Category:Meeting Summary
MONTHYEARML24282A9072024-10-17017 October 2024 Summary of June 28, 2024, Pre-submittal Meeting with Arizona Public Service Company to Discuss a Planned License Amendment Request Changes to Technical Specifications 3.5.1 and 3.5.2 ML24271A3052024-10-0404 October 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss a LAR to Modify the TS 5.6.5 List of Allowable Methodologies for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML23258A1402023-09-27027 September 2023 Summary of August 31, 2023, Presubmittal Meeting with Arizona Public Service Company to Discuss Planned Submittal of License Renewal Commitment Regarding Alloy 600 Management Program Plan at Palo Verde Station, Units 1, 2, & 3 ML23150A1982023-06-0505 June 2023 Summary of 5/25/2023, Presubmittal Meeting with Arizona Public Service Company to Discuss ASME, Section XI Appendix L Alternate Approach to Pressurizer Surge Line Inspections at Palo Verde, Units 1, 2, and 3 ML23097A0692023-04-14014 April 2023 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment Request Regarding Containment Temperature and Safety Injection Tank Volume at Palo Verde Units 1, 2, and 3 ML23095A0932023-04-0606 April 2023 Summary of April 4, 2023, Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment Request to Adopt TSTF-266 at Palo Verde Nuclear Generating Station ML23072A0312023-03-14014 March 2023 March 1, 2023, Summary of Meeting with Arizona Public Service Company to Discuss Proposed 10 CFR 20.1703 and 20.1705 Requests to Use Supplied Air Suits at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML22314A2742022-11-15015 November 2022 October 27, 2022 Meeting with Arizona Public Service Company to Discuss Proposed LAR to Adopt TSTF-107, Revision 4, Separate Control Rods That Are Untrippable Versus Inoperable, for Palo Verde, Units 1, 2, & 3 ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22098A0322022-04-20020 April 2022 Summary of April 6, 2022, Public Meeting with Arizona Public Service Company to Discuss Upcoming License Amendment Request to Adopt Technical Specification Task Force Traveler TSTF-487 (EPID L-LRM-0025) ML21347A9522021-12-14014 December 2021 Summary of December 9, 2021, Public Meeting with Arizona Public Service Company to Discuss Upcoming LAR to Adopt TSTF-567, Add Containment TS to Address GSI-191 Issues for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML21333A0022021-12-0202 December 2021 Summary of Pre-Submittal Meeting with Arizona Public Service Company RIPE Exemption for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML21278A5462021-10-13013 October 2021 Summary of Meeting with Arizona Public Service Company to Discuss Relief Request No. 68 for Certain ASME Code Piping for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML21245A4152021-09-0808 September 2021 Summary of Public Meeting with Arizona Public Service Company to Discuss Upcoming Exemption to Eliminate Diverse Auxiliary Feedwater Actuation System Using Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station ML21168A2632021-06-24024 June 2021 Summary of June 16, 2021, Public Meeting with Arizona Public Service Company to Discuss Upcoming Relief Request No. 67, Extension of Containment Tendon Inservice Testing from 10 Years to 20 Years for Palo Verde Nuclear Generating Station, U ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21134A0002021-05-18018 May 2021 Summary of Public Meeting with Arizona Public Service Company to Discuss Upcoming Order License Transfer from Pnm to Salt River Project Agriculture Improvement and Power District for Palo Verde, Units 1 and 2 and the ISFSI ML21061A3202021-03-10010 March 2021 Summary of February 25, 2021, Public Meeting with Nuclear Energy Institute to Further Discuss the Inclusion of TSTF-425 Under the Risk-Informed