Letter Sequence Request |
|---|
|
|
MONTHYEARRS-09-133, Attachment 6, LaSalle, Unit 2, Nuclear Power Station Spent Fuel Storage Pool Criticality Safety Analysis with Neutron Absorbing Inserts and Without Boraflex2009-08-31031 August 2009 Attachment 6, LaSalle, Unit 2, Nuclear Power Station Spent Fuel Storage Pool Criticality Safety Analysis with Neutron Absorbing Inserts and Without Boraflex Project stage: Request ML0928102792009-10-0505 October 2009 License Amendment Regarding the Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks Project stage: Other ML0931705992009-12-0202 December 2009 Request for Withholding Information from Public Disclosure by Letter Dated 10/5/09 Project stage: Withholding Request Acceptance ML1009802092010-04-26026 April 2010 Request for Additional Information Related to License Amendment Request Regarding the Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks Project stage: RAI ML1011904862010-05-0303 May 2010 Notice of Meeting with Exelon, LaSalle, Units 1 and 2, to Discuss Response to Request for Additional Information License Amendment Request Regarding the Use of Neutron Absorbing Inserts in Spent Fuel Pool Storage Racks Project stage: RAI ML1016502292010-06-10010 June 2010 Additional Information Supporting License Amendment Request Regarding the Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks Project stage: Request ML1016103942010-06-10010 June 2010 E-mail Response to Eeeb AST RAI on June 10, 2010 Project stage: Request ML1016502862010-06-23023 June 2010 June 1, 2010, Summary of Meeting with Exelon Generation Co., LLC, on Responses to Request for Information License Amendment Request for the Use of Netco-SNAP-In Rack Inserts Project stage: RAI ML1028003592010-10-0707 October 2010 Notice of Public Meeting with Exelon Generation Company, LLC, Regarding LaSalle Netco Insert Request Project stage: Meeting ML1030004242010-10-28028 October 2010 Notice of Meeting with Exelon Genertion Company to Discuss the License Amendment Request to Allow Full Recovery of Spent Fuel Storage Rack Cells That Are Unusable Due to Boraflex Neutron Absorber Degradation Project stage: Meeting ML1032104992010-11-19019 November 2010 Request for Additional Information, Related to the Use of Neutron Absorbing Inserts Project stage: RAI ML1030704842010-11-19019 November 2010 Summary of Public Meeting with Exelon Generation Company, LLC Regarding LaSalle Netco Insert Request Project stage: Meeting ML1030903782010-11-19019 November 2010 Licensee Handouts for LaSalle Meeting with Exelon to Discuss Netco Inserts Project stage: Meeting RS-10-202, Additional Information Supporting License Amendment Request Re Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks2010-11-23023 November 2010 Additional Information Supporting License Amendment Request Re Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks Project stage: Request ML1034304232010-12-10010 December 2010 Request for Additional Information Related to the Use of Nuetron Absorbing Inserts Project stage: RAI RS-10-210, Additional Information Supporting License Amendment Request Regarding the Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks2010-12-14014 December 2010 Additional Information Supporting License Amendment Request Regarding the Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks Project stage: Request ML1034904622010-12-16016 December 2010 Notice of Meeting with Exelon Generation Company, LLC Regarding LaSalle Netco Insert Request Project stage: Meeting RS-10-216, Additional Information Supporting License Amendment Request Regarding the Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks2010-12-22022 December 2010 Additional Information Supporting License Amendment Request Regarding the Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks Project stage: Request ML1100503592010-12-29029 December 2010 NRC Meeting Slides for December 29, 2010, Public Conference Call with Exelon Generation Company Regarding LaSalle Netco Insert Request Project stage: Meeting ML1101300742011-01-11011 January 2011 Additional Information Supporting License Amendment Request Regarding the Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks Project stage: Request ML1100502552011-01-17017 January 2011 December 29, 2010, Summary of Public Conference Call with Exelon Generation Company, LLC, Regarding LaSalle Netco Insert Request Project stage: Other ML1101803312011-01-24024 January 2011 Proposed License Conditions Related to Use of Neutron Absorbers Project stage: Other RS-11-009, Additional Information Supporting License Amendment Request Regarding the Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks2011-01-24024 January 2011 Additional Information Supporting License Amendment Request Regarding the Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks Project stage: Request RS-11-014, Additional Information Supporting License Amendment Request Regarding the Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks2011-01-28028 January 2011 Additional Information Supporting License Amendment Request Regarding the Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks Project stage: Request ML1102500512011-01-28028 January 2011 Issuance of Amendments Concerning Spent Fuel Neutron Absorbers Project stage: Approval ML1104606172011-03-0404 March 2011 Request for Additional Inforamtion Related to the Use of Neutron Absorbing Inserts Project stage: Other RS-11-067, Response to Request for Additional Information Regarding Unit 2 Spent Fuel Pool Storage Racks2011-04-18018 April 2011 Response to Request for Additional Information Regarding Unit 2 Spent Fuel Pool Storage Racks Project stage: Response to RAI RS-11-109, Completion of License Condition 2.C.(30) Associated with Unit 2 Spent Fuel Pool Storage Racks2011-07-13013 July 2011 Completion of License Condition 2.C.(30) Associated with Unit 2 Spent Fuel Pool Storage Racks Project stage: Other ML1120301262011-08-0404 August 2011 Closure of Spent Fuel Pool Neutron Absorbers Inserts Project stage: Other RS-11-170, Completion of License Condition 2.C.(31) Associated with Unit 2 Spent Fuel Pool Storage Racks2011-10-20020 October 2011 Completion of License Condition 2.C.(31) Associated with Unit 2 Spent Fuel Pool Storage Racks Project stage: Other 2010-04-26
[Table View] |
Text
W W W.eXelonCOrp.COTT1 Exelon Generation 4300 Winfield Road Warrenvilie, IL 6o555 Exekn.
