2010 Dresden Nuclear Power Station Initial Examination Outline Submittal
ML102250246
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 03/08/2010
From:
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML093130397 List:
References
Download: ML102250246 (24)


Text

2010 DRESDEN NUCLEAR POWER STATION INITIAL EXAMINATION OUTLINE SUBMITTAL

15M Exelon Generation Company, LLC Dresden Nuclear Power Station www exeloncorp corn Nuclear 6500 North Dresden Road Morris, IL 60450-9765 November 13,2009 SVPLTR: #09-0051 Regional Administrator, Region 111 U. S. Nuclear Regulatory Commission 2443 Warrenville Road Lisle, IL 60532-4352 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 Docket Nos. 50-237 and 50-249

Subject:

Submittal of Initial Operator Licensing Examination Outlines Enclosed are the examination outlines supporting the Initial License Examination at Dresden Nuclear Power Station. The examinations are scheduled for the weeks of March 08, 201 0 through March 19, 2010.

This submittal includes all appropriate Examination Standard forms and outlines in accordance with NUREG-1021, Operator Licensing Examination Standards, revision 9 supplement 1.

In accordance with NUREG 1021 , Revision 9, supplement 1, Section ES-201, Initial Operator Licensing Examination Process, please ensure that these materials are withheld from public disclosure until after the examinations are complete.

Should you have any questions concerning this letter, please contact Ms. Marri Marchionda, Regulatory Assurance Manager, at 815-416-2800. For questions concerning examination outlines, please contact Mr. Frank Ferrero at 81 5-416-2620.

Respectfully.

Tim Hanley Site Vice President Dresden Nuclear Power Station NOV 0 6 ZOO9

Enclosures:

(Hand delivered to Chief Examiner Region I l l )

Examination Security Agreements (Form ES-201-3)

Administrative Topics Outline (Form ES-301-1)

Control Room/ln-Plant Systems Outline (Form ES-301-2)

BWR Examination Outline (Forms ES-401-1)

Generic Knowledge and Abilities Outline (Tier 3) (Form ES-401-3)

Scenario Outlines (Form ES-D-1)

Record of Rejected WAS (Form ES-401-4)

Examination Outline Quality Checklist (Form ES-201-2)

Transient and Event Checklist (Form ES-301-5) cc: (without enclosures)

Chief, NRC Operator Licensing Branch NRC Senior Resident Inspector - Dresden Nuclear Power Station

ES-201 Examination Outline Quality Checklist Form ES-201-2 Facility: Dresden Date of Examination: 3/8/10

~ ~~

Initials Item Task Description 1.

a. Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401.

R b. Assess whether the outline was systematically and randomly prepared in accordance with I Section D.l of ES-401 and whether all K/A categories are appropriately sampled.

T T C. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.

L N I d. Assess whether the justifications for deselected or rejected K/A statements are appropriate.

a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications,
r. and major transients.

1 b. Assess whether there are enough scenario sets (and spares) to test the projected number and mix of applicants in accordance with the expected crew composition and rotation schedule without compromising exam integrity, and ensure that each applicant can be tested using

, at least one new or significantly modified scenario, that no scenarios are duplicated from the applicants audit test(s), and scenarios will not be repeated on subsequent days.

C. To the extent possible, assess whether the outline(s) conform(s) with the qualitative and quantitative criteria specified on Form ES-301-4 and described in Appendix D.

3. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:

4)the outline(s) contain(s) the required number of control room and in-plant tasks w distributed among the safety functions as specified on the form

/ <2) task repetition from the last two NRC examinations is within the limits specified on the form T (3) no tasks are duplicated from the applicants audit test(s) q4) the number of new or modified tasks meets or exceeds the minimums specified on the form 4 5 ) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form

b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:
41) the tasks are distributed among the topics as specified on the form
42) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations
c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.
4. a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the amrotxiate exam section.

u E b. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate.

N c. Ensure that WA importance ratings (except for plant-specific priorities) are at least 2.5.

E .

R d. Check for duplication and overlap among exam sections.

A e. Check the entire exam for balance of coverage.

L

f. Assess whether the exam fits the appropriate job level (RO or SRO).

Date

a. Author /u-627- 9 b Facility Reviewer (*) 1 0
  • 3 0 07
c. NRC Chief Examiner (#)
d. NRC Supervisor rlllzlop I j P / & C j NOTE: # Independent NRC Reviewer initial items in Column c; chief examiner concurrence required.
  • Not applicable for NRC-prepared examination outlines.

