ML102160772

From kanterella
Jump to navigation Jump to search
Indian Communitys Revised Exhibit List
ML102160772
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 08/04/2010
From: Mahowald P
Prairie Island Community Council
To:
Atomic Safety and Licensing Board Panel
SECY RAS
Shared Package
ML102160759 List:
References
50-282-LR, 50-306-LR, ASLBP 08-871-01-LR-BD01, RAS 18361
Download: ML102160772 (2)


Text

August 4, 2010 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of

)

)

Northern States Power Co.

)

Docket Nos. 50-282-LR

)

50-306-LR (Prairie Island Nuclear Generating Plant,

)

Units 1 and 2)

)

ASLBP No. 08-871-01-LR

)

PRAIRIE ISLAND INDIAN COMMUNITYS REVISED EXHIBIT LIST Exhibit Description 1

Resume of Christopher I. Grimes 2

Declaration of Christopher I. Grimes (November 23, 2009) 3 Safety Evaluation Report, Related to the License Renewal of Prairie Island Nuclear Generating Plant Units 1 and 2, U.S. Nuclear Regulatory Commission (October 2009) 4 Transcript, Advisory Committee on Reactor Safeguards Plant License Renewal Subcommittee, Prairie Island Nuclear Generating Station (ACRS Transcript) (July 7, 2009) 5 Inspection Manual Chapter 0609, Containment Integrity Significance Determination Process, Appendix H, U.S. Nuclear Regulatory Commission (May 6, 2004) 6 Standard Review Plan for License Renewal, NUREG-1800, Revision 1, U.S.

Nuclear Regulatory Commission (September 2005) 7 NRC Information Notice 2009-11 (July 7, 2009) 8 Reactor Oversight Process, NUREG-1649, Rev. 4, U.S. Nuclear Regulatory Commission (December 2006) 9 Inspection Manual Chapter 0305, Operating Reactor Assessment Program, U.S.

Nuclear Regulatory Program, at 04.16 (August 11, 2009) 10 Information on the Changes Made to the Reactor Oversight Process to More Fully Address Safety Culture, Regulatory Issue Summary 2006-13, U.S. Nuclear Regulatory Commission (July 31, 2006) 11 Letter from James L. Caldwell, Regional Administrator, U.S. Nuclear Regulatory Commission to Michael D. Wadley, Site Vice President, Prairie Island Nuclear Generating Plant in regard to EA-08-272 (January 27, 2009)

2 12 Letter from James L. Caldwell, Regional Administrator, U.S. Nuclear Regulatory Commission to Michael D. Wadley, Site Vice President, Prairie Island Nuclear Generating Plant in regard to EA-08-349 (February 10, 2009) 13 Letter from Mark A. Satorius, Regional Administrator, U.S. Nuclear Regulatory Commission to Mark A. Schimmel, Acting Site Vice President, Prairie Island nuclear Plant in regard to EA-09-167 (September 3, 2009) 14 Annual Assessment Letter from Stephen West, Director of Reactor Projects, U.S.

Nuclear Regulatory Commission to Mark A. Schimmel, Site Vice President, Prairie Island Nuclear Generating Plant (ML100610286) (March 3, 2010) 15 Letter from K. Stephen West, Director of Reactor Projects, U.S. Nuclear Regulatory Commission to Mark A. Schimmel, Site Vice President (Acting),

Prairie Island Nuclear Generating Plant in regard to Mid-Cycle Performance Review and Inspection Plan (ML092440367) (September 1, 2009) 16 U.S. Nuclear Regulatory Commission, Draft Policy Statement on Safety Culture, 74 Fed. Reg. 57525, 57528, (November 6, 2009) 17 Problem Identification and Resolution (PI&R) Inspection Report (December 21, 2007) 18 Xcel Energy, Prairie Island Nuclear Generating Plant, Nuclear Safety Culture Assessment, United Service Alliance (USA) (August 25-29, 2008) 19 Required Briefing by Department Managers (NSPM PROD00003603) (January 2009) 20 Biennial Problem Identification and Resolution (PI&R) Inspection Report (EA 06-178, ML092680208) (September 25, 2009) 21 Xcel Management Safety Review Committee Meeting Summary Meeting No.

2010-01, MSRC Meeting Date March 17 and 18, 2010 (NSPM PROD00000267)