DC Cook, 2010 Initial License Exam, Control Room and In-Plant JPMs
ML102220115
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/21/2010
From:
Division of Reactor Safety III
To:
Indiana Michigan Power Co
References
Download: ML102220115 (84)


Text

OPERATIONS JPM TRAINING PROGRAM INITIAL LICENSE TRAINING TIME: 15 MINUTES TITLE NUMBER AND NRC2010-Inp01 TITLE: S/G 2/3 Level Control through AFW Unit Crosstie REVISION: 0 SCOPE OF Initial Issue: From: NRC2007-INP02 REVISION DATE:

PREPARED BY: Name:

(Exam Writer)

Signature:

APPROVED BY: Name:

(Facility Reviewer)

Signature:

NRC2010-Inp01, S/G 2/3 Level Control through AFW Unit Crosstie Revision: 0 NRC2010-Inp01.doc Page 1 of 7

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedure: 02-OHP-4025-LS-3-1, R4 Steam Generator 2/3 Level Control K/A Number: APE 054 AA1.01 Ability to operate and / or monitor the following as they apply to the Loss of Main Feedwater (MFW):

(CFR 41.7 / 45.5 / 45.6)

AFW controls, including the use of alternate AFW sources K/A Imp.: RO: 4.5 SRO: 4.4 Task Number: 05600290604 Establish Local Control of AFW to Maintain SG Level TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS Task Briefing 02-OHP-4025-LS-3 Steam Generator 2/3 Level Control ATTACHMENTS None EVALUATION SETTINGS In-Plant EVALUATION METHOD: PERFORM: SIMULATE:

SIMULATOR/LAB SETUP None EVALUATOR INSTRUCTIONS Provide the operator with a of 02-OHP-4025-LS-3, Steam Generator 2/3 Level Control.

NRC2010-Inp01, S/G 2/3 Level Control through AFW Unit Crosstie Revision: 0 NRC2010-Inp01.doc Page 2 of 7

OPERATIONS JPM TASK BRIEFING You are an RO on Unit 2 Unit 2 has experienced an Appendix R Fire event and is in the process of establishing local control. The Unit Supervisor has requested that you perform 02-OHP-4025-LS-3-1, Steam Generator 2/3 Level Control, to align the 1W MDAFP to Unit 2 SG 2/3.

GENERAL STANDARDS/PRECAUTIONS Perform SG 2/3 level control operations locally in response to an Appendix R event forcing control room evacuation.

NRC2010-Inp01, S/G 2/3 Level Control through AFW Unit Crosstie Revision: 0 NRC2010-Inp01.doc Page 3 of 7

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

ACTIONS:

NOTE:To Open the Breakers the handle must be pushed down to the RESET position. Cue the operator that a "Click" sound is heard.

STANDARD: (CS) The operator locates and simulates opening the supply breakers for 2-FMO-222 and 2-FMO232 SAT: UNSAT:

STANDARD: The operator locates indications on 2-LSI-2.

SAT: UNSAT:

NRC2010-Inp01, S/G 2/3 Level Control through AFW Unit Crosstie Revision: 0 NRC2010-Inp01.doc Page 4 of 7

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: (CS) The operator places the switches for BLI-120 and BLI-130 to the LOCAL position.

SAT: UNSAT:

CUE: Meters BLI-120 and BLI-130 come on scale CUE: The 1W MDAFW PP is running and with manual crosstie to Unit 2 open.

NRC2010-Inp01, S/G 2/3 Level Control through AFW Unit Crosstie Revision: 0 NRC2010-Inp01.doc Page 5 of 7

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

CUE: Levels on BLI-120 and BLI-130 are currently 39% and slowly lowering STANDARD: (CS) The operator locates and simulates manual operation of 2-FMO-222 and 2-FMO-232.

SAT: UNSAT:

NOTE: Manual Valve Operation Actions/CUEs:

1. Engage Handle
2. Turn Handlewheel Counter Clockwise
3. Observe Stem Rising or Listen for Flow noise.

STANDARD: The operator locates monitors SG WR level on 2-LSI-2 SAT: UNSAT:

CUE: Levels on BLI-120 and BLI-130 are currently 40% and slowly rising STANDARD: The operator reports task is complete.

SAT: UNSAT:

TERMINATION CUE: This JPM is complete.

NRC2010-Inp01, S/G 2/3 Level Control through AFW Unit Crosstie Revision: 0 NRC2010-Inp01.doc Page 6 of 7

Task Briefing You are an RO on Unit 2 Unit 2 has experienced an Appendix R Fire event and is in the process of establishing local control. The Unit Supervisor has requested that you perform 02-OHP-4025-LS-3-1, Steam Generator 2/3 Level Control, to align the 1W MDAFP to Unit 2 SG 2/3.

Revision: 0 NRC2010-Inp01.doc Page 7 of 7

OPERATIONS JPM TRAINING PROGRAM INITIAL LICENSE TRAINING TIME: 10 MINUTES TITLE NUMBER AND NRC2010-Inp02 TITLE: Locally control the blender to Charging Pump REVISION: 0 suction (QRV-400)

SCOPE OF Initial Issue REVISION From: AE-O-E234 DATE:

PREPARED BY: Name:

(Exam Writer)

Signature:

APPROVED BY: Name:

(Facility Reviewer)

Signature:

NRC2010-Inp02, Revision: 0 Locally control the blender to Charging Pump suction (QRV-400)

NRC2010-Inp02.doc Page 1 of 7

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedure: 01-OHP-4025-R-12, R5 COMPONENT RESTORATION K/A Number: 068.AA1.22 Ability to operate and / or monitor the following as they apply to the Control Room Evacuation:

(CFR 41.7 / 45.5 / 45.6)

Flow control valve for RCS charging header K/A Imp.: RO: 4.0 SRO: 4.3 Task Number: APR0030604 Locally control air operated isolation valves.

TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS Task Briefing 1-OHP 4025.R-12-18 Component Restoration ATTACHMENTS None EVALUATION SETTINGS In-Plant EVALUATION METHOD: PERFORM: SIMULATE:

SIMULATOR/LAB SETUP None EVALUATOR INSTRUCTIONS Note: This JPM is based on 1-OHP-4025-R-12-18 Rev. 5, Component Restoration. Any subsequent revisions to the procedures will require a review of this JPM to ensure that the NRC2010-Inp02, Revision: 0 Locally control the blender to Charging Pump suction (QRV-400)

NRC2010-Inp02.doc Page 2 of 7

OPERATIONS JPM content of the JPM is still valid. This JPM may be used without revision if the procedure changes do not affect the JPM.

1. Brief student.
2. Announce start of JPM. Perform evaluation.
3. When evaluation is complete, announce end of JPM. +
4. Document evaluation (may be delayed until the end of a series of JPMs).
5. Give copy of Task Briefing to examinee.

TASK BRIEFING The Shift Manager has implemented Emergency Remote Shutdown procedure 01-OHP-4025-001-001. Unit 1 is in mode 3 with Control Air available.

The SM directs you to establish local control capability for 1-QRV-400, Blender to CHG Pump Suction, then OPEN the valve in accordance with 01-OHP-4025 Section R-12-18, Local Control of Air Operated Isolation Valves.

GENERAL STANDARDS/PRECAUTIONS Establish local control of QRV-400, Blender to CHG Pumps Suction, in accordance with approved procedure and demonstrate proper operation of the valve.

NRC2010-Inp02, Revision: 0 Locally control the blender to Charging Pump suction (QRV-400)

NRC2010-Inp02.doc Page 3 of 7

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

CUE: Typical response to operator when operating valves is when near end of travel resistance is felt STANDARD: Operator correctly identifies QRV-400 in Table 2 SAT: UNSAT:

NRC2010-Inp02, Revision: 0 Locally control the blender to Charging Pump suction (QRV-400)

NRC2010-Inp02.doc Page 4 of 7

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Operator verifies that the valve number on flex hose matches number on emergency connections.

SAT: UNSAT:

STANDARD: (CS) - Operator pulls back retaining collar, then inserts hose and ensures retaining ring snaps back into place.

SAT: UNSAT:

CUE: You hear a click when the hose is connected.

STANDARD: (CS) Operator simulates opening emergency control air supply valve.

SAT: UNSAT:

CUE: States resistance is felt when simulating opening control air valve STANDARD: (CS) Operator simulates closing emergency control air supply valve and then removes hose from emergency air station.

SAT: UNSAT:

CUE: When operator informs SM that QRV-400 is open state SM directs operator to close QRV-400, Blender to Charging Pump Suction. A brief hiss of air can be heard when disconnecting hoses. Air flow can be continuous if control air isolation is not closed before removing the flex hose.

NRC2010-Inp02, Revision: 0 Locally control the blender to Charging Pump suction (QRV-400)

NRC2010-Inp02.doc Page 5 of 7

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

TERMINATION CUE: When report is made that QRV-400, Blender to Charging Pump Suction, is closed, then, This JPM is complete.

NRC2010-Inp02, Revision: 0 Locally control the blender to Charging Pump suction (QRV-400)

NRC2010-Inp02.doc Page 6 of 7

Task Briefing The Shift Manager has implemented Emergency Remote Shutdown procedure 01-OHP-4025-001-001. Unit 1 is in mode 3 with Control Air available.

The SM directs you to establish local control capability for 1-QRV-400, Blender to CHG Pump Suction, then OPEN the valve in accordance with 01-OHP-4025 Section R-12-18, Local Control of Air Operated Isolation Valves.

Revision: 0 NRC2010-Inp02.doc Page 7 of 7

OPERATIONS JPM TRAINING PROGRAM INITIAL LICENSE TRAINING TIME: 20 MINUTES TITLE NUMBER AND NRC2010-Inp03 TITLE: Perform Local DG Trip and Isolation REVISION: 0 (Alternate Path)

SCOPE OF Initial Issue.

REVISION From: Audit07-INP03 DATE:

PREPARED BY: Name:

(Exam Writer)

Signature:

APPROVED BY: Name:

(Facility Reviewer)

Signature:

NRC2010-Inp03, Perform Local DG Trip and Isolation Revision: 0 NRC2010-Inp03.doc Page 1 of 6

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedure: 02-OHP-4025-LTI-3, R2 Local Diesel Generator Trip and Isolation K/A Number: APE 068 AA1.31 Ability to operate and/or monitor the EDG as applied to Control Room Evacuation.

K/A Imp.: RO: 3.9 SRO: 4.0 Task Number: 0320250604 Locally trip the Emergency Diesel Generator TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS Task Briefing Copy of 02-OHP-4025-LTI-3, Local Diesel Generator Trip and Isolation Picture of the inside of a 4KV Breaker Control Power (Top) Cubicle Picture of Breaker Mechanical Trip Pushbutton and Flag ATTACHMENTS None EVALUATION SETTINGS In plant, Unit 2 591elevation AB DG room and 609 elevation 4KV room EVALUATION METHOD: PERFORM: SIMULATE:

SIMULATOR/LAB SETUP None EVALUATOR INSTRUCTIONS Provide the operator with a of 02-OHP-4025-LS-3, Steam Generator 2/3 Level Control.

TASK BRIEFING NRC2010-Inp03, Perform Local DG Trip and Isolation Revision: 0 NRC2010-Inp03.doc Page 2 of 6

OPERATIONS JPM Following a fire event on Unit 2, the 2AB Diesel Generator started but failed to load.

The US directs you to locally trip and isolate the 2AB Diesel Generator in accordance with 02-OHP-4025-LTI-3-1, DG2AB Local Trip and Isolation.

GENERAL STANDARDS/PRECAUTIONS Perform a local trip and isolation on Unit 2 AB Diesel Generator per 02-OHP-4025-LTI-3, observing applicable precautions and limitations and procedural steps.

NRC2010-Inp03, Perform Local DG Trip and Isolation Revision: 0 NRC2010-Inp03.doc Page 3 of 6

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

NOTE: Double Hearing Protection is required if the EDG is running:

It may be SIMULATED for the purpose of this JPM.

CUE: 2AB Diesel Generator started but failed to load after a fire event on Unit 2. If asked, indicate that fire areas do not interfere with the implementation of this task.

STANDARD: (CS) Operator (simulates) depressing local EMERGENCY TRIP CUE: AB EDG is still Operating SAT: UNSAT:

STANDARD: (CS) Operator (Simulates) closing 2-DG-184A & 2-DG-186A CUE: 2-DG-184A Handwheel has stopped turning.

CUE: 2-DG-186A Push pin is pulled out (Pin latches when handle is vertical).

SAT: UNSAT:

STANDARD: (CS) Operator (Simulates) closing 2-DG-138A & 2-DG-144A CUE: Handwheel has stopped turning. If asked, pressure is still at 100 psig.

SAT: UNSAT:

STANDARD: (CS) Operator (Simulates) opening 2-DG-252A & 2-DG-254A CUE: Handwheel has stopped turning. Air is blowing from the drain valves and air receiver pressure is lowering to 0 psig.

CUE: 2 AB EDG has stopped running.

SAT: UNSAT:

NRC2010-Inp03, Perform Local DG Trip and Isolation Revision: 0 NRC2010-Inp03.doc Page 4 of 6

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

NOTE: Operator leaves the 2AB DG room , proceeds to 4kV Switchgear Room and (simulates) dons Full Flash Equipment EVALUATOR NOTE: Use attached picture (Inside of a 4KV Breaker Control Power [Top] Cubicle) to evaluate operators ability to locate control power fuses.

CUE: GREEN light ON before removing fuse(s)

STANDARD: (CS) Operator locates T21A11 breaker and (simulates) removes control power fuses CUE: GREEN lights OFF on front of breaker panel.

SAT: UNSAT:

STANDARD: Operator verifies breaker T21A11 tripped SAT: UNSAT:

EVALUATOR NOTE: Provide attached picture of Breaker Mechanical Trip Pushbutton and Flag (green OPEN flag is showing.)

STANDARD: (CS) Operator locates T21B4 breaker and (simulates) removes control power fuses CUE: GREEN lights OFF on front of breaker panel.

SAT: UNSAT:

STANDARD: Operator verifies breaker T21B4 tripped EVALUATOR NOTE: Provide attached picture of Breaker Mechanical Trip Pushbutton and Flag (green OPEN flag is showing.)

SAT: UNSAT:

STANDARD: Reports task completed.

SAT: UNSAT:

TERMINATION CUE: This JPM is complete.

NRC2010-Inp03, Perform Local DG Trip and Isolation Revision: 0 NRC2010-Inp03.doc Page 5 of 6

Task Briefing Following a fire event on Unit 2, the 2AB Diesel Generator started but failed to load.

The US directs you to locally trip and isolate the 2AB Diesel Generator in accordance with 02-OHP-4025-LTI-3-1, DG2AB Local Trip and Isolation.

Revision: 0 NRC2010-Inp03.doc Page 6 of 6

OPERATIONS JPM TRAINING PROGRAM INITIAL LICENSE TRAINING TIME: 15 MINUTES TITLE NUMBER AND NRC2010-Sim01 TITLE: Perform Emergency Boration due to Shutdown REVISION: 0 Margin Not Met (Alternate Path)

SCOPE OF Initial Issue.

REVISION From: RO-O-E022A DATE:

PREPARED BY: Name:

(Exam Writer)

Signature:

APPROVED BY: Name:

(Facility Reviewer)

Signature:

NRC2010-Sim01, Revision: 0 Perform Emergency Boration due to Shutdown Margin Not Met NRC2010-Sim01.doc Page 1 of 8

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedure: 1-OHP-4021-005-007, R4 Operation Of Emergency Boration Flow Paths K/A Number: APE 024 AA1.17 Ability to operate and / or monitor the following as they apply to Emergency Boration:

(CFR 41.7 / 45.5 / 45.6)

Emergency borate control valve and indicators K/A Imp.: RO: 3.9 SRO: 3.9 Task Number: EOP0880501 Emergency Borate the RCS TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS Task Briefing Copy of 1-OHP-4021-005-007 procedure ATTACHMENTS None EVALUATION SETTINGS Unit 1 Simulator EVALUATION METHOD: PERFORM: SIMULATE:

NRC2010-Sim01, Revision: 0 Perform Emergency Boration due to Shutdown Margin Not Met NRC2010-Sim01.doc Page 2 of 8

OPERATIONS JPM SIMULATOR/LAB SETUP

1. Initialize to IC 995 (Mode 3 IC with Setups)
2. Insert Override ZGI101QMO410 to CLOSE ZGI101QMO410_U1
3. Insert Override ZGI101IMO910 to CLOSE ZGI101IMO910_U1
4. Insert Override ZGI101IMO911 to CLOSE ZGI101IMO911_U1 EVALUATOR INSTRUCTIONS
1. Ensure simulator setup is complete
2. Brief the operator (May be performed by giving out Task Briefing Sheet)
3. Announce start of the JPM
4. Perform evolution
5. At completion of evolution, announce the JPM is complete.
6. Document evaluation performance.

TASK BRIEFING When I tell you to begin, you are to initiate Emergency Boration to the RCS. You may use any approved reference material that is normally available in the Control Room. You must complete all required data sheets that apply to the assigned task.

You are the Reactor Operator. The crew has just performed 1-OHP-4021-001-012, Determination of Reactor Shutdown Margin and discovered that Shutdown Margin has NOT been met.

The Unit Supervisor directs you to initiate Emergency Boration to the RCS in accordance with 1-OHP-4021-005-007, Operation Of Emergency Boration Flow Paths, using the Preferred Method.

GENERAL STANDARDS/PRECAUTIONS Operator has established Emergency Boration to the RCS.

NRC2010-Sim01, Revision: 0 Perform Emergency Boration due to Shutdown Margin Not Met NRC2010-Sim01.doc Page 3 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Operator Places Speed Selector for operating Boric Acid Transfer pump in FAST. (May place both Speed Selectors in FAST)

SAT: UNSAT:

STANDARD: Operator Verifies BA Transfer Pump Recirculation valves are closed.

SAT: UNSAT:

STANDARD: Operator verifies 1-QRV-411 and 1-QRV-412 are closed.

SAT: UNSAT:

STANDARD: (CS) Operator attempts to open 1-QMO-410.

SAT: UNSAT:

STANDARD: Operator identifies failed 1-QMO-410, and no flow on 1-QFI-410 SAT: UNSAT:

CUE: If asked, as Unit Supervisor direct to use the blender flow path.

NRC2010-Sim01, Revision: 0 Perform Emergency Boration due to Shutdown Margin Not Met NRC2010-Sim01.doc Page 4 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

Note: Step 4.1.2 is N/A (The IMO-910 and IMO-911 valves will fail to open if the operator attempts to use this flowpath.)

CUE: Blender is NOT aligned to CVCS HUT or RWST.

STANDARD: (CS) Operator Verifies Speed Selector for operating Boric Acid Transfer pump in FAST. (Previously placed in FAST Speed)

SAT: UNSAT:

STANDARD: Operator verifies following closed:

 12-QRV-420, Middle BAT Recirc

 l-QRV-410, North BA Tank Recirc

 1-QRV-451, Blender To VCT

 1-QRV-412, Prim Water to Blender SAT: UNSAT:

NRC2010-Sim01, Revision: 0 Perform Emergency Boration due to Shutdown Margin Not Met NRC2010-Sim01.doc Page 5 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: (CS) Operator Opens 1-QRV-400 and 1-QRV-411.

SAT: UNSAT:

STANDARD: (CS) Operator Verifies Flow at 1-QFC-411 Is Greater Than 36 gpm.

SAT: UNSAT:

STANDARD: Operator verifies at least ONE Charging Pump running.

SAT: UNSAT:

STANDARD: Operator verifies open the following 1-QMO-200 and l-QMO-201.

SAT: UNSAT:

STANDARD: Operator verifies open OR throttled 1-QRV-251 and 1-QRV-200 SAT: UNSAT:

STANDARD: Operator verifies open EITHER 1-QRV-61 OR 1-QRV-62.

SAT: UNSAT:

CUE: QRV-200 is NOT failed closed Note: Step 4.2.3 is N/A NRC2010-Sim01, Revision: 0 Perform Emergency Boration due to Shutdown Margin Not Met NRC2010-Sim01.doc Page 6 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

Note: Step 4.2.4 is N/A STANDARD:Operator Verifies Flow at 1-QFI-200 Is Greater Than 50 gpm..

SAT: UNSAT:

Note: Step 4.2.6 is N/A STANDARD: Operator Diverts Letdown as required to maintain VCT level and pressure.

SAT: UNSAT:

TERMINATION CUE: This JPM is complete.

NRC2010-Sim01, Revision: 0 Perform Emergency Boration due to Shutdown Margin Not Met NRC2010-Sim01.doc Page 7 of 8

Task Briefing When I tell you to begin, you are to initiate Emergency Boration to the RCS. You may use any approved reference material that is normally available in the Control Room. You must complete all required data sheets that apply to the assigned task.

You are the Reactor Operator. The crew has just performed 1-OHP-4021-001-012, Determination of Reactor Shutdown Margin and discovered that Shutdown Margin has NOT been met.

The Unit Supervisor directs you to initiate Emergency Boration to the RCS in accordance with 1-OHP-4021-005-007, Operation of Emergency Boration Flow Paths, using the Preferred Method.

Revision: 0 NRC2010-Sim01.doc Page 8 of 8

OPERATIONS JPM TRAINING PROGRAM INITIAL LICENSE TRAINING TIME: 15 MINUTES TITLE NUMBER AND NRC2010-Sim02 TITLE: Establish Letdown In Accordance With 1-OHP- REVISION: 0 4023-SUP-015 (Alternate Path)

SCOPE OF Initial Issue.

REVISION From: NRC2007-SIM04 DATE:

PREPARED BY: Name:

(Exam Writer)

Signature:

APPROVED BY: Name:

(Facility Reviewer)

Signature:

NRC2010-Sim02, Revision: 0 Establish Letdown In Accordance With 1-OHP-4023-SUP-015 NRC2010-Sim02.doc Page 1 of 7

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedure: 01-OHP-4023-SUP-015, R OPERATION OF NORMAL AND EXCESS LETDOWN Ability to (a) predict the impacts of the following K/A Number: SYS 004 A2.07 malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:

(CFR: 41.5/ 43/5 / 45/3 / 45/5)

Isolation of letdown/makeup K/A Imp.: RO: 3.4 SRO: 3.7 Task Number: 0030020101 Place Letdown in Service 0030240101 Place Excess Letdown in Service TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS Task Briefing Copy of 01-OHP-4023-SUP-015 procedure ATTACHMENTS None EVALUATION SETTINGS Unit 1 Simulator EVALUATION METHOD: PERFORM: SIMULATE:

NRC2010-Sim02, Revision: 0 Establish Letdown In Accordance With 1-OHP-4023-SUP-015 NRC2010-Sim02.doc Page 2 of 7

OPERATIONS JPM SIMULATOR/LAB SETUP

1. Reset to IC 994 (IC 38 with an SI with ES-1.1 performed through Step 14)
2. Verify ZGI101QRV111 override to CLOSE ZGI101QRV111_U1 EVALUATOR INSTRUCTIONS
1. Ensure simulator setup is complete
2. Brief the operator (May be performed by giving out Task Briefing Sheet)
3. Announce start of the JPM
4. Perform evolution
5. At completion of evolution, announce the JPM is complete.
6. Document evaluation performance.

TASK BRIEFING When I tell you to begin, you are to place normal letdown in service. You may use any approved reference material that is normally available in the Control Room. You must complete all required data sheets that apply to the assigned task.

You are the RO on Unit 1.

The unit has experienced a spurious Safety Injection. The crew has transitioned from E-0, Reactor Trip or Safety Injection, to ES-1.1, SI Termination.

The Unit Supervisor has requested that you place letdown in service in accordance with the 01-OHP-4023-SUP-015, OPERATION OF NORMAL AND EXCESS LETDOWN, per current procedure directions.

GENERAL STANDARDS/PRECAUTIONS Place CVCS letdown in service in accordance with 1-OHP-4023-SUP-015. Recognize that normal letdown cannot be established and place Excess Letdown in service (Alternate Path).

NRC2010-Sim02, Revision: 0 Establish Letdown In Accordance With 1-OHP-4023-SUP-015 NRC2010-Sim02.doc Page 3 of 7

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Operator verifies air is available to containment SAT: UNSAT:

Operator places QRV-302 in the DIVERT position.

SAT: UNSAT:

Operator verifies orifice isolation valves are closed (may give switches a green target is desired)

SAT: UNSAT:

Operator opens QCR-300/301 open.

SAT: UNSAT:

Operator resets and opens 1-CRV-470.

SAT: UNSAT:

STANDARD: (CS) Operator attempts to open QRV-111.

SAT: UNSAT:

NOTE: QRV-111 will not open.

CUE: If asked inform operator that Excess Letdown is desired.

STANDARD: (CS)

Operator goes to Attachment A in accordance with Step 2 RNO due to failure of QRV-111 to open.

SAT: UNSAT:

NRC2010-Sim02, Revision: 0 Establish Letdown In Accordance With 1-OHP-4023-SUP-015 NRC2010-Sim02.doc Page 4 of 7

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Operator verifies CCP suction is aligned as required.

CUE: If Required, Align CCP suction to the RWST.

SAT: UNSAT:

CUE: CCW flow has been established to seal water heat exchanger.

STANDARD: (CS) Operator opens QCM-250/350 SAT: UNSAT:

NRC2010-Sim02, Revision: 0 Establish Letdown In Accordance With 1-OHP-4023-SUP-015 NRC2010-Sim02.doc Page 5 of 7

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: (CS) Operator opens 2-CCR-460/462 SAT: UNSAT:

STANDARD: (CS) Operator Opens QRV-113/114.

SAT: UNSAT:

CUE: If asked, inform operator that excess letdown return will be aligned to the preferred flowpath.

STANDARD: Operator verifies QRV-171 in the VCT position SAT: UNSAT:

STANDARD: (CS) Operator opens QRV-170 while maintaining excess letdown temperature less than 195°F.

SAT: UNSAT:

When Excess Letdown is in Service, then TERMINATION CUE: This JPM is complete.

NRC2010-Sim02, Revision: 0 Establish Letdown In Accordance With 1-OHP-4023-SUP-015 NRC2010-Sim02.doc Page 6 of 7

Task Briefing When I tell you to begin, you are to place normal letdown in service. You may use any approved reference material that is normally available in the Control Room. You must complete all required data sheets that apply to the assigned task.

You are the RO on Unit 1.

The unit has experienced a spurious Safety Injection. The crew has transitioned from E-0, Reactor Trip or Safety Injection, to ES-1.1, SI Termination.

The Unit Supervisor has requested that you place letdown in service in accordance with the 01-OHP-4023-SUP-015, OPERATION OF NORMAL AND EXCESS LETDOWN, per current procedure directions.

Revision: 0 NRC2010-Sim02.doc Page 7 of 7

OPERATIONS JPM TRAINING PROGRAM INITIAL LICENSE TRAINING TIME: 15 MINUTES TITLE NUMBER AND NRC2010-Sim03 TITLE: Isolate SI Accumulators during Post LOCA REVISION: 0 Cooldown and Depressurization SCOPE OF Initial Issue.

REVISION From: Audit07-Sim02 DATE:

PREPARED BY: Name:

(Exam Writer)

Signature:

APPROVED BY: Name:

(Facility Reviewer)

Signature:

NRC2010-Sim03 Revision: 0 Isolate SI Accumulators during Post LOCA Cooldown and Depressurization NRC2010-Sim03.doc Page 1 of 6

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedure: 1-OHP-4023.ES-1.2, Rev. 9 Post LOCA Cooldown and Depressurization K/A Number: 006 A4.02 Emergency Core Cooling System (ECCS)

Ability to manually operate and/or monitor in the control room:

(CFR: 41.7 / 45.5 to 45.8)

Valves K/A Imp.: RO: 4.0 SRO: 3.8 Task Number: 0080020101 Isolate Accumulators TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS Task Briefing Copy of 1-OHP-4023.ES-1.2, Post LOCA Cooldown and Depressurization, Step 26 ATTACHMENTS None EVALUATION SETTINGS Unit 1 Simulator EVALUATION METHOD: PERFORM: SIMULATE:

NRC2010-Sim03 Revision: 0 Isolate SI Accumulators during Post LOCA Cooldown and Depressurization NRC2010-Sim03.doc Page 2 of 6

OPERATIONS JPM SIMULATOR/LAB SETUP Post Trip conditions with IC 993 (~950 PSIG, ~485 0F CETCs, ES 1.2 step 25)

Malfunction: RC10B (severity 40%) ~600 GPM SBLOCA (run for ~ 40 minutes to be in ES 1.2)

U1_RC10B

  • Insert Override ZGI101IMO120 to OPEN ZGI101IMO120_U1 Note: The Booth Operator is required to delete global malf 101IMO110, 101IMO120 and 101IMO130 when directed. Do Not delete the Global for 101IMO140 (T11A lost power but it may be restored via another JPM)

EVALUATOR INSTRUCTIONS

1. Ensure simulator setup is complete
2. Brief the operator (May be performed by giving out Task Briefing Sheet)
3. Announce start of the JPM
4. Perform evolution
5. At completion of evolution, announce the JPM is complete.
6. Document evaluation performance.

TASK BRIEFING You are an extra RO. The unit has experienced a small break LOCA with a Loss of Offsite Power. The crew has transitioned from E-1, Loss of Reactor or Secondary Coolant to ES-1.2, Post LOCA Cooldown and Depressurization.

Bus T11A has NOT been Re-Energized.

Containment Pressure Has remained less than 2.8 psig.

Containment Radiation has remained less than 100R/Hr.

The Unit Supervisor directs you to perform Step 26 of ES-1.2 to check if accumulators should be isolated.

GENERAL STANDARDS/PRECAUTIONS Operator has successfully isolated or vented ALL four accumulators per procedure ES 1.2 step 26.

NRC2010-Sim03 Revision: 0 Isolate SI Accumulators during Post LOCA Cooldown and Depressurization NRC2010-Sim03.doc Page 3 of 6

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

Evaluator Notes: #2 and #4 Accumulators isolation valves will not close.

The RNO column actions will be required to vent N2 pressure to complete step 26.

STANDARD: Operator checks RCS subcooling >40°F SAT: UNSAT:

STANDARD: Operator checks Prz level >21%

SAT: UNSAT:

STANDARD: (CS) Operator directs Aux Operator to restore power SAT: UNSAT:

CUE: Local Aux Operator will restore power as directed CUE: Booth Operator delete global malf 101IMO110, 101IMO120 and 101IMO130.

U1_101IMO110 U1_101IMO120 U1_101IMO130 CUE: Report back to Operator that all breakers are closed.

STANDARD: (CS) Operator closes 1-IMO-110 and 1-IMO-130 (1-IMO-120 will not close and 1-IMO-140 has no Power)

SAT: UNSAT:

STANDARD: Operator determines RNO is needed for #2 and 4 Accumulators SAT: UNSAT:

STANDARD: Operator CLOSES: 1-GCR-314 SAT: UNSAT:

STANDARD: (CS) Operator OPENS 1-GRV-341 SAT: UNSAT:

NRC2010-Sim03 Revision: 0 Isolate SI Accumulators during Post LOCA Cooldown and Depressurization NRC2010-Sim03.doc Page 4 of 6

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: (CS) Operator OPENS: 1-IRV-122 and 1-IRV-142 SAT: UNSAT:

NOTE: Annunciator Panel 105 Drops 31 and 32 may alarm as the Accumulators are vented (containment pressure high alarms).

TERMINATION CUE: When Panel 106 Drops 22 and 24 are acknowledged (accumulator 2 & 4 low pressure alarms), then This JPM is complete.

NRC2010-Sim03 Revision: 0 Isolate SI Accumulators during Post LOCA Cooldown and Depressurization NRC2010-Sim03.doc Page 5 of 6

Task Briefing You are an extra RO. The unit has experienced a small break LOCA with a Loss of Offsite Power. The crew has transitioned from E-1, Loss of Reactor or Secondary Coolant to ES-1.2, Post LOCA Cooldown and Depressurization.

Bus T11A has NOT been Re-Energized.

Containment Pressure Has remained less than 2.8 psig.

Containment Radiation has remained less than 100R/Hr.

The Unit Supervisor directs you to perform Step 26 of ES-1.2 to check if accumulators should be isolated.

Revision: 0 NRC2010-Sim03.doc Page 6 of 6

OPERATIONS JPM TRAINING PROGRAM INITIAL LICENSE TRAINING TIME: 15 MINUTES TITLE NUMBER AND NRC2010-Sim04 TITLE: Establish Cooling Flow to a Reactor Coolant Pump REVISION: 0 SCOPE OF Initial Issue.

REVISION From: NRC2008-SIM04 DATE:

PREPARED BY: Name:

(Exam Writer)

Signature:

APPROVED BY: Name:

(Facility Reviewer)

Signature:

NRC2010-Sim04 Revision: 0 Establish Cooling Flow to a Reactor Coolant Pump NRC2010-Sim04.doc Page 1 of 8

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedure: 1-OHP-4023-SUP-007, R1a Restoration of RCP Cooling 1-OHP-4023-ES-1.2, R14 Post Loca Cooldown And Depressurization K/A Number: 003 A4.08 Reactor Coolant Pump System (RCPS)

Ability to manually operate and/or monitor in the control room:

(CFR: 41.7 / 45.5 to 45.8)

RCP cooling water supplies K/A Imp.: RO: 3.2 SRO: 2.9 Task Number: 0020030501 Restore RCP Support Systems following Containment Isolation TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS Task Briefing 1-OHP-4023-ES-1.2, R14 Post Loca Cooldown And Depressurization 1-OHP-4023-SUP-007, Rev 1a Restoration of RCP Cooling (withhold until required)

ATTACHMENTS None EVALUATION SETTINGS Unit 1 Simulator EVALUATION METHOD: PERFORM: SIMULATE:

NRC2010-Sim04 Revision: 0 Establish Cooling Flow to a Reactor Coolant Pump NRC2010-Sim04.doc Page 2 of 8

OPERATIONS JPM SIMULATOR/LAB SETUP Post Trip conditions with IC 993 (~950 PSIG, ~485 0F CETCs, ES 1.2 step 28)

Malfunction: RC10B (severity 40%) ~600 GPM SBLOCA (run for ~ 40 minutes to be in ES 1.2)

  • A SB LOCA in progress and ready to restart an RCP
  • Verify/Close valves CCM-458, CCM-453 and CCM-451
  • To Ensure Power Remains Off, Turn Off Light/Power Indications for valves CCM-459, CCM-454 and CCM-452, CCM-430, CCM-431, MCM-221 U1_101CCM459 U1_101CCM454 U1_101CCM452 U1_101CCM430 U1_101CCM431 U1_101MCM221 EVALUATOR INSTRUCTIONS
1. Ensure simulator setup is complete
2. Brief the operator (May be performed by giving out Task Briefing Sheet)
3. Announce start of the JPM
4. Perform evolution
5. At completion of evolution, announce the JPM is complete.
6. Document evaluation performance.

TASK BRIEFING You are an extra RO. The unit has experienced a small break LOCA with a Loss of Offsite Power. The crew has transitioned from E-1, Loss of Reactor or Secondary Coolant to ES-1.2, Post LOCA Cooldown and Depressurization.

Bus T11A has NOT been Re-Energized.

The Unit Supervisor has requested you to "Check RCP Cooling Normal" per Step 28 of 1-OHP-4023-ES-1.2, Post LOCA Cooldown and Depressurization GENERAL STANDARDS/PRECAUTIONS Restore CCW Cooling to RCPs per 01-OHP-4023-SUP-007 while observing all applicable precautions and limitations and procedure steps.

NRC2010-Sim04 Revision: 0 Establish Cooling Flow to a Reactor Coolant Pump NRC2010-Sim04.doc Page 3 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Operator determines that CCW flows are less than required SAT: UNSAT:

STANDARD: Operator determines that SUP-007 is required SAT: UNSAT:

CUE: If required, The US directs you to perform SUP-007 Restoration of RCP Cooling. (Provide operator with 1-OHP-4023-SUP-007 copy)

NRC2010-Sim04 Revision: 0 Establish Cooling Flow to a Reactor Coolant Pump NRC2010-Sim04.doc Page 4 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Operator verifies Panel 107 Drops 14, 34, 74, and 94 NOT LIT CUE: All RCP alarms currently standing are the only ones that have been in alarm.

SAT: UNSAT:

STANDARD: Operator verifies 1-QTI-210 through 1-QTI-240 are less than 225ºF SAT: UNSAT:

CUE: If Asked, Lower bearing temperatures have NOT exceeded 150ºF.

NRC2010-Sim04 Revision: 0 Establish Cooling Flow to a Reactor Coolant Pump NRC2010-Sim04.doc Page 5 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Operator verifies Panel 107 Drops 8, 28, 68, 88 NOT LIT CUE: All RCP alarms currently standing are the only ones that have been in alarm.

SAT: UNSAT:

Instructor Note: Ann. 107 panel alarms for CCW flow mismatch and Low Cooling Flow to RCP Bearings may alarm/clear when restoring CCW flow to RCPs. CCM-459, CCM-454, & CCM-452 are de-energized, positions may be verified with status lights/flow after opening associated valves, or via Local Verification (*PROVIDE CUE if Required, Valve is OPEN)

STANDARD: (CS) Operator places 1-CCM-458 CS to OPEN SAT: UNSAT:

STANDARD: Operator verifies 1-CCM-458 is OPEN with red light lit

  • Operator verifies 1-CCM-459 is OPEN with NO light lit SAT: UNSAT:

STANDARD: (CS) Operator places 1-CCM-453 CS to OPEN SAT: UNSAT:

STANDARD: Operator verifies 1-CCM-453 is OPEN with red light lit

  • Operator verifies 1-CCM-454 is OPEN with NO light lit SAT: UNSAT:

STANDARD: (CS) Operator places 1-CCM-451 CS to OPEN SAT: UNSAT:

STANDARD: Operator verifies 1-CCM-451 is OPEN with red light lit

  • Operator verifies 1-CCM-452 is OPEN with NO light lit SAT: UNSAT:

NRC2010-Sim04 Revision: 0 Establish Cooling Flow to a Reactor Coolant Pump NRC2010-Sim04.doc Page 6 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Checks Both CCP pumps running SAT: UNSAT:

STANDARD: Establishes RCP Seal Injection to 6-12 gpm SAT: UNSAT:

TERMINATION CUE: When operator returns to 1-OHP-4023-ES-1.2, then This JPM is complete.

NRC2010-Sim04 Revision: 0 Establish Cooling Flow to a Reactor Coolant Pump NRC2010-Sim04.doc Page 7 of 8

Task Briefing You are an extra RO. The unit has experienced a small break LOCA with a Loss of Offsite Power. The crew has transitioned from E-1, Loss of Reactor or Secondary Coolant to ES-1.2, Post LOCA Cooldown and Depressurization.

Bus T11A has NOT been Re-Energized.

The Unit Supervisor has requested you to "Check RCP Cooling Normal" per Step 28 of 1-OHP-4023-ES-1.2, Post LOCA Cooldown and Depressurization Revision: 0 NRC2010-Sim04.doc Page 8 of 8

OPERATIONS JPM TRAINING PROGRAM INITIAL LICENSE TRAINING TIME: 10 MINUTES TITLE NUMBER AND NRC2010-Sim05 TITLE: Perform Steam Generator Stop Valve Dump Valve REVISION: 0 Surveillance Test SCOPE OF Initial Issue.

REVISION From: NRC2008-Sim05 DATE:

PREPARED BY: Name:

(Exam Writer)

Signature:

APPROVED BY: Name:

(Facility Reviewer)

Signature:

NRC2010-Sim01, Perform Emergency Boration During ATWS Revision: 0 NRC2010-Sim05.doc Page 1 of 8

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedure: 1-OHP-4030-151-018, R4 Steam Generator Stop Valve Dump Valve Surveillance Test K/A Number: 039 K4.05 Knowledge of the Main Steam System design features which provide for automatic isolation of the steam line K/A Imp.: RO: 3.7 SRO: 3.7 Task Number: ADM1190301 Stroke a valve for Post Maintenance operability TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS Task Briefing 1-OHP-4030-151-018 Stopwatch (with current cal due date sticker)

ATTACHMENTS None EVALUATION SETTINGS Unit 1 Simulator EVALUATION METHOD: PERFORM: SIMULATE:

NRC2010-Sim01, Perform Emergency Boration During ATWS Revision: 0 NRC2010-Sim05.doc Page 2 of 8

OPERATIONS JPM SIMULATOR/LAB SETUP

1. Initialize simulator to IC 995 (Any Mode 1-3 IC)
2. FREEZE the simulator.
3. Stop Watch Required with Calibration Sticker EVALUATOR INSTRUCTIONS
1. Ensure simulator setup is complete
2. Brief the operator (May be performed by giving out Task Briefing Sheet)
3. Announce start of the JPM
4. Perform evolution
5. At completion of evolution, announce the JPM is complete.
6. Document evaluation performance.

TASK BRIEFING You are the Balance of Plant Operator.

Steam Generator Stop Valve Dump Valve Surveillance Test is required for 1-MRV-210 following a conduit repair. The Unit Supervisor directs you to perform 01-OHP 4030-151-018 on 1-MRV-210 (Section 4.1).

All personnel have been briefed and are locally standing by for the test of 1-MRV-210 Dump Valves.

GENERAL STANDARDS/PRECAUTIONS Perform 1 OHP 4030-151-018, Steam Generator Stop Valve Dump Valve Surveillance Test on 1-MRV-210.

NRC2010-Sim01, Perform Emergency Boration During ATWS Revision: 0 NRC2010-Sim05.doc Page 3 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

General CUES:

Provide candidate marked up copy of 1-OHP-4030-151-018, Steam Generator Stop Valve Dump Valve Surveillance Test, (Marked to perform section 4.1).

CUE: If asked, all procedure prerequisites have been met and an AEO is stationed at the Valve and in communication CUE: if asked, US acknowledges 1-MRV-210 is inoperable for testing.

Instructor Note: Primary Stop Watch Data is already entered. Secondary SW-002 stopwatch data is N/A.

12-25-2010 N/A N/A NRC2010-Sim01, Perform Emergency Boration During ATWS Revision: 0 NRC2010-Sim05.doc Page 4 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Operator verifies local operator stationed at stop valve.

CUE: If asked, per task brief an operator is stationed at stop valve.

STANDARD: (CS) Operator places AND holds 1-MMO-210 switch to the POS A position.

SAT: UNSAT:

STANDARD: Operator verifies POS A light is LIT.

SAT: UNSAT:

NRC2010-Sim01, Perform Emergency Boration During ATWS Revision: 0 NRC2010-Sim05.doc Page 5 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Verifies neon lamp for 2-MRV-211 is dark. (Starts Stopwatch)

SAT: UNSAT:

STANDARD: Records OPEN time from Stopwatch (Stops Stopwatch when Green Light goes Dark & the RED light is lit)

SAT: UNSAT:

CUE: AEO reports pressure indicates 0 psi on 1-MPI-211.

0 2 STANDARD: (CS) Operator places 1-MMO-210 switch to the NORM position.

SAT: UNSAT:

STANDARD: Operator verifies 1-MRV-211indicates CLOSED.

SAT: UNSAT:

STANDARD: Operator verifies NORMAL light is LIT.

SAT: UNSAT:

STANDARD: (CS) Operator places AND holds 1-MMO-210 switch to the POS B position.

SAT: UNSAT:

STANDARD: Operator verifies POS B light is LIT SAT: UNSAT:

STANDARD: Verifies neon lamp for 2-MRV-212 is dark. (Starts Stopwatch)

SAT: UNSAT:

0 2 STANDARD: Records OPEN time from Stopwatch (Stops Stopwatch when Green Light goes Dark & the RED light is lit)

SAT: UNSAT:

CUE: AEO reports pressure indicates 0 psi on 1-MPI-212.

NRC2010-Sim01, Perform Emergency Boration During ATWS Revision: 0 NRC2010-Sim05.doc Page 6 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: (CS) Operator places 1-MMO-210 switch to the NORM position.

SAT: UNSAT:

STANDARD: Operator verifies 1-MRV-211indicates CLOSED.

SAT: UNSAT:

STANDARD: Operator verifies NORMAL light is LIT.

SAT: UNSAT:

STANDARD: Operator reports testing complete on 1-MRV-210.

SAT: UNSAT:

TERMINATION CUE: This JPM is complete.

NRC2010-Sim01, Perform Emergency Boration During ATWS Revision: 0 NRC2010-Sim05.doc Page 7 of 8

Task Briefing You are the Balance of Plant Operator.

Steam Generator Stop Valve Dump Valve Surveillance Test is required for 1-MRV-210 following a conduit repair. The Unit Supervisor directs you to perform 01-OHP 4030-151-018 on 1-MRV-210 (Section 4.1).

All personnel have been briefed and are locally standing by for the test of 1-MRV-210 Dump Valves.

Revision: 0 NRC2010-Sim05.doc Page 8 of 8

OPERATIONS JPM TRAINING PROGRAM INITIAL LICENSE TRAINING TIME: 15 MINUTES TITLE NUMBER AND NRC2010-Sim06 TITLE: Restoration of 4kV T11A Power from SDG REVISION: 0 (Alternate Path)

SCOPE OF Initial Issue.

REVISION NEW DATE:

PREPARED BY: Name:

(Exam Writer)

Signature:

APPROVED BY: Name:

(Facility Reviewer)

Signature:

NRC2010-Sim06, Restoration of 4kV T11A Power from SDG Revision: 0 NRC2010-Sim06.doc Page 1 of 13

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedure: 1-OHP- 4023.SUP.009 Restoration of 4KV Power from EP K/A Number: SYS 062- A2.11 Ability to (a) predict the impacts of the following malfunctions or operations on the ac distribution system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:

Aligning standby equipment with correct emergency power source (D/G)

K/A Imp.: RO: 3.7 SRO: 4.1 Task Number: 0820110501 Restoration of 4KV Power from EP TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS Task Briefing Copy of 1-OHP- 4023.SUP.009 procedure ATTACHMENTS None EVALUATION SETTINGS Unit 1 Simulator EVALUATION METHOD: PERFORM: SIMULATE:

NRC2010-Sim06, Restoration of 4kV T11A Power from SDG Revision: 0 NRC2010-Sim06.doc Page 2 of 13

OPERATIONS JPM SIMULATOR/LAB SETUP Reset to IC 993 (Setup complete, Small LOCA ES-1.2 with Loss of T11A11 and EP)

Setup SDG controls SDG1 & 2 Engine Controls to OFF/RESET Master Mode Selector Switch to MANUAL IMF EG13A T11A11 fail to Auto Close/Close U1_EG13A IMF ED01, ED04, Loss of all AC power (EP Xfrmr, 345kv lines)

U12_ED01 U1_ED04 Verify/Place West MDAFW, CCP, RHR, CTS, CCW, ESW, and the South SI Pumps in Pull to Loakout.

EVALUATOR INSTRUCTIONS

1. Ensure simulator setup is complete
2. Brief the operator (May be performed by giving out Task Briefing Sheet)
3. Announce start of the JPM
4. Perform evolution
5. At completion of evolution, announce the JPM is complete.
6. Document evaluation performance.

TASK BRIEFING You are an extra RO. The unit has experienced a small break LOCA with a Loss of Offsite Power. The crew has transitioned from E-1, Loss of Reactor or Secondary Coolant to ES-1.2, Post LOCA Cooldown and Depressurization. Bus T11A has NOT been Re-Energized.

The Unit Supervisor directs you to, "Restore Bus T11A power from the EP per 01-OHP-4023.SUP.009."

GENERAL STANDARDS/PRECAUTIONS When directed by the Unit Supervisor, restore 4kV power from EP as directed and within the time limits specified the accident analyses.

NRC2010-Sim06, Restoration of 4kV T11A Power from SDG Revision: 0 NRC2010-Sim06.doc Page 3 of 13

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Determines that EP 4KV Bus 1 is NOT Energized by SDGs SAT: UNSAT:

CUE: (If Required) FWTDC & Transmission control can NOT restore EP for another 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

CUE: (If Required) SM Directs that EP be restored from SDG.

STANDARD: Verify EP Supply Breakers are Open SAT: UNSAT:

STANDARD: (CS): Place SDG Master Mode Selector to Transfer to Emergency SAT: UNSAT:

STANDARD: (CS): Press Immediate Transfer Button SAT: UNSAT:

STANDARD: Candidate determines that Attachment I is required since SDGs do not start SAT: UNSAT:

CUE: (If Required) SM Directs that Attachment I be performed to manually restore power.

NRC2010-Sim06, Restoration of 4kV T11A Power from SDG Revision: 0 NRC2010-Sim06.doc Page 4 of 13

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: (CS) Place SDG1 & SDG2 Eng Ctrl & Sync Ctrl to Auto SAT: UNSAT:

STANDARD: Verifies 52T1 & MDS Sync Mode in Auto SAT: UNSAT:

STANDARD: Place System Master Mode to Auto SAT: UNSAT:

STANDARD: Check SDGs AVAILABLE (Screen May indicate Running)

SAT: UNSAT:

CUE: If required, SM & SRO Direct you to continue with Step 2 Check MDS Open SAT: UNSAT:

NRC2010-Sim06, Restoration of 4kV T11A Power from SDG Revision: 0 NRC2010-Sim06.doc Page 5 of 13

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Check SDGs both Running SAT: UNSAT:

STANDARD: Check Output Breakers 52G1 & G2 Closed SAT: UNSAT:

NRC2010-Sim06, Restoration of 4kV T11A Power from SDG Revision: 0 NRC2010-Sim06.doc Page 6 of 13

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Checks 52T1 Closed SAT: UNSAT:

NRC2010-Sim06, Restoration of 4kV T11A Power from SDG Revision: 0 NRC2010-Sim06.doc Page 7 of 13

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Verify EP bus energized SAT: UNSAT:

STANDARD: Verify both SDGs running and connected to EP bus SAT: UNSAT:

STANDARD: (CS) Return to Step 2 SAT: UNSAT:

NRC2010-Sim06, Restoration of 4kV T11A Power from SDG Revision: 0 NRC2010-Sim06.doc Page 8 of 13

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Checks EP 4KV Bus Energized by SDG SAT: UNSAT:

STANDARD: Checks Train A DG1CD Trip Ctrl Bus Volt Fail - Not Lit SAT: UNSAT:

STANDARD: Checks Train B DG1AB Trip Ctrl Bus Volt Fail - Not Lit SAT: UNSAT:

STANDARD: (CS) Place Train B Load Conservation Switch to LOAD CON SAT: UNSAT:

NOTE: Train A is Energized - Placing Train A Load Conservation to LOAD CON causes a load shed of Train A Lighting Transformer NRC2010-Sim06, Restoration of 4kV T11A Power from SDG Revision: 0 NRC2010-Sim06.doc Page 9 of 13

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Go to Attachment A to Restore T11A SAT: UNSAT:

NRC2010-Sim06, Restoration of 4kV T11A Power from SDG Revision: 0 NRC2010-Sim06.doc Page 10 of 13

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Verify Annunciators are Not Lit SAT: UNSAT:

STANDARD: Place T11A11 in PULL TO LOCKOUT SAT: UNSAT:

STANDARD: Verify T11A9 & T11A6 Open with Green Targets SAT: UNSAT:

STANDARD: Verify Pumps in PTL SAT: UNSAT:

CUE: All pumps are in PTL STANDARD: (CS) Close T11A12 SAT: UNSAT:

NRC2010-Sim06, Restoration of 4kV T11A Power from SDG Revision: 0 NRC2010-Sim06.doc Page 11 of 13

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

When Transition is made:

TERMINATION CUE: This JPM is complete.

NRC2010-Sim06, Restoration of 4kV T11A Power from SDG Revision: 0 NRC2010-Sim06.doc Page 12 of 13

Task Briefing You are an extra RO. The unit has experienced a small break LOCA with a Loss of Offsite Power. The crew has transitioned from E-1, Loss of Reactor or Secondary Coolant to ES-1.2, Post LOCA Cooldown and Depressurization. Bus T11A has NOT been Re-Energized.

The Unit Supervisor directs you to, "Restore Bus T11A power from the EP per 01-OHP-4023.SUP.009."

Revision: 0 NRC2010-Sim06.doc Page 13 of 13

OPERATIONS JPM TRAINING PROGRAM INITIAL LICENSE TRAINING TIME: 15 MINUTES TITLE NUMBER AND NRC2010-Sim07 TITLE: Setup of Audio Count Rate Channel REVISION: 0 SCOPE OF Initial Issue.

REVISION New DATE:

PREPARED BY: Name:

(Exam Writer)

Signature:

APPROVED BY: Name:

(Facility Reviewer)

Signature:

NRC2010-Sim07, Setup of Audio Count Rate Channel Revision: 0 NRC2010-Sim07.doc Page 1 of 7

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedure: 1-OHP-4021-013-005, Rev. 13 Visual Audio Count Rate Channel (NIS)

K/A Number: 015 A4.02 Ability to manually operate and/or monitor in the control room:

(CFR: 41.7 / 45.5 to 45.8)

NIS indicators K/A Imp.: RO: 3.9 SRO: 3.9 Task Number: 0130140101 Energize the Audio Count Rate Channel TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS

1. Task Briefing
2. Copy of 1-OHP-4021-013-005 (Attachment 1)

ATTACHMENTS None EVALUATION SETTINGS Unit 1 Simulator EVALUATION METHOD: PERFORM: SIMULATE:

SIMULATOR/LAB SETUP

1. Initialize to IC 995 (Any Mode 3 IC)
2. Align the Scaler Timer switches as follows:

 POWER switch in OFF (Down)

 Scaler Timer Polarity Toggle Switch is in the (+) position

 Thumbwheels to 00000

 Sampling Mode Toggle Switch to MAN NRC2010-Sim07, Setup of Audio Count Rate Channel Revision: 0 NRC2010-Sim07.doc Page 2 of 7

OPERATIONS JPM EVALUATOR INSTRUCTIONS

1. Ensure simulator setup is complete
2. Brief the operator (May be performed by giving out Task Briefing Sheet)
3. Announce start of the JPM
4. Perform evolution
5. At completion of evolution, announce the JPM is complete.
6. Document evaluation performance.

TASK BRIEFING You are the Unit 1 RO.

MTI has just finished installing a new Scaler Timer Drawer. The Unit Supervisor has requested that you set up the Audio Count Rate Channel for a 60 second sample in accordance with 1-OHP-4021-013-005, VISUAL AUDIO COUNT RATE CHANNEL (NIS).

GENERAL STANDARDS/PRECAUTIONS Operator has set up the Audio Count Rate Channel NRC2010-Sim07, Setup of Audio Count Rate Channel Revision: 0 NRC2010-Sim07.doc Page 3 of 7

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: (CS) Operator verifies scaler timer POWER toggle switch in the UP position SAT: UNSAT:

STANDARD: Operator verifies lights lit SAT: UNSAT:

STANDARD: Operator verifies Channel Selector switch in SRN31 or SRN32 position SAT: UNSAT:

STANDARD: (CS) Operator verifies Scaler Timer Polarity switch is in the

(-) position SAT: UNSAT:

NRC2010-Sim07, Setup of Audio Count Rate Channel Revision: 0 NRC2010-Sim07.doc Page 4 of 7

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Operator verifies sampling mode switch in COUNT/SEC position (second part of step on next page).

SAT: UNSAT:

STANDARD: Operator verifies VOLUME switch in any position SAT: UNSAT:

STANDARD: (CS) Operator checks thumbwheels set to 00600 SAT: UNSAT:

STANDARD: (CS) Operator verifies sampling mode toggle switch in AUTO position SAT: UNSAT:

STANDARD: Operator depresses the STOP and RESET pushbuttons SAT: UNSAT:

STANDARD: (CS) Depresses the START pushbutton SAT: UNSAT:

STANDARD: Operator verifies gate light lit SAT: UNSAT:

NRC2010-Sim07, Setup of Audio Count Rate Channel Revision: 0 NRC2010-Sim07.doc Page 5 of 7

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Operator adjusts audio multiplier switch to produce a distinguishable gap in audio output SAT: UNSAT:

STANDARD: Operator determines Containment is N/A SAT: UNSAT:

STANDARD: Operator Signs for Attachment 1 being complete SAT: UNSAT:

TERMINATION CUE: This JPM is complete.

NRC2010-Sim07, Setup of Audio Count Rate Channel Revision: 0 NRC2010-Sim07.doc Page 6 of 7

Task Briefing You are the Unit 1 RO.

MTI has just finished installing a new Scaler Timer Drawer. The Unit Supervisor has requested that you set up the Audio Count Rate Channel for a 60 second sample in accordance with 1-OHP-4021-013-005, VISUAL AUDIO COUNT RATE CHANNEL (NIS).

Revision: 0 NRC2010-Sim07.doc Page 7 of 7

OPERATIONS JPM TRAINING PROGRAM INITIAL LICENSE TRAINING TIME: 15 MINUTES TITLE NUMBER AND NRC2010-Sim08 TITLE: Respond to an R5 High Alarm REVISION: 0 (Alternate Path) - (Auto Actions Failed)

SCOPE OF Initial Issue.

REVISION New DATE:

PREPARED BY: Name:

(Exam Writer)

Signature:

APPROVED BY: Name:

(Facility Reviewer)

Signature:

NRC2010-Sim08, Respond To An R5 High Alarm Revision: 0 NRC2010-Sim08.doc Page 1 of 7

OPERATIONS JPM REFERENCES/NRC KA/TASKS Procedure: 01-OHP-4021-138, R9 ANNUNCIATOR #138 RESPONSE: RMS ELECTRO-LARM Ability to predict and/or monitor changes in K/A Number: SYS 033 A1.02 parameters (to prevent exceeding design limits) associated with Spent Fuel Pool Cooling System operating the controls including:

Radiation monitoring systems SYS 034 A4.01 Fuel Handling Equipment System Ability to manually operate and/or monitor in the control room: Radiation levels APE 036 AA1.02 Ability to operate and / or monitor the following as they apply to the Fuel Handling Incidents:

ARM system K/A Imp.: RO: 2.8 SRO: 3.3 3.3 3.7 3.1 3.5 Task Number:

TRAINING AIDS/TOOLS/EQUIPMENT None HANDOUTS Task Briefing Copy of 01-OHP-4021-138 procedure ATTACHMENTS None EVALUATION SETTINGS Unit 1 Simulator EVALUATION METHOD: PERFORM: SIMULATE:

NRC2010-Sim08, Respond To An R5 High Alarm Revision: 0 NRC2010-Sim08.doc Page 2 of 7

OPERATIONS JPM SIMULATOR/LAB SETUP

1. Initialize to IC 995 (Mode 3 IC with Setups)
2. Place Channel VRS-5000 to Poll OFF
3. Fail Outputs of R5 to simulate High Alarm Fail R5 Meter High Fail R5 High Light On Fail R5 Electro Alarm ON AN23_U1(046)
4. Place R5 Electro-Alarm in PENDING EVALUATOR INSTRUCTIONS
1. Ensure simulator setup is complete
2. Brief the operator (May be performed by giving out Task Briefing Sheet)
3. Announce start of the JPM
4. Perform evolution
5. At completion of evolution, announce the JPM is complete.
6. Document evaluation performance.

TASK BRIEFING When I tell you to begin, you are to respond to the ANN 123 DROP 46 alarm.. You may use any approved reference material that is normally available in the Control Room.

The Unit Supervisor directs you to respond to the ANN 123 DROP 46 alarm.

GENERAL STANDARDS/PRECAUTIONS Operator has verified/completed automatic actions associated with R5 Westinghouse Radiation Monitor.

NRC2010-Sim08, Respond To An R5 High Alarm Revision: 0 NRC2010-Sim08.doc Page 3 of 7

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: (CS) Operator identifies that R5 is in Alarm.

SAT: UNSAT:

STANDARD: Operator refers to 1-OHP-4024-138.

SAT: UNSAT:

CUE: Provide Operator with a copy of 1-OHP-4024-138 Drop 5 NRC2010-Sim08, Respond To An R5 High Alarm Revision: 0 NRC2010-Sim08.doc Page 4 of 7

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Operator may notify Radiation Protection and Unit Supervisor of High Alarm On R5 SAT: UNSAT:

STANDARD: Operator verifies that R5 is indicating High Alarm with pegged indication.

SAT: UNSAT:

CUE: If required, "The US directs you to perform the automatic actions" STANDARD: (CS) Operator determines that 12-HV-AFS-1, 12-HV-AFS-2, 12-HV-AFS-3, and 12-HV-AFS-4 spent fuel area fans are still running.

SAT: UNSAT:

STANDARD: (CS) Operator Stops 12-HV-AFS-1, 12-HV-AFS-2, 12-HV-AFS-3, and 12-HV-AFS-4 spent fuel area fans.

SAT: UNSAT:

STANDARD: (CS) Operator determines that charcoal filter outlet dampers are CLOSED and the bypass dampers are OPEN.

SAT: UNSAT:

NRC2010-Sim08, Respond To An R5 High Alarm Revision: 0 NRC2010-Sim08.doc Page 5 of 7

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: (CS) Operator places charcoal filter outlet dampers to OPEN and the bypass dampers to CLOSE by selecting filter.

SAT: UNSAT:

STANDARD: Operator Provides notification to RP, verifies Fuel Movement Stopped, and Consults with Unit Supervisor on Evacuating the SFP.

SAT: UNSAT:

CUE: RP has been notified, No Fuel Movement is in place, RP is coordinating Evacuation of the SFP area.

STANDARD: Operator verifies that only 1 fuel handling exhaust fan is running.

SAT: UNSAT:

TERMINATION CUE: This JPM is complete.

NRC2010-Sim08, Respond To An R5 High Alarm Revision: 0 NRC2010-Sim08.doc Page 6 of 7

Task Briefing When I tell you to begin, you are to respond to the ANN 123 DROP 46 alarm.. You may use any approved reference material that is normally available in the Control Room.

The Unit Supervisor directs you to respond to the ANN 123 DROP 46 alarm.

Revision: 0 NRC2010-Sim08.doc Page 7 of 7