ES-201, Page 26 of 28

0 ES-301 Administrative Topics 0utIine Form ES-301-1 Facility: Dresden Date of Examination: 3/8/10 Examination Level: RO SRO 0 Operating Test Number: 2010-301 Administrative Topic Type Describe activity to be performed (See Note) Code*

Perform Assist NSO Daily Log For U1 and 2/3 Conduct of Operations N, S Condensate Storage Tank Inventory Calculations ,

Generic.2.1.18 Verify Acceptance Criteria Met For Accoustic Monitor Conduct of Operations D, P, R Generic.2.1.7 Review Security Diesel Generator Loaded Surveillance Equipment Control Generic.2.2.12 Select Personnel For Radiation Work Radiation Control M, R Generic.2.3.4 Emergency Procedures/Plan NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (53 for ROs; 5 4 for SROs & RO retakes)

(N)ew or (M)odified from bank (2 1)J (P)revious 2 exams (5 1; randomly selected#

ES 301,Page 22 of 27

@ ES-301 Administrative Topics 0 utIine Form ES-301-1 Facility: Dresden Date of Examination: 3/8/10 Examination Level: RO 0 SRO Operating Test Number: 2010-301 Administrative Topic Type Describe activity to be performed (See Note) Code*

Reactivation Of An SRO License Conduct of Operations Generic.2.1.4 Authorize a Waiver of 10 CFR 26 Work Hour Limits Conduct of Operations Generic.2.1.5 Verify Semi-Annual HRSS AFU Operability Test Equipment Control Generic.2.2.12 Select Personnel For Radiation Work Radiation Control M,R Generic.2.3.4 Determine Emergency Classification And Fill Out Emergency Procedures/Plan N, S NARS Form Generic.2.4.38 NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (53 for ROs; 5 4 for SROs & RO retakes)

(N)ew or (M)odified from bank (2 l ) y (P)revious 2 exams (51; randomly selected)/

ES 301,Page 22 of 27

ES-301 Control Room/ln-Plant Systems Outline Form ES-301-2 c Facility: Dresden Date of Examination: 318110 Exam Level: RO SRO-I SRO-U 0 Operating Test Number: 2010-301

~ ~~~ ~~~

Control Room Systems@(8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System I JPM Title I I Safety Function

a. RECIRC - Shutdown Pump (202001.A4.01)
b. CORE SPRAY - Perform Pump Surveillance Test, With Pump Trip A, D, L, S 2 (209001.A4.01)
c. MAIN STEAM - Unisolate One Line Using Preferred Method D, S 3 (239001.A4.01)
d. IS0 COND - Startup, With Failure Of The MIU System (207000.A4.01) A, D, P, S 4
e. PClS - Verify Group 2 Isolation, With Incomplete Isolation A, L, M, s 5 (223002.A4.0 1)
f. EDG - Perform Surveillance Testing, With Scram (264000.A4.05) A, D, s 6
g. TIPS - Perform TIP Test in Manual Mode (215001.A4.03) I ~~

N,S I 7 a h. SBGT - Post Maintenance Testing, With Auto Initiation (261000.A2.13)

Implant Systems@(3 for RO); (3 for SRO-I); (3or 2 for SRO-U)

A, D, P, S 9 (C)ontrol room (D)irect from bank ~ 9 ~ 1 15 584 (E)mergency or abnormal in-plant > 1 /1

- 21 121 (EN)gineered safety feature - I - I 2 1 (control room system)

(L)ow-Power I Shutdown > 1/ 1 2 1 lrl (N)ew or (M)odified from bank including 1(A) -

>2//22 I 1 1 (P)revious 2 exams -

c 3*1I 5 3 I 5 2 (randomly selected)

(WCA -

>lJ/Z1 121 ES-301, Page 23 of 27

ES-301 Control RooMn-Plant Svstems Outline Form ES-301-2 Facility: Dresden Date of Examination: 318110 Exam Level: RO SRO-I SRO-U Operating Test Number: 2010-301 Control Room Systems@(8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title I Typecode*

Safety Function a.

b. CORE SPRAY - Perform Pump Surveillance Test, With Pump Trip A, D, L, s 2 (209001.A4.01)
c. MAIN STEAM - Unisolate One Line Using Preferred Method D, s 3 (239001.A4.01)
d. IS0 COND - Startup, With Failure Of The M/U System (207000.A4.01) A, D, P, S 4
e. PClS - Verify Group 2 Isolation, With Incomplete Isolation A, L, M, s 5 (223002.A4.01)
f. EDG - Perform Surveillance Testing, With Scram (264000.A4.05) A, D, S 6
g. TIPS - Perform TIP Test in Manual Mode (215001.A4.03) N, S 7
h. SBGT - Post Maintenance Testing, With Auto Initiation (261000.A2.13) I A, D, P, S 9 In-Plant Systems@(3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. CRD - Vent Scram Air Header (295037.A1.05) E, D, R 1
j. IS0 COND - Valve In Local Sightglass (207000.A3.01) D, R 4
k. AUX POWER - Rack Out 4KV Breaker (262001.G.4.35) I D 1 6 Q All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may
  • Type Codes (A)lternate path 4-6 / 4-6"/ 2-3 (C)ontrol room I/

(D)irect from bank -e 9 118 114 (E)mergency or abnormal in-plant -> 1 /21'/21 (EN)gineered safety feature - I - I 2 1 (control room system)

(L)ow-PowerI Shutdown -> 1 /~1'/2.1 (N)ew or (M)odified from bank including 1(A) - >2 122'1 2 1 (P)revious 2 exams - e3 / 5 3' / 1.2 (randomly selected)

( W A -> 1 /2.1*/L1 (S)imulator ES-301,Page 23 of 27

ES-301 Control Room/ln-Plant Svstems Outline Form ES-301-2 FaciIity : Dresden Date of Examination: 318110 Exam Level: RO 0 SRO-I 0 SRO-U (XI Operating Test Number: 2010-301 Control Room Systems@(8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System I JPM Title Type 'Ode* I Safety Function a.

b. CORE SPRAY - Perform Pump Surveillance Test, With Pump Trip (209001.A4.01)

C.

d. I S 0 COND - Startup, With Failure Of The MIU System (207000.A4.01)
e. PClS - Verify Group 2 Isolation, With Incomplete Isolation (223002.A4.0 1 )

f.

=F In-Plant Systems@(3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

I. CRD - Vent Scram Air Header (295037.A1.05) E, D, R 1 Q All RO and SRO-I control room (and in-plant) systems must be different and serve different safety

  • Type Codes Criteria for RO I SRO-I I SRO-U
A)lternate path 4-6 I 4-6 I 2-3/
C)ontrol room
D)irect from bank -< 9 1 5 8 154'
E)mergency or abnormal in-plant ->1 121 121v (EN)gineered safety feature - 1 - I 2 l"(contro1 room system)

(L)ow-Power / Shutdown -> 1 121 />lJ (N)ew or (M)odified from bank including 1(A) - >2 1 2 2 1 ~ 1 ~

(P)revious 2 exams -e 3 I 5 3 I 52"(randomly selected)

-> 1 1 2 1 121J (S)imulator ES-301,Page 23 of 27

tS-301 Transient and tvent ChecklistForm ES-301-5 acility: Dresden A

Date of Exam: 31811 0 Operatinn Test Number: 2010-301 P

P L

I C

A N

T SRO-I

  1. I
  1. 4 IXI

-Instruci Ins:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward

- the minimum requirements specified for the applicants license level in the right-hand columns.

ES-301, Page 26 of 27

ES-301 Iransient and Event Checks il)t D

Dresden Date of Exam: 3/8/10 Operating Test Number: 2010-301 E

\ I l Scenarios

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls(ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those ES-301, Page 26 of 27

ES-401 BWR Examination Outline FORM ES-401-1

acility Name: Dresden Date of Exam: 3/8/10 Tier 1.

Emergency &

Abnormal Plant Evolutions 2.

Plant Systems

3. Generic K I

lote: yf Ensure that at least two topics from every applicable WA category are sampled within each tier of the RO and SRO-only outlines (i.e., except for one category in Tier 3 of the SRO-only outline, the Tier Totals in each WA category shall not be less than two).

a: The point total for each group and tier in the proposed outline must match that specified in the table.

The final point total for each group and tier may deviate by e1 from that specified in the table based on NRC revisions. The fina RO exam must total 75 points and the SRO-only exam must total 25 points.

Systemslevolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site-specific systems that are not included on the outline should be added. Refer to Section D.l.b of ES-401for guidance regarding the elimination of inappropriate WA statements.

Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selectin!

a second topic for any system or evolution.

Absent a plant-specific priority, only those WAS having an importance rating (IR) of 2.5 or higher shall be selected.

Use the RO and SRO ratings for the RO and SRO-only portions, respectively.

Select SRO topics for Tiers 1 and 2 from the shaded systems and WA categories.

The generic (G) WAS in Tiers 1 and 2 shall be selected from Section 2 of the WA Catalog, but the topics must be relevant to the applicable evolution or system. Refer to Section D.l.b of ES-401 for the applicable WAS.

d On the following pages, enter the WA numbers, a brief description of each topic, the topics importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above; if fuel handling equipment is sampled in other than Category A2 or G on the SRO-only exam, enter it on the left side of Column A2 for Tier 2, Group 2 (Note #1 does not apply). Use duplicate pages for RO and SRO-only exams.

For Tier 3,select topics from Section 2 of the WA catalog, and enter the WA numbers, descriptions, IRs, and Doint totals (#) on Form ES-401-3. Limit SRO selections to WAS that are linked to 10 CFR 55.43.

ES-401, Page 17 of 34

ES-401 2 Form ES-401-1 ES-401 BWR Examination Outline Form ES-401-Emeraencv and Abnormal Plant Evolutions - Tier l/Grouo 1 (RO)

E/APE # I Name I Safety Function It95003 Partial or Complete Loss of AC / 6 95004 Partial or Total Loss of DC Pwr / 6 95005 Main Turbine Generator Trip / 3 295006 SCRAM I 1 295016 Control Room Abandonment / 7 295018 Partial or Total Loss of CCW / 8 95019 Partial or Total Loss of Inst. Air / 8 95021 Loss of Shutdown Cooling I 4 95023 Refueling Acc I 8 95024 High Drywell Pressure / 5 95025 High Reactor Pressure I 3 95026 Suppression Pool High Water Temp. /

95027 High Containment Temperature I5 95028 High Drywell Temperature / 5 It95030 Low Suppression Pool Wtr Lvl I 5 I I 95031 Reactor Low Water Level I 2 95037 SCRAM Condition Present 95038 High Off-site Release Rate I 9 Plant Fire On Site / 8 I 1:

700000 Generator Voltage and Electric Grid Disturbances / 6

ES-401 3 Form ES-401-1 ES-401 BWR Examination Outline Form ES-401-Emergency and Abnormal Plant Evolutions - Tier l/Group 2 (RO)

ES-401, Page 19 of 34

ES-401 4 Form ES-401-1 e ES-401 BWR Examination Outline Form ES-401-IlSystem # I Name 11203000 RHWLPCI: Injection Mode 206000 HPCl 207000 Isolation (Emergency) 209001 LPCS 11000 SLC 215003 IRM 1I215004 Source Range Monitor 215005 APRM I LPRM 217000 RClC 18000 ADS 223002 PCISINuclear Steam Supply Shutoff 239002 SRVs 259002 Reactor Water Level Control 261000 SGTS 262001 AC Electrical Distribution 262002 UPS (AC/DC) 1&63OOODC Electrical Distribution 264000 EDGs 300000 Instrument Air I. 00000 Component Cooling Water WA Category Totals:

ES-401, Page 20 of 34

ES-401-1 5 Form ES-401-1 ES-401, Page 22 of 34

ES-401 Form ES-401-1 llES-401 BWR Examination Outline Form ES-401.

95004 Partial or Total Loss 95018 Partial or Total Loss of CCW / 8 95024 High Drywell Pressure I 5 Suppression pool water temperature 95027 High Containment Temperature / 5 Not Applicable to Dresden

ES-401 3 Form ES-401-1 ES-401, Page 19 of 34

4 Form ES-401-1 ES-401, Page 20 of 34

ES-401 .e; Form ES-401-1 0002 Reactor Vessel Int ES-401, Page 21 of 34

ES-401 Generic Knowledge and Abilities Outline (Tier 3) Form ES-401-3 acility Name:Dresden Date of Exam:3/8/10 Category WA# Topic RO I SRO-Only I R I # I I R I #

Ability to evaluate plant performanceand make operational judgments based on operating (2.1. 071 characteristics, reactor behavior, and instrument Interpretation.

(2.1. 13 (Knowledgeof facility requiremenis for controlling vitaVcontrolledaccess.

2.1 . 18 Ability to make accurate, clear, and concise logs, records, status boards, and reports. 3.6 1

onduct of 2.1.

)perations Knowledge of procedures, guidelines, or limitations associated with reactivity 12.1. 37 Imanaaement.

12.1. 40 IKnowledge of refueling administrative requirements I I 3.9 I 1 Knowledge of the bases in Technical Specifications for limiting conditions for operations 12.2. 251and safetv limits.

ontrol L.3.

I I I I 12.3. 06 lAbilityto approve release permits I I 3.8 I 1 or emergency conditions or activities.

.4. 13 Knowledge of crew roles and responsibilities during EOP usage. 4.0 1 I I I 12.4. 19 IKnowledge of EOP layout. symbols, and icons.

I 13.4)

I I 1 I I

I I

2.4. I mergency rocedures 2.4.

>Ian 2.4.

Ability to perform without reference to procedures those actions that require immediate 2,4. 49 operation of system components and controls.

4.4 1 ES-401, Page 27 of 34

TQ-AA-151-F10 Revision 0 Page 1 of 1 Scenario Outline Station: Dresden Generatina Station Scenario No.: ILT-N-1 Class ID: 2010-301 Evaluators Operators / crew position

/ ATC I BOP

/ CRS Initial Conditions: 91% power.

Turnover : Lower Power With Recirc Flow.

Switching Orders Received To Remove 345KV LO302 From Service.

Event No.

1 Malf.

No.

NONE

+ Event Event Description RECIRC - Lower Reactor Power using Recirculation Flow.

2 SWITCHYARDS - Remove 345KV LO302 Powerton From NONE Service.

3 N33 INST AIR - Instrument Air Compressor Trip.

4 R DFAlLF5 CRD - RPlS failure for rod F-05.

5 RLLMLS FW - FWLC Controller Drifts High.

6 I CSPDFT BOP IS0 COND - Inadvertent Initiation.

7 NP2 M TEAM Instrument Air System Leak /Team Takes a Manual Scram.

121 Steam Leak inside the Drywell & Loss of Bus 23-1 & 28, Losing 8 K23 M TEAM Ability to Spray Drywell / Team Emergency Depressurizes.

K40

' (N)orrr , (R)eactivity, (I)n: ument, (C)omponent, (M)ajor, (T)ech Spec SRRS: 3D.105

TQ-AA-151-F10 Revision 0 Page 1 of 1 Scenario Outline Station: Dresden Generatina Station Scenario No.: ILT-N-2 Class ID: 2010-301 Eva1uators Operators I crew position I ATC I BOP I CRS Initial Conditions: Full Power.

Turnover: Maintain Power Per BPO Direction.

~~ ~~~

Event Malf. Event Event No. No. T Description 1 RRMASDND I ATC RECIRC - Master Recirc Flow Controller Fails Downscale.

2 RDFILTB C ATC CRD - 28 Pump Suction Filter Plugging, Must Swap.

SER1589 3 EDG - Diesel Generator hop Due to Cooling Water Pump SER0710 C BOP FaiIure. T T18 4

B15 NBI - B Med Range Level lnst Fails Low with Partial Half I ATC NVM100BP Scram. T

~ ~~

5 H2 SEAL OIL - Main Seal Oil Pump Trip / Failure Of K50 C BOP Emergency Seal Oil Pump To Auto Start.

6 Q01 C BOP RBCCW - Pump Trip.

SER1784 WRPPDSH1 SER1735 7 SER0369 M TEAM Loss of RBCCW System / Team Takes a Manual Scram.

SER0322 RRMPMAHI RRMPMBHI B12 8

SERlO26 M ATWS - Electrical, ARI Unsuccessful / Team Takes Actions To TEAM SER1060 Insert Rods.

AW4

, (R)eactivity, (I)nstrument, (C)ompZent, (M)ajor, (T)ech Spec SRRS: 3D.105

TQ-AA-151 -F10 Revision 0 Page 1 of 1 Scenario Outline Station: Dresden Generatinq Station Scenario No.: ILT-N-3 Class ID: 2010-301 Eva1uators Operators I crew position I ATC I BOP I CRS Initial Conditions: 2% Power Startup On Hold For REMA Re-evaluation Bv QNE.

Turnover: Remove 'B' RNRV From Service After Assumina Shift.

-Event Malf. Event Event

- No.

1 No. 2- le* Description NONE N ATC FW - Remove 'B' FWRV From Service.

FW - Cond/Cond Bstr Pump Trip with Failure of Standby to Auto 2 H21 C ATC Start.

3 NONE T CRS CONTAINMENT - Secondary Containment Doors Found Open.T 4 NII12POT I ATC NI - IRM Channel Fails Upscale with Half Scram.

5 J33 M TEAM Loss of EHC System / Team Takes a Manual Scram.

F41 RLMFAFC Recirc System Leak and Loss of All Feedwater Reg Valves /

6 M TEAM RLMFBFC Team Emergency Depressurizes Due to Lowering RPV Level.

RLMLFFC

' (N)orm , (R)eactivity, (I)nstrument, :)ompot SRRS: 3D.105