Notification of an NRC Triennial Heat Sink Performance Inspection and Gas Accumulation Management Temporary Inspection; and Request for Information Regarding 05000454-10-005; 05000455-10-005
ML102380199
Person / Time
Site: Byron  Constellation icon.png
Issue date: 08/25/2010
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
References
Download: ML102380199 (11)


See also: IR 05000454/2010005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE ROAD, SUITE 210

LISLE, IL 60532-4352

August 25, 2010

Mr. Michael J. Pacilio

Senior Vice President, Exelon Generation Company, LLC

President and Chief Nuclear Officer (CNO), Exelon Nuclear

4300 Winfield Road

Warrenville IL 60555

SUBJECT:

BYRON STATION - NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK

PERFORMANCE INSPECTION AND GAS ACCUMULATION

MANAGEMENT TEMPORARY INSPECTION; AND REQUEST FOR

INFORMATION 05000454/2010005; 05000455/2010005

Dear Mr. Pacilio:

On November 15, 2010, the NRC will begin the on-site portion of the Triennial Heat Sink

Performance Inspection and the Gas Accumulation Management in Emergency Core Cooling,

Decay Heat Removal, and Containment Spray Systems Temporary Instruction at your Byron

Station. These inspections will be performed in accordance with NRC baseline inspection

procedure (IP) 71111.07, and temporary instruction (TI) 2515/177, respectively.

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

documents have been divided into three groups.

The first group lists information necessary for our initial inspection scoping activities. This

information should be available to the lead inspector no later than September 30, 2010.

By October 7, 2010, the inspector will communicate the initial selected set of

approximately 2-3 risk significant heat exchangers for IP 71111.07 and the initial selected

samples for TI 2515/177.

The second group of documents requested, are those items needed to support our in-

office preparation activities. This set of documents should be available at the Regional

Office no later than November 4, 2010. This information should be separated by

inspection and by component, especially if provided electronically (e.g., folder with

component name that includes calculations, condition reports, maintenance history, etc.).

During the in-office preparation activities, the inspector may identify additional information

needed to support the inspection.

The last group includes the additional information above as well as plant specific reference

material. This information should be available to the inspector on November 15, 2010. It

is also requested that corrective action documents and/or questions developed during the

inspection be provided to the inspector as the documents are generated.

M. Pacilio

-2-

It is important that these documents be as complete as possible, in order to minimize the

number of documents requested during the preparation week or during the on-site inspection.

If no activities were accomplished associated with a specific request, then provide a statement

indicating that the request is not applicable.

The lead inspector for this inspection is Caroline Tilton. If there are questions about the material

requested, or the inspection, please call Mrs. Tilton at (630) 829-9718. Please send the

information to the following e-mail address HUcaroline.tilton@nrc.govUH. A hard-copy with the

required information is also an acceptable option.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA by C. Tilton Acting For/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-454; 50-455

License Nos. NPF-37; NPF-66

Enclosures:

1.

Triennial Heat Sink Inspection Document Request

2.

Temporary Inspection Document Request, Management of Gas Accumulation in

Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems

cc w/encl:

Distribution via ListServ

TRIENNIAL HEAT SINK INSPECTION DOCUMENT REQUEST

1

Enclosure 1

UInspection ReportU:

05000454/2010-005; 05000455/2010-005

UInspection DatesU:

November 15 - 19, 2010, and November 29 - December 3, 2010

UInspection ProcedureU:

IP 71111.07, Triennial Heat Sink Performance Inspection

UInspectors:U

Caroline Tilton (Lead)

(630) 829-9718

HUcaroline.tilton@nrc.govU

Michael Jones

(630) 829-9745

HUmichael.jones@nrc.govU

I.

Information Requested By September 30, 2010

1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk-significance.

2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat

exchanger.

3. List of corrective action program documents (with a short description) associated

with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat

exchanger testing, for the previous two years or since the last Triennial Heat Sink

Inspection.

4. Copy of any self-assessment done on any of GL 89-13 heat exchangers.

5. System health report(s) and maintenance rule system notebooks for all the GL 89-13

heat exchangers.

II.

Information Requested By November 4, 2010

1. For the specific heat exchangers selected:

a. Copies of the two most recent completed tests confirming thermal performance

for those heat exchangers which are performance tested;

b. Copy of system description and design basis document for the heat exchangers

(as applicable);

TRIENNIAL HEAT SINK INSPECTION DOCUMENT REQUEST

2

Enclosure 1

c. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the operation for

the selected heat exchangers;

d. Copy of the Updated Final Safety Analysis Report (UFSAR) sections applicable for

each heat exchanger; and

e. Provide a list of calculations with a description which currently apply to each heat

exchanger.

2. A schedule of all inspections, cleanings, maintenance, or testing of any plant heat

exchanger to be done during the on-site portion of the inspection.

3. Copies of procedures developed to implement the recommendations of GL 89-13, e.g.,

the GL 89-13 Heat Exchanger Program description.

