NRC Response to GDC 2, 4, and 5 One-PagerML090260039 |
Person / Time |
---|
Site: |
Nine Mile Point, Fermi, Summer, River Bend, Framatome, Callaway, Vogtle, Comanche Peak, Bellefonte, Victoria, Levy County, 05200012, 05200013, 05200017, Bell Bend, 05200006, 05200022, 05200023, 05200016, 05200024, 05200001, 05200021, 05200009, 05200002, 05200008, 05200003, 05200010, 05200011, 05200007, 05200004, Lee |
---|
Issue date: |
01/23/2009 |
---|
From: |
Bergman T NRC/NRO/DNRL |
---|
To: |
Bell R Nuclear Energy Institute |
---|
Bergman, T A., NRO/DNRL, 415-1158 |
Shared Package |
---|
ML090220497 |
List: |
---|
References |
---|
+reviewedmc |
Download: ML090260039 (1) |
|
Similar Documents at Nine Mile Point, Fermi, Summer, River Bend, Framatome, Callaway, Vogtle, Comanche Peak, Bellefonte, Victoria, Levy County, 05200012, 05200013, 05200017, Bell Bend, 05200006, 05200022, 05200023, 05200016, 05200024, 05200001, 05200021, 05200009, 05200002, 05200008, 05200003, 05200010, 05200011, 05200007, 05200004, Lee |
---|
Category:E-Mail
MONTHYEARML24312A1662024-11-0707 November 2024 Request for Additional Information (11/7/2024 E-mail) - LAR to Revise TSs to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3 ML24306A1422024-11-0101 November 2024 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Adopt Alternative Seismic Method for 50.69 Categorization of SSCs ML24309A0552024-11-0101 November 2024 NRR E-mail Capture - Request for Additional Information - TVA LAR to Revised Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 Re TS Table 3.3.2-1, Function 5 ML24305A0542024-10-31031 October 2024 Email Dated 10-31-24 from Ngarcia Santos (NRC) to Mrose (Inc), Final Signed Letter with Requests for Supplemental Information for the Model No. IR 100ST ML24304B0682024-10-30030 October 2024 Terrapower CP Env Docs - Batch 3 Information Needs Request ML24304B0562024-10-30030 October 2024 Acceptance of LAR to Revise TS to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML24304A8922024-10-30030 October 2024 Acceptance Review - Farley Units 1 and 2 - RG 1.183 Table 3 Footnote 11 Exception UFSAR Change LAR ML24304A3752024-10-29029 October 2024 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) to Revise Watts Bar Updated Final Safety Analysis Report (UFSAR) for Hydrologic Analysis ML24303A4052024-10-29029 October 2024 Email from Uusa Response to NRC Request for Further Clarification ML24304A8572024-10-29029 October 2024 Draft Request for Additional Information: Palisades Operating Final Safety Analysis Report RA-24-0276, EN 57402 - Catawba Nuclear Station Interim Part 21 Report2024-10-28028 October 2024 EN 57402 - Catawba Nuclear Station Interim Part 21 Report ML24302A0672024-10-25025 October 2024 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Revise Technical Specifications to Increase Safety/Relief Valve (S/Rv) Setpoints License Amendment Request (LAR) ML24303A3142024-10-25025 October 2024 Notification of Shearon Harris Nuclear Power Plant FEI and Information Request ML24298A0202024-10-24024 October 2024 NRR E-mail Capture - Braidwood Station, Units 1 and 2, Byron Station, Units 1 and 2, Relief Request I4R-19 and I4-26, Associated with the Fourth and Fifth Inservice Inspection Intervals ML24298A1382024-10-24024 October 2024 Final RAI for FitzPatrick JAFP-24-0047 (L-2024-LLA-0134) ML24298A1142024-10-23023 October 2024 Terrapower CP Env Docs - Subject Terrapower, LLC, Request for Confirmation of Information for Kemmerer Unit 1 Environmental Report Batch 1 Information Needs ML24297A6212024-10-22022 October 2024 Request for Additional Information Relief Request (RR) No. 72: Re-Submittal of RR-39/ASME Code X1 IWC-3420, IWA-3300 ML24296B2062024-10-22022 October 2024 Email Response to Oklos Request