran Almboden BPham DATE 01127/2011 01/28/2011 02/06/2011 02/09/2011 OFFICIAL RECORD COPY
Letter to Javier Loera from Bo M. Pham dated February 09. 2011
SUBJECT:
REQUEST FOR COMMENTS CONCERNING THE SOUTH TEXAS PROJECT.
UNITS 1 AND 2. LICENSE RENEWAL APPLICATION REVIEW DISTRIBUTION:
HARDCOPY:
DLR RtF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDraApla Resource RidsOgcMailCenter TTran CFells ICouret. PA MThadani. DORL GPick, RIV JDixon, RIV VDricks, RIV WMaier, RIV CTucci RCaniano, RIV DChamberlain, RIV EWilliamson,OGC