UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 1, 2010 Mr. Larry Meyer Site Vice-President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2

Dear Mr. Meyer:

On August 4, 2010, the NRC staff completed its performance review of the Point Beach Nuclear Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2009, through June 30, 2010. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information.

A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at Point Beach Nuclear Plant Units 1 and 2 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

L. Meyer In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9618 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27

Enclosure:

Point Beach Nuclear Plant Inspection/Activity Plan cc w/encl: Distribution via ListServ

L. Meyer In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9618 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27

Enclosure:

Point Beach Nuclear Plant Inspection/Activity Plan cc w/encl: Distribution via ListServ DISTRIBUTION:

See next page DOCUMENT NAME: G:\Branch TSS\ALL MOC\midcycle 2010 to 2011\midcycle letters\PB 2010 MOC Letter.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME PCardona-Morales MKunowski for Jandovitz:dtp:cs DATE 08/26/10 08/26/10 OFFICIAL RECORD COPY

Letter to L. Meyer from M. Kunowski dated September 1, 2010

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

POINT BEACH NUCLEAR PLANT DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-1 RidsNrrPMPointBeach RidsNrrDirslpab Resource Steven Reynolds Steven Orth Jared Heck Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource

Point Beach Inspection / Activity Plan 09/01/2010 - 12/31/2011 Planned Dates No. of Staff Start End Inspection Activity Title on Site STRIKE - STRIKE CONTINGENCY - OPS/MAINT/RP/ 1 07/16/2010 09/15/2010 IP 92709 Licensee Strike Contingency Plans BI EP - EP EXERCISE INSPECTION / PI VERIFICATION 3 10/25/2010 10/29/2010 IP 7111401 Exercise Evaluation 10/25/2010 10/29/2010 IP 71151-EP01 Drill/Exercise Performance 10/25/2010 10/29/2010 IP 71151-EP02 ERO Drill Participation 10/25/2010 10/29/2010 IP 71151-EP03 Alert & Notification System BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 10/25/2010 10/29/2010 IP 71124.05 Radiation Monitoring Instrumentation UPRATE - POWER UPRATE - FAC/EC NON-OUTAGE PORTION 1 01/24/2011 01/28/2011 IP 71004 Power Uprate UPRATE - POWER UPRATE FAC/EC OUTAGE PORTION 1 03/01/2011 04/04/2011 IP 71004 Power Uprate BI ENG - INSERVICE INSPECTION - UNIT 2 & UPRATE 1 03/01/2011 05/14/2011 IP 71004 Power Uprate 03/01/2011 05/14/2011 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 03/14/2011 03/18/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 04/04/2011 04/08/2011 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation OL PREP - POINT BEACH INIT PREP - 02/2011 3 04/04/2011 04/08/2011 W90233 OL - INITIAL EXAM - MAR 2011 - POIN OL EXAM - POINT BEACH INIT EXAM - 03/2011 3 04/25/2011 05/06/2011 W90233 OL - INITIAL EXAM - MAR 2011 - POIN ISFSI - ISFSI INSPECTION - SCHEDULE DEPENDENT 2 06/01/2011 06/30/2011 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 06/06/2011 06/10/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 06/06/2011 06/10/2011 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 06/06/2011 06/10/2011 IP 71151-BI01 Reactor Coolant System Activity 06/06/2011 06/10/2011 IP 71151-OR01 Occupational Exposure Control Effectiveness 06/06/2011 06/10/2011 IP 71151-PR01 RETS/ODCM Radiological Effluent BI PI&R - BIENNIAL PI&R INSPECTION 3 06/27/2011 07/15/2011 IP 71152B Identification and Resolution of Problems

Point Beach Inspection / Activity Plan 09/01/2010 - 12/31/2011 Planned Dates No. of Staff Start End Inspection Activity Title on Site BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 07/10/2011 07/14/2011 IP 71124.02 Occupational ALARA Planning and Controls BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 07/18/2011 07/22/2011 IP 71124.07 Radiological Environmental Monitoring Program BI ENG - COMPONENT DESIGN BASIS INSPECTION 5 08/01/2011 09/02/2011 IP 7111121 Component Design Bases Inspection BI OL - BIENNIAL REQUAL PROGRAM INSPECTION 2 08/08/2011 08/12/2011 IP 7111111B Licensed Operator Requalification Program BI EP - EP ROUTINE INSPECTION / PI VERIFICATION 2 09/12/2011 09/16/2011 IP 7111402 Alert and Notification System Testing 09/12/2011 09/16/2011 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 09/12/2011 09/16/2011 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 09/12/2011 09/16/2011 IP 71151-EP01 Drill/Exercise Performance 09/12/2011 09/16/2011 IP 71151-EP02 ERO Drill Participation 09/12/2011 09/16/2011 IP 71151-EP03 Alert & Notification System BI ENG - INSERVICE INSPECTION - U1 & UPRATE 1 10/03/2011 12/18/2011 IP 71004 Power Uprate 10/03/2011 12/18/2011 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 10/24/2011 10/28/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 10/24/2011 10/28/2011 IP 71124.04 Occupational Dose Assessment 10/24/2011 10/28/2011 IP 71124.05 Radiation Monitoring Instrumentation