for Security Related Information ML24296A0652024-10-22022 October 2024 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - Verbal Authorization of Relief Request for the Proposed Alternative ANO2-RR-24-001 ML24296A0632024-10-22022 October 2024 NRR E-mail Capture - Acceptance Review Wolf Creek License Amendment and Exemption Requests for a risk-informed Resolution to GSI-191 ML24295A3712024-10-22022 October 2024 Approval of NAC Request for Withholding Information from Public Disclosure for the Submittal of NAC-MPC Amendment No. 9 and Revisions to Amendment Nos. 6, 7, and 8 ML24297A6042024-10-22022 October 2024 Acceptance Review - License Amendment Request to Revise TS SR 3.4.14.3 and Correct Admin Oversight ML24295A3622024-10-21021 October 2024 Request for Additional Information Quality Assurance Program to Support License Transfer Request ML24298A1602024-10-21021 October 2024 Acceptance Email for Aco’S Request to Extend HALEU Phase II Through June 30, 2025 ML24302A2682024-10-21021 October 2024 Email from Penn State University Dated 10/21/24 (Public) ML24292A0282024-10-18018 October 2024 NRR E-mail Capture - Acceptance Review Comanche Peak Adoption of TSTF-51, TSTF-471, and TSTF-571 ML24295A1762024-10-18018 October 2024 Press Release from X-Energy with Regard to New Funding to TRISO-X for the TRISO-X License Application Review ML24292A1582024-10-17017 October 2024 Email from Uusa Response to NRC Request for Clarification ML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24291A1072024-10-16016 October 2024 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia Generating Station - Application to Revise TS to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements - EPID L-2024-LLA-0132 ML24290A1572024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds (L-2024-LLR-0047) ML24296B1852024-10-16016 October 2024 NRR E-mail Capture - Final - Request for Additional Information - Columbia - Relief Request for Fourth Ten-Year Interval Inservice Testing - EPID: L-2024-LLR-0039 ML24220A2502024-10-15015 October 2024 Email to Ryan Joyce Re Decision on the Hatch Exemption ML24290A0442024-10-15015 October 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for September 2024 ML24289A2002024-10-15015 October 2024 NRR E-mail Capture - for Your Action - RAI - Proposed License Amendment Request (LAR) for Vogtle Electric Generating Plant, Units 3 and 4 TS 3.7.6 Action E and SR 3.7.6.5 (L-2024-LLA-0083) ML24289A1442024-10-15015 October 2024 NRR E-mail Capture - Acceptance Review - Entergy (Grand Gulf Nuclear Station and River Bend Station) - CNRO2024-00017 - Adopt TSTF-592 - CLIIP (L-2024-LLA-0133) ML24220A2472024-10-11011 October 2024 Email to Ryan Joyce Re Availability of EA-FONSI for Hatch Exemption ML24285A1682024-10-11011 October 2024 Email Response: LTR-24-0212 David Lochbaum Letter - Public Access to Advisory Committee on Reactor Safeguards Materials - Seabrook ASR ML24289A1962024-10-10010 October 2024 Email Dated October 10, 2024 from Wallace Taylor Indicating His Intention to Refile ML24289A2052024-10-0909 October 2024 E-mail with Responses to Clarification Questions on Response to Request for Additional Information on the Phase 1 Final Status Survey Reports ML24289A1952024-10-0909 October 2024 Follow-up Email Dated October 9, 2024 from the Office of the Secretary to Wallace Taylor Regarding the Filing Error ML24282A9732024-10-0808 October 2024 Temporary SW Piping LAR Acceptance Email ML24289A1942024-10-0808 October 2024 Email Dated October 8, 2024 from the Office of the Secretary to the Participants of the Palisades 50-255 & 72-007 LT-3 Proceeding Regarding Filing Error ML24282A6722024-10-0808 October 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24285A1902024-10-0808 