Process for Evaluations Initiative ML21055A8502021-02-24024 February 2021 Public Meeting Summary ML21011A2742021-01-26026 January 2021 Summary of January 6, 2021, Public Meeting with Arizona Public Service Company to Discuss Upcoming LAR Regarding Containment Integrated Leak Rate Test Permanent Extension to 15 Years for Palo Verde Nuclear Generating Station, Units 1, 2, an ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML19219A6122019-08-13013 August 2019 Summary of July 11, 2019, Teleconference with APS to Discuss Proposed License Amendment Request to Revise the Emergency Plan for Palo Verde Nuclear Generating Station ML17353A1902017-12-29029 December 2017 Summary of 12/12/2017, Public Meeting with Arizona Public Service Company, on Proposed Relief Request 50 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML17003A0352017-01-0404 January 2017 Summary of Pre-Application Meeting with Arizona Public Service to Discuss a Proposed Second Emergency License Amendment Request to Revise Technical Specification 3.8.1, AC (Alternating Current) Sources - Operating, for Palo Verde Nuclear ML16088A0602016-04-15015 April 2016 3/24/16 Summary of Pre-application Meeting with Arizona Public Service Company to Discuss Next Generation Fuel License Amendment Request for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML16028A3942016-02-12012 February 2016 Summary of Prelicensing Meeting with Arizona Public Service Company to Discuss Next Generation Fuel License Amendment Request for Palo Verde, Units 1, 2, and 3 ML16011A0582016-01-21021 January 2016 Summary of Public Meeting Via Conference Call with Arizona Public Service Company Regarding Ongoing Resolution of Generic Letter 2004-02 for Palo Verde, Units 1, 2, and 3 ML15306A2352015-11-13013 November 2015 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Degraded Voltage Relay Setpoints License Amendment Request for Palo Verde, Units 1, 2, and 3 ML15286A0282015-10-23023 October 2015 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Revised Methodology for Spent Fuel Pool Criticality Analysis and Associated Technical Specification Changes for Palo Verde, Units 1, 2, and 3 (CAC MF6600-MF6602) ML15268A1312015-10-0505 October 2015 Summary of Public Meeting Via Conference Call with Arizona Public Service Company Regarding Ongoing Resolution of Generic Letter 2004-02 for Palo Verde, Units 1, 2, and 3 ML15239B3222015-09-0909 September 2015 Summary of Public Meeting Via Conference Call with Arizona Public Service Company Regarding Ongoing Resolution of Generic Letter 2004-02 for Palo Verde, Units 1, 2, and 3 ML15244B0772015-09-0101 September 2015 Summary of Annual Assessment Meeting with Arizona Public Service Regarding Palo Verde Nuclear Generating Station 2014 Performance ML15173A2892015-06-30030 June 2015 June 9, 2015, Summary of Category 1 Public Meeting with Arizona Public Service Company to Discuss Palo Verde Nuclear Generating Station Seismic Hazard Reevaluation Associated with Implementation of Japan Lessons-Learned NTTF Recommendation ML15140A3142015-06-16016 June 2015 Summary of Preapplication Meeting with Arizona Public Service Company to Discuss Revised Methodology for Spent Fuel Pool Criticality Analysis and Associated Technical Specification Changes for Palo Verde, Units 1, 2, and 3 (TAC MF5843-MF584 ML15117A0422015-04-29029 April 2015 Memorandum to File Summarizing 4/24/15 Telephone Conference Granting Verbal Relief for Relief Request 53, Request for Approval of an Alternative to ASME Code, Section XI, Requirements for Flaw Removal ML15078A0052015-03-25025 March 2015 Summary of 2/18/2015 Preapplication Meeting with Arizona Public Service Company to Discuss License Amendment Request for Palo Verde, Units 1, 2, and 3 on TSTF-505, Risk-Informed Technical Specifications ML14150A1772014-06-0202 