4. Updated Final Safety Analysis Report pages for the GL 89-13 Heat Exchanger

Program.

5. Maximum Cooling Water system inlet temperature limit that still allows full licensed

power operation of the nuclear reactor. Please provide the document that states this

limit (e.g., USAR or TRM) and the operating procedure that ensures this limit is not

exceeded.

III.

Information Requested to be Available on First Day of Inspection, November 15, 2010

1. For the specific heat exchangers selected:

a. Provide the Design Basis Documents and Updated Final Safety Analysis Report

pages for the selected heat exchangers;

b. Copy of the design specification and heat exchanger data sheets for each heat

exchanger;

c. Copy of the vendor manuals including component drawings for each heat

exchanger;

d. Copy of the calculation which establishes the limiting (maximum) design basis heat

load which is required to be removed by each of these heat exchangers;

e. Copy of the calculation which correlates surveillance testing results from these

heat exchangers with design basis heat removal capability (e.g., basis for

surveillance test acceptance criteria);

f.

Copy of the calculations or documents which evaluate the potential for water

hammer or excessive tube vibration in the heat exchanger or associated piping.

TRIENNIAL HEAT SINK INSPECTION DOCUMENT REQUEST

3

Enclosure 1

g. List of engineering-related Operator Workarounds/Temporary Modifications for

these heat exchangers since the last Heat Sink Performance;

h. Copy of the evaluations of data for the two most recent completed tests

confirming the thermal performance of each heat exchanger;

i.

Documentation and procedures that identify the types, accuracy, and location of

any special instrumentation used for the two most recently completed thermal

performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow

instruments or temperature instruments). Include calibration records for the

instruments used during these tests;

j.

Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers;

k. Copies of the documents that verify the structural integrity of the heat exchanger,

e.g., eddy current summary sheets, ultrasonic testing results, and visual

inspection results;

l.

The cleaning and inspection maintenance schedule for each heat exchanger for

the next five years;

m. Copy of the document describing the inspection results for the last two clean and

inspection activities completed on each heat exchanger;

n. Copy of the document which identifies the current number of tubes in service for

each heat exchanger and the supporting calculation which establishes the

maximum number of tubes which can be plugged in each heat exchanger;

o. Copy of the document establishing the repair criteria (plugging limit) for degraded

tubes which are identified in each heat exchanger; and

p. Information regarding any alarms which monitor on-line

performance.

2. For the safety-related service water system (or equivalent):

a. Copies of any design changes performed on the system;

b. Copies of procedures for a loss of service water system;

c. Copies of inspections and/or maintenance related to macro-fouling (silt, dead

mussel shells, debris, etc.) and aquatic life such as fish, algae, grass, or kelp;

d. Copies of inspections and/or maintenance related to preventing biotic fouling;

e. Copies of procedures and/or test results to survey or monitor interface valves

between the safety-related section of the service water system and the

non-safety-related section;

TRIENNIAL HEAT SINK INSPECTION DOCUMENT REQUEST

4

Enclosure 1

f.

History of any thru wall pipe leak on the system; and

g. Copies of evaluations for strong-pump vs. weak-pump interaction.

If the information requested above will not be available, please contact the lead inspector.

TEMPORARY INSTRUCTION 2515/177 REQUEST FOR INFORMATION DOCUMENTS

1

Enclosure 2

UInspection ReportU:

05000454/2010005; 05000455/2010005

UOnsite Inspection DatesU:

November 15 - 19, 2010, and November 29 - December 3, 2010

UInspection ProcedureU:

TI 2515/177, Management of Gas Accumulation in Emergency

Core Cooling, Decay Heat Removal, and

Containment Spray Systems

UInspectorsU:

Caroline Tilton (Lead)

(630) 829-9718

HUcaroline.tilton@nrc.govU

Michael Jones

(630) 829-9745

HUmichael.jones@nrc.govU

I

Information Requested By September 30, 2010

1.

Copy of the station response to Generic Letter (GL) 2008-01 and any supplemental

report.

2.

Copies of all the requests for additional information (RAIs) and the associated

responses.

3.

List of corrective action program documents (with a short description) associated

with GL 2008-01, voids in piping, and pressure transients for the previous three

years.

4.

List of the suction piping sections identified as susceptible to gas accumulation (the

list should identify the corresponding system).

5.

List of the discharge piping sections identified as susceptible to gas accumulation

(the list should identify the corresponding system).

6.

List of changes (with a short description and tracking number) to the Final Safety

Evaluation Report (FSAR), Technical Specifications, Technical Specification

Bases, and Technical Requirement Manual associated with the resolution of

GL 2008-01.

7.

List of calculations that have been change or created in response to GL 2008-01

(with a short description of the calculation and the change).

8.

Copies of self-assessments associated with the implementation of the GL 2008-01

program.

