Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARML1013700652010-05-14014 May 2010 Part 21 Reportable Condition Notification: Bent Fuel Spacer Flow Wing - GNF2 Fuel Project stage: Request ML1035001802010-12-15015 December 2010 License Amendment Request - Safety Limit Minimum Critical Power Ratio Change Project stage: Request ML1100600092011-01-0606 January 2011 Acceptance Review of Limerick Unit 2 Safety Limit Minimum Critical Power Ratio License Amendment Request Project stage: Acceptance Review ML1100605942011-01-18018 January 2011 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML1103304292011-02-0303 February 2011 Electronic Transmission, Draft Request for Additional Information Regarding Proposed Technical Specification Safety Limit Minimum Critical Power Ratio Changes Project stage: Draft RAI ML1103401732011-02-0404 February 2011 Request for Additional Information Regarding Proposed Technical Specification Safety Limit Minimum Critical Power Ratio Changes Project stage: RAI ML1104905722011-02-17017 February 2011 Response to Request for Additional Information Concerning the Safety Limit Minimum Critical Power Ratio Change License Amendment Request Project stage: Response to RAI ML1106103602011-03-0404 March 2011 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML1107701842011-03-17017 March 2011 Response to Request for Additional Information Concerning the Safety Limit Minimum Critical Power Ratio Change License Amendment Request Project stage: Response to RAI ML1108109282011-03-25025 March 2011 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML1107504462011-04-0505 April 2011 License Amendment, Safety Limit Minimum Critical Power Ration Changes Project stage: Other ML1110403432011-09-15015 September 2011 Correction Letter for Limerick Generating Station, Unit 2 - Safety Evaluation Regarding Safety Limit Minimum Critical Power Ratios Project stage: Approval 2011-02-03
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24026A2922024-01-26026 January 2024 Request for Additional Information Regarding Limerick Digital Instrumentation and Controls License Amendment Request ML23331A0062023-11-22022 November 2023 (External Sender) Supplement - Limerick Security Rule Exemption Request ISFSI Docket No. Reference ML23311A2412023-11-0707 November 2023 NRR E-mail Capture - NRC Notification to the Commonwealth of Pennsylvania Re. Limerick Generating Station, Units 1 and 2 Amendment - Control Room Ventilation System Technical Specifications ML23304A0192023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Limerick 1 & 2 - Exemption from Security Rule (L-2023-LLE-0026) ML23276B4642023-10-0303 October 2023 NRR E-mail Capture - NRC Request for Additional Information Limerick TSTF-477 LAR ML23255A2872023-09-12012 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative to Use the Successive Inspection Requirements of BWRVIP-75-A ML23248A1282023-09-0101 September 2023 NRR E-mail Capture - Action: Opportunity to Review and Comment on a New NRC Information Collection, 10 CFR Part 50.55a, Codes and Standards (3150-XXXX) ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23208A1942023-07-27027 July 2023 NRR E-mail Capture - Limerick Generating Station - Audit Plan for TSTF-477 LAR Review (L-2022-LLA-0174) ML23202A0682023-07-21021 July 2023 NRR E-mail Capture - NRC Request for Additional Information Re. TSTF-477 LAR ML23201A1262023-07-18018 July 2023 Additional RAIs for Limerick Generation Station, Units 1 and 2 - LAR and Exemption Request for Digital I&C Installation Support ML23173A0632023-06-20020 June 2023 RAIs for Limerick Generation Station, Units 1 and 2 - LAR and Exemption Request for Digital I&C Installation Support ML23102A1642023-04-12012 April 2023 Generation Station, Unit No. 2 Potential Emergent Relief Request for HPCI IST (EPID L-2023-LLR-0015) - Closure E-mail Dated 4/12/2023 ML23125A0522023-03-31031 March 2023 NRR E-mail Capture - Clean OL Pages for 50.69 LAR ML23089A1602023-03-30030 March 2023 NRR E-mail Capture - NRC Notification to the Commonwealth of Pennsylvania Re. Limerick Generating Station, Units 1 and 2 Amendment - Alternative 10 CFR 50.69 Categorization Approaches ML23086B9282023-03-27027 March 2023 Acceptance of Requested Licensing Action for License Amendment Request to Support Digital Modernization Project Installation ML23086A0822023-03-27027 March 2023 Acceptance of Requested Licensing Action for Exemption Request to Support Digital