June 2014 Summary of Conference Call Regarding Spring 2014 Steam Generator Tube Inspections ML14136A0582014-06-0202 June 2014 5/14/2014 Summary of Meeting with Arizona Public Service Company to Discuss Flooding Hazard Reevaluation Extension Request for Palo Verde, Units 1, 2, and 3; Near-Term Task Force Recommendation 2.1 ML14099A4692014-04-21021 April 2014 Summary of 4/2/2014 Pre-Application Meeting with Arizona Public Service Company to Discuss Extension of Authorized Repair to Palo Verde, Unit 3, Bottom Mounted Instrumentation to End-of-Unit Life ML13333B5742013-12-0505 December 2013 Summary of 11/1/2013 Conference Call Regarding the Fall 2013 Steam Generator Tube Inspections ML13330A5732013-12-0505 December 2013 Verbal Authorization of Relief Request 51, Alternative to ASME Code for Flaw Removal, Reactor Vessel Bottom-mounted Instrumentation Nozzle, Third 10-Year ISI Interval ML13312A5402013-11-18018 November 2013 11/5/2013 Summary of Preapplication Meeting to Discuss License Amendment Request to Incorporate Nuclear Energy Institute NEI-11-04 Quality Assurance Program at Palo Verde, Units 1, 2, and 3 ML13311B1832013-11-18018 November 2013 Summary of Meeting with Arizona Public Service Company to Discuss Non-destructive Examination Efforts, Repairs, and Progress on Root Cause Identified During Inspection of Bottom-Mounted Instrumentation Nozzles at Palo Verde, Unit 3 ML13234A0052013-08-26026 August 2013 8/21/2013 - Summary of Preapplication Meeting with Arizona Public Service Company Low Pressure Safety Injection Pump Single Failure Analysis for Minimum Required Refueling Water Tank Transfer Volume at Palo Verde, Units 1, 2, and 3 ML13203A0852013-08-0505 August 2013 Summary of Preapplication Meeting with Arizona Public Service Company to Discuss License Amendment Request Related to the Startup Test Activity Reduction Program at Palo Verde, Units 1, 2, and 3 (TAC Nos. MF1932-MF1934) ML13161A2522013-06-26026 June 2013 Summary of Conference Call with Arizona Public Service Company to Discuss Draft Requests for Additional Information for Palo Verde, Units 1, 2, and 3 NRC Order Number EA-12-049 Related to Mitigation Strategies (TAC Nos. MF0829-MF0831) ML13154A4502013-06-26026 June 2013 Summary of Meeting Via Conference Call with Arizona Public Service Co. to Discuss Palo Verde Request to Revise Technical Specifications; Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev 3 (TAC ME8160-ME816 ML13154A4322013-06-13013 June 2013 5/30/13 Summary of Conference Call with Arizona Public Service Company to Discuss Draft Requests for Additional Information for Palo Verde, Units 1, 2, and 3 NRC Order Number EA-12-049 Related to Mitigation Strategies (TAC Nos. MF0829-MF083 ML12244A2152012-09-20020 September 2012 8/30/2012 Summary of Meeting with Arizona Public Service Company to Discuss Relief Request 48 - Alternative to ASME Section III, Phased Array Ultrasonic Examination Techniques for Palo Verde, Units 1, 2, and 3 2024-09-27
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24297A6212024-10-22022 October 2024 Request for Additional Information Relief Request (RR) No. 72: Re-Submittal of RR-39/ASME Code X1 IWC-3420, IWA-3300 ML24257A1012024-09-11011 September 2024 Request for Additional Information License Renewal Commitment for AMP of Alloy 600 Components ML24143A1112024-05-20020 May 2024 Draft 2nd Round Request for RAIs Concerning LAR to Modify LCO for TS 3.5.2, LCO for TS 3.6.5, and Surveillance Requirements 3.5.1.2 and 3.5.2.2 for TS 3.5.1 and TS 3.5.2 ML24123A2002024-05-0101 May 2024 (E-Mail) Draft 2nd Round Request for Additional Information Concerning License Amendment Request to Modify Limiting Condition for Operation (LCO) for Technical Specification (TS) 3.5.2, LCO for TS 3.6.5, 3.5.1.2 and 3.5.2.2 for TS 3.5.1, a