TEMPORARY INSTRUCTION 2515/177 REQUEST FOR INFORMATION DOCUMENTS

2

Enclosure 2

II

Information Requested By November 4, 2010

1.

Copies of program documents and procedures developed to implement the

resolution of GL 2008-01.

2.

Copies of the selected corrective action program documents.

3.

Copies of the selected licensing and design basis document changes.

4.

Copies of isometric drawings of the subject systems (hard-copies are preferred).

5.

Copies of piping and instrumentation diagrams (P&IDs) of the subject systems

6.

(hard-copies are preferred).

7.

List of commitments (with a description) in response to GL 2008-01.

8.

List of actions that were completed in response to GL 2008-01.

9.

Copies of all the corrective actions identified in the nine-month response and

supplemental reports.

10. List (with a short description) of gas intrusion mechanisms that apply to the plant and

the affected system locations (e.g., identify the source, conditions, and expected

void locations).

11. Design basis documents of the subject systems (i.e., emergency core cooling, decay

heat removal, and containment spray systems).

12. Design basis documents of keep-full systems of the subject systems.

13.

If available, electronic copies of the current Technical Specifications, Technical

Specifications Basis, Final Safety Analysis Report, and Technical Report Manual.

III

Information Requested to be Available on First Day of Inspection, November

15, 2010

1.

Copies of surveillance procedures associated with the resolution of GL 2008-01 and

the results of the last two surveillances for the subject systems.

2.

Copies of the modification packages for hardware modifications as part of the

resolution of GL 2008-01.

3.

Copies of the selected calculations.

4.

Copies of procedures use for detecting and determining void volumes.

5.

Copies of procedures use for filling and venting.

TEMPORARY INSTRUCTION 2515/177 REQUEST FOR INFORMATION DOCUMENTS

3

Enclosure 2

6.

Subject systems walkdown work documents associated with the resolution of

GL 2008-01 and the results of these walkdowns.

7.

Copies of the engineering evaluations performed for all identified voids.

8.

Copies of trends of periodic venting results.

9.

Copy of the design change review checklist that establish if a design change

introduces or increases the potential for gas accumulation beyond established

acceptance criteria.

10. Copies of training documents that ensure that personnel are aware of gas-related

concerns.

11. Copy of the void transport analysis.

12. Basis for the void acceptance criteria (e.g., calculation). If applicable, provide the

justification for any deviation from the void acceptance criteria established by the

Office of Nuclear Reactor Regulations (NRR).

13. Basis for horizontal pipe acceptance criteria (e.g., calculation).

14.

Copy of vortexing calculations associated with systems under the scope of

GL 2008-01.

15. If applicable, provide a list of inaccessible locations where plant walkdowns of the

subject systems have not been completed. Include an explanation of why each

area is considered inaccessible.

If you have questions regarding the information requested, please contact the lead inspector.

M. Pacilio

-2-

It is important that these documents be as complete as possible, in order to minimize the number of

documents requested during the preparation week or during the on-site inspection.

If no activities were accomplished associated with a specific request, then provide a statement indicating

that the request is not applicable.

The lead inspector for this inspection is Caroline Tilton. If there are questions about the material

requested, or the inspection, please call Mrs. Tilton at (630) 829-9718. Please send the information to

the following e-mail address HUcaroline.tilton@nrc.govUH. A hard-copy with the required information is also an

acceptable option.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements

were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not

conduct or sponsor, and a person is not required to respond to, a request for information or an

information collection requirement unless the requesting document displays a currently valid Office of

Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure

will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Sincerely,

/RA by C. Tilton Acting for/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-454; 50-455

License Nos. NPF-37; NPF-66

Enclosures:

1.

Triennial Heat Sink Inspection Document Request

2.

Temporary Inspection Document Request, Management Of Gas Accumulation In Emergency Core

Cooling, Decay Heat Removal, And Containment Spray Systems

cc w/encl:

Distribution via ListServ

UDISTRIBUTIONU:

See next page

DOCUMENT NAME: G:\\DRS\\Work in Progress\\Ltr 082510 Byron TI-2515-177 RFI CET.docx

9 Publicly Available

9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive

To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy

OFFICE

RIII

RIII

NAME

CTilton:ls

CTilton for AMStone

DATE

08/25/10

08/25/10

OFFICIAL RECORD COPY

Letter to Mr. Michael Pacilio from Ms. Ann Marie Stone dated August 25, 2010.

SUBJECT:

BYRON STATION - NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK

PERFORMANCE INSPECTION AND GAS ACCUMULATION

MANAGEMENT TEMPORARY INSPECTION; AND REQUEST FOR

INFORMATION 05000454/2010005; 05000455/2010005

UDISTRIBUTIONU:

Susan Bagley

RidsNrrDorlLpl3-2 Resource

RidsNrrPMByron Resource

RidsNrrDirsIrib Resource

Steven Reynolds

Steven Orth

Jared Heck

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Patricia Buckley

Tammy Tomczak

ROPreports Resource