Modernization Project Installation ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML23060A1662022-12-20020 December 2022 Acceptance Review: Adopt TSTF-477, Revision 3-Acceptance Letter ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22172A0752022-06-17017 June 2022 Response: Review and Feedback on Draft Limerick Digital License Amendment Request (L-2020-LRM-0041) ML22136A0032022-05-13013 May 2022 NRR E-mail Capture - NRC Request for Additional Information - Limerick License Amendment Request (L-2021-LLA-0042) ML22124A2862022-05-0404 May 2022 Information Needed to Provide Substantive Feedback on Human Factors Engineering Supporting the Planned Limerick Digital I&C License Amendment Request ML22089A1172022-03-30030 March 2022 Additional Comments and Questions on Constellation'S March 31st Presentation ML22112A2152022-03-28028 March 2022 Limerick_Acceptance Review TS Change to Correct Nonconservative Technical Specification Table 3.3.3-1 ML22089A1162022-03-28028 March 2022 Comments and Questions on Constellation'S March 31st Presentation ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22034A0142022-02-0202 February 2022 NRR E-mail Capture - Audit Plan Supplement for LIM 50.69 LAR (L-2021-LLA-0042) ML22028A1832022-01-24024 January 2022 NRR E-mail Capture - Audit Plan Supplement for LIM 50.69 LAR (L-2021-LLA-0042) ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML22005A1812022-01-0505 January 2022 NRR E-mail Capture - Staff'S Questions Pertaining to Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting Slides December 7, 2021 ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21295A0362021-10-20020 October 2021 NRR E-mail Capture - Supplement to Limerick 50.69 Audit Plan Dated October 1, 2021 (L-2021-LLA-0042) ML21286A0302021-10-13013 October 2021 Staff'S Questions Pertaining to Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting Slides October 20, 2021 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21140A0842021-05-19019 May 2021 Acceptance of Requested Licensing Action Revision to Appendix C License Conditions in Accordance with the Requirements of 10 CFR 50.69 (E-mail) ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21111A0312021-04-20020 April 2021 Application to Modify 50.69 Categorization to Implement an Alternate Defense-in-Depth Categorization Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Tier 1 Categorization Process ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21070A0062021-03-10010 March 2021 Acceptance Review to Adopt TSTF-205-A Revision of Calibration, Channel Functional Test, and Related Definitions ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) 2024-01-26
[Table view] |
Text
From: Bamford, Peeter Sent: Thursday, Jaanuary 06, 2011 7:14 AM To: 'thomas.loom mis@exeloncorp.com' Cc: 'david.helker@exeloncorp.com'
Subject:
Acceptance Review of Limerick Unit 2 Safety Limit Minimum Critical Power Ratio Licensee Amendment Request (TAC No. ME5182)
By letter dated December 15, 2010 (ADAMS Accession No. ML103500180), Exelon Generation Company, LLC submitted a license amendment a request (LAR) for Limerick Generatin ng Station (LGS), Unit 2, proposing changes to o the Technical Specifications relating to the safetty limit minimum critical power ratios. The proposed p changes are based on the cycle speciffic analysis performed for the upcoming LGS, Unit 2, Cycle 12.
The purpose of this email is to provid de the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of thist amendment request. The acceptance review w was performed to determine if there is su ufficient technical information in scope and depth to allow the NRC staff to complete its detailed te echnical review. The acceptance review is also in ntended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory req quirements or the licensing basis of the plant.
The NRC staff has reviewed your ap pplication and concluded that it does provide techhnical information in sufficient detail to ena able the staff to proceed with its detailed technica al review and make an independent assessment regarding the acceptability of the proposed liccense amendment in terms of regulatory re equirements and the protection of public health and safety and the environment. If additional in nformation is needed for the staff to complete its ttechnical review, you will be advised by separrate correspondence.
Peter Bamford NRR/DORL/LPL 1-2 Limerick & TMI-1 Project Manager 301-415-2833