7/22/10 Summary of Meeting with Energy Northwest to Discuss the Acceptance Review and Request for Supplemental Information Regarding Licensees Application to Install a Digital Neutron Monitoring System at Columbia Generating Station
ML102040214
Person / Time
Site: Columbia 
Issue date: 07/30/2010
From: Lyon C
Plant Licensing Branch IV
To:
Lyon C Fred, NRR/DORL/LPL4, 301-415-2296
Shared Package
ml1020402000 List:
References
TAC ME3981
Download: ML102040214 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 30, 2010 LICENSEE:

Energy Northwest FACILITY:

Columbia Generating Station SUB~IECT:

SUMMARY

OF MEETING ON JULY 22,2010, TO DISCUSS THE LICENSEE'S PROPOSED RESPONSE TO THE NRC STAFF'S REQUEST DATED JULY 13, 2010, FOR SUPPLEMENTAL INFORMATION TO COMPLETE THE ACCEPTANCE REVIEW OF THE APPLICATION DATED MAY 11,2010, REGARDING PRNM/ARTS/MELLLA (TAC NO. ME3981)

On July 22, 2010, members of the U.S. Nuclear Regulatory Commission (NRC) staff met with representatives from Energy Northwest (EN, the licensee), at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The licensee was accompanied by representatives from its contractor, General Electric - Hitachi Nuclear Energy (GEH). The meeting was a Category 1 public meeting.

The meeting was requested by the licensee to discuss its proposed responses to the NRC staff's request for supplemental information dated July 13, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML101830271). The supplemental information was requested in order to complete the acceptance review of the licensee's application dated May 11, 2010 (ADAMS Accession No. ML101390369, public version), which requested staff approval of an amendment to Columbia Generating Station to reflect (1) installation of the digital GEH Nuclear Measurement Analysis and Control Power Range Neutron Monitoring (NUMAC PRNM) System and (2) an expanded operating domain resulting from the implementation of Average Power Range Monitor/Rod Block MonitorlTechnical Specifications/Maximum Extended Load Line Limit Analysis (ARTS/MELLLA).

The licensee presented its understanding of the NRC staff's request and its proposed approach to responding to each of the questions.

The NRC staff provided comments for consideration by the licensee in the preparation of its response.

No regulatory decisions were made at the meeting. The meeting agenda was provided with the meeting notice dated July 12, 2010 (ADAMS Accession No. ML101930083). The licensee's presentation slides have been placed in ADAMS (ADAMS Accession No. ML102040225). A list of attendees is enclosed.

- 2 Members of the public were in attendance. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-2296, or fred.lyon@nrc.gov.

Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-397

Enclosure:

Attendance List cc w/encl: Distribution via Listserv

ATrENDANCE LIST NRC MEETING WITH ENERGY NORTHWEST (EN)

PROPOSED RESPONSE TO SUPPLEMENTAL INFORMATION REQUEST COLUMBIA GENERATING STATION JULY 22,2010 D. Gregoire, EN F. Lyon, NRR E. Mino, GEH W. Kemper, NRR K. Whildin, GEH L. Gibson, NRR T. Rogers, GEH B. Dittman, NRR F. Novak, GEH M. Razzaque, NRR J. Snyder, EN K. Bucholtz, NRR P. Campbell, GEH L. Benton, NRR E. Schrull, GEH G. Singh, NRR J. Hauger, EN D. Rahn, NRR M. Huiatt, EN J. Lewis, EN C. Sonada, EN G. Davant, member of the public (Entergy)

A. Poulos, GEH E. Helin, EN N. Chadha, EN K. Miller, GEH Enclosure

- 2 Members of the public were in attendance. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-2296, or fred.lyon@nrc.gov.

/raj Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-397

Enclosure:

Attendance List cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC LPLIV r/f RidsAcrsAcnw_MailCTR Resource RidsNrrDeEicb Resource RidsNrrDorlLpl4 Resource RidsNrrLAJBurkhardt Resource RidsNrrPMGrandGulf Resource RidsOgcRp Resource RidsRgn4MailCenter Resource CSteger, NRR GSingh, NRRIDE/EICB BDittman, NRRIDE/EICB DRahn, NRRIDE/EICB KBucholtz, NRR/DIRS/ITSB MRazzaque, NRRIDSS/SRXB LBenton, NRR/DRAlAADB LTrocine, EDO RIV ADAMS Accession Nos.:

Pkg ML102040200; Mtg. Notice ML101930083, Mtg. Summary ML102040214; Licensee Slides ML102040225 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LP4/BC NRR/LPL4/PM NAME FLyon Jfsurkhardt MMarkley FLyon DATE 7/30/10 7/26/10 7/30/10 7/30/10 OFFICIAL RECORD COpy