Nuclear RS-1 1-008 January 11, 2011 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-1 1 and NPF-1 8 NRC Docket Nos. 50-373 and 50-374
Subject:
Additional Information Supporting License Amendment Request Regarding the Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks
References:
1.
Letter from P. R. Simpson (Exelon Generation Company, LLC) to U.S. NRC, "License Amendment Regarding the Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks," dated October 5, 2009 2.
Letter from P. R. Simpson (Exelon Generation Company, LLC) to U.S. NRC, "Additional Information Supporting License Amendment Request Regarding the Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks," dated November 23, 2010 In Reference 1, Exelon Generation Company, LLC (EGC) requested an amendment to Facility Operating License Nos. NPF-1 1 and NPF-18 for LaSalle County Station (LSCS), Units 1 and 2, respectively. The proposed change revises Technical Specifications (TS) Section 4.3.1, "Criticality," to address a non-conservative TS. Specifically, the proposed change addresses the BORAFLEXTM degradation issue in the Unit 2 spent fuel storage racks by revising TS Section 4.3.1 to allow the use of NETCO-SNAP-IN rack inserts in Unit 2 spent fuel storage rack cells as a replacement for the neutron absorbing properties of the existing BORAFLEXTM panels.
In Reference 2, EGC provided a revised markup of the proposed Technical Specifications (TS) page that addressed information requested by the NRC. EGC recently identified an editorial change that is needed for proposed TS 4.3.1.1.a. Specifically, the proposed text to be inserted should end with a period. A revised markup of the proposed TS page is attached.
EGC has reviewed the information supporting a finding of no significant hazards consideration, and the environmental consideration, that were previously provided to the NRC in Attachment 1 of Reference 1. The additional information provided in this submittal does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards
January 11, 2011 U.S. Nuclear Regulatory Commission Page 2 consideration. In addition, the additional information provided in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.
There are no regulatory commitments contained in this letter. Should you have any questions concerning this letter, please contact Mr. Kenneth M. Nicely at (630) 657-2803.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 11th day of January 2011.
Respectfully, Patrick R. Simpson Manager - Licensing
Attachment:
Revised Markup of Proposed Technical Specifications Page cc:
NRC Regional Administrator, Region III NRC Senior Resident Inspector - LaSalle County Station Illinois Emergency Management Agency - Division of Nuclear Safety
ATTACHMENT Revised Markup of Proposed Technical Specifications Page LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 REVISED TECHNICAL SPECIFICATIONS PAGE 4.0-2
Design Features 4.0 LaSalle 1 and 2 4.0-2 Amendment No. 147/133 4.0 DESIGN FEATURES (continued) 4.3 Fuel Storage 4.3.1 Criticality 4.3.1.1 The spent fuel storage racks are designed and shall be maintained with:
- a.
keff 0.95 if fully flooded with unborated water, which includes an allowance for uncertainties as described in Section 9.1.2 of the UFSAR; and
- b.
A nominal 6.26 inch center to center distance between fuel assemblies placed in the storage racks.
4.3.2 Drainage The spent fuel storage pool is designed and shall be maintained to prevent inadvertent draining of the pool below elevation 819 ft.
4.3.3 Capacity The spent fuel storage pool is designed and shall be maintained with a storage capacity limited to no more than 3986 fuel assemblies for Unit 1 and 4078 fuel assemblies for Unit 2.
- c. For Unit 2 only, a neutron absorbing rack insert shall be installed in spent fuel storage rack cells prior to loading fuel assemblies in cells that cannot otherwise maintain the requirements of 4.3.1.1.a. The neutron absorbing rack inserts shall have a minimum certified 10B areal density greater than or equal to 0.0086 grams 10B/cm2.
- d. The combination of U-235 enrichment and gadolinia loading shall be limited to ensure fuel assemblies have a maximum k-infinity of 0.9185 for all lattices in the top of the assembly, a maximum k-infinity of 0.8869 for all lattices in the intermediate portion of the assembly, and a maximum k-infinity of 0.8843 for all lattices in the bottom of the assembly as determined at 4°C in the normal spent fuel pool in-rack configuration. The bottom, intermediate, and top zones are between 0"-96", 96"-126", and greater than 126" above the bottom of the active fuel.
- e. For Unit 2 only, at the interface between a non-insert rack module and an insert rack module of the spent fuel pool, the placement of inserts will be expanded one row and one column into the non-insert rack module as necessary to completely surround all assemblies in the insert rack module with four wings of an insert.
either: (1) Section 9.1.2 of the UFSAR, or (2) AREVA NP Inc. Report No. ANP-2843(P), "LaSalle Unit 2 Nuclear Power Station Spent Fuel Storage Pool Criticality Safety Analysis with Neutron Absorbing Inserts and Without Boraflex," Revision 1, dated August 2009, for the Unit 2 spent fuel storage racks with rack inserts.