October 2024 Email - Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Environmental Assessment ML24284A3182024-10-0808 October 2024 Response from Ohio NRC Request for Review of EA for Proposed Termination of License for Lead Cascade Facility ML24289A1932024-10-0808 October 2024 Email Dated October 9, 2024 from the Office of the Secretary to Wallace Taylor Regarding Filing Error ML24282A7042024-10-0808 October 2024 NRR E-mail Capture - Acceptance Reviews of Relief Requests Associated with the Fifth Inservice Inspection Interval at Byron and Braidwood Stations 2024-11-07 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Nine Mile Point]] OR [[:Fermi]] OR [[:Summer]] OR [[:River Bend]] OR [[:Framatome]] OR [[:Callaway]] OR [[:Vogtle]] OR [[:Comanche Peak]] OR [[:Bellefonte]] OR [[:Victoria]] OR [[:Levy County]] OR [[:05200012]] OR [[:05200013]] OR [[:05200017]] OR [[:Bell Bend]] OR [[:05200006]] OR [[:05200022]] OR [[:05200023]] OR [[:05200016]] OR [[:05200024]] OR [[:05200001]] OR [[:05200021]] OR [[:05200009]] OR [[:05200002]] OR [[:05200008]] OR [[:05200003]] OR [[:05200010]] OR [[:05200011]] OR [[:05200007]] OR [[:05200004]] OR [[:Lee]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Nine Mile Point]] OR [[:Fermi]] OR [[:Summer]] OR [[:River Bend]] OR [[:Framatome]] OR [[:Callaway]] OR [[:Vogtle]] OR [[:Comanche Peak]] OR [[:Bellefonte]] OR [[:Victoria]] OR [[:Levy County]] OR [[:05200012]] OR [[:05200013]] OR [[:05200017]] OR [[:Bell Bend]] OR [[:05200006]] OR [[:05200022]] OR [[:05200023]] OR [[:05200016]] OR [[:05200024]] OR [[:05200001]] OR [[:05200021]] OR [[:05200009]] OR [[:05200002]] OR [[:05200008]] OR [[:05200003]] OR [[:05200010]] OR [[:05200011]] OR [[:05200007]] OR [[:05200004]] OR [[:Lee]] </code>. |
Text
From: Thomas Bergman Sent: Friday, January 23, 2009 12:39 PM To: russ bell (rjb@nei.org)
Cc: David Matthews; Felicia Keith; Meena Khanna; Belkys Sosa; Eileen McKenna; Jeffrey Cruz; Joseph Colaccino; Larry Burkhart; Michael Norato; Mohammed Shuaibi; Stephanie Coffin
Subject:
NRC response to GDC 2, 4 and 5 one-pager In a December 19, 2008, email, you provided an industry position regarding the applicability of GDC's 2, 4 and 5 to the offsite power system (ML090220480). The staff agrees that GDCs 2 and 4 do not apply, and that GDC 5 would only apply where systems are shared among units.
The staff will clarfiy this position in an ISG and the next update to the SRP.
This email will be added to all appropriate dockets.
Thank you.
Tom Bergman Deputy Director for Licensing Operations Division of New Reactor Licensing Office of New Reactors (O) 301-415-1199 (C) 240-688-6527 E-mail Properties Mail Envelope Properties (BB882299B277DB4C9C9A613B507A6F6006A4A1269D)
Subject:
NRC response to GDC 2, 4 and 5 one-pager Sent Date: 1/23/2009 12:39:06 PM Received Date: 1/23/2009 12:39:06 PM From: Thomas Bergman Created By: Thomas.Bergman@nrc.gov Recipients:
rjb@nei.org (russ bell (rjb@nei.org))
Tracking Status: None David.Matthews@nrc.gov (David Matthews)
Tracking Status: None Felicia.Keith@nrc.gov (Felicia Keith)
Tracking Status: None Meena.Khanna@nrc.gov (Meena Khanna)
Tracking Status: None Belkys.Sosa@nrc.gov (Belkys Sosa)
Tracking Status: None Eileen.McKenna@nrc.gov (Eileen McKenna)
Tracking Status: None Jeffrey.Cruz@nrc.gov (Jeffrey Cruz)
Tracking Status: None Joseph.Colaccino@nrc.gov (Joseph Colaccino)
Tracking Status: None Larry.Burkhart@nrc.gov (Larry Burkhart)
Tracking Status: None Michael.Norato@nrc.gov (Michael Norato)
Tracking Status: None Mohammed.Shuaibi@nrc.gov (Mohammed Shuaibi)
Tracking Status: None Stephanie.Coffin@nrc.gov (Stephanie Coffin)
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 17335 1/23/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: