UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 5, 2010 LICENSEE:
FirstEnergy Nuclear Operating Company FACILITY:
Davis-Besse Nuclear Power Station
SUBJECT:
SUMMARY
OF THE JULY 29, 2010, PUBLIC MEETING TO DISCUSS THE DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On July 29, 2010, the Nuclear Regulatory Commission (NRC) held a public meeting at the Davis-Besse Energy Education Center in Oak Harbor, OH. The meeting was between NRC Region III management and FirstEnergy Nuclear Operating Company management to discuss the NRC=s assessment of the safety performance of Davis-Besse Nuclear Power Station, Unit 1, for the period from January 1 through December 31, 2009. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML101940243 and ML102150111, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.
The NRC began the meeting with an overview of the NRC=s Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC=s assessment of the performance of Davis-Besse Nuclear Power Station, Unit 1, in calendar year 2009, which was documented in the March 4, 2009, end-of-cycle assessment letter, as ML100610239. As part of this regulatory performance meeting, FirstEnergy briefly responded to the NRC=s assessment. The FirstEnergy presentation can be found in ADAMS as ML102150118. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.
Sincerely,
/RA/
Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-346 License Nos. NPF-3
Enclosure:
As Stated cc w/encl: Distribution via ListServ
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 5, 2010 LICENSEE:
FirstEnergy Nuclear Operating Company FACILITY:
Davis-Besse Nuclear Power Station
SUBJECT:
SUMMARY
OF THE JULY 29, 2010, PUBLIC MEETING TO DISCUSS THE DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On July 29, 2010, the Nuclear Regulatory Commission (NRC) held a public meeting at the Davis-Besse Energy Education Center in Oak Harbor, OH. The meeting was between NRC Region III management and FirstEnergy Nuclear Operating Company management to discuss the NRC=s assessment of the safety performance of Davis-Besse Nuclear Power Station, Unit 1, for the period from January 1 through December 31, 2009. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML101940243 and ML102150111, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.
The NRC began the meeting with an overview of the NRC=s Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC=s assessment of the performance of Davis-Besse Nuclear Power Station, Unit 1, in calendar year 2009, which was documented in the March 4, 2009, end-of-cycle assessment letter, as ML100610239. As part of this regulatory performance meeting, FirstEnergy briefly responded to the NRC=s assessment. The FirstEnergy presentation can be found in ADAMS as ML102150118. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.
Sincerely,
/RA/
Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-346 License Nos. NPF-3
Enclosure:
As Stated cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\\Branch TSS\\ALL EOC\\EOC CY 2009\\EOC letters\\EOC Meeting Summaries\\Davis-Besse 2009 EOC Public Meeting Summary.docx G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME AGarmoe JCameron DATE 08/04/10 08/05/10 OFFICIAL RECORD COPY
Letter to FirstEnergy Nuclear Operating Company from J. Cameron dated August 5, 2010.
SUBJECT:
SUMMARY
OF THE JULY 29, 2010, PUBLIC MEETING TO DISCUSS THE DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT DISTRIBUTION:
RidsNrrDorlLpl3-2 Resource Susan Bagley RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Steven Reynolds Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource
Enclosure Meeting Participants NRC G. Shear, Deputy Director, Division of Reactor Projects, Region III J. Cameron, Chief, Branch 6, Division of Reactor Projects, Region III J. Rutkowski, Senior Resident Inspector, Davis-Besse A. Wilson, Resident Inspector, Davis-Besse V. Mitlyng, Senior Public Affairs Officer, Region III FirstEnergy Nuclear Operating Company J. Lash, President and Chief Nuclear Officer, FirstEnergy Nuclear Operating Company B. Allen, Site Vice President, Davis-Besse B. Boles, Director of Site Operations, Davis-Besse V. Kaminskas, Director of Engineering, Davis-Besse J. Dominy, Director of Maintenance, Davis-Besse C. Price, Director of Performance Improvement, Davis-Besse Ohio Emergency Management Agency B. Martin, Radiological Analyst Ottawa County J. Witt, County Administrator