ML101480029
| ML101480029 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 06/17/2010 |
| From: | Vaaler M Plant Licensing Branch II |
| To: | Burton C Carolina Power & Light Co |
| Vaaler, Marlayna, NRR/DORL 415-3178 | |
| References | |
| TAC ME3765 | |
| Download: ML101480029 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 17, 2010 Christopher Burton, Vice President Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 -ACCEPTANCE REVIEW REGARDING A RELIEF REQUEST TO DEFER AN AMERICAN SOCIETY OF MECHANICAL ENGINEERS CODE-REQUIRED REPAIR OF A SERVICE WATER SYSTEM WELD UNTIL THE NEXT REFUELING OUTAGE (TAC NO. ME3765)
Dear Mr. Burton:
By letter dated April 15, 2010, Carolina Power & Light Company (the licensee), now doing business as Progress Energy Carolinas, Inc., submitted a relief request for the Shearon Harris Nuclear Power Plant, Unit 1 (HNP). The proposed relief request seeks approval to defer the code-required repair of a flaw in an American Society of Mechanical Engineers Code Class 3 piping socket weld in the HNP service water system. The relief request pertains to the third 10-year inspection interval at HNP.
In accordance with Sections 50.55a(a)(3)(i) and 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of 10 CFR 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.
The purpose of this letter is to provide the final results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed the licensee's application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment.
C.Burton
- 2 If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. Should you have any questions regarding this review, please contact me at (301) 415-3178.
II~~
Marlayna Vaaler, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400 cc: Distribution via Listserv
C. Burton
- 2 If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. Should you have any questions regarding this review, please contact me at (301) 415-3178.
Sincerely, IRA!
Marlayna Vaaler, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL2-2 r/f RidsNrrDorlLpl2-2 RidsNrrLACSola RidsNrrPMShearonHarris RidsNrrDorlDpr ADAMS Accession No'
"" ML101480029 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC NAME MVaaler CSoia DBroaddus DATE 6/10/2010 6/07/2010 6/17/2010 OFFICIAL RECORD COpy