ML24114A2812024-04-19019 April 2024 Request for Additional Information (RAI-10150-R1) ML24011A1002024-01-10010 January 2024 March 2024 Emergency Preparedness Program Inspection - Request for Information ML23334A1612023-11-30030 November 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - RAIs Associated with License Renewal Commitment for Pressurizer Surge Line Welds Inspection Program to Manage Environmentally Assisted Fatigue ML23334A0072023-11-29029 November 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for LAR That Revises TSs 3.5.1, SITs - Operating; 3.5.2, SIT Shutdown; 3.6.5, Containment Air Temperature; and SRs for TS 3.5.1, SITs Operating ML23298A1232023-10-25025 October 2023 NRR E-mail Capture - Palo Verde, Unit 1 - RAIs for Relief Request 70, Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle ML23031A3392023-01-31031 January 2023 In-service Inspection Request for Information ML23013A0632023-01-13013 January 2023 NRR E-mail Capture - Palo Verde Unit 1 -Request for Additional Information - U1R23 Inspection Summary Report for Steam Generator Tubing ML22348A1672022-12-14014 December 2022 March 2023 Emergency Preparedness Exercise Inspection - Request for Information ML22339A2372022-12-0505 December 2022 NRR E-mail Capture - Palo Verde Unit 1 Request for Additional Information - U1R23 Inspection Summary Report for Steam Generator Tubing ML22272A3252022-09-29029 September 2022 Licensed Operator Positive Fitness-For-Duty Test Request for Additional Information ML22209A1752022-07-28028 July 2022 Inservice Inspection Request for Information ML22187A2632022-07-0606 July 2022 Notification of Inspection (NRC IR 05000528/2022004, 05000529/2022004 and 05000530/2022004) and Request for Information ML22067A2292022-03-0202 March 2022 Inservice Inspection Inspection PWR Request for Information ML22055A5842022-02-24024 February 2022 NRR E-mail Capture - Palo Verde, Unit 3 - Final RAIs for 22nd Refueling Outage (Spring 2021) Steam Generator Tube Inservice Inspection Report ML22035A3302022-02-10010 February 2022 Requests for Confirmation of Information for Exemption to Delete Diverse Auxiliary Feedwater Actuation System Based on Risk-Informed Process for Evaluations ML22025A4012022-01-0303 January 2022 March 2022 Emergency Preparedness Program Inspection - Request for Information ML21245A2222021-09-0101 September 2021 Request for Information ML21200A2392021-07-20020 July 2021 Docs Request AC - AA August 2021 ML21154A0082021-05-26026 May 2021 NRR E-mail Capture - Palo Verde 1, 2 and 3 - Official RAIs for LAR Associated with Permanent Extension of Containment ILRT Frequency to 15 Years (Type a) and CIV Leak Rate Test Frequency to 75 Months (Type C) ML21064A2372021-03-0303 March 2021 ISI Request for Information Rls ML21042B9692021-02-18018 February 2021 Notification of NRC Design Bases Assurance Inspection and Initial Request for Information ML21043A1462021-02-11011 February 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAI for an Order Associated with Indirect License Transfer from Public Service Company of New Mexico to Avangrid, Inc ML21023A0212021-01-13013 January 2021 PVNGS PI&R Request for Information RA ML21011A1972021-01-12012 January 2021 Unit 2, and Unit 3 - Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000528/2021012, 05000529/2021012 and 05000530/2021012) and Request for Information ML20227A0992020-08-14014 August 2020 Licensed Operator Positive Fitness-For-Duty Test Request for Additional Information ML20118D1362020-04-28028 April 2020 Licensed Operator Positive Fitness-For-Duty Test Request for Additional Information ML20049A0992020-02-14014 February 2020 Notification of Cyber Security Inspection (NRC Inspection Report 05000528/2020401; 05000529/2020401; and 05000530/2020401) and Request for Information ML20049A0252020-02-12012 