Acceptance Review for Implementation of EAL Schemes
ML102320419
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/26/2010
From: Mahesh Chawla
Division of Operating Reactor Licensing
To:
Entergy Nuclear Operations
Chawla M, NRR/DORL, 415-8371
References
NEI 99-01, TAC ME3977
Download: ML102320419 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 August 26, 2010 Vice President, Operations Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530

SUBJECT:

PALISADES NUCLEAR PLANT - ACCEPTANCE REVIEW FOR IMPLEMENTATION OF EMERGENCY ACTION LEVEL SCHEMES DEVELOPED FROM NEI 99-01, REVISION 5 (TAC NO. ME3977)

Dear Sir or Madam:

By letter to the Nuclear Regulatory Commission (!\IRC) dated May 6, 2010 (Agencywide Documents Access and Management System (ADAMS) (non-public) Accession No. ML101440477), Entergy Nuclear Operations, Inc. (ENO, the licensee), submitted a request for NRC review and approval of revisions to the Emergency Plan (EP) Emergency Action Levels (EALs) for the subject plant. The proposed EP changes would incorporate EALs based on the NRC-endorsed methodology Nuclear Energy Institute (NEI) 99-01, Revision 5, "Methodology for Development of Emergency Action Levels," dated February 22,2008 (ADAMS Accession No. ML080450149).

By memo dated July 9,2010 (ADAMS Accession No. ML101890434), the NRC staff concluded that an entire revision from NE199-01, Rev. 4 to Rev. 5 is an EAL scheme change that requires prior NRC review and approval per Appendix E to 10 CFR Part 50. Specifically, EAL scheme changes require approval pursuant to 10 CFR Part 50, Appendix E, Section IV(B)( 1). In accordance with the requirements of 10 CFR Part 50, Appendix E, Section IV(B)(1), the licensee requested NRC staff review and approval to adopt EALs based on NEI 99-01, Rev. 5. The existing EAL scheme for the subject facility is the NEI 99-01, Rev. 4 methodology.

The purpose of this letter is to provide the results of the NRC staffs acceptance review of the proposed changes to the EP EALs. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application, and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review, and make an independent assessment regarding the acceptability of the proposed changes in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

-2 If you have any questions regarding this matter, I may be reached at 301-415-8371.

Sincerely, 1

, /i .....

Li~' Lt.'! I}{L-**-

Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255 cc: Distribution via ListServ