February 2020 NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 1 - Official RAIs for License Amendment Request Associated with Changes to Emergency Plan Staffing Requirements ML20021A3172020-01-21021 January 2020 NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 1 - Official RAIs for Relief Request 64, Impractical Examinations for the Third 10-Year ISI Interval ML19317D0782019-11-13013 November 2019 NRR E-mail Capture - Palo Verde 1 - Requests for Additional Information on Unit 1 21st Refueling Outage Steam Generator Tube Inspection Report ML19234A3202019-08-29029 August 2019 Redacted - Request for Additional Information for Amendment and Exemption Request to Support the Implementation of Framatome High Thermal Performance Fuel (EPID L-2018-LLA-0194; EPID L-2018-LLE-0010) ML19155A1842019-05-30030 May 2019 NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 3 - Mvib Official RAIs for RR-63, Impractical Examinations for the Third 10-Year ISI Interval ML19095A6552019-04-0404 April 2019 NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 3 - Mphb Official RAIs for RR-63, Impractical Examinations for the Third 10-Year ISI Interval ML19044A7342019-02-13013 February 2019 NRR E-mail Capture - Palo Verde1, 2, and 3 - Official Requests for Additional Information for RR 62, Third and Fourth 10-Year ISI Intervals, Proposed Alternative - Pressurizer Heat Sleeve Repairs ML19008A3612019-01-0808 January 2019 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for LAR Associated with Response Time Testing of Pressure Transmitters ML18341A0252018-12-0303 December 2018 Notification of NRC Design Bases Assurance Inspection (Teams)(05000528/2019011, 05000529/2019011, and 05000530/2019011) and Initial Request for Information ML18271A0392018-10-0202 October 2018 Non Proprietary - Supplemental Information Needed for Acceptance of Requested License Amendments and Exemptions Implementation of Framatome High Thermal Performance Fuel (Epids L-2018-LLA-0194 and L-2018-LLE-0010) ML18221A5102018-08-23023 August 2018 Request for Additional Information License Amendment Request to Adopt Risk-Informed Completion Times (CAC Nos. MF6576, MF6577, and MF6578; EPID: L-2015-LLA-0001) ML18229A3132018-08-17017 August 2018 NRR E-mail Capture - Request for Additional Information Relief Request 58: Impractical Examinations for the Third 10-Year Inservice Inspection Interval Arizona Public Service Company Palo Verde Nuclear Generation Station, Unit 2 - Second Se ML18227A8672018-08-15015 August 2018 NRR E-mail Capture - Request for Additional Information Relief Request 58: Impractical Examinations for the Third 10-Year Inservice Inspection Interval Arizona Public Service Company Palo Verde Nuclear Generation Station, Unit 2 ML18124A0112018-05-0303 May 2018 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official Eeob RAIs for TSTF-505 (4b) LAR (CAC Nos. MF6576, MF6577, and MF6578; EPID L-2015-LLA-0001) ML18099A0072018-04-0606 April 2018 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for 10 CFR 50.69 LAR (CAC Nos. MF9971, MF9972, and MF9973; EPID L-2017-LLA-0276) ML18094B1122018-04-0404 April 2018 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Final RAIs for TSTF-505 (Initiative 4b) LAR (CAC Nos. MF6576, MF6577, and MF6578: EPID L-2015-LLA-0001) ML18066A7032018-03-0707 March 2018 Notification of Nrc Design Bases Assurance Inspection (Programs) 05000528/2018011, 05000529/2018011, and 05000530/2018011 Initial Request for Information ML17248A0162017-08-31031 August 2017 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Final RAI for RRs PRR-03, PRR-04 and PRR-05, Pump Testing ML17107A0052017-04-14014 April 2017 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Ngf LAR and Exemption RAIs (CAC Nos. MF8076 to MF8081) 2024